DAFTAR HARGA SATUAN BAHAN DAN UPAH

PEKERJAAN PENGADAAN TIANG BALIHO


KEGIATAN PENGADAAN SARANA MEDIA PUBLIKASI
PADA DINAS KOMUNIKASI DAN INFORMATIKA PROVINSI SUMATERA SE
TAHUN ANGGARAN 2019

HARGA DASAR (Rp)


No. SATUAN KETERA
NAMA BAHAN
I.
Semen PC Zak 57,000.00
1

2 Semen PC kg 1,140.00

3 Pasir Beton m3 115,000.00

4 Pasir Beton kg 82.14

5 Pasir Urug m3 90,000.00

6 Pasir Urug kg 64.29

7 Batu split m3 450,000.00

8 Batu split kg 333.33

9 Seng gelombang uk. 5' kpg 56,178.00

10 Seng gelombang uk. 7' kpg 78,650.00

11 Seng gelombang uk. 10' kpg 112,357.00

12 Seng Polos t.30 m 52,800.00

13 Seng Polos t.35 m 63,800.00

14 Seng Polos t.40 m 74,800.00

15 Seng Polos t.30 m 57,200.00

16 Seng Polos t.35 m 68,200.00

17 Seng Polos t.40 m 79,200.00

18 Seng Polos t.30 m 66,000.00

19 Seng Polos t.35 m 77,000.00

20 Seng Polos t.40 m 88,000.00

21 Papan m3 5,250,000.00

22 Balok kayu m3 5,250,000.00

23 Papan m3 4,500,000.00

24 Balok kayu m3 4,000,000.00

25 Papan m3 1,400,000.00

26 Balok kayu m3 1,600,000.00

27 Papan racuk t.20 cm kpg 35,000.00

28 Besi beton kg 12,000.00

29 Kawat beton kg 20,000.00


Wiremesh kg 11,075.95
30

31 Baja WF, IWF, H kg 14,000.00

32 Baja Siku, CNP kg 10,000.00

33 Baja Siku, 40.40.4 kg 14,000.00

34 Baja Siku, 50.50.5 kg 15,000.00

35 Baja Siku, 60.60.6 kg 15,000.00

36 Kawat las kg 35,000.00

37 Pia Baja Hitam Ø 4 " 6 T kg 17,500.00

I-1
HARGA DASAR (Rp)
No. SATUAN KETERA
NAMA BAHAN
38 Pia Baja Hitam Ø 12 " t 6 mm kg 19,000.00

39 Pia Baja Hitam Ø 14 " t 6 mm kg 19,000.00

40 Pia Baja Hitam Ø 16 " t 6 mm kg 19,000.00

41 Skrup gypsum 1" dus 60,000.00

42 Lakban gypsum roll 15,000.00

43 Paku plywood kg 25,000.00

44 Hollow galvanis 20x40 m 3,500.00

45 Hollow galvanis 40x40 m 5,000.00

I-2
HARGA DASAR (Rp)
No. SATUAN KETERA
NAMA BAHAN
46 Besi Hollow 30. 30.1,2 kh 12,000.00

47 Menie kayu kg 46,100.00

48 Plamir kayu kg 9,300.00

49 Cat dasar kg 31,000.00

50 Cat penutup kg 52,000.00

51 Teak Oil ltr 57,500.00

52 Politur ltr 63,000.00

53 Residu/Ter ltr 4,500.00

54 Dempul kayu kg 9,300.00

55 Vernis ltr 57,500.00


Menie kg 32,900.00
56
Thinner liter 31,800.00
57

58 Kuas 1" bh 10,000.00

59 Kuas 1 1/2" bh 11,500.00

60 Kuas 2" bh 14,000.00

61 Kuas 3" bh 24,900.00

62 Kuas 4" bh 35,900.00

63 Kual roll bh 45,900.00

64 NYM 2 x 1,5 m 7,770.00

65 NYM 2 x 2,5 m 13,600.00

66 NYM 3 x 2,5 m 13,800.00

67 NYA 2,5 m 4,700.00

68 Downlight 4" bh 87,500.00

69 Lampu SL bh 45,000.00

70 Lampu LED bh 45,000.00

71 Lampu T5 p. 60 cm bh 37,500.00

72 Lampu TL RAM 2 x 28 watt bh 240,000.00

73 Lampu Taman t. 1m bh 699,000.00

74 Lampu Halogen bh 2,250,000.00

75 Lampu Halogen BVP 150 50 Watt bh 650,000.00

76 Lampu Halogen 100 Watt bh 1,322,000.00

77 Pipa listrik btg 10,900.00

78 T dus, L bh 6,600.00

79 Lakban listrik roll 11,500.00

80 Klem kabel bks 8,500.00

81 Mangkok inbow bh 5,000.00

82 Fitting bh 11,900.00

83 Klem pipa bh 700.00

84 Fleksibel m 4,000.00

85 MCB 10A bh 55,100.00

86 Paku bermacam ukuran kg 18,000.00

87 Beton ktk 20,000.00

88 Paku seng kg 28,000.00

I-3
HARGA DASAR (Rp)
No. SATUAN KETERA
NAMA BAHAN
89 Paku atap bitumen bh 1,000.00

90 Skrup fixer bh 700.00


Lem kayu kg 19,375.00
91

92 Lem aica aibon kg 51,580.00

93 Sealent tube 28,000.00

94 Amplas lbr 8,000.00

95 Diamond wheel bh 130,000.00

96 Tali Ijuk kg 38,000.00

97 Air ltr 66.60

98 Minyak Bekesting ltr 10,700.00

99 Minyak Pelumas ltr 35,000.00

100 Solar ltr 10,130.00

101 Soda api kg 40,000.00

102 Sewa alat las jam 6,700.00

103 Sewa scafolding unit 45,000.00

104 Sewa molen unit/hari 600,000.00

105 Karung goni lbr 9,700.00

106 Plastik m2 3,125.00

107 Geotekstil m2 22,000.00

108 Sewa alat Berat ( Buldozer 100 - 150 HP ) jam 200,000.00

109 Sewa alat Berat ( Motor Grader ) jam 200,000.00

110 Pekerja OH 110,000.00

111 Tukang OH 130,000.00

112 Kepala Tukang OH 150,000.00

113 Mandor OH 200,000.00

I-4
AFTAR HARGA SATUAN BAHAN DAN UPAH
PEKERJAAN PENGADAAN TIANG BALIHO
ATAN PENGADAAN SARANA MEDIA PUBLIKASI
NIKASI DAN INFORMATIKA PROVINSI SUMATERA SELATAN
TAHUN ANGGARAN 2019

KETERANGAN

semen tipe I; semen baturaja;1 zak @ 50 kg

BJ 1400 kg/m3

BJ 1400 kg/m3

BJ 1350 kg/m3
uk. 0,8 x 1,50 m

uk. 0,8 x 2,1 m

uk. 0,8 x 3,0 m

lebar 60 cm

lebar 60 cm

lebar 60 cm

lebar 90 cm

lebar 90 cm

lebar 90 cm

lebar 120 cm

lebar 120 cm

lebar 120 cm

Kayu Klas II

Kayu Klas II

Kayu klas III

Kayu klas III

uk 2/25

1 batang @ 12 m

uk. 2,1 m x 5,4 m; jarak150mm x150mm (6mm)


@336000

###

setara Niko; 1 ktk @ 2 kg

I-5
KETERANGAN

1 kotak @ 1000

1 btg @ 4 m

1 btg @ 4 m

I-6
KETERANGAN

setara Nippon Paint

setara Rj; 1 klg@ 5 kg

setara bodiluc

setara Impra

setara ultran

setara Bintang bola

setara Rj; 1 klg@ 5 kg

setara impra
setara Nippon Bodelac ; 1 galon @ 5kg

setara Jotun: 1 kaleng @ 1 l

setara prima

setara prima

setara prima

setara ace

setara ace

setara ace

setara supreme; 1 roll @ 50 m

setara supreme; 1 roll @ 50 m

setara supreme; 1 roll @ 50 m

setara Praba; 1 roll @ 50 m

setara Philips

setara Philips

setara Panasonic

setara Philips; 2 x 28 watt

besi tempa (wrougt iron)

setara Philips 250 watt

setara Philips 250 watt

setara Philips 100 watt

setara clipsal; 1 btg @ 3 meter

1 bks @ 50 pcs

setara panasonic

setara schneider

1 ktk @ 50 buah

I-7
KETERANGAN

p. 70 mm

1 kotak @ 100 pcs


setara lem fox; 1 bungkus @ 800 gram

setara Bosch

1 bulan

uk. 75 cm x 110 cm

1 roll @ 20m x 1,2m

I-8
DAFTAR HARGA SATUAN PEKERJAAN
TAHUN 2018 SEMESTER I

DIV. NO. JENIS PEKERJAAN

2.2.1 HARGA SATUAN PEKERJAAN PERSIAPAN


1. #REF!
2. #REF!
3. #REF!
4. #REF!
5. #REF!
6. #REF!
7. #REF!
8. #REF!
9. #REF!
10 . #REF!
11 . #REF!
12 . #REF!

2.3.1 HARGA SATUAN PEKERJAAN TANAH


1. Err:509
2. Menggali 1 m3 tanah biasa sedalam 3 m
3. Err:509
4. Err:509
5. Err:509
6. Pembuangan 1 m3 tanah sejauh 30 meter
7. Err:509
8. Err:509
9. Err:509
10 . Err:509
11 . Err:509

3.2.1 HARGA SATUAN PEKERJAAN PONDASI


1 Pemasangan 1 m3 pondasi batu kali campuran 1 SP: 3 PP
2 Pemasangan 1 m3 pondasi batu kali campuran 1 SP: 4 PP
3 Pemasangan 1 m3 pondasi batu bata (8x8x16) cm campuran 1 SP: 3 PP
4 Pemasangan 1 m3 pondasi batu bata (8x8x16) cm campuran 1 SP: 4 PP
5. 1 m2 pasang cerucup gelam untuk pondasi (p.1,5m-20 cm)

4.1.1 HARGA SATUAN PEKERJAAN BETON


1. Err:509
2. Err:509
3. Err:509
4. Err:509
5. Err:509
6. Err:509
7. Err:509
8. Pembesian 1 kg dengan besi polos atau besi ulir
9. Pemasangan 1 kg jaring kawat baja (wiremesh)
10 . Err:509

II - 9
DIV. NO. JENIS PEKERJAAN
11 . Err:509
12 . Err:509
13 . Err:509
14 . Err:509
15 . Err:509
16 . Err:509
17 . Err:509
18 . Err:509
19 . Err:509
20 . Err:509
21 . Err:509
22 . Err:509
23 . Err:509
24 . Err:509
25 . Err:509

4.2.1 HARGA SATUAN PEKERJAAN BESI DAN ALUMINIUM


1. Pembuatan 1 Unit Rangka Baliho Uk Lebar 5 m x Tinggi 10 m dan tebal 48 cm
2. Err:509
3. Err:509
4. Err:509
5. Err:509
6. Err:509
7. Err:509
8. Err:509
9. Err:509
10 . Err:509
11 . Pemasangan 1 m2 sengplat Alumunium
12 . Err:509
13 . Err:509
14 . Err:509
15 . Err:509
16 . Err:509

17 . Err:509

4.4.1 HARGA SATUAN PEKERJAAN PASANGAN DINDING


1. Pemasangan 1 m2 dinding bata lobang (8x8x16) cm tebal 1 batu campuran 1 SP:3PP
2. Pemasangan 1 m2 dinding bata lobang (8x8x16) tebal 1 batu campuran 1 SP:4PP
3. Pemasangan 1 m2 dinding bata lobang (8x8x16) cm tebal 1/2 batu campuran 1 SP:3PP
4. Pemasangan 1 m2 dinding bata lubang (8x8x16) cm tebal 1/2 batu campuran 1 SP:4PP
5. Pemasangan 1 m2 dinding terawang (roster) 10x12x20 campuran 1SP : 4PP
6. Pemasangan 1 m2 dinding roster keramik 30x30 campuran 1SP : 4PP
7 Pemasangan 1 m2 dinding roster keramik 20x20 campuran 1SP : 4PP
8. Pemasangan 1 m2 dinding glass block 20x20 campuran 1SP : 4PP

4.4.2 HARGA SATUAN PEKERJAAN PLESTERAN

II - 10
DIV. NO. JENIS PEKERJAAN
1. Pemasangan 1 m2 plesteran 1SP : 3PP tebal 15 mm
2. Pemasangan 1 m2 plesteran 1SP : 3PP tebal 20 mm
3. Pemasangan 1 m2 plesteran 1SP : 4PP tebal 15 mm
4. Pemasangan 1 m2 plesteran 1SP : 4PP tebal 20 mm
5. Pemasangan 1 m2 Berapen 1SP : 5PP tebal 15 mm
6. Pemasangan 1 m' plesteran skonig 1 Sp : 3 PP lebar 10 cm
7. Pemasangan 1 m2 plesteran ciprat 1 Sp : 2 PP
8. Pemasangan 1 m2 finishing siar pasangan batu kali campuran 1 SP : 2 PP
9. Pemasangan 1 m2 acian

4.4.3 HARGA SATUAN PEKERJAAN PENUTUP LANTAI DAN PENUTUP DINDING


1. Pemasangan 1 m2 lantai granite tile ukuran 60cm x 60cm
2 Pemasangan 1 m2 lantai granite tile ukuran 80cm x 80cm
3. Pemasangan 1 m2 lantai keramik putih ukuran 30cm x 30cm
4. Pemasangan 1 m2 lantai keramik putih ukuran 40cm x 40cm
5. Pemasangan 1 m2 lantai keramik KM/WC ukuran 20cm x 20cm
6. Pemasangan 1 m2 lantai keramik warna ukuran 30cm x 30cm
7. Pemasangan 1 m2 lantai keramik warna ukuran 40cm x 40cm
8. Pemasangan 1 m' plint keramik ukuran 10 cm x 30 cm
9 Pemasangan 1 m' plint keramik ukuran 10 cm x 40 cm
10 . Pemasangan 1 m' plint Granite Tile ukuran 10 cm x 60 cm
11 . Pemasangan 1 m' plint Granite Tile ukuran 10 cm x 80 cm
12 . Pemasangan 1 m2 lantai marmer ukuran 100cm x 100cm
13 Pemasangan 1 m2 lantai lantai karpet t. 4-5 mm
14 . Pemasangan 1 m2 lantai vinyl
15 . Pemasangan 1 m2 dinding keramik warna ukuran 20cm x 25cm
16 Pemasangan 1 m2 dinding keramik putih ukuran 20cm x 25cm
17 . Pemasangan 1 m2 dinding marmer 100cm x 100 cm
18 Pemasangan 1 m2 dinding batu candi / andesit
19 . Pemasangan 1 m2 dinding batu tempel hitam
20 . Pemasangan 1 m2 wallpaper
21 Pemasangan 1 m2 floor harderner

4.5.1 HARGA SATUAN PEKERJAAN LANGIT-LANGIT (PLAFOND)


1. Pemasangan 1 m2 langit-langit asbes semen (tebal 4 mm, 5 mm, 6 mm)
2. Pemasangan 1 m2 langit-langit plywood ukuran (120 x 240) cm (tebal 3 mm, 4 mm, 6 mm)
3. Pemasangan 1 m2 langit-langit gypsum board ukuran (120 x 240 x 9) mm (tebal 9 mm)
4. Pemasangan 1 m' list langit-langit kayu profil
5. Pemasangan 1 m' list langit-langit gypsum profil
6. Pemasangan 1 m2 langit-langit kalsiboard ukuran (120 x 240 x 9) mm (tebal 3,5 mm)

II - 11
DIV. NO. JENIS PEKERJAAN

4.5.2 HARGA SATUAN PEKERJAAN PENUTUP ATAP


1. Pemasangan 1 m2 roof polycarbonate
2. Pemasangan 1 m2 atap asbes gelombang
3. Pemasangan 1 m' nok asbes
4. Pemasangan 1 m2 genteng keramik warna natural
5. Pemasangan 1 m2 genteng metal
6. Pemasangan 1 m' nok genteng keramik
7. Pemasangan 1 m' nok genteng metal
8. Pemasangan 1 m2 atap seng gelombang
9. Pemasangan 1 m' nok atap seng
10 . Pemasangan 1 m2 atap aluminium/alkan
11 . Pemasangan 1 m' nok aluminium
12 . Pemasangan 1 m2 aluminium foil
13 . Pemasangan 1 m2 atap bitumen motif gelombang (uk. 200x95x0,3cm) kemiringan atap
>=15° jarak gording 60 cm
14 . Pemasangan 1 m2 atap bitumen motif gelombang (uk. 200x95x0,3cm) kemiringan atap
antara 10°-15° jarak gording 45 cm
15 . Pemasangan 1 m2 atap bitumen motif gelombang (uk. 200x95x0,3cm) kemiringan atap
antara 5°-10° memakai decking plywood 12 mm
16 . Pemasangan 1 m2 atap bitumen motif genteng (uk. 106x40x0,3 cm) jarak gording 32 cm
17 . Pemasangan 1 m' nok bitumen
18 . Pemasangan 1 m2 atap zincalume t. 0,35mm
19 . Pemasangan 1 m2 atap zincalume warna t. 0,35mm
20 . Pemasangan 1 m2 atap zincalume warna t. 0,45mm
21 . Pemasangan 1 m' nok zincalume
22 . Pemasangan 1 m2 atap zincalume warna t. 0,22mm
23 . Pemasangan 1 m2 genteng tanah liat
24 . Pemasangan 1 m' nok genteng tanah liat

4.6.1 HARGA SATUAN PEKERJAAN KAYU


1. Pembuatan dan Pemasangan 1 m3 kusen pintu dan kusen jendela, kayu kelas II
2. Pembuatan dan pemasangan 1 m2 daun pintu panel kayu klas II
3. Pembuatan dan pemasangan 1 m2 pintu dan jendela kaca
4. Pembuatan 1 m2 daun pintu plywood rangkap, rangka kayu kelas III tertutup (lebar sampai
90 cm)
5. Pemasangan 1 m2 jalusi kusen, kayu kelas II
6. Pemasangan 1 m3 konstruksi kuda-kuda konvensional, kayu kelas II bentang 6 meter
7. Pemasangan 1 m3 konstruksi gordeng, kayu kelas II
8. Pemasangan 1 m2 rangka atap genteng keramik, kayu kelas III
9. Pemasangan 1 m2 rangka langit-langit (50x100) cm, kayu kelas III
10 . Pemasangan 1 m2 rangka langit-langit (60x60) cm, III
11 . Pemasangan 1 m' lisplank ukuran (3x20) cm, kayu kelas II
12 . Pemasangan 1 m' lisplank ukuran (3x30) cm, kayu kelas II
13 . Pemasangan 1 m2 rangka dinding pemisah (60x120) cm kayu kelas III
14 . Pemasangan 1 m2 rangka dinding pemisah plywood rangkap, rangka kayu kelas III
15 . Pemasangan 1 m2 dinding lambrisering dari papan kayu kelas II
16 . Pemasangan 1 m2 dinding lambrisering dari plywood ukuran (120x240) cm
17 . Pemasangan 1 m' kalsiplank

II - 12
DIV. NO. JENIS PEKERJAAN

4.6.2 HARGA SATUAN PEKERJAAN KUNCI DAN KACA


1. Pemasangan 1 buah kunci tanam biasa
2. Pemasangan 1 buah kunci tanam stainless steel
3. Pemasangan 1 buah kunci silinder
4. Pemasangan 1 buah engsel pintu biasa
5. Pemasangan 1 buah engsel pintu stainless steel
6. Pemasangan 1 buah engsel jendela kupu-kupu
7. Pemasangan 1 buah spring knip
8. Pemasangan 1 buah kait angin
9. Pemasangan 1 buah door closer
10 . Pemasangan 1 buah kunci slot
11 . Pemasangan 1 buah Door handle
12 . Pemasangan 1 buah door stop
13 . Pemasangan 1 m2 kaca tebal 5 mm
14 . Pemasangan 1 m2 kaca tebal 8 mm
15 . Pemasangan 1 m2 kaca tebal 12 mm
16 . Pemasangan 1 m2 kaca patri tebal 5 mm

4.7.1 HARGA SATUAN PEKERJAAN PENGECATAN


1 . Err:509
2 . 1 m2 Pengecatan bidang besi (1 lapis meni, 1 lapis cat dasar, 2 lapis cat penutup)

II - 13
DIV. NO. JENIS PEKERJAAN
3. Err:509
4. Err:509
5. Err:509
6. Err:509
7. Err:509
8. Err:509
9. Err:509
10 . Err:509
11 . Err:509

12 . Err:509
13 . Err:509

5.1.1 HARGA SATUAN PEKERJAAN SANITASI DALAM GEDUNG


1. Pemasangan 1 buah closed duduk (setara AmStand)
2. Pemasangan 1 buah closed jongkok (setara Toto)
3. Pemasangan 1 buah urinoir (setara AmStand)
4. Pemasangan 1 buah wastafel (setara AmStand)
5. Pemasangan 1 buah bathube
6. Pemasangan 1 buah bak fibreglass vol 1 m3
7. Pemasangan 1 buah bak cuci piring stainlessteel
8. Pemasangan 1 buah floor drain biasa
9. Pemasangan 1 m' pipa galvanis diameter 1/2"
10 . Pemasangan 1 buah kran diameter 1/2" atau 3/4"
11 . Pemasangan 1 m' pipa galvanis diameter 3/4"
12 . Pemasangan 1 m' pipa PVC tipe AW diameter 1/2"
13 . Pemasangan 1 m' pipa PVC tipe AW diameter 3/4"
14 . Pemasangan 1 m' pipa PVC tipe DW diameter 3"
15 . Pemasangan 1 m' pipa PVC tipe DW diameter 4"
16 . Pemasangan 1 m' pipa beton diameter 40 cm

Taksir HARGA SATUAN PEKERJAAN LAIN-LAIN


1. Err:509
2. Err:509
3 Err:509
4. Err:509
5 Err:509
6. Pemasangan 1 titik nyala Lampu
7. Err:509
8. Err:509
9. Err:509
10 . Err:509
11 . Err:509
12 . Err:509
13 . Err:509
14 . Err:509
15 . Err:509

II - 14
RJAAN

SATUAN HARGA (RP)

m2 #REF!
m #REF!
m2 #REF!
m2 #REF!
m2 #REF!
m2 #REF!
m2 #REF!
bh #REF!
m3 #REF!
m3 #REF!
m2 #REF!
unit #REF!

m3 Err:509
m3 186,300.00
m3 Err:509
m3 Err:509
m2 Err:509
m3 44,045.00
m3 Err:509
m3 Err:509
m3 Err:509
m3 Err:509
m3 Err:509

m3 Err:509
m3 Err:509
m3 Err:509
m3 Err:509
m2 Err:509

m3 Err:509
m3 Err:509
m3 Err:509
m3 Err:509
m3 Err:509
m3 Err:509
m3 Err:509
kg Err:509
kg Err:509
m2 Err:509

II - 15
SATUAN HARGA (RP)
m2 Err:509
m2 Err:509
m2 Err:509
m2 Err:509
m2 Err:509
m2 Err:509
m2 Err:509
m Err:509
m Err:509
m2 Err:509
m2 Err:509
m2 Err:509
m Err:509
m2 Err:509
m3 Err:509

kg 17,239,671.16
kg Err:509
kg Err:509
m2 Err:509
cm Err:509
m2 Err:509
m Err:509
m2 Err:509
m2 Err:509
m2 Err:509
m 103,661.00
m2 Err:509
m2 Err:509
bh Err:509
bh Err:509
bh Err:509

bh Err:509

m2 Err:509
m2 Err:509
m2 Err:509
m2 Err:509
m2 Err:509
m2 Err:509
m2 Err:509
m2 Err:509

II - 16
SATUAN HARGA (RP)
m2 Err:509
m2 Err:509
m2 Err:509
m2 Err:509
m2 Err:509
m' Err:509
m2 Err:509
m2 Err:509
m2 Err:509

m2 Err:509
m2 Err:509
m2 Err:509
m2 Err:509
m2 Err:509
m2 Err:509
m2 Err:509
m2 Err:509
m2 Err:509
m Err:509
m Err:509
m Err:509
m Err:509
m2 Err:509
m2 Err:509
m2 Err:509
m2 Err:509
m2 Err:509
m2 Err:509
m2 Err:509
m2 Err:509

m2 Err:509
m2 Err:509
m2 Err:509
m Err:509
m Err:509
m2 Err:509

II - 17
SATUAN HARGA (RP)

m2 Err:509
m2 Err:509
m Err:509
m2 Err:509
m2 Err:509
m Err:509
m Err:509
m2 Err:509
m Err:509
m2 Err:509
m Err:509
m2 Err:509
m2 Err:509

m2 Err:509

m2 Err:509

m2 Err:509
m Err:509
m2 Err:509
m2 Err:509
Err:509
m Err:509
m2 Err:509
m2 Err:509
m Err:509

m3 Err:509
m2 Err:509
m2 Err:509
m2 Err:509

m2 Err:509
m3 Err:509
m3 Err:509
m2 Err:509
m2 Err:509
m2 Err:509
m' Err:509
m Err:509
m2 Err:509
m2 Err:509
m2 Err:509
m2 Err:509
m Err:509

II - 18
SATUAN HARGA (RP)

bh Err:509
bh Err:509
bh Err:509
bh Err:509
bh Err:509
bh Err:509
bh Err:509
bh Err:509
bh Err:509
bh Err:509
bh Err:509
bh Err:509
m2 Err:509
m2 Err:509
m2 Err:509
m2 Err:509

m2 Err:509
m2 42,686.85

II - 19
SATUAN HARGA (RP)
m2 Err:509
m2 Err:509
m2 Err:509
m2 Err:509
m2 Err:509
m2 Err:509
m2 Err:509
m2 Err:509

m2 Err:509
m2 Err:509
m3 Err:509

bh Err:509
bh Err:509
bh Err:509
bh Err:509
bh Err:509
bh Err:509
bh Err:509
bh Err:509
m Err:509
bh Err:509
m Err:509
m Err:509
m Err:509
m Err:509
m Err:509
m Err:509

m2 Err:509
m2 Err:509
m2 Err:509
m2 Err:509
m2 Err:509
titik 340,371.25
titik Err:509
m2 Err:509
bh Err:509
m2 Err:509
m2 Err:509
m2 Err:509
m2 Err:509
m2 Err:509
m' Err:509

II - 20
2.3.1. HARGA SATUAN PEKERJAAN TANAH

1, Menggali 1 m3 tanah biasa sedalam 3 m


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 1.350 110,000.00 148,500.00
Mandor L.04 OH 0.068 200,000.00 13,500.00
JUMLAH TENAGA KERJA 162,000.00
B BAHAN
-
JUMLAH TENAGA BAHAN -
C. PERALATAN
-
JUMLAH TENAGA ALAT -

D. Jumlah (A+B+C) 162,000.00


E. Overhead & Profit 15% X D 24,300.00
F. Harga Satuan Pekerjaan (D+E) 186,300.00

2, Pembuangan 1 m3 tanah sejauh 30 meter


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.330 110,000.00 36,300.00
Mandor L.04 OH 0.010 200,000.00 2,000.00
JUMLAH TENAGA KERJA 38,300.00
B BAHAN
-
JUMLAH TENAGA BAHAN -
C. PERALATAN
-
JUMLAH TENAGA ALAT -

D. Jumlah (A+B+C) 38,300.00


E. Overhead & Profit 15% X D 5,745.00
F. Harga Satuan Pekerjaan (D+E) 44,045.00
3.2.1. HARGA SATUAN PEKERJAAN PONDASI

1. Pemasangan 1 m3 pondasi batu kali campuran 1 SP: 3 PP


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp)
A. TENAGA
Pekerja L.01 OH 1.500 200,000.00
Tukang Batu L.02 OH 0.750 Err:509
Kepala Tukang L.03 OH 0.075 Err:509
Mandor L.04 OH 0.075 110,000.00
JUMLAH TENAGA KERJA
B BAHAN
Batu kali m3 1.200 Err:509
Sement Portland kg 202.000 1,140.00
Pasir Pasang m3 0.485 115,000.00
JUMLAH TENAGA BAHAN
C. PERALATAN

JUMLAH TENAGA ALAT

D. Jumlah (A+B+C)
### E. Overhead & Profit 15% X D
F. Harga Satuan Pekerjaan (D+E)

2. Pemasangan 1 m3 pondasi batu kali campuran 1 SP: 4 PP


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp)
A. TENAGA
Pekerja L.01 OH 1.500 200,000.00
Tukang Batu L.02 OH 0.750 Err:509
Kepala Tukang L.03 OH 0.075 Err:509
Mandor L.04 OH 0.075 110,000.00
JUMLAH TENAGA KERJA
B BAHAN
Batu kali m3 1.200 Err:509
Sement Portland kg 163.000 1,140.00
Pasir Pasang m3 0.520 115,000.00
JUMLAH TENAGA BAHAN
C. PERALATAN

JUMLAH TENAGA ALAT

D. Jumlah (A+B+C)
### E. Overhead & Profit 15% X D
F. Harga Satuan Pekerjaan (D+E)

3. Pemasangan 1 m3 pondasi batu bata (8x8x16) cm campuran 1 SP: 3 PP


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp)
A. TENAGA
Pekerja L.01 OH 2.025 200,000.00
Tukang Batu L.02 OH 0.675 Err:509
Kepala Tukang L.03 OH 0.068 Err:509
Mandor L.04 OH 0.101 110,000.00
JUMLAH TENAGA KERJA
B BAHAN
Batu bata bh 726.000 Err:509
Sement Portland kg 170.022 1,140.00
Pasir Pasang m3 0.470 115,000.00
JUMLAH TENAGA BAHAN
C. PERALATAN

JUMLAH TENAGA ALAT

D. Jumlah (A+B+C)
### E. Overhead & Profit 15% X D
F. Harga Satuan Pekerjaan (D+E)

DIV. 3.2.1 - 1
4. Pemasangan 1 m3 pondasi batu bata (8x8x16) cm campuran 1 SP: 4 PP
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp)
A. TENAGA
Pekerja L.01 OH 2.025 200,000.00
Tukang Batu L.02 OH 0.675 Err:509
Kepala Tukang L.03 OH 0.068 Err:509
Mandor L.04 OH 0.101 110,000.00
JUMLAH TENAGA KERJA
B BAHAN
Batu bata bh 726.000 Err:509
Sement Portland kg 136.998 1,140.00
Pasir Pasang m3 0.480 115,000.00
JUMLAH TENAGA BAHAN
C. PERALATAN

JUMLAH TENAGA ALAT

D. Jumlah (A+B+C)
### E. Overhead & Profit 15% X D
F. Harga Satuan Pekerjaan (D+E)

5. 1 m2 pasang cerucup gelam untuk pondasi (p.1,5m-20 cm)


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp)
A. TENAGA
Pekerja L.01 OH 0.300 Err:509
Tukang Batu L.02 OH Err:509
Kepala Tukang L.03 OH 0.030 Err:509
Mandor L.04 OH Err:509
JUMLAH TENAGA KERJA
B BAHAN
Gelam dia.6-8 btg 6.000 Err:509
JUMLAH TENAGA BAHAN
C. PERALATAN

JUMLAH TENAGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit 15% X D
F. Harga Satuan Pekerjaan (D+E)
DIV. 3.2.1 - 2
Jumlah Harga (Rp)

300,000.00
Err:509
Err:509
8,250.00
Err:509

Err:509
230,280.00
55,775.00
Err:509

-
-

Err:509
Err:509
Err:509

Jumlah Harga (Rp)

300,000.00
Err:509
Err:509
8,250.00
Err:509

Err:509
185,820.00
59,800.00
Err:509

-
-

Err:509
Err:509
Err:509

Jumlah Harga (Rp)

405,000.00
Err:509
Err:509
11,137.50
Err:509
Err:509
193,825.08
53,999.40
Err:509

-
-

Err:509
Err:509
Err:509
Jumlah Harga (Rp)

405,000.00
Err:509
Err:509
11,137.50
Err:509

Err:509
156,177.72
55,186.20
Err:509

-
-

Err:509
Err:509
Err:509

Jumlah Harga (Rp)

Err:509
Err:509
Err:509
Err:509
Err:509

Err:509
Err:509

-
-

Err:509
Err:509
Err:509
4.1.1. HARGA SATUAN PEKERJAAN BETON

1, Membuat 1 m3 pondasi beton bertulang (150 kg besi + bekesting) Mutu Beton K 250
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 5.300 110,000.00 583,000.00
Tukang Batu L.02 OH 0.275 130,000.00 35,750.00
Tukang Kayu L.02 OH 1.300 130,000.00 169,000.00
Tukang Besi L.02 OH 1.050 130,000.00 136,500.00
Kepala Tukang L.03 OH 0.262 150,000.00 39,300.00
Mandor L.04 OH 0.265 200,000.00 53,000.00
JUMLAH TENAGA KERJA 1,016,550.00
B BAHAN
Kayu m3 0.200 1,400,000.00 280,000.00
Paku 5-12 cm kg 1.500 18,000.00 27,000.00
Minyak bekesting Liter 0.400 10,700.00 4,280.00
Besi beton polos kg 157.500 12,000.00 1,890,000.00
Kawat beton kg 2.250 20,000.00 45,000.00
Sement Portland kg 384.000 1,140.00 437,760.00
Pasir Beton kg 692.000 82.14 56,842.86
Kerikil kg 1039.000 333.33 346,333.33
Air Ltr 215.000 66.60 14,319.00
JUMLAH TENAGA BAHAN 3,087,216.19
C. PERALATAN
-
JUMLAH TENAGA ALAT -

D. Jumlah (A+B+C) 4,103,766.19


E. Overhead & Profit 15% X D 615,564.93
F. Harga Satuan Pekerjaan (D+E) 4,719,331.12
4.2.1. HARGA SATUAN PEKERJAAN BESI & ALUMINIUM

1 Pembuatan 1 Unit Rangka Baliho Uk Lebar 5 m x Tinggi 10 m dan tebal 48 cm


material besi siku 40 . 40 . 4 dan hollow 30 . 30 .1,2, ( VERTIKAL )
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 41.683 110,000.00 4,585,125.60
Tukang Las Konstruksi L.03 OH 6.224 130,000.00 809,140.80
Kepala Tukang L.03 OH 0.012 150,000.00 1,800.00
Mandor L.04 OH 0.012 200,000.00 2,400.00
JUMLAH TENAGA KERJA 5,398,466.40
B BAHAN
Besi siku 40.40.4 Kg 592.98 14,000.00 8,301,720.00
Besi hollow 30.30.1,2 Kg 101.736 12,000.00 1,220,832.00
Kawat Las Kg 2.000 35,000.00 70,000.00
JUMLAH TENAGA BAHAN 9,592,552.00
C. PERALATAN
-
JUMLAH TENAGA ALAT -
D. Jumlah (A+B+C) 14,991,018.40
### E. Overhead & Profit 15% X D 2,248,652.76
F. Harga Satuan Pekerjaan (D+E) 17,239,671.16

2 Pembuatan 1 Unit Rangka Baliho Uk Lebar 10 m x Tinggi 5 m dan tebal 48 cm


material besi siku 60.60.6 + 40 . 40 . 4 dan hollow 30 . 30 .1,2, ( HORIZONTAL )
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 62.851 110,000.00 6,913,605.60
Tukang Las Konstruksi L.03 OH 35.492 130,000.00 4,613,980.80
Kepala Tukang L.03 OH 0.622 150,000.00 93,362.40
Mandor L.04 OH 0.062 200,000.00 12,440.00
JUMLAH TENAGA KERJA 11,633,388.80
B BAHAN
Besi siku 40.40.4 Kg 457.98 14,000.00 6,411,720.00
Besi siku 60.60.6 Kg 487.80 15,000.00 7,317,000.00
Besi hollow 30.30.1,2 Kg 101.736 12,000.00 1,220,832.00
Kawat Las Kg 2.000 35,900.00 71,800.00
JUMLAH TENAGA BAHAN 15,021,352.00
C. PERALATAN
-
JUMLAH TENAGA ALAT -
D. Jumlah (A+B+C) 26,654,740.80
E. Overhead & Profit 15% X D 3,998,211.12
F. Harga Satuan Pekerjaan (D+E) 30,652,951.92

3 Pemasangan 1 m2 sengplat Alumunium


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.100 110,000.00 11,000.00
Tukang L.03 OH 0.100 130,000.00 13,000.00
Kepala Tukang L.03 OH 0.010 150,000.00 1,500.00
Mandor L.04 OH 0.001 200,000.00 200.00
JUMLAH TENAGA KERJA 25,700.00
B BAHAN
Seng plat m 1.050 52,800.00 55,440.00
Paku sekrup kg 0.150 60,000.00 9,000.00
JUMLAH TENAGA BAHAN 64,440.00
-
JUMLAH TENAGA ALAT -

D. Jumlah (A+B+C) 90,140.00


E. Overhead & Profit 15% X D 13,521.00
F. Harga Satuan Pekerjaan (D+E) 103,661.00
4 Pemasangan 1 kg kolom pipa besi baja hitam Ø 16" t 6 mm

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.030 130,000.00 3,900.00
Tukang Las Konstruksi L.03 OH 0.030 150,000.00 4,500.00
Kepala Tukang L.03 OH 0.006 170,000.00 1,020.00
Mandor L.04 OH 0.003 200,000.00 600.00
JUMLAH TENAGA KERJA 10,020.00
B BAHAN
Pipa besi hitam Ø 16" t 6 mm Kg 1.100 19,000.00 20,900.00
Kawat Las Kg 0.015 35,000.00 525.00
JUMLAH TENAGA BAHAN 21,425.00
JUMLAH TENAGA ALAT -
D. Jumlah (A+B+C) 31,445.00
E. Overhead & Profit 15% X D 4,716.75
F. Harga Satuan Pekerjaan (D+E) 36,161.75

5 Pemasangan 1 kg kolom pipa besi baja hitam Ø 12" t 6 mm

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.030 110,000.00 3,300.00
Tukang Las Konstruksi L.03 OH 0.030 130,000.00 3,900.00
Kepala Tukang L.03 OH 0.006 150,000.00 900.00
Mandor L.04 OH 0.003 200,000.00 600.00
JUMLAH TENAGA KERJA 8,700.00
B BAHAN
Pipa besi Ø 12" t 6" Kg 1.100 19,000.00 20,900.00
Kawat Las Kg 0.015 35,000.00 525.00
JUMLAH TENAGA BAHAN 21,425.00
C. PERALATAN
-
JUMLAH TENAGA ALAT -
D. Jumlah (A+B+C) 30,125.00
E. Overhead & Profit 15% X D 4,518.75
F. Harga Satuan Pekerjaan (D+E) 34,643.75
4.4.1 HARGA SATUAN PEKERJAAN PASANGAN DINDING

1. Pemasangan 1 m2 dinding bata lobang (8x8x16) cm tebal 1 batu campuran 1 SP:3PP


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp)
A. TENAGA
Pekerja L.01 OH 0.600 200,000.00
Tukang Batu L.02 OH 0.200 Err:509
Kepala Tukang L.03 OH 0.020 Err:509
Mandor L.04 OH 0.030 110,000.00
JUMLAH TENAGA KERJA
B BAHAN
Bata merah bh 121.000 Err:509
Semen Portland kg 21.747 1,140.00
Pasir pasang m3 0.060 115,000.00
JUMLAH TENAGA BAHAN
C. PERALATAN

JUMLAH TENAGA ALAT

D. Jumlah (A+B+C)
### E. Overhead & Profit 15% X D
F. Harga Satuan Pekerjaan (D+E)

2. Pemasangan 1 m2 dinding bata lobang (8x8x16) tebal 1 batu campuran 1 SP:4PP


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp)
A. TENAGA
Pekerja L.01 OH 0.600 200,000.00
Tukang Batu L.02 OH 0.200 Err:509
Kepala Tukang L.03 OH 0.020 Err:509
Mandor L.04 OH 0.030 110,000.00
JUMLAH TENAGA KERJA
B BAHAN
Bata merah bh 121.000 Err:509
Semen Portland kg 17.523 1,140.00
Pasir pasang m3 0.061 115,000.00
JUMLAH TENAGA BAHAN
C. PERALATAN

JUMLAH TENAGA ALAT

D. Jumlah (A+B+C)
### E. Overhead & Profit 15% X D
F. Harga Satuan Pekerjaan (D+E)

3. Pemasangan 1 m2 dinding bata lobang (8x8x16) cm tebal 1/2 batu campuran 1 SP:3PP
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp)
A. TENAGA
Pekerja L.01 OH 0.300 200,000.00
Tukang Batu L.02 OH 0.100 Err:509
Kepala Tukang L.03 OH 0.010 Err:509
Mandor L.04 OH 0.015 110,000.00
JUMLAH TENAGA KERJA
B BAHAN
Bata merah bh 66.000 Err:509
Semen Portland kg 7.832 1,140.00
Pasir pasang m3 0.022 115,000.00
JUMLAH TENAGA BAHAN
C. PERALATAN

JUMLAH TENAGA ALAT

D. Jumlah (A+B+C)
### E. Overhead & Profit 15% X D
F. Harga Satuan Pekerjaan (D+E)

DIV. 4.4.1 - 1
4. Pemasangan 1 m2 dinding bata lubang (8x8x16) cm tebal 1/2 batu campuran 1 SP:4PP
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp)
A. TENAGA
Pekerja L.01 OH 0.300 200,000.00
Tukang Batu L.02 OH 0.100 Err:509
Kepala Tukang L.03 OH 0.010 Err:509
Mandor L.04 OH 0.015 110,000.00
JUMLAH TENAGA KERJA
B BAHAN
Bata merah bh 66.000 Err:509
Semen Portland kg 6.268 1,140.00
Pasir pasang m3 0.023 115,000.00
JUMLAH TENAGA BAHAN
C. PERALATAN

JUMLAH TENAGA ALAT

D. Jumlah (A+B+C)
### E. Overhead & Profit 15% X D
F. Harga Satuan Pekerjaan (D+E)

5. Pemasangan 1 m2 dinding terawang (roster) 10x12x20 campuran 1SP : 4PP


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp)
A. TENAGA
Pekerja L.01 OH 0.300 200,000.00
Tukang Batu L.02 OH 0.100 Err:509
Kepala Tukang L.03 OH 0.010 Err:509
Mandor L.04 OH 0.015 110,000.00
JUMLAH TENAGA KERJA
B BAHAN
Bata rooster bh 45.000 Err:509
Roster terawang kg 11.000 1,140.00
Pasir pasang m3 0.035 115,000.00
JUMLAH TENAGA BAHAN
C. PERALATAN

JUMLAH TENAGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit 15% X D
F. Harga Satuan Pekerjaan (D+E)

6. Pemasangan 1 m2 dinding roster keramik 30x30 campuran 1SP : 4PP


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp)
A. TENAGA
Pekerja L.01 OH 0.300 200,000.00
Tukang Batu L.02 OH 0.100 Err:509
Kepala Tukang L.03 OH 0.010 Err:509
Mandor L.04 OH 0.015 110,000.00
JUMLAH TENAGA KERJA
B BAHAN
Rooster keramik 30x30cm bh 11.110 Err:509
Semen Portland kg 11.000 1,140.00
Pasir pasang m3 0.035 115,000.00
JUMLAH TENAGA BAHAN
C. PERALATAN

JUMLAH TENAGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit 15% X D
F. Harga Satuan Pekerjaan (D+E)

DIV. 4.4.1 - 2
7. Pemasangan 1 m2 dinding roster keramik 20x20 campuran 1SP : 4PP
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp)
A. TENAGA
Pekerja L.01 OH 0.300 200,000.00
Tukang Batu L.02 OH 0.100 Err:509
Kepala Tukang L.03 OH 0.010 Err:509
Mandor L.04 OH 0.015 110,000.00
JUMLAH TENAGA KERJA
B BAHAN
Rooster keramik 20x20cm bh 25.000 Err:509
Semen Portland kg 11.000 1,140.00
Pasir pasang m3 0.035 115,000.00
JUMLAH TENAGA BAHAN
C. PERALATAN

JUMLAH TENAGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit 15% X D
F. Harga Satuan Pekerjaan (D+E)

8. Pemasangan 1 m2 dinding glass block 20x20 campuran 1SP : 4PP


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp)
A. TENAGA
Pekerja L.01 OH 0.300 200,000.00
Tukang Batu L.02 OH 0.100 Err:509
Kepala Tukang L.03 OH 0.010 Err:509
Mandor L.04 OH 0.015 110,000.00
JUMLAH TENAGA KERJA
B BAHAN
Glass block bh 26.500 Err:509
Semen Portland kg 11.000 1,140.00
Pasir pasang m3 0.035 115,000.00
JUMLAH TENAGA BAHAN
C. PERALATAN
JUMLAH TENAGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit 15% X D
F. Harga Satuan Pekerjaan (D+E)
DIV. 4.4.1 - 3
u campuran 1 SP:3PP
Jumlah Harga (Rp)

120,000.00
Err:509
Err:509
3,300.00
Err:509

Err:509
24,791.58
6,906.90
Err:509

-
-

Err:509
Err:509
Err:509

Jumlah Harga (Rp)

120,000.00
Err:509
Err:509
3,300.00
Err:509

Err:509
19,976.22
7,058.70
Err:509

-
-

Err:509
Err:509
Err:509

atu campuran 1 SP:3PP


Jumlah Harga (Rp)

60,000.00
Err:509
Err:509
1,650.00
Err:509
Err:509
8,928.08
2,507.00
Err:509

-
-

Err:509
Err:509
Err:509
tu campuran 1 SP:4PP
Jumlah Harga (Rp)

60,000.00
Err:509
Err:509
1,650.00
Err:509

Err:509
7,144.95
2,695.03
Err:509

-
-

Err:509
Err:509
Err:509

Jumlah Harga (Rp)

60,000.00
Err:509
Err:509
1,650.00
Err:509

Err:509
12,540.00
4,025.00
Err:509

-
-

Err:509
Err:509
Err:509

Jumlah Harga (Rp)

60,000.00
Err:509
Err:509
1,650.00
Err:509

Err:509
12,540.00
4,025.00
Err:509

-
-

Err:509
Err:509
Err:509
Jumlah Harga (Rp)

60,000.00
Err:509
Err:509
1,650.00
Err:509

Err:509
12,540.00
4,025.00
Err:509

-
-

Err:509
Err:509
Err:509

Jumlah Harga (Rp)

60,000.00
Err:509
Err:509
1,650.00
Err:509

Err:509
12,540.00
4,025.00
Err:509

Err:509
Err:509
Err:509
4.4.2 HARGA SATUAN PEKERJAAN PLESTERAN

1. Pemasangan 1 m2 plesteran 1SP : 3PP tebal 15 mm


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp)
A. TENAGA
Pekerja L.01 OH 0.300 200,000.00
Tukang Batu L.02 OH 0.150 Err:509
Kepala Tukang L.03 OH 0.015 Err:509
Mandor L.04 OH 0.015 110,000.00
JUMLAH TENAGA KERJA
B BAHAN
Semen Portland kg 7.776 1,140.00
Pasir pasang m3 0.023 115,000.00
JUMLAH TENAGA BAHAN
C. PERALATAN

JUMLAH TENAGA ALAT

D. Jumlah (A+B+C)
### E. Overhead & Profit 15% X D
F. Harga Satuan Pekerjaan (D+E)

2. Pemasangan 1 m2 plesteran 1SP : 3PP tebal 20 mm


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp)
A. TENAGA
Pekerja L.01 OH 0.260 200,000.00
Tukang Batu L.02 OH 0.200 Err:509
Kepala Tukang L.03 OH 0.020 Err:509
Mandor L.04 OH 0.013 110,000.00
JUMLAH TENAGA KERJA
B BAHAN
Semen Portland kg 10.368 1,140.00
Pasir pasang m3 0.031 115,000.00
JUMLAH TENAGA BAHAN
C. PERALATAN

JUMLAH TENAGA ALAT

D. Jumlah (A+B+C)
### E. Overhead & Profit 15% X D
F. Harga Satuan Pekerjaan (D+E)

3. Pemasangan 1 m2 plesteran 1SP : 4PP tebal 15 mm


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp)
A. TENAGA
Pekerja L.01 OH 0.300 200,000.00
Tukang Batu L.02 OH 0.150 Err:509
Kepala Tukang L.03 OH 0.015 Err:509
Mandor L.04 OH 0.015 110,000.00
JUMLAH TENAGA KERJA
B BAHAN
Semen Portland kg 6.240 1,140.00
Pasir pasang m3 0.024 115,000.00
JUMLAH TENAGA BAHAN
C. PERALATAN

JUMLAH TENAGA ALAT

D. Jumlah (A+B+C)
### E. Overhead & Profit 15% X D
F. Harga Satuan Pekerjaan (D+E)

DIV. 4.4.2 - 1
4. Pemasangan 1 m2 plesteran 1SP : 4PP tebal 20 mm
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp)
A. TENAGA
Pekerja L.01 OH 0.260 200,000.00
Tukang Batu L.02 OH 0.200 Err:509
Kepala Tukang L.03 OH 0.020 Err:509
Mandor L.04 OH 0.013 110,000.00
JUMLAH TENAGA KERJA
B BAHAN
Semen Portland kg 8.320 1,140.00
Pasir pasang m3 0.032 115,000.00
JUMLAH TENAGA BAHAN
C. PERALATAN

JUMLAH TENAGA ALAT

D. Jumlah (A+B+C)
### E. Overhead & Profit 15% X D
F. Harga Satuan Pekerjaan (D+E)

5. Pemasangan 1 m2 Berapen 1SP : 5PP tebal 15 mm


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp)
A. TENAGA
Pekerja L.01 OH 0.150 200,000.00
Tukang Batu L.02 OH 0.075 Err:509
Kepala Tukang L.03 OH 0.008 Err:509
Mandor L.04 OH 0.008 110,000.00
JUMLAH TENAGA KERJA
B BAHAN
Semen Portland kg 5.184 1,140.00
Pasir pasang m3 0.026 115,000.00
JUMLAH TENAGA BAHAN
C. PERALATAN

JUMLAH TENAGA ALAT

D. Jumlah (A+B+C)
### E. Overhead & Profit 15% X D
F. Harga Satuan Pekerjaan (D+E)

6. Pemasangan 1 m' plesteran skonig 1 Sp : 3 PP lebar 10 cm


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp)
A. TENAGA
Pekerja L.01 OH 0.080 200,000.00
Tukang Batu L.02 OH 0.400 Err:509
Kepala Tukang L.03 OH 0.040 Err:509
Mandor L.04 OH 0.004 110,000.00
JUMLAH TENAGA KERJA
B BAHAN
Semen Portland kg 0.500 1,140.00
Pasir pasang m3 0.013 115,000.00
JUMLAH TENAGA BAHAN
C. PERALATAN

JUMLAH TENAGA ALAT

D. Jumlah (A+B+C)
### E. Overhead & Profit 15% X D
F. Harga Satuan Pekerjaan (D+E)

DIV. 4.4.2 - 2
7. Pemasangan 1 m2 plesteran ciprat 1 Sp : 2 PP
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp)
A. TENAGA
Pekerja L.01 OH 0.300 200,000.00
Tukang Batu L.02 OH 0.100 Err:509
Kepala Tukang L.03 OH 0.010 Err:509
Mandor L.04 OH 0.015 110,000.00
JUMLAH TENAGA KERJA
B BAHAN
Semen Portland kg 4.320 1,140.00
Pasir pasang m3 0.006 115,000.00
JUMLAH TENAGA BAHAN
C. PERALATAN

JUMLAH TENAGA ALAT

D. Jumlah (A+B+C)
### E. Overhead & Profit 15% X D
F. Harga Satuan Pekerjaan (D+E)

8. Pemasangan 1 m2 finishing siar pasangan batu kali campuran 1 SP : 2 PP


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp)
A. TENAGA
Pekerja L.01 OH 0.300 200,000.00
Tukang Batu L.02 OH 0.150 Err:509
Kepala Tukang L.03 OH 0.015 Err:509
Mandor L.04 OH 0.015 110,000.00
JUMLAH TENAGA KERJA
B BAHAN
Semen Portland kg 6.340 1,140.00
Pasir pasang m3 0.012 115,000.00
JUMLAH TENAGA BAHAN
C. PERALATAN

JUMLAH TENAGA ALAT

D. Jumlah (A+B+C)
### E. Overhead & Profit 15% X D
F. Harga Satuan Pekerjaan (D+E)

9. Pemasangan 1 m2 acian
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp)
A. TENAGA
Pekerja L.01 OH 0.200 200,000.00
Tukang Batu L.02 OH 0.100 Err:509
Kepala Tukang L.03 OH 0.010 Err:509
Mandor L.04 OH 0.010 110,000.00
JUMLAH TENAGA KERJA
B BAHAN
Semen Portland kg 3.250 Err:509
JUMLAH TENAGA BAHAN
C. PERALATAN
JUMLAH TENAGA ALAT

D. Jumlah (A+B+C)
### E. Overhead & Profit 15% X D
F. Harga Satuan Pekerjaan (D+E)

DIV. 4.4.2 - 3
Jumlah Harga (Rp)

60,000.00
Err:509
Err:509
1,650.00
Err:509

8,864.64
2,645.00
11,509.64

-
-

Err:509
Err:509
Err:509

Jumlah Harga (Rp)

52,000.00
Err:509
Err:509
1,430.00
Err:509

11,819.52
3,565.00
15,384.52

-
-

Err:509
Err:509
Err:509

Jumlah Harga (Rp)

60,000.00
Err:509
Err:509
1,650.00
Err:509

7,113.60
2,760.00
9,873.60

-
-

Err:509
Err:509
Err:509
Jumlah Harga (Rp)

52,000.00
Err:509
Err:509
1,430.00
Err:509

9,484.80
3,680.00
13,164.80

-
-

Err:509
Err:509
Err:509

Jumlah Harga (Rp)

30,000.00
Err:509
Err:509
880.00
Err:509

5,909.76
2,990.00
8,899.76

-
-

Err:509
Err:509
Err:509

Jumlah Harga (Rp)

16,000.00
Err:509
Err:509
440.00
Err:509

570.00
1,495.00
2,065.00
-
-

Err:509
Err:509
Err:509
Jumlah Harga (Rp)

60,000.00
Err:509
Err:509
1,650.00
Err:509

4,924.80
690.00
5,614.80

-
-

Err:509
Err:509
Err:509

Jumlah Harga (Rp)

60,000.00
Err:509
Err:509
1,650.00
Err:509

7,227.60
1,380.00
8,607.60

-
-

Err:509
Err:509
Err:509

Jumlah Harga (Rp)

40,000.00
Err:509
Err:509
1,100.00
Err:509

Err:509
Err:509
-
-

Err:509
Err:509
Err:509
4.4.3 HARGA SATUAN PEKERJAAN PENUTUP LANTAI DAN PENUTUP DINDING

1. Pemasangan 1 m2 lantai granite tile ukuran 60cm x 60cm


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp)
A. TENAGA
Pekerja L.01 OH 0.250 200,000.00
Tukang Batu L.02 OH 0.125 Err:509
Kepala Tukang L.03 OH 0.013 Err:509
Mandor L.04 OH 0.013 110,000.00
JUMLAH TENAGA KERJA
B BAHAN
Granite tile bh 3.050 Err:509
Semen Portland kg 8.190 1,140.00
Pasir pasang kg 0.045 115,000.00
Semen warna kg 1.620 Err:509
JUMLAH TENAGA BAHAN
C. PERALATAN

JUMLAH TENAGA ALAT

D. Jumlah (A+B+C)
### E. Overhead & Profit 15% X D
F. Harga Satuan Pekerjaan (D+E)

2. Pemasangan 1 m2 lantai granite tile ukuran 80cm x 80cm


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp)
A. TENAGA
Pekerja L.01 OH 0.250 200,000.00
Tukang Batu L.02 OH 0.125 Err:509
Kepala Tukang L.03 OH 0.013 Err:509
Mandor L.04 OH 0.013 110,000.00
JUMLAH TENAGA KERJA
B BAHAN
Granite tile bh 1.716 Err:509
Semen Portland kg 8.190 1,140.00
Pasir pasang kg 0.045 115,000.00
Semen warna kg 1.620 Err:509
JUMLAH TENAGA BAHAN
C. PERALATAN

JUMLAH TENAGA ALAT

D. Jumlah (A+B+C)
### E. Overhead & Profit 15% X D
F. Harga Satuan Pekerjaan (D+E)

3. Pemasangan 1 m2 lantai keramik putih ukuran 30cm x 30cm


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp)
A. TENAGA
Pekerja L.01 OH 0.250 200,000.00
Tukang Batu L.02 OH 0.125 Err:509
Kepala Tukang L.03 OH 0.013 Err:509
Mandor L.04 OH 0.013 110,000.00
JUMLAH TENAGA KERJA
B BAHAN
Keramik 30x30 (putih) bh 11.870 Err:509
Semen Portland kg 10.000 1,140.00
Pasir pasang kg 0.045 115,000.00
Semen warna kg 1.500 Err:509
JUMLAH TENAGA BAHAN
C. PERALATAN

JUMLAH TENAGA ALAT

D. Jumlah (A+B+C)
### E. Overhead & Profit 15% X D
F. Harga Satuan Pekerjaan (D+E)

DIV. 4.4.3 - 1
4. Pemasangan 1 m2 lantai keramik putih ukuran 40cm x 40cm
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp)
A. TENAGA
Pekerja L.01 OH 0.250 200,000.00
Tukang Batu L.02 OH 0.125 Err:509
Kepala Tukang L.03 OH 0.013 Err:509
Mandor L.04 OH 0.013 110,000.00
JUMLAH TENAGA KERJA
B BAHAN
Keramik 40x40 (putih) bh 6.630 Err:509
Semen Portland kg 10.000 1,140.00
Pasir pasang kg 0.045 115,000.00
Semen warna kg 1.500 Err:509
JUMLAH TENAGA BAHAN
C. PERALATAN

JUMLAH TENAGA ALAT

D. Jumlah (A+B+C)
### E. Overhead & Profit 15% X D
F. Harga Satuan Pekerjaan (D+E)

5. Pemasangan 1 m2 lantai keramik KM/WC ukuran 20cm x 20cm


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp)
A. TENAGA
Pekerja L.01 OH 0.270 200,000.00
Tukang Batu L.02 OH 0.135 Err:509
Kepala Tukang L.03 OH 0.014 Err:509
Mandor L.04 OH 0.014 110,000.00
JUMLAH TENAGA KERJA
B BAHAN
Keramik 20x20 (KM/WC) bh 26.500 Err:509
Semen Portland kg 10.400 1,140.00
Pasir pasang kg 0.045 115,000.00
Semen warna kg 1.620 Err:509
JUMLAH TENAGA BAHAN
C. PERALATAN

JUMLAH TENAGA ALAT

D. Jumlah (A+B+C)
### E. Overhead & Profit 15% X D
F. Harga Satuan Pekerjaan (D+E)

6. Pemasangan 1 m2 lantai keramik warna ukuran 30cm x 30cm


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp)
A. TENAGA
Pekerja L.01 OH 0.250 200,000.00
Tukang Batu L.02 OH 0.125 Err:509
Kepala Tukang L.03 OH 0.013 Err:509
Mandor L.04 OH 0.013 110,000.00
JUMLAH TENAGA KERJA
B BAHAN
Keramik 30x30 warna bh 11.870 Err:509
Semen Portland kg 10.000 1,140.00
Pasir pasang kg 0.045 115,000.00
Semen warna kg 1.500 Err:509
JUMLAH TENAGA BAHAN
C. PERALATAN

JUMLAH TENAGA ALAT

D. Jumlah (A+B+C)
### E. Overhead & Profit 15% X D
F. Harga Satuan Pekerjaan (D+E)

DIV. 4.4.3 - 2
7. Pemasangan 1 m2 lantai keramik warna ukuran 40cm x 40cm
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp)
A. TENAGA
Pekerja L.01 OH 0.250 200,000.00
Tukang Batu L.02 OH 0.125 Err:509
Kepala Tukang L.03 OH 0.013 Err:509
Mandor L.04 OH 0.013 110,000.00
JUMLAH TENAGA KERJA
B BAHAN
Keramik 40x40 warna bh 6.630 Err:509
Semen Portland kg 10.000 1,140.00
Pasir pasang kg 0.045 115,000.00
Semen warna kg 1.500 Err:509
JUMLAH TENAGA BAHAN
C. PERALATAN

JUMLAH TENAGA ALAT

D. Jumlah (A+B+C)
### E. Overhead & Profit 15% X D
F. Harga Satuan Pekerjaan (D+E)

8. Pemasangan 1 m' plint keramik ukuran 10 cm x 30 cm


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp)
A. TENAGA
Pekerja L.01 OH 0.090 200,000.00
Tukang Batu L.02 OH 0.090 Err:509
Kepala Tukang L.03 OH 0.035 Err:509
Mandor L.04 OH 0.005 110,000.00
JUMLAH TENAGA KERJA
B BAHAN
Plint keramik bh 3.530 Err:509
Semen Portland kg 1.140 1,140.00
Pasir pasang kg 0.003 115,000.00
Semen warna kg 0.050 Err:509
JUMLAH TENAGA BAHAN
C. PERALATAN
JUMLAH TENAGA ALAT

D. Jumlah (A+B+C)
### E. Overhead & Profit 15% X D
F. Harga Satuan Pekerjaan (D+E)

9. Pemasangan 1 m' plint keramik ukuran 10 cm x 40 cm


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp)
A. TENAGA
Pekerja L.01 OH 0.090 200,000.00
Tukang Batu L.02 OH 0.090 Err:509
Kepala Tukang L.03 OH 0.035 Err:509
Mandor L.04 OH 0.005 110,000.00
JUMLAH TENAGA KERJA
B BAHAN
Plint keramik bh 2.650 Err:509
Semen Portland kg 1.140 1,140.00
Pasir pasang kg 0.003 115,000.00
Semen warna kg 0.050 Err:509
JUMLAH TENAGA BAHAN
C. PERALATAN

JUMLAH TENAGA ALAT

D. Jumlah (A+B+C)
### E. Overhead & Profit 15% X D
F. Harga Satuan Pekerjaan (D+E)

DIV. 4.4.3 - 3
10. Pemasangan 1 m' plint Granite Tile ukuran 10 cm x 60 cm
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp)
A. TENAGA
Pekerja L.01 OH 0.090 200,000.00
Tukang Batu L.02 OH 0.090 Err:509
Kepala Tukang L.03 OH 0.035 Err:509
Mandor L.04 OH 0.005 110,000.00
JUMLAH TENAGA KERJA
B BAHAN
Plint granite tile bh 1.760 Err:509
Semen Portland kg 1.140 1,140.00
Pasir pasang kg 0.003 115,000.00
Semen warna kg 0.050 Err:509
JUMLAH TENAGA BAHAN
C. PERALATAN

JUMLAH TENAGA ALAT

D. Jumlah (A+B+C)
### E. Overhead & Profit 15% X D
F. Harga Satuan Pekerjaan (D+E)

11. Pemasangan 1 m' plint Granite Tile ukuran 10 cm x 80 cm


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp)
A. TENAGA
Pekerja L.01 OH 0.090 200,000.00
Tukang Batu L.02 OH 0.090 Err:509
Kepala Tukang L.03 OH 0.035 Err:509
Mandor L.04 OH 0.005 110,000.00
JUMLAH TENAGA KERJA
B BAHAN
Plint granite tile bh 1.325 Err:509
Semen Portland kg 1.140 1,140.00
Pasir pasang kg 0.003 115,000.00
Semen warna kg 0.050 Err:509
JUMLAH TENAGA BAHAN
C. PERALATAN

JUMLAH TENAGA ALAT

D. Jumlah (A+B+C)
### E. Overhead & Profit 15% X D
F. Harga Satuan Pekerjaan (D+E)

12. Pemasangan 1 m2 lantai marmer ukuran 100cm x 100cm


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp)
A. TENAGA
Pekerja L.01 OH 0.700 200,000.00
Tukang Batu L.02 OH 0.350 Err:509
Kepala Tukang L.03 OH 0.035 Err:509
Mandor L.04 OH 0.035 110,000.00
JUMLAH TENAGA KERJA
B BAHAN
Marmer bh 1.060 Err:509
Semen Portland kg 8.190 1,140.00
Pasir pasang kg 0.045 115,000.00
Semen warna kg 0.650 Err:509
JUMLAH TENAGA BAHAN
C. PERALATAN

JUMLAH TENAGA ALAT

D. Jumlah (A+B+C)
### E. Overhead & Profit 15% X D
F. Harga Satuan Pekerjaan (D+E)

DIV. 4.4.3 - 4
13. Pemasangan 1 m2 lantai lantai karpet t. 4-5 mm
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp)
A. TENAGA
Pekerja L.01 OH 0.170 200,000.00
Tukang Batu L.02 OH 0.170 Err:509
Kepala Tukang L.03 OH 0.017 Err:509
Mandor L.04 OH 0.009 110,000.00
JUMLAH TENAGA KERJA
B BAHAN
Karpet m2 1.050 Err:509
Lem kg 0.350 700.00
JUMLAH TENAGA BAHAN
C. PERALATAN

JUMLAH TENAGA ALAT

D. Jumlah (A+B+C)
### E. Overhead & Profit 15% X D
F. Harga Satuan Pekerjaan (D+E)

14. Pemasangan 1 m2 lantai vinyl


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp)
A. TENAGA
Pekerja L.01 OH 0.700 200,000.00
Tukang Batu L.02 OH 0.350 Err:509
Kepala Tukang L.03 OH 0.035 Err:509
Mandor L.04 OH 0.035 110,000.00
JUMLAH TENAGA KERJA
B BAHAN
Vinyl kayu m2 1.050 Err:509
Lem kg 0.600 700.00
JUMLAH TENAGA BAHAN
C. PERALATAN

JUMLAH TENAGA ALAT

D. Jumlah (A+B+C)
### E. Overhead & Profit 15% X D
F. Harga Satuan Pekerjaan (D+E)

15. Pemasangan 1 m2 dinding keramik warna ukuran 20cm x 25cm


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp)
A. TENAGA
Pekerja L.01 OH 0.1875 200,000.00
Tukang Batu L.02 OH 0.3750 Err:509
Kepala Tukang L.03 OH 0.0450 Err:509
Mandor L.04 OH 0.0188 110,000.00
JUMLAH TENAGA KERJA
B BAHAN
Keramik 20x25 warna bh 22.000 Err:509
Semen Portland kg 9.300 1,140.00
Pasir pasang kg 0.018 115,000.00
Semen warna kg 1.940 Err:509
JUMLAH TENAGA BAHAN
C. PERALATAN

JUMLAH TENAGA ALAT

D. Jumlah (A+B+C)
### E. Overhead & Profit 15% X D
F. Harga Satuan Pekerjaan (D+E)
15a. Pemasangan 1 m2 dinding keramik warna ukuran 30cm x 60cm
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp)
A. TENAGA
Pekerja L.01 OH 0.1875 Err:509
Tukang Batu L.02 OH 0.3750 110,000.00
Kepala Tukang L.03 OH 0.0450 Err:509
Mandor L.04 OH 0.0188 110,000.00
JUMLAH TENAGA KERJA
B BAHAN
Keramik 30x60 warna bh 6.000 Err:509
Semen Portland kg 9.300 1,140.00
Pasir pasang kg 0.018 82.14
Semen warna kg 1.940 Err:509
JUMLAH TENAGA BAHAN
C. PERALATAN

JUMLAH TENAGA ALAT

D. Jumlah (A+B+C)
E. Overhead & Profit 15% X D
F. Harga Satuan Pekerjaan (D+E)

DIV. 4.4.3 - 5
16. Pemasangan 1 m2 dinding keramik putih ukuran 20cm x 25cm
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp)
A. TENAGA
Pekerja L.01 OH 0.1875 200,000.00
Tukang Batu L.02 OH 0.3750 Err:509
Kepala Tukang L.03 OH 0.0450 Err:509
Mandor L.04 OH 0.0188 110,000.00
JUMLAH TENAGA KERJA
B BAHAN
Keramik 20x25 putih bh 22.000 Err:509
Semen Portland kg 9.300 1,140.00
Pasir pasang kg 0.018 115,000.00
Semen warna kg 1.940 Err:509
JUMLAH TENAGA BAHAN
C. PERALATAN

JUMLAH TENAGA ALAT

D. Jumlah (A+B+C)
### E. Overhead & Profit 15% X D
F. Harga Satuan Pekerjaan (D+E)

17. Pemasangan 1 m2 dinding marmer 100cm x 100 cm


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp)
A. TENAGA
Pekerja L.01 OH 1.300 200,000.00
Tukang Batu L.02 OH 0.650 Err:509
Kepala Tukang L.03 OH 0.065 Err:509
Mandor L.04 OH 0.035 110,000.00
JUMLAH TENAGA KERJA
B BAHAN
Marmer m2 1.060 Err:509
Semen Portland kg 12.440 1,140.00
Pasir pasang kg 0.025 115,000.00
Semen warna kg 0.650 Err:509
Paku 12 cm kg 3.030 Err:509
JUMLAH TENAGA BAHAN
C. PERALATAN

JUMLAH TENAGA ALAT

D. Jumlah (A+B+C)
### E. Overhead & Profit 15% X D
F. Harga Satuan Pekerjaan (D+E)

18. Pemasangan 1 m2 dinding batu candi / andesit


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp)
A. TENAGA
Pekerja L.01 OH 0.700 200,000.00
Tukang Batu L.02 OH 0.350 Err:509
Kepala Tukang L.03 OH 0.035 Err:509
Mandor L.04 OH 0.035 110,000.00
JUMLAH TENAGA KERJA
B BAHAN
Batu candi / andesit m2 1.100 Err:509
Semen Portland kg 11.750 1,140.00
Pasir pasang kg 0.035 115,000.00
JUMLAH TENAGA BAHAN
C. PERALATAN

JUMLAH TENAGA ALAT

D. Jumlah (A+B+C)
### E. Overhead & Profit 15% X D
F. Harga Satuan Pekerjaan (D+E)

DIV. 4.4.3 - 6
19. Pemasangan 1 m2 dinding batu tempel hitam
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp)
A. TENAGA
Pekerja L.01 OH 0.700 200,000.00
Tukang Batu L.02 OH 0.350 Err:509
Kepala Tukang L.03 OH 0.035 Err:509
Mandor L.04 OH 0.035 110,000.00
JUMLAH TENAGA KERJA
B BAHAN
Batu tempel m2 1.100 Err:509
Semen Portland kg 11.750 1,140.00
Pasir pasang kg 0.035 115,000.00
JUMLAH TENAGA BAHAN
C. PERALATAN

JUMLAH TENAGA ALAT

D. Jumlah (A+B+C)
### E. Overhead & Profit 15% X D
F. Harga Satuan Pekerjaan (D+E)

20. Pemasangan 1 m2 wallpaper


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp)
A. TENAGA
Pekerja L.01 OH 0.350 200,000.00
Tukang Batu L.02 OH 0.175 Err:509
Kepala Tukang L.03 OH 0.017 Err:509
Mandor L.04 OH 0.002 110,000.00
JUMLAH TENAGA KERJA
B BAHAN
Wallpaper m 2.200 Err:509
Lem kg 0.250 700.00
JUMLAH TENAGA BAHAN
C. PERALATAN

JUMLAH TENAGA ALAT

D. Jumlah (A+B+C)
### E. Overhead & Profit 15% X D
F. Harga Satuan Pekerjaan (D+E)
21. Pemasangan 1 m2 floor harderner
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp)
A. TENAGA
Pekerja L.01 OH 0.120 200,000.00
Tukang Batu L.02 OH 0.120 Err:509
Kepala Tukang L.03 OH 0.012 Err:509
Mandor L.04 OH 0.006 110,000.00
JUMLAH TENAGA KERJA
B BAHAN
Floor harderner kg 3.000 Err:509
JUMLAH TENAGA BAHAN
C. PERALATAN

JUMLAH TENAGA ALAT

D. Jumlah (A+B+C)
### E. Overhead & Profit 15% X D
F. Harga Satuan Pekerjaan (D+E)

DIV. 4.4.3 - 7
I DAN PENUTUP DINDING

Jumlah Harga (Rp)

50,000.00
Err:509
Err:509
1,430.00
Err:509

Err:509
9,336.60
5,175.00
Err:509
Err:509

-
-

Err:509
Err:509
Err:509

Jumlah Harga (Rp)

50,000.00
Err:509
Err:509
1,430.00
Err:509

Err:509
9,336.60
5,175.00
Err:509
Err:509

-
-

Err:509
Err:509
Err:509

Jumlah Harga (Rp)

50,000.00
Err:509
Err:509
1,430.00
Err:509

Err:509
11,400.00
5,175.00
Err:509
Err:509

-
-

Err:509
Err:509
Err:509
Jumlah Harga (Rp)

50,000.00
Err:509
Err:509
1,430.00
Err:509

Err:509
11,400.00
5,175.00
Err:509
Err:509

-
-

Err:509
Err:509
Err:509

Jumlah Harga (Rp)

54,000.00
Err:509
Err:509
1,540.00
Err:509

Err:509
11,856.00
5,175.00
Err:509
Err:509

-
-

Err:509
Err:509
Err:509

Jumlah Harga (Rp)

50,000.00
Err:509
Err:509
1,430.00
Err:509
Err:509
11,400.00
5,175.00
Err:509
Err:509

-
-

Err:509
Err:509
Err:509

Jumlah Harga (Rp)

50,000.00
Err:509
Err:509
1,430.00
Err:509

Err:509
11,400.00
5,175.00
Err:509
Err:509

-
-

Err:509
Err:509
Err:509

Jumlah Harga (Rp)

18,000.00
Err:509
Err:509
550.00
Err:509

Err:509
1,299.60
345.00
Err:509
Err:509

-
-

Err:509
Err:509
Err:509

Jumlah Harga (Rp)

18,000.00
Err:509
Err:509
550.00
Err:509

Err:509
1,299.60
345.00
Err:509
Err:509

-
-

Err:509
Err:509
Err:509

Jumlah Harga (Rp)

18,000.00
Err:509
Err:509
550.00
Err:509

Err:509
1,299.60
345.00
Err:509
Err:509

-
-

Err:509
Err:509
Err:509
Jumlah Harga (Rp)

18,000.00
Err:509
Err:509
550.00
Err:509

Err:509
1,299.60
345.00
Err:509
Err:509

-
-

Err:509
Err:509
Err:509

Jumlah Harga (Rp)

140,000.00
Err:509
Err:509
3,850.00
Err:509

Err:509
9,336.60
5,175.00
Err:509
Err:509

-
-

Err:509
Err:509
Err:509

Jumlah Harga (Rp)

34,000.00
Err:509
Err:509
990.00
Err:509
Err:509
245.00
Err:509

-
-

Err:509
Err:509
Err:509

Jumlah Harga (Rp)

140,000.00
Err:509
Err:509
3,850.00
Err:509

Err:509
420.00
Err:509

-
-

Err:509
Err:509
Err:509

Jumlah Harga (Rp)

37,500.00
Err:509
Err:509
2,068.00
Err:509

Err:509
10,602.00
2,070.00
Err:509
Err:509

-
-

Err:509
Err:509
Err:509
Jumlah Harga (Rp)

Err:509
41,250.00
Err:509
2,068.00
Err:509

Err:509
10,602.00
1.48
Err:509
Err:509

-
-

Err:509
Err:509
Err:509

Jumlah Harga (Rp)


37,500.00
Err:509
Err:509
2,068.00
Err:509

Err:509
10,602.00
2,070.00
Err:509
Err:509

-
-

Err:509
Err:509
Err:509

Jumlah Harga (Rp)

260,000.00
Err:509
Err:509
3,850.00
Err:509

Err:509
14,181.60
2,875.00
Err:509
Err:509
Err:509

-
-

Err:509
Err:509
Err:509

Jumlah Harga (Rp)

140,000.00
Err:509
Err:509
3,850.00
Err:509

Err:509
13,395.00
4,025.00
Err:509

-
-

Err:509
Err:509
Err:509

Jumlah Harga (Rp)

140,000.00
Err:509
Err:509
3,850.00
Err:509

Err:509
13,395.00
4,025.00
Err:509

-
-

Err:509
Err:509
Err:509

Jumlah Harga (Rp)

70,000.00
Err:509
Err:509
220.00
Err:509

Err:509
175.00
Err:509

-
-

Err:509
Err:509
Err:509
Jumlah Harga (Rp)

24,000.00
Err:509
Err:509
660.00
Err:509

Err:509
Err:509

-
-

Err:509
Err:509
Err:509
4.5.1 HARGA SATUAN PEKERJAAN LANGIT-LANGIT (PLAFOND)

1. Pemasangan 1 m2 langit-langit asbes semen (tebal 4 mm, 5 mm, 6 mm)


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp)
A. TENAGA
Pekerja L.01 OH 0.030 200,000.00
Tukang Kayu L.02 OH 0.070 Err:509
Kepala Tukang L.03 OH 0.007 Err:509
Mandor L.04 OH 0.004 110,000.00
JUMLAH TENAGA KERJA
B BAHAN
Asbes semen m2 1.100 Err:509
Paku tripleks kg 0.010 Err:509
JUMLAH TENAGA BAHAN
C. PERALATAN

JUMLAH TENAGA ALAT

D. Jumlah (A+B+C)
### E. Overhead & Profit 15% X D
F. Harga Satuan Pekerjaan (D+E)

2. Pemasangan 1 m2 langit-langit plywood ukuran (120 x 240) cm (tebal 3 mm, 4 mm, 6 mm)
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp)
A. TENAGA
Pekerja L.01 OH 0.100 200,000.00
Tukang Batu L.02 OH 0.100 Err:509
Kepala Tukang L.03 OH 0.010 Err:509
Mandor L.04 OH 0.005 110,000.00
JUMLAH TENAGA KERJA
B BAHAN
Plywood 4mm Lembar 0.375 Err:509
Paku tripleks kg 0.030 Err:509
JUMLAH TENAGA BAHAN
C. PERALATAN

JUMLAH TENAGA ALAT

D. Jumlah (A+B+C)
### E. Overhead & Profit 15% X D
F. Harga Satuan Pekerjaan (D+E)

3. Pemasangan 1 m2 langit-langit gypsum board ukuran (120 x 240 x 9) mm (tebal 9 mm)


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp)
A. TENAGA
Pekerja L.01 OH 0.100 200,000.00
Tukang Batu L.02 OH 0.050 Err:509
Kepala Tukang L.03 OH 0.005 Err:509
Mandor L.04 OH 0.005 110,000.00
JUMLAH TENAGA KERJA
B BAHAN
Gypsum board Lembar 0.364 Err:509
Paku skrup kg 0.110 Err:509
Cornis kg 0.300 Err:509
Lakban gypsum roll 0.070 Err:509
JUMLAH TENAGA BAHAN
C. PERALATAN

JUMLAH TENAGA ALAT

D. Jumlah (A+B+C)
### E. Overhead & Profit 15% X D
F. Harga Satuan Pekerjaan (D+E)

DIV. 4.5.1 - 1
4. Pemasangan 1 m' list langit-langit kayu profil
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp)
A. TENAGA
Pekerja L.01 OH 0.050 200,000.00
Tukang Batu L.02 OH 0.050 Err:509
Kepala Tukang L.03 OH 0.005 Err:509
Mandor L.04 OH 0.003 110,000.00
JUMLAH TENAGA KERJA
B BAHAN
List kayu profil m 1.050 Err:509
Paku kg 0.010 Err:509
JUMLAH TENAGA BAHAN
C. PERALATAN

JUMLAH TENAGA ALAT

D. Jumlah (A+B+C)
### E. Overhead & Profit 15% X D
F. Harga Satuan Pekerjaan (D+E)

5. Pemasangan 1 m' list langit-langit gypsum profil


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp)
A. TENAGA
Pekerja L.01 OH 0.050 200,000.00
Tukang Batu L.02 OH 0.050 Err:509
Kepala Tukang L.03 OH 0.005 Err:509
Mandor L.04 OH 0.003 110,000.00
JUMLAH TENAGA KERJA
B BAHAN
List gypsum sedang m 1.050 Err:509
Paku skrup kg 0.010 Err:509
Cornis kg 0.100 Err:509
JUMLAH TENAGA BAHAN
C. PERALATAN

JUMLAH TENAGA ALAT

D. Jumlah (A+B+C)
### E. Overhead & Profit 15% X D
F. Harga Satuan Pekerjaan (D+E)

6. Pemasangan 1 m2 langit-langit kalsiboard ukuran (120 x 240 x 9) mm (tebal 3,5 mm)


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp)
A. TENAGA
Pekerja L.01 OH 0.100 200,000.00
Tukang Batu L.02 OH 0.050 Err:509
Kepala Tukang L.03 OH 0.005 Err:509
Mandor L.04 OH 0.005 110,000.00
JUMLAH TENAGA KERJA
B BAHAN
Kalsiboard Lembar 0.364 Err:509
Paku skrup kg 0.110 Err:509
Cornis kg 0.300 Err:509
Lakban gypsum roll 0.070 Err:509
JUMLAH TENAGA BAHAN
C. PERALATAN

JUMLAH TENAGA ALAT

D. Jumlah (A+B+C)
### E. Overhead & Profit 15% X D
F. Harga Satuan Pekerjaan (D+E)

DIV. 4.5.1 - 2
Jumlah Harga (Rp)

6,000.00
Err:509
Err:509
440.00
Err:509

Err:509
Err:509
Err:509

-
-

Err:509
Err:509
Err:509

(tebal 3 mm, 4 mm, 6 mm)


Jumlah Harga (Rp)

20,000.00
Err:509
Err:509
550.00
Err:509

Err:509
Err:509
Err:509

-
-

Err:509
Err:509
Err:509

40 x 9) mm (tebal 9 mm)
Jumlah Harga (Rp)

20,000.00
Err:509
Err:509
550.00
Err:509

Err:509
Err:509
Err:509
Err:509
Err:509

-
-

Err:509
Err:509
Err:509
Jumlah Harga (Rp)

10,000.00
Err:509
Err:509
330.00
Err:509

Err:509
Err:509
Err:509

-
-

Err:509
Err:509
Err:509

Jumlah Harga (Rp)

10,000.00
Err:509
Err:509
330.00
Err:509

Err:509
Err:509
Err:509
Err:509

-
-

Err:509
Err:509
Err:509

9) mm (tebal 3,5 mm)


Jumlah Harga (Rp)

20,000.00
Err:509
Err:509
550.00
Err:509

Err:509
Err:509
Err:509
Err:509
Err:509

-
-

Err:509
Err:509
Err:509
4.5.2 HARGA SATUAN PEKERJAAN PENUTUP ATAP

1. Pemasangan 1 m2 roof polycarbonate


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp)
A. TENAGA
Pekerja L.01 OH 0.140 200,000.00
Tukang Kayu L.02 OH 0.067 Err:509
Kepala Tukang L.03 OH 0.007 Err:509
Mandor L.04 OH 0.007 110,000.00
JUMLAH TENAGA KERJA
B BAHAN
Rooflight 2,1m x 11,8m m2 1.050 Err:509
Paku kg 0.050 Err:509
JUMLAH TENAGA BAHAN
C. PERALATAN

JUMLAH TENAGA ALAT

D. Jumlah (A+B+C)
### E. Overhead & Profit 15% X D
F. Harga Satuan Pekerjaan (D+E)

2. Pemasangan 1 m2 atap asbes gelombang


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp)
A. TENAGA
Pekerja L.01 OH 0.1400 200,000.00
Tukang Kayu L.02 OH 0.0700 Err:509
Kepala Tukang L.03 OH 0.0070 Err:509
Mandor L.04 OH 0.0070 110,000.00
JUMLAH TENAGA KERJA
B BAHAN
Asbes gelombang Lbr 0.800 Err:509
Paku pancing 6x23 kg 0.120 Err:509
JUMLAH TENAGA BAHAN
C. PERALATAN

JUMLAH TENAGA ALAT

D. Jumlah (A+B+C)
### E. Overhead & Profit 15% X D
F. Harga Satuan Pekerjaan (D+E)

3. Pemasangan 1 m' nok asbes


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp)
A. TENAGA
Pekerja L.01 OH 0.084 200,000.00
Tukang Kayu L.02 OH 0.125 Err:509
Kepala Tukang L.03 OH 0.013 Err:509
Mandor L.04 OH 0.004 110,000.00
JUMLAH TENAGA KERJA
B BAHAN
Nok asbes Lbr 1.000 Err:509
Paku seng kg 0.040 Err:509
JUMLAH TENAGA BAHAN
C. PERALATAN

JUMLAH TENAGA ALAT

D. Jumlah (A+B+C)
### E. Overhead & Profit 15% X D
F. Harga Satuan Pekerjaan (D+E)

DIV. 4.5.2 -1
4. Pemasangan 1 m2 genteng keramik warna natural
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp)
A. TENAGA
Pekerja L.01 OH 0.200 200,000.00
Tukang Kayu L.02 OH 0.100 Err:509
Kepala Tukang L.03 OH 0.010 Err:509
Mandor L.04 OH 0.010 110,000.00
JUMLAH TENAGA KERJA
B BAHAN
Genteng keramik Bh 14.000 Err:509
Paku biasa 2"-5" kg 0.030 Err:509
JUMLAH TENAGA BAHAN
C. PERALATAN

JUMLAH TENAGA ALAT

D. Jumlah (A+B+C)
### E. Overhead & Profit 15% X D
F. Harga Satuan Pekerjaan (D+E)

5. Pemasangan 1 m2 genteng metal


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp)
A. TENAGA
Pekerja L.01 OH 0.200 200,000.00
Tukang Kayu L.02 OH 0.100 Err:509
Kepala Tukang L.03 OH 0.010 Err:509
Mandor L.04 OH 0.001 110,000.00
JUMLAH TENAGA KERJA
B BAHAN
Genteng metal ex. Multiroof Bh 1.620 Err:509
Paku biasa 1/2"-1" kg 0.200 Err:509
JUMLAH TENAGA BAHAN
C. PERALATAN

JUMLAH TENAGA ALAT

D. Jumlah (A+B+C)
### E. Overhead & Profit 15% X D
F. Harga Satuan Pekerjaan (D+E)

6. Pemasangan 1 m' nok genteng keramik


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp)
A. TENAGA
Pekerja L.01 OH 0.400 200,000.00
Tukang Kayu L.02 OH 0.200 Err:509
Kepala Tukang L.03 OH 0.020 Err:509
Mandor L.04 OH 0.020 110,000.00
JUMLAH TENAGA KERJA
B BAHAN
Nok genteng beton Bh 3.900 Err:509
Paku biasa 1/2"-1" kg 0.050 Err:509
Semen PC kg 10.800 1,140.00
Pasir pasang m3 0.032 115,000.00
Semen warna kg 1.000 Err:509
JUMLAH TENAGA BAHAN
C. PERALATAN

JUMLAH TENAGA ALAT

D. Jumlah (A+B+C)
### E. Overhead & Profit 15% X D
F. Harga Satuan Pekerjaan (D+E)

DIV. 4.5.2 -2
7. Pemasangan 1 m' nok genteng metal
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp)
A. TENAGA
Pekerja L.01 OH 0.250 200,000.00
Tukang Kayu L.02 OH 0.150 Err:509
Kepala Tukang L.03 OH 0.015 Err:509
Mandor L.04 OH 0.013 110,000.00
JUMLAH TENAGA KERJA
B BAHAN
Nok genteng metal Bh 1.100 Err:509
Paku biasa 1/2"-1" kg 0.050 Err:509
JUMLAH TENAGA BAHAN
C. PERALATAN

JUMLAH TENAGA ALAT

D. Jumlah (A+B+C)
### E. Overhead & Profit 15% X D
F. Harga Satuan Pekerjaan (D+E)

8. Pemasangan 1 m2 atap seng gelombang


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp)
A. TENAGA
Pekerja L.01 OH 0.120 200,000.00
Tukang Kayu L.02 OH 0.060 Err:509
Kepala Tukang L.03 OH 0.006 Err:509
Mandor L.04 OH 0.006 110,000.00
JUMLAH TENAGA KERJA
B BAHAN
Atap seng gelombang Lbr 0.913 56,178.00
Paku biasa 1/2"-1" kg 0.020 Err:509
JUMLAH TENAGA BAHAN
C. PERALATAN

JUMLAH TENAGA ALAT

D. Jumlah (A+B+C)
### E. Overhead & Profit 15% X D
F. Harga Satuan Pekerjaan (D+E)

9. Pemasangan 1 m' nok atap seng


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp)
A. TENAGA
Pekerja L.01 OH 0.150 200,000.00
Tukang Kayu L.02 OH 0.070 Err:509
Kepala Tukang L.03 OH 0.007 Err:509
Mandor L.04 OH 0.006 110,000.00
JUMLAH TENAGA KERJA
B BAHAN
Seng plat 3"x6" Bh 0.300 52,800.00
Paku biasa 1/2"-1" kg 0.040 Err:509
JUMLAH TENAGA BAHAN
C. PERALATAN

JUMLAH TENAGA ALAT

D. Jumlah (A+B+C)
### E. Overhead & Profit 15% X D
F. Harga Satuan Pekerjaan (D+E)

DIV. 4.5.2 -3
10. Pemasangan 1 m2 atap aluminium/alkan
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp)
A. TENAGA
Pekerja L.01 OH 0.150 200,000.00
Tukang Kayu L.02 OH 0.075 Err:509
Kepala Tukang L.03 OH 0.080 Err:509
Mandor L.04 OH 0.006 110,000.00
JUMLAH TENAGA KERJA
B BAHAN
alkan t. 0,35 Lbr 1.050 Err:509
Paku hak panj.15 cm kg 0.020 Err:509
JUMLAH TENAGA BAHAN
C. PERALATAN

JUMLAH TENAGA ALAT

D. Jumlah (A+B+C)
### E. Overhead & Profit 15% X D
F. Harga Satuan Pekerjaan (D+E)

11. Pemasangan 1 m' nok aluminium


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp)
A. TENAGA
Pekerja L.01 OH 0.100 200,000.00
Tukang Kayu L.02 OH 0.100 Err:509
Kepala Tukang L.03 OH 0.100 Err:509
Mandor L.04 OH 0.050 110,000.00
JUMLAH TENAGA KERJA
B BAHAN
Nok standar 40x18 Bh 1.200 Err:509
Paku hak panj.15 cm kg 0.040 Err:509
JUMLAH TENAGA BAHAN
C. PERALATAN

JUMLAH TENAGA ALAT

D. Jumlah (A+B+C)
### E. Overhead & Profit 15% X D
F. Harga Satuan Pekerjaan (D+E)

12. Pemasangan 1 m2 aluminium foil


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp)
A. TENAGA
Pekerja L.01 OH 0.150 200,000.00
Tukang Kayu L.02 OH 0.050 Err:509
Kepala Tukang L.03 OH 0.005 Err:509
Mandor L.04 OH 0.008 110,000.00
JUMLAH TENAGA KERJA
B BAHAN
Aluminium foil m2 1.050 Err:509
JUMLAH TENAGA BAHAN
C. PERALATAN
JUMLAH TENAGA ALAT

D. Jumlah (A+B+C)
### E. Overhead & Profit 15% X D
F. Harga Satuan Pekerjaan (D+E)

DIV. 4.5.2 -4
13. Pemasangan 1 m2 atap bitumen motif gelombang (uk. 200x95x0,3cm) kemiringan atap >=15° jarak g
cm

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp)


A. TENAGA
Pekerja L.01 OH 0.140 200,000.00
Tukang Kayu L.02 OH 0.070 Err:509
Kepala Tukang L.03 OH 0.007 Err:509
Mandor L.04 OH 0.007 110,000.00
JUMLAH TENAGA KERJA
B BAHAN
Atap bitumen ex. Onduline Lbr 0.641 Err:509
Paku ex. onduline bh 7.051 18,000.00
JUMLAH TENAGA BAHAN
C. PERALATAN

JUMLAH TENAGA ALAT

D. Jumlah (A+B+C)
### E. Overhead & Profit 15% X D
F. Harga Satuan Pekerjaan (D+E)

14. Pemasangan 1 m2 atap bitumen motif gelombang (uk. 200x95x0,3cm) kemiringan atap antara 10°-15
gording 45 cm

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp)


A. TENAGA
Pekerja L.01 OH 0.140 200,000.00
Tukang Kayu L.02 OH 0.070 Err:509
Kepala Tukang L.03 OH 0.007 Err:509
Mandor L.04 OH 0.007 110,000.00
JUMLAH TENAGA KERJA
B BAHAN
Atap bitumen ex. Onduline Lbr 0.667 Err:509
Paku ex. onduline bh 7.051 18,000.00
JUMLAH TENAGA BAHAN
C. PERALATAN

JUMLAH TENAGA ALAT

D. Jumlah (A+B+C)
### E. Overhead & Profit 15% X D
F. Harga Satuan Pekerjaan (D+E)

15. Pemasangan 1 m2 atap bitumen motif gelombang (uk. 200x95x0,3cm) kemiringan atap antara 5°-10°
decking plywood 12 mm

No. Uraian Kode Satuan Koefisien Harga Satuan (Rp)


A. TENAGA
Pekerja L.01 OH 0.140 200,000.00
Tukang Kayu L.02 OH 0.070 Err:509
Kepala Tukang L.03 OH 0.007 Err:509
Mandor L.04 OH 0.007 110,000.00
JUMLAH TENAGA KERJA
B BAHAN
Atap bitumen ex. Onduline Lbr 0.783 Err:509
Plywood 12 mm Lbr 0.336 Err:509
Paku ex. onduline bh 15.660 18,000.00
JUMLAH TENAGA BAHAN
C. PERALATAN

JUMLAH TENAGA ALAT

D. Jumlah (A+B+C)
### E. Overhead & Profit 15% X D
F. Harga Satuan Pekerjaan (D+E)

DIV. 4.5.2 - 5
16. Pemasangan 1 m2 atap bitumen motif genteng (uk. 106x40x0,3 cm) jarak gording 32 cm
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp)
A. TENAGA
Pekerja L.01 OH 0.200 200,000.00
Tukang L.02 OH 0.100 Err:509
Kepala Tukang L.03 OH 0.010 Err:509
Mandor L.04 OH 0.001 110,000.00
JUMLAH TENAGA KERJA
B BAHAN
Atap bitumen motif genteng Lbr 3.226 Err:509
Sekrup ex. Onduline bh 16.150 18,000.00
JUMLAH TENAGA BAHAN
C. PERALATAN

JUMLAH TENAGA ALAT

D. Jumlah (A+B+C)
### E. Overhead & Profit 15% X D
F. Harga Satuan Pekerjaan (D+E)

17. Pemasangan 1 m' nok bitumen


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp)
A. TENAGA
Pekerja L.01 OH 0.084 200,000.00
Tukang Kayu L.02 OH 0.125 Err:509
Kepala Tukang L.03 OH 0.013 Err:509
Mandor L.04 OH 0.004 110,000.00
JUMLAH TENAGA KERJA
B BAHAN
Nok bitumen bh 1.280 Err:509
Paku bh 10.240 18,000.00
JUMLAH TENAGA BAHAN
C. PERALATAN

JUMLAH TENAGA ALAT

D. Jumlah (A+B+C)
### E. Overhead & Profit 15% X D
F. Harga Satuan Pekerjaan (D+E)

18. Pemasangan 1 m2 atap zincalume t. 0,35mm


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp)
A. TENAGA
Pekerja L.01 OH 0.150 200,000.00
Tukang Kayu L.02 OH 0.075 Err:509
Kepala Tukang L.03 OH 0.080 Err:509
Mandor L.04 OH 0.006 110,000.00
JUMLAH TENAGA KERJA
B BAHAN
Zincalujme t.0,35 Lbr 1.050 Err:509
Paku hak panj.15 cm kg 0.020 Err:509
JUMLAH TENAGA BAHAN
C. PERALATAN

JUMLAH TENAGA ALAT

D. Jumlah (A+B+C)
### E. Overhead & Profit 15% X D
F. Harga Satuan Pekerjaan (D+E)

DIV. 4.5.2 - 6
19. Pemasangan 1 m2 atap zincalume warna t. 0,35mm
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp)
A. TENAGA
Pekerja L.01 OH 0.150 200,000.00
Tukang Kayu L.02 OH 0.075 Err:509
Kepala Tukang L.03 OH 0.080 Err:509
Mandor L.04 OH 0.006 110,000.00
JUMLAH TENAGA KERJA
B BAHAN
Zincalujme warna t.0,35 Lbr 1.050 Err:509
Paku hak panj.15 cm kg 0.020 Err:509
JUMLAH TENAGA BAHAN
C. PERALATAN

JUMLAH TENAGA ALAT

D. Jumlah (A+B+C)
### E. Overhead & Profit 15% X D
F. Harga Satuan Pekerjaan (D+E)

20. Pemasangan 1 m2 atap zincalume warna t. 0,45mm


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp)
A. TENAGA
Pekerja L.01 OH 0.150 200,000.00
Tukang Kayu L.02 OH 0.075 Err:509
Kepala Tukang L.03 OH 0.080 Err:509
Mandor L.04 OH 0.006 110,000.00
JUMLAH TENAGA KERJA
B BAHAN
Zincalujme warna t.0,45 Lbr 1.050 Err:509
Paku hak panj.15 cm kg 0.020 Err:509
JUMLAH TENAGA BAHAN
C. PERALATAN

JUMLAH TENAGA ALAT

D. Jumlah (A+B+C)
### E. Overhead & Profit 15% X D
F. Harga Satuan Pekerjaan (D+E)

21. Pemasangan 1 m' nok zincalume


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp)
A. TENAGA
Pekerja L.01 OH 0.100 200,000.00
Tukang Kayu L.02 OH 0.100 Err:509
Kepala Tukang L.03 OH 0.100 Err:509
Mandor L.04 OH 0.050 110,000.00
JUMLAH TENAGA KERJA
B BAHAN
Nok zincalume m 1.200 Err:509
Paku kg 0.040 Err:509
JUMLAH TENAGA BAHAN
C. PERALATAN

JUMLAH TENAGA ALAT

D. Jumlah (A+B+C)
### E. Overhead & Profit 15% X D
F. Harga Satuan Pekerjaan (D+E)

DIV. 4.5.2 - 7
22. Pemasangan 1 m2 atap zincalume warna t. 0,22mm
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp)
A. TENAGA
Pekerja L.01 OH 0.150 200,000.00
Tukang Kayu L.02 OH 0.075 Err:509
Kepala Tukang L.03 OH 0.080 Err:509
Mandor L.04 OH 0.006 110,000.00
JUMLAH TENAGA KERJA
B BAHAN
Zincalujme t.0,22 Lbr 1.050 Err:509
Paku hak panj.15 cm kg 0.020 Err:509
JUMLAH TENAGA BAHAN
C. PERALATAN

JUMLAH TENAGA ALAT

D. Jumlah (A+B+C)
### E. Overhead & Profit 15% X D
F. Harga Satuan Pekerjaan (D+E)

23. Pemasangan 1 m2 genteng tanah liat


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp)
A. TENAGA
Pekerja L.01 OH 0.200 200,000.00
Tukang Kayu L.02 OH 0.100 Err:509
Kepala Tukang L.03 OH 0.010 Err:509
Mandor L.04 OH 0.010 110,000.00
JUMLAH TENAGA KERJA
B BAHAN
Genteng ex. Lokal Bh 17.500 Err:509
Paku biasa 2"-5" kg 0.030 Err:509
JUMLAH TENAGA BAHAN
C. PERALATAN

JUMLAH TENAGA ALAT

D. Jumlah (A+B+C)
### E. Overhead & Profit 15% X D
F. Harga Satuan Pekerjaan (D+E)

24. Pemasangan 1 m' nok genteng tanah liat


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp)
A. TENAGA
Pekerja L.01 OH 0.400 200,000.00
Tukang Kayu L.02 OH 0.200 Err:509
Kepala Tukang L.03 OH 0.020 Err:509
Mandor L.04 OH 0.020 110,000.00
JUMLAH TENAGA KERJA
B BAHAN
Nok genteng Bh 3.500 Err:509
Paku biasa 1/2"-1" kg 0.050 Err:509
Semen PC kg 10.800 1,140.00
Pasir pasang m3 0.032 115,000.00
Semen warna kg 1.000 Err:509
JUMLAH TENAGA BAHAN
C. PERALATAN

JUMLAH TENAGA ALAT

D. Jumlah (A+B+C)
### E. Overhead & Profit 15% X D
F. Harga Satuan Pekerjaan (D+E)

DIV. 4.5.2 - 8
Jumlah Harga (Rp)

28,000.00
Err:509
Err:509
770.00
Err:509

Err:509
Err:509
Err:509

-
-

Err:509
Err:509
Err:509

Jumlah Harga (Rp)

28,000.00
Err:509
Err:509
770.00
Err:509

Err:509
Err:509
Err:509

-
-

Err:509
Err:509
Err:509

Jumlah Harga (Rp)

16,800.00
Err:509
Err:509
440.00
Err:509

Err:509
Err:509
Err:509

-
-

Err:509
Err:509
Err:509
Jumlah Harga (Rp)

40,000.00
Err:509
Err:509
1,100.00
Err:509

Err:509
Err:509
Err:509

-
-

Err:509
Err:509
Err:509

Jumlah Harga (Rp)

40,000.00
Err:509
Err:509
110.00
Err:509

Err:509
Err:509
Err:509

-
-

Err:509
Err:509
Err:509

Jumlah Harga (Rp)

80,000.00
Err:509
Err:509
2,200.00
Err:509

Err:509
Err:509
12,312.00
3,680.00
Err:509
Err:509

-
-

Err:509
Err:509
Err:509
Jumlah Harga (Rp)

50,000.00
Err:509
Err:509
1,430.00
Err:509

Err:509
Err:509
Err:509

-
-

Err:509
Err:509
Err:509

Jumlah Harga (Rp)

24,000.00
Err:509
Err:509
660.00
Err:509

51,290.51
Err:509
Err:509

-
-

Err:509
Err:509
Err:509

Jumlah Harga (Rp)

30,000.00
Err:509
Err:509
660.00
Err:509

15,840.00
Err:509
Err:509
-
-

Err:509
Err:509
Err:509
Jumlah Harga (Rp)

30,000.00
Err:509
Err:509
660.00
Err:509

Err:509
Err:509
Err:509

-
-

Err:509
Err:509
Err:509

Jumlah Harga (Rp)

20,000.00
Err:509
Err:509
5,500.00
Err:509

Err:509
Err:509
Err:509

-
-

Err:509
Err:509
Err:509

Jumlah Harga (Rp)

30,000.00
Err:509
Err:509
880.00
Err:509

Err:509
Err:509
-
-

Err:509
Err:509
Err:509
m) kemiringan atap >=15° jarak gording 60

Jumlah Harga (Rp)

28,000.00
Err:509
Err:509
770.00
Err:509

Err:509
126,923.40
Err:509

-
-

Err:509
Err:509
Err:509

m) kemiringan atap antara 10°-15° jarak

Jumlah Harga (Rp)

28,000.00
Err:509
Err:509
770.00
Err:509

Err:509
126,923.40
Err:509

-
-

Err:509
Err:509
Err:509

m) kemiringan atap antara 5°-10° memakai

Jumlah Harga (Rp)

28,000.00
Err:509
Err:509
770.00
Err:509
Err:509
Err:509
281,880.00
Err:509

-
-

Err:509
Err:509
Err:509
arak gording 32 cm
Jumlah Harga (Rp)

40,000.00
Err:509
Err:509
110.00
Err:509

Err:509
290,700.00
Err:509

-
-

Err:509
Err:509
Err:509

Jumlah Harga (Rp)

16,800.00
Err:509
Err:509
440.00
Err:509

Err:509
184,320.00
Err:509

-
-

Err:509
Err:509
Err:509

Jumlah Harga (Rp)

30,000.00
Err:509
Err:509
660.00
Err:509

Err:509
Err:509
Err:509
-
-

Err:509
Err:509
Err:509
Jumlah Harga (Rp)

30,000.00
Err:509
Err:509
660.00
Err:509

Err:509
Err:509
Err:509

-
-

Err:509
Err:509
Err:509

Jumlah Harga (Rp)

30,000.00
Err:509
Err:509
660.00
Err:509

Err:509
Err:509
Err:509

-
-

Err:509
Err:509
Err:509

Jumlah Harga (Rp)

20,000.00
Err:509
Err:509
5,500.00
Err:509

Err:509
Err:509
Err:509
-
-

Err:509
Err:509
Err:509
Jumlah Harga (Rp)

30,000.00
Err:509
Err:509
660.00
Err:509

Err:509
Err:509
Err:509

-
-

Err:509
Err:509
Err:509

Jumlah Harga (Rp)

40,000.00
Err:509
Err:509
1,100.00
Err:509

Err:509
Err:509
Err:509

-
-

Err:509
Err:509
Err:509

Jumlah Harga (Rp)

80,000.00
Err:509
Err:509
2,200.00
Err:509

Err:509
Err:509
12,312.00
3,680.00
Err:509
Err:509

-
-

Err:509
Err:509
Err:509
4.6.1 HARGA SATUAN PEKERJAAN KAYU

1. Pembuatan dan Pemasangan 1 m3 kusen pintu dan kusen jendela, kayu kelas II
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp)
A. TENAGA
Pekerja L.01 OH 6.000 200,000.00
Tukang Kayu L.02 OH 18.000 Err:509
Kepala Tukang L.03 OH 1.800 Err:509
Mandor L.04 OH 0.300 110,000.00
JUMLAH TENAGA KERJA
B BAHAN
Balok kayu klas II m3 1.200 5,250,000.00
Paku 10 cm kg 1.250 Err:509
Lem kayu kg 1.000 1,000.00
JUMLAH TENAGA BAHAN
C. PERALATAN

JUMLAH TENAGA ALAT

D. Jumlah (A+B+C)
### E. Overhead & Profit 15% X D
F. Harga Satuan Pekerjaan (D+E)

2. Pembuatan dan pemasangan 1 m2 daun pintu panel kayu klas II


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp)
A. TENAGA
Pekerja L.01 OH 1.000 200,000.00
Tukang Kayu L.02 OH 3.000 Err:509
Kepala Tukang L.03 OH 0.300 Err:509
Mandor L.04 OH 0.050 110,000.00
JUMLAH TENAGA KERJA
B BAHAN
Papan kayu klas II m3 0.040 5,250,000.00
Lem kayu kg 0.500 1,000.00
JUMLAH TENAGA BAHAN
C. PERALATAN

JUMLAH TENAGA ALAT

D. Jumlah (A+B+C)
### E. Overhead & Profit 15% X D
F. Harga Satuan Pekerjaan (D+E)

3. Pembuatan dan pemasangan 1 m2 pintu dan jendela kaca


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp)
A. TENAGA
Pekerja L.01 OH 0.800 200,000.00
Tukang Kayu L.02 OH 2.400 Err:509
Kepala Tukang L.03 OH 0.240 Err:509
Mandor L.04 OH 0.040 110,000.00
JUMLAH TENAGA KERJA
B BAHAN
Papan kayu klas II m3 0.024 5,250,000.00
Lem kayu kg 0.300 1,000.00
Kaca polos 5 mm m2 1.000 Err:509
JUMLAH TENAGA BAHAN
C. PERALATAN

JUMLAH TENAGA ALAT

D. Jumlah (A+B+C)
### E. Overhead & Profit 15% X D
F. Harga Satuan Pekerjaan (D+E)

DIV. 4.6.1 - 1
4. Pembuatan 1 m2 daun pintu plywood rangkap, rangka kayu kelas III tertutup (lebar sampai 90 cm)
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp)
A. TENAGA
Pekerja L.01 OH 0.700 200,000.00
Tukang Kayu L.02 OH 2.100 Err:509
Kepala Tukang L.03 OH 0.210 Err:509
Mandor L.04 OH 0.035 110,000.00
JUMLAH TENAGA KERJA
B BAHAN
Papan kayu klas III m3 0.025 4,500,000.00
Paku 1 cm - 2,5 cm kg 0.030 Err:509
Lem kayu kg 0.500 1,000.00
Plywood tebal 4 mm Lembar 1.000 Err:509
JUMLAH TENAGA BAHAN
C. PERALATAN

JUMLAH TENAGA ALAT

D. Jumlah (A+B+C)
### E. Overhead & Profit 15% X D
F. Harga Satuan Pekerjaan (D+E)

5. Pemasangan 1 m2 jalusi kusen, kayu kelas II


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp)
A. TENAGA
Pekerja L.01 OH 0.670 200,000.00
Tukang Kayu L.02 OH 2.000 Err:509
Kepala Tukang L.03 OH 0.200 Err:509
Mandor L.04 OH 0.335 110,000.00
JUMLAH TENAGA KERJA
B BAHAN
Papan kayu klas II m3 0.060 5,250,000.00
Paku 1 cm - 2,5 cm kg 0.150 Err:509
JUMLAH TENAGA BAHAN
C. PERALATAN

JUMLAH TENAGA ALAT

D. Jumlah (A+B+C)
### E. Overhead & Profit 15% X D
F. Harga Satuan Pekerjaan (D+E)

6. Pemasangan 1 m3 konstruksi kuda-kuda konvensional, kayu kelas II bentang 6 meter


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp)
A. TENAGA
Pekerja L.01 OH 4.000 200,000.00
Tukang Kayu L.02 OH 12.000 Err:509
Kepala Tukang L.03 OH 1.200 Err:509
Mandor L.04 OH 0.200 110,000.00
JUMLAH TENAGA KERJA
B BAHAN
Balok kayu klas II m3 1.100 5,250,000.00
Besi strip tebal 5mm kg 15.000 14,000.00
Paku 12 cm kg 5.600 Err:509
JUMLAH TENAGA BAHAN
C. PERALATAN

JUMLAH TENAGA ALAT

D. Jumlah (A+B+C)
### E. Overhead & Profit 15% X D
F. Harga Satuan Pekerjaan (D+E)

DIV. 4.6.1 - 2
7. Pemasangan 1 m3 konstruksi gordeng, kayu kelas II
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp)
A. TENAGA
Pekerja L.01 OH 6.700 200,000.00
Tukang Kayu L.02 OH 20.100 Err:509
Kepala Tukang L.03 OH 2.010 Err:509
Mandor L.04 OH 0.335 110,000.00
JUMLAH TENAGA KERJA
B BAHAN
Balok kayu klas II m3 1.100 5,250,000.00
Besi strip tebal 5mm kg 15.000 14,000.00
Paku 12 cm kg 3.000 Err:509
JUMLAH TENAGA BAHAN
C. PERALATAN

JUMLAH TENAGA ALAT

D. Jumlah (A+B+C)
### E. Overhead & Profit 15% X D
F. Harga Satuan Pekerjaan (D+E)

8. Pemasangan 1 m2 rangka atap genteng keramik, kayu kelas III


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp)
A. TENAGA
Pekerja L.01 OH 0.100 200,000.00
Tukang Kayu L.02 OH 0.100 Err:509
Kepala Tukang L.03 OH 0.010 Err:509
Mandor L.04 OH 0.005 110,000.00
JUMLAH TENAGA KERJA
B BAHAN
Kaso 5x7 cm m3 0.014 4,000,000.00
Reng 2x3 cm m3 0.036 4,000,000.00
Paku 5 dan 10 cm kg 0.250 Err:509
JUMLAH TENAGA BAHAN
C. PERALATAN

JUMLAH TENAGA ALAT

D. Jumlah (A+B+C)
### E. Overhead & Profit 15% X D
F. Harga Satuan Pekerjaan (D+E)

9. Pemasangan 1 m2 rangka langit-langit (50x100) cm, kayu kelas III


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp)
A. TENAGA
Pekerja L.01 OH 0.150 200,000.00
Tukang Kayu L.02 OH 0.300 Err:509
Kepala Tukang L.03 OH 0.030 Err:509
Mandor L.04 OH 0.075 110,000.00
JUMLAH TENAGA KERJA
B BAHAN
Kaso 5x7 cm m3 0.0154 4,000,000.00
Paku kg 0.200 Err:509
JUMLAH TENAGA BAHAN
C. PERALATAN

JUMLAH TENAGA ALAT

D. Jumlah (A+B+C)
### E. Overhead & Profit 15% X D
F. Harga Satuan Pekerjaan (D+E)

DIV. 4.6.1 - 3
10. Pemasangan 1 m2 rangka langit-langit (60x60) cm, III
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp)
A. TENAGA
Pekerja L.01 OH 0.200 200,000.00
Tukang Kayu L.02 OH 0.300 Err:509
Kepala Tukang L.03 OH 0.030 Err:509
Mandor L.04 OH 0.010 110,000.00
JUMLAH TENAGA KERJA
B BAHAN
Kaso 5x7 cm m3 0.0163 4,000,000.00
Paku kg 0.250 Err:509
JUMLAH TENAGA BAHAN
C. PERALATAN

JUMLAH TENAGA ALAT

D. Jumlah (A+B+C)
### E. Overhead & Profit 15% X D
F. Harga Satuan Pekerjaan (D+E)

11. Pemasangan 1 m' lisplank ukuran (3x20) cm, kayu kelas II


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp)
A. TENAGA
Pekerja L.01 OH 0.100 200,000.00
Tukang Kayu L.02 OH 0.200 Err:509
Kepala Tukang L.03 OH 0.020 Err:509
Mandor L.04 OH 0.005 110,000.00
JUMLAH TENAGA KERJA
B BAHAN
Papan kayu klas II m3 0.0108 5,250,000.00
Paku kg 0.100 Err:509
JUMLAH TENAGA BAHAN
C. PERALATAN

JUMLAH TENAGA ALAT

D. Jumlah (A+B+C)
### E. Overhead & Profit 15% X D
F. Harga Satuan Pekerjaan (D+E)

12. Pemasangan 1 m' lisplank ukuran (3x30) cm, kayu kelas II


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp)
A. TENAGA
Pekerja L.01 OH 0.100 200,000.00
Tukang Kayu L.02 OH 0.200 Err:509
Kepala Tukang L.03 OH 0.020 Err:509
Mandor L.04 OH 0.005 110,000.00
JUMLAH TENAGA KERJA
B BAHAN
Papan kayu klas II m3 0.0110 5,250,000.00
Paku kg 0.050 Err:509
JUMLAH TENAGA BAHAN
C. PERALATAN

JUMLAH TENAGA ALAT

D. Jumlah (A+B+C)
### E. Overhead & Profit 15% X D
F. Harga Satuan Pekerjaan (D+E)

DIV. 4.6.1 - 4
13. Pemasangan 1 m2 rangka dinding pemisah (60x120) cm kayu kelas III
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp)
A. TENAGA
Pekerja L.01 OH 0.150 200,000.00
Tukang Kayu L.02 OH 0.450 Err:509
Kepala Tukang L.03 OH 0.045 Err:509
Mandor L.04 OH 0.008 110,000.00
JUMLAH TENAGA KERJA
B BAHAN
Balok kayu klas III m3 0.0280 4,000,000.00
Paku kg 0.150 Err:509
JUMLAH TENAGA BAHAN
C. PERALATAN

JUMLAH TENAGA ALAT

D. Jumlah (A+B+C)
### E. Overhead & Profit 15% X D
F. Harga Satuan Pekerjaan (D+E)

14. Pemasangan 1 m2 rangka dinding pemisah plywood rangkap, rangka kayu kelas III
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp)
A. TENAGA
Pekerja L.01 OH 0.028 200,000.00
Tukang Kayu L.02 OH 0.150 Err:509
Kepala Tukang L.03 OH 0.860 Err:509
Mandor L.04 OH 0.560 110,000.00
JUMLAH TENAGA KERJA
B BAHAN
Balok kayu klas III, 6x12 m3 0.0280 4,000,000.00
Paku kg 0.1500 Err:509
Plywood 4 mm, 120x240 Lembar 0.8600 Err:509
Lem kayu kg 0.560 1,000.00
JUMLAH TENAGA BAHAN
C. PERALATAN

JUMLAH TENAGA ALAT

D. Jumlah (A+B+C)
### E. Overhead & Profit 15% X D
F. Harga Satuan Pekerjaan (D+E)

15. Pemasangan 1 m2 dinding lambrisering dari papan kayu kelas II


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp)
A. TENAGA
Pekerja L.01 OH 0.600 200,000.00
Tukang Kayu L.02 OH 1.800 Err:509
Kepala Tukang L.03 OH 0.180 Err:509
Mandor L.04 OH 0.030 110,000.00
JUMLAH TENAGA KERJA
B BAHAN
Papan kayu klas II m3 0.0070 5,250,000.00
Paku kg 0.1000 Err:509
Paku skrup kg 0.1500 Err:509
JUMLAH TENAGA BAHAN
C. PERALATAN

JUMLAH TENAGA ALAT

D. Jumlah (A+B+C)
### E. Overhead & Profit 15% X D
F. Harga Satuan Pekerjaan (D+E)

DIV. 4.6.1 - 5
16. Pemasangan 1 m2 dinding lambrisering dari plywood ukuran (120x240) cm
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp)
A. TENAGA
Pekerja L.01 OH 0.025 200,000.00
Tukang Kayu L.02 OH 0.075 Err:509
Kepala Tukang L.03 OH 0.008 Err:509
Mandor L.04 OH 0.001 110,000.00
JUMLAH TENAGA KERJA
B BAHAN
Plywod 4 mm m3 0.4000 Err:509
Paku 1' dan 2,5' kg 0.0500 Err:509
JUMLAH TENAGA BAHAN
C. PERALATAN

JUMLAH TENAGA ALAT

D. Jumlah (A+B+C)
### E. Overhead & Profit 15% X D
F. Harga Satuan Pekerjaan (D+E)

17. Pemasangan 1 m' kalsiplank


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp)
A. TENAGA
Pekerja L.01 OH 0.100 200,000.00
Tukang Kayu L.02 OH 0.200 Err:509
Kepala Tukang L.03 OH 0.020 Err:509
Mandor L.04 OH 0.005 110,000.00
JUMLAH TENAGA KERJA
B BAHAN
Kalsiplank btg 0.3500 Err:509
Paku kg 0.100 Err:509
JUMLAH TENAGA BAHAN
C. PERALATAN

JUMLAH TENAGA ALAT

D. Jumlah (A+B+C)
### E. Overhead & Profit 15% X D
F. Harga Satuan Pekerjaan (D+E)
DIV. 4.6.1 - 6
Jumlah Harga (Rp)

1,200,000.00
Err:509
Err:509
33,000.00
Err:509

6,300,000.00
Err:509
1,000.00
Err:509

-
-

Err:509
Err:509
Err:509

Jumlah Harga (Rp)

200,000.00
Err:509
Err:509
5,500.00
Err:509

210,000.00
500.00
210,500.00

-
-

Err:509
Err:509
Err:509

Jumlah Harga (Rp)

160,000.00
Err:509
Err:509
4,400.00
Err:509
126,000.00
300.00
Err:509
Err:509

-
-

Err:509
Err:509
Err:509
elas III tertutup (lebar sampai 90 cm)
Jumlah Harga (Rp)

140,000.00
Err:509
Err:509
3,850.00
Err:509

112,500.00
Err:509
500.00
Err:509
Err:509

-
-

Err:509
Err:509
Err:509

Jumlah Harga (Rp)

134,000.00
Err:509
Err:509
36,850.00
Err:509

315,000.00
Err:509
Err:509

-
-

Err:509
Err:509
Err:509

kelas II bentang 6 meter


Jumlah Harga (Rp)

800,000.00
Err:509
Err:509
22,000.00
Err:509

5,775,000.00
210,000.00
Err:509
Err:509

-
-

Err:509
Err:509
Err:509
Jumlah Harga (Rp)

1,340,000.00
Err:509
Err:509
36,850.00
Err:509

1,340,000.00
Err:509
Err:509
Err:509

-
-

Err:509
Err:509
Err:509

Jumlah Harga (Rp)

20,000.00
Err:509
Err:509
550.00
Err:509

56,000.00
144,000.00
Err:509
Err:509

-
-

Err:509
Err:509
Err:509

Jumlah Harga (Rp)

30,000.00
Err:509
Err:509
8,250.00
Err:509

61,600.00
Err:509
Err:509

-
-

Err:509
Err:509
Err:509
Jumlah Harga (Rp)

40,000.00
Err:509
Err:509
1,100.00
Err:509

65,200.00
Err:509
Err:509

-
-

Err:509
Err:509
Err:509

Jumlah Harga (Rp)

20,000.00
Err:509
Err:509
550.00
Err:509

56,700.00
Err:509
Err:509

-
-

Err:509
Err:509
Err:509

Jumlah Harga (Rp)

20,000.00
Err:509
Err:509
550.00
Err:509

57,750.00
Err:509
Err:509
-
-

Err:509
Err:509
Err:509
Jumlah Harga (Rp)

30,000.00
Err:509
Err:509
880.00
Err:509

112,000.00
Err:509
Err:509

-
-

Err:509
Err:509
Err:509

rangka kayu kelas III


Jumlah Harga (Rp)

5,600.00
Err:509
Err:509
61,600.00
Err:509

112,000.00
Err:509
Err:509
560.00
Err:509

-
-

Err:509
Err:509
Err:509

Jumlah Harga (Rp)

120,000.00
Err:509
Err:509
3,300.00
Err:509

36,750.00
Err:509
Err:509
Err:509

-
-

Err:509
Err:509
Err:509
Jumlah Harga (Rp)

5,000.00
Err:509
Err:509
110.00
Err:509

Err:509
Err:509
Err:509

-
-

Err:509
Err:509
Err:509

Jumlah Harga (Rp)

20,000.00
Err:509
Err:509
550.00
Err:509

Err:509
Err:509
Err:509

-
-

Err:509
Err:509
Err:509
4.7.1 HARGA SATUAN PEKERJAAN PENGECATAN

1, 1 m2 Pengecatan bidang besi (1 lapis meni, 1 lapis cat dasar, 2 lapis cat penutup)
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.070 110,000.00 7,700.00
Tukang cat L.02 OH 0.009 130,000.00 1,170.00
Kepala tukang L.03 OH 0.006 150,000.00 900.00
Mandor L.04 OH 0.003 200,000.00 600.00
JUMLAH TENAGA KERJA 10,370.00
B BAHAN
Cat menie kg 0.200 32,900.00 6,580.00
Cat dasar kg 0.170 31,000.00 5,270.00
Cat penutup kg 0.260 46,100.00 11,986.00
Kuas bh 0.010 35,900.00 359.00
Pengencer kg 0.030 31,800.00 954.00
Amplas Lbr 0.200 8,000.00 1,600.00
JUMLAH TENAGA BAHAN 26,749.00
C. PERALATAN
-
JUMLAH TENAGA ALAT -

D. Jumlah (A+B+C) 37,119.00


### E. Overhead & Profit 15% X D 5,567.85
F. Harga Satuan Pekerjaan (D+E) 42,686.85
HARGA SATUAN PEKERJAAN INSTALASI TITIK LAMPU

1, Pemasangan 1 titik nyala Lampu


No. Uraian Kode Satuan Koefisien Harga Satuan (Rp)
A. TENAGA
Pekerja L.01 OH
Tukang L.02 OH 0.1350 130,000.00
Kepala Tukang L.03 OH 0.0135 150,000.00
Mandor L.04 OH 0.0050 200,000.00
JUMLAH TENAGA KERJA
B BAHAN
NYM 2 x 2,5 mm2 m 15.000 13,600.00
Perlengkapan ( 35% harga conduit,klem,isolasi )
JUMLAH TENAGA BAHAN
C. PERALATAN

JUMLAH TENAGA ALAT

D. Jumlah (A+B+C)
### E. Overhead & Profit 15% X D
F. Harga Satuan Pekerjaan (D+E)
Jumlah Harga (Rp)

-
17,550.00
2,025.00
1,000.00
20,575.00

204,000.00
71,400.00
275,400.00

-
-

295,975.00
44,396.25
340,371.25
LAMPIRAN SURAT SURVEY
NOMOR : /01/DISKOM
TANGGAL : 2 OKTOBER 20

PEMBANGUNAN/PENGADAAN TIANG BALIHO


UKURAN 5 M X 10 M SEBANYAK 4 UNIT

NO. URAIAN PEKERJAAN VOLUME

I PEKERJAAN PERSIAPAN

A PEMASANGAN SECARA HORIZONTAL (UNTUK 2 UNIT)

1. PEKERJAAN BESI DAN BETON

2. PEKERJAAN PENERANGAN

B PEMASANGAN SECARA VERTIKAL (UNTUK 2 UNIT)

1. PEKERJAAN BESI DAN BETON

2. PEKERJAAN PENERANGAN

II PEKERJAAN PEMBERSIHAN AKHIR

Jumlah
PPN 10%
Total

Palembang, Ok

Nama PT.C

Nama Direktur d
LAMPIRAN SURAT SURVEY
NOMOR : /01/DISKOMINFO/2019
TANGGAL : 2 OKTOBER 2019

ADAAN TIANG BALIHO


M SEBANYAK 4 UNIT

HARGA

5,700,000.00

315,600,000.00

29,500,000.00

307,300,000.00

26,000,000.00

6,000,000.00

690,100,000.00
69,010,000.00
759,110,000.00

Palembang, Oktober 2019

Nama PT.CV

Nama Direktur dan Cap


REKAPITULASI
RENCANA ANGGARAN BIAYA (RAB)
NOMOR : /01/DISKOMIN
TANGGAL : 2 OKTOBER 201
0
Err:509

NO. URAIAN PEKERJAAN

I PEKERJAAN PERSIAPAN

A PEMASANGAN SECARA HORIZONTAL (UNTUK 2 UNIT)

0 1. PEKERJAAN BESI DAN BETON

0 2. PEKERJAAN PENERANGAN

B PEMASANGAN SECARA VERTIKAL (UNTUK 2 UNIT)

0 1. PEKERJAAN BESI DAN BETON

0 2. PEKERJAAN PENERANGAN

II PEKERJAAN PEMBERSIHAN AKHIR

JUMLAH

Ppn 10 %

JUMLAH TOTAL SETELAH PAJAK


DIBULATKAN
Terbilang ( Tujuh Ratus Lima Puluh Delapan Juta Enam Ratus Enam Puluh Ribu Rupiah )

Palembang, Oktobe

Dibuat/Dihitung
Pengelola Teknis
Mengetahui Dinas Perumahan dan K
Pejabat Pelaksana Teknis Kegiatan Permukiman

MARJONI,S.Sos M. RIYANDA , ST
NIP.196403281987091001 NIP.19811020200801

Menyetujui
Plt. Kepala Dinas Komunikasi dan Informtika
Provinsi Sumatera Selata
Selaku Pengguna Anggaran

H. ACHMAD RIZWAN, SSTP.,M.M


PEMBINA TINGKAT I (IV/b)
NIP.198109232000121001
Menyetujui
Plt. Kepala Dinas Komunikasi dan Informtika
Provinsi Sumatera Selata
Selaku Pengguna Anggaran

H. ACHMAD RIZWAN, SSTP.,M.M


PEMBINA TINGKAT I (IV/b)
NIP.198109232000121001
PITULASI
GARAN BIAYA (RAB)
NOMOR : /01/DISKOMINFO/2019
TANGGAL : 2 OKTOBER 2019
0
rr:509

JUMLAH HARGA

Err:509

Err:509

Err:509

758,666,593.53
758,660,000.00

Palembang, Oktober 2019

Dibuat/Dihitung
Pengelola Teknis
Dinas Perumahan dan Kawasan
Permukiman

M. RIYANDA , ST
NIP.19811020200801001