You are on page 1of 1

Centrifuge Building observation

Pl provide uniform title block ,fonts etc in design document.Pl make the design document arrangement
legible for final submission.

1.Pl correct the title sheet as noted in place of TITLE:Numeration & RC Details of Column,Footings & Plint
Beam for 20 MLD STP Centrifuge Building at Chinnandipalayam,Tiruppur.

2.Pl check and correct the section details provided in Numeration Sheet 4. Why beams are projected
downwards?

3.Pl check plinth beam 2 corner Ast provided in design and drawing.

4.Pl add FB6,7,8 calc in design document.

5.It is recommended not to provide 8mm diameter bar as main r/f for any structural element in 20 MLD
STP.

You might also like