FA1- TWO WHELLERS / CAR / SHUTTLE BUS PARKING AREA

B2

Guard Room
8m x 2.5m
14m x 8m

3m Wide Covered Walk Way 5m Covered Wide Walk Way

18.000
FA1 WAITING HALL
22.0m x 12.0m

28.000 32.000
1.2m Wide Walkway

Shuttle Bus Pickup / Drop Green Mountain


Four Wheeler

3m Wide Walk Way


3m Wide Covered Walk Way
3m Wide Walk Way

36.000

ay
4.5m Wide Walk Way
Parking Area

W
alk
W
ide
W
9.000 9.000

5m
3.
20 Nos
HIGH MASS LIGHT

Two Wheeler Parking - Total 1242 Nos


3.5m Wide Walk Way 3.5m Wide Walk Way

LEGEND:
S.No. DESCRIPTION AREA PERCENT KEY

1) Total FA1- Parking Expansion Area 7229 Sq.m 100% -


(Two Wheeler's / Car's / Shuttle Buses)

2) Existing Floor Area to be dismantled


(RCC / PCC / GSB) for the Foundation., 754 Sq.m 10.43%
after completion and flooring to be relaid

3) Existing RCC Flooring Area to be dismantled 128 Sq.m 1.77%


(Developing Landscape Area's)
4) Existing Greenery & Walkway Area's
to be laid as flooring (RCC / PCC / GSB) 1105 Sq.m 15.275%