You are on page 1of 1

Date: 08.09.

2020

Design-Drawing Review Report – Trichi STP – Security Building

Client : Trichi City Corporation


Name of the Work : Amrut, Phase 2, Package III – 37 mld STP
Contractor : M/s Eco Protection Engineers Pvt. Ltd.
Date of Receipt : 07.09.2020
Design & Drawing : 1. Drawing Nos. 19-EPE-TCC-STP-SB-CVL-01, Rev 1
Document details 2. Document No. 19-EPE-TCC-STP-SB-CIV-01, Rev 0
Reviewed By : Shah Technical Consultants

Observations

The revised drawing. 19-EPE-TCC-STP-SB-CVL-01(R1) is in order & may be approved for construction.

Thanking you,
Yours faithfully,
For STC Ltd.

Vivek Pagnis