TITLE:
OPERATION, MAINTENANCE & CARE OF BOILERS
LECTURE ON:
OPERATION & MAINTENANCE OF CONTROL &
INSTRUMENTATION
FACULTY:
Mr. R.ANBARASU, Sr. Mgr.-C&I/FB.
PNEUMATIC CONTROL
S
AFR
~
AIR LOCK
S
PNEUMATIC CONTROL
REGULATING POWER CYLINDER
POSITION 4-20mA
TRANSMITTER
ZT 4-20mA
AIR FILTER
E/P REGULATOR
I
Positioner
~
P
AFR
AIR SUPPLY
~
AIR LOCK
PNEUMATIC CONTROL
HYDRAULIC CONTROL
ELECTRICAL CONTROL
ELECTRICAL CONTROL
ELECTRICAL CONTROL
ELECTRICAL CONTROL
ELECTRICAL CONTROL
FURNACE EXPLOSION
DIGITAL GATES
‘ON DELAY’ TIMER
‘OR’ GATE
I/P SIGNAL 1 I/P O/P
2
3 OR O/P
O/P 1
FLIP FLOP / MEMORY
‘NOT’ GATE S
I/P 1
I/P 2 R O/P 2
I/P
O/P
FURNACE SAFEGUARD SUPERVISORY SYSTEM
EMERGENCY TRIP
NO BOILER TRIP
PROGRAMMABLE LOGIC CONTROL
WHAT IS A PLC?
•PLC is short for Programmable Logic Controller. A more common
name would be industrial computer.
•It has a power supply, microprocessor chip, RAM, input / output and
com ports.
•It can sense large number of inputs and control a large number of
outputs all in a matter of milliseconds.
• The system shall have dynamic self diagnostic features and indication
for each component failure.
• Redundant central processing units(CPU).
• Redundant I/O system for critical outputs and non-redundant I/O
system for remaining I/Os.
• Engineering console with interface
• Operating console with interface.
• Communication system.
PROGRAMMABLE LOGIC CONTROL
• The CPU shall have capability to meet the following minimum
requirement.
a) Logic functions
b) Timing functions
c) Counter
d) Any other functional capabilities to perform the system
requirement.
• The communication between the sub-system shall be redundant
and with complete error checking.
• In case of redundant processors, the failure of any processor or any
other component shall not affect the operation and the other
processor shall take over the complete operation smoothly
PROGRAMMABLE LOGIC CONTROL
• On-line replacement of failed processor after rectification shall be
possible , without affecting the operation.
• Redundancy shall be provided for the complete processor system
including CPU, memory, power supply, and communication sub-
system.
• The failure of any single component shall not cause the control
system to be completely inoperative and thus ensuring total
system availability.
• The failure of a processor or any other component shall be
annunciated.The minimum requirements are:
Processor failure
Memory failure
I/O module failure
Communication link failure
Battery voltage level low.
PROGRAMMABLE LOGIC CONTROL
Steam out
Steam in
Electrode
PTFE Cable
Electronic
Cabinet
BHELMHO SWITCH
24V DC
Water out Water in
Relay output
Contacts
BHELMHO Level Switch Applications
Areas of Application in Power and Process Plants
De-aerator storage level
HP & LP Heater columns
Main boiler Drum Level
Blow down tank level
Main steam header drain
Hot and cold reheat drains
Turbine Extraction drain
Hot well alarms
Generator coolant level
Turbine casing drain
BHELSCAN BHEL make indigenous
BHELSONIC System
1 595
10
2 544
12
3 505
504
12 14
4 46.95 13
42.5
5 15
6 41.5
7 39.0
30.15 16 17
8
16.0
18
9
Pulse amplifier :
Generates and amplifies weak pulses proportional to the
volume of oil displaced thro’ the flow meter.
F to I converter :
Converts the pulse generated by the pulse generator into a
linear 4 – 20 mA current signal.
PD flow meter
Strainer
Oval wheel
Pulse F/I
meter
generator converter
4-20mA to DCS
Turn down ratio :
Alternate meter :
Since mass flow meter is very costly when compared
with the PD flow meter and the problems faced with PD flow
meter are not mainly due to the defect in the equipment but
are installation problems, PD flow meter itself shall be
envisaged for this application with incorporating the
recommended procedure.
AUTO CONTROL SYSTEM
AUTO CONTROL SYSTEM