0 KOS UPAH BURUH

4.1 TUJUAN 

Bahagian ini mengandungi maklumat berhubung dengan kos dan kadar upah
buruh.

4.2 BENTUK MAKLUMAT DAN PERTIMBANGAN

Maklumat diberikan dalam bentuk RM sehari iaitu bagi tempoh lapan jam.
Kadar ini adalah termasuk 'Site Allowances', tetapi tidak termasuk kos
pengurusan dan keuntungan ke atas Kontraktor.

39
4.0 KOS UPAH BURUH

PURATA KOS UPAH BURUH BAGI  *PURATA KOS UPAH 
BIL KETERANGAN KERJA UNIT TAHUN BURUH
2008 2009
(RM) (RM) (RM)

1 Bar Bender & Fixer Day 72.83 74.19 74.00

2 Bitumen Worker Day 60.00 ‐ 60.00

3 Bricklayer Day 80.38 86.67 84.00

4 Carpenter / Joiner Day 75.02 74.89 75.00

5 Chainman Day 88.75 110.00 99.00

6 Concretor Day 69.88 70.53 70.00

7 Concretor (Leveller / Screeder) Day 50.00 ‐ 50.00

8 Concretor & Greaser Day 92.00 88.00 90.00

9 Drainlayer Day 72.55 75.00 74.00

10 Driver (Lorry) Day 72.45 73.33 73.00

11 Driver (Roller) Day 65.00 65.00 65.00

12 Electrician Day 80.67 85.00 83.00

13 Fitter Day 76.85 78.33 78.00

14 Fitter / Mechanic Day 110.00 106.67 108.00

15 Foreman Day 87.50 100.00 94.00

16 Ganger / Chargehand (Kepala) Day 89.71 110.82 100.00

17 Labour (Blasting) Day 66.67 ‐ 67.00

18 Labour (Female) Day 47.79 51.00 50.00

19 Labour (General) Day 53.66 52.27 53.00

* Purata Keseluruhan (rounded up) yang ditetapkan 40
4.0 KOS UPAH BURUH

PURATA KOS UPAH BURUH BAGI  *PURATA KOS UPAH 
BIL KETERANGAN KERJA UNIT TAHUN BURUH
2008 2009
(RM) (RM) (RM)

20 Labour (Male) Day 51.91 80.00 66.00

21 Labour (Skilled) Day 86.00 90.50 88.00

22 Labour (Piling) Day 60.00 ‐ 60.00

23 Mason Day 70.97 72.37 72.00

24 Metal Worker Day 77.67 81.76 80.00

25 Operator (Blasting) Day 112.86 ‐ 113.00

26 Operator (Crane) Day 120.00 120.00 120.00

27 Operator (Heavy Plant) Day 85.17 92.00 89.00

28 Operator (Light Plant) Day 73.25 76.00 75.00

29 Operator (Machine) Day 64.00 ‐ 64.00

30 Operator (Major Plant) Day 85.00 ‐ 85.00

31 Operator (Pneumatic Tool) Day 80.74 78.89 80.00

32 Operator (Portable Compactor) Day 85.00 ‐ 85.00

33 Operator / Attendant (Compresor /  Day 55.00 ‐ 55.00


Pump)

34 Operator / Driver (Plant / Excavator) Day 81.43 85.67 84.00

35 Painter Day 76.07 81.25 79.00

36 Pavior / Plasterer Day 75.41 75.71 76.00

37 Piling Foreman Day 158.33 200.00 179.00

* Purata Keseluruhan (rounded up) yang ditetapkan 41
4.0 KOS UPAH BURUH

PURATA KOS UPAH BURUH BAGI  *PURATA KOS UPAH 
BIL KETERANGAN KERJA UNIT TAHUN BURUH
2008 2009
(RM) (RM) (RM)

38 Piling Rigger Day 82.00 ‐ 82.00

39 Piling Serang Day 65.00 ‐ 65.00

40 Piling Operator Day 119.00 140.00 130.00

41 Pipelayer Day 70.00 75.00 73.00

42 Plant / Crane Operator Day 80.00 80.00 80.00

43 Plasterer / Painter Day 85.00 ‐ 85.00

44 Plumber Day 89.17 86.67 88.00

45 Pneumatic Driller Day 80.00 ‐ 80.00

46 Rigger / Driller Day 84.10 86.50 85.00

47 Soil Investigation Supervisor Day 125.00 140.00 133.00

48 Steel Worker Day 71.50 70.00 71.00

49 Surveyor Day 148.00 200.00 174.00

50 Watchman Day 57.88 57.25 58.00

51 Welder Day 86.91 87.5 87.00

52 Welder / Oxy‐Acetylene Cutter Day 78.33 80.00 79.00

* Purata Keseluruhan (rounded up) yang ditetapkan 42