Professional Documents
Culture Documents
OFFER - 152x43
OFFER - 152x43
SUBJECT PAGE #
1. Index 1
2. Introduction 2
3. Scope of Supply 3
6. Construction Price 5
7. Terms of Payment 5
8. Certified Builders 5
KAM/WIN/R0/26032019
WINNTRA PEB AND ROOFING SYSTEMS PVT. LIMITED.
(Authorised Manufacturer of Kamdhenu PEB under licence User Agreement)
S-43, Phase-1, Badli Industrial Area Delhi- 110042 (INDIA)
Date- 26th Mar’ 2019
Subject: Technical and commercial specifications for design, supply and construction of PRE
ENGINEERING BUILDING for your site.
Dear Sir,
We thank you for the enquiry and are pleased to submit our proposal for the supply and erection of Pre-
engineered building system at above referred job site.
WINNTRA’s proposal is in accordance with the building/s layout, overall dimensions and design loads given in
your enquiry. Our scope of work covers the design, fabrication and supply of materials in accordance with the
enclosed standards and specifications of WINNTRA PEB & ROOFING SYSTEMS., unless otherwise stated.
This proposal is indexed for easy reference and includes scope of supply, building description and design
loads /criteria, standard product specifications and standard conditions of sale.
We assure you of our best attention and look forward to your favorable response at the earliest.
Sincerely yours,
1. Scope of Supply:
Building Parameters:
2.1 Deflections
Main Frame
Vertical : L/180
Lateral : H/100
Purlins / Girts : Span /150
Mezzanine Beam : Span /240
Values in INR
Price Break UP
Taxes:
5. Payment Terms:
Payment shall be as follows:
6. Certified Builders
For unloading of building components at site and erection of the same, Winntra Peb And Roofing Systems
building shall depute highly experienced and skilled force of erectors and cladding contractors approved by
WPEBRS.
Winntra Peb and Roofing Systems shall ensure that the Certified Builder undertakes execution as per
Winntra Peb and Roofing Systems norms.
Winntra Peb and Roofing Systems CONSTRUCTION Manager shall make periodic visits to site to ensure the
same.
1. Proposal Validity:
This proposal is valid for (15) days from the date of this proposal. Any extension of validity must be received in
writing from Winntra Peb and Roofing Systems the SELLER.
2. Erection Drawings:
Winntra Peb and Roofing Systems, the SELLER will furnish the BUYER with all standard erection drawings
required for the erection of the buildings. The SELLER will also furnish the BUYER with Anchor Bolts setting
plans and columns base reactions.
3. Specification Changes:
SELLER reserve the right to modify the design of his standard buildings and to substitute material equal to or
superior to that originally specified (in order to permit incorporation of changes and improvements, in the
continued development of the SELLER's product).
4. Cancellation:
Agreement and orders CANNOT be cancelled or modified by BUYER under any circumstances without
BUYER first reaching an agreement in writing with SELLER covering all damages. If cancellation or
modification is agreed to by SELLER, BUYER agrees to promptly pay all reasonable engineering and other
expenses incurred by SELLER in connection with this Agreement and in any case not less than 5 % of the
Agreement price in case of cancellation.
6. Shipment:
That portion of this order that is not shipped within THREE months from date of Contract / Purchase Order will
be subject to a price increase in accordance with new current prices posted at the end of the above noted time
period unless a longer delivery period is mutually agreed by SELLER and BUYER. Unloading at jobsite is the
responsibility of the BUYER / BUILDER.
7. Variation of orders:
Any change and / or revision to the above stated scope of supply MAY lead to a variation in the price and the
delivery period.
8. Force Majeure:
SELLER shall not be liable for any loss or damage to BUYER for delay in delivery or cancellation of any
Purchaser's Orders by SELLER due to circumstances beyond SELLER's control, such as, but not limited to,
war, riots, civil commotion, revolution, government regulations, orders, or acts of any government authority
directly or indirectly interfering with or rendering more burdensome the production or delivery of the products,
floods, fires, delays due to transporter’s strike and any other circumstance or event beyond SELLER's control.
9. Permits:
SELLER shall not be responsible or liable for the obtaining of permits to erect or install any product.
11. Exclusions:
SELLER supply does not include any material or labor in connection with foundations, concrete, setting of
anchor bolts, grouting under columns or in recess around bottom of wall sheets, electrical installations,
plumbing, finished painting, heating, masonry, interior finishing, partitions, glass and glazing or any item not
shown in Approval Drawings, roof fans unless specifically mentioned in this Agreement. All surplus material/
scrap including template, wooden planks/ packaging items, if any left out at site, is our material and will be
taken by us unconditionally without any commercial benefit to customer. Unloading and storage of anchor
bolts are in customer scope.
12. Warranty:
Winntra Peb and Roofing Systems products are warranted against failure due to defective material or
workmanship for a period of one year after shipment.
Authorized Signatory
(With Acceptance)