Chiller Plant

This document compares the capital costs, operating costs, and life cycle costs of a water cooled centrifugal chiller system versus an air cooled screw chiller system for cooling a 3,800 ton building. The water cooled system has a total investment of Rs. 21.37 crores with annual operating costs of Rs. 11.56 crores, while the air cooled system has a total investment of Rs. 19.77 crores but higher annual operating costs of Rs. 17.48 crores. Over the 15-20 year lifetime of the technologies, the water cooled system saves Rs. 1.60 crores in initial investment costs and Rs. 5.92 crores in energy costs compared to the air cooled system.

Uploaded by

KOTESH
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
955 views1 page

Chiller Plant

This document compares the capital costs, operating costs, and life cycle costs of a water cooled centrifugal chiller system versus an air cooled screw chiller system for cooling a 3,800 ton building. The water cooled system has a total investment of Rs. 21.37 crores with annual operating costs of Rs. 11.56 crores, while the air cooled system has a total investment of Rs. 19.77 crores but higher annual operating costs of Rs. 17.48 crores. Over the 15-20 year lifetime of the technologies, the water cooled system saves Rs. 1.60 crores in initial investment costs and Rs. 5.92 crores in energy costs compared to the air cooled system.

Uploaded by

KOTESH
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd

CAPITAL AND OPERATING COST ANALYSIS + LIFE CYCLE COST ANALYSIS

SR. NO DESCRIPTION Chilled water system

SYSTEM Water cooled centrifugal chiller Air cooled screw chiller

A BASIS Units 4 10

B INVESTMENT ON HVAC WORKS

High Efficiency Water cooled


1 Cooling Technology High efficiency air cooled chiller
chiller

2 Configuration - 3800 TR 3800 TR 3800 TR

3 Capital Investment in Highside Rs/TR 33000 40000

4 Capital Investment in Lowside Rs/TR 15000 12000

5 Total Highside on HVAC of Buildings Rs/TR 48000 52000

6 TOTAL INVESTMENT ON HVAC WORKS FOR BUILDINGS RS. LACS 1824.00 1976.00

Water consumption Rs.Lacs 275.00 0.56

Make Up Water Requirement per year Rs.Lacs 37.50 0.01

D TOTAL INVESTMNET (PLANT ROOM + ELECTRICALS) RS. CRORES 21.37 19.77

E OPERATING COSTS WORKINGS

1 Actual TR 100% 3800 TR 3800 TR

2 Energy Consumption for Chillers Annual Ikw/TR 0.7 1.25

3 Energy Consumption for Pumps & Cooling Towers per TR Ikw/TR 0.1 0

4 Total KW / HR for Entire Plant Room KW / HR 3040 4750

5 Operating Hours per Annum - 20 Hours & 270 days Hrs. 5400 5400

6 Power Cost Rs/Kwh 6 6

7 Total Energy Cost for Electricity RS. LACS 984.96 1,539.00

8 Total MD Charges - CAMC chargs per year for entire system RS. LACS 171.00 209.00

9 Total Operating Cost per ANNUM RS. CRORES 11.56 17.48

G LIFE OF THE TECHNOLOGY 15 to 20 years 15 to 20 years

J TOTAL INVESTMENT RS. CRORES 21.37 19.77

TOTAL ENERGY COST PER YEAR RS. CRORES 11.56 17.48

SAVING IN INITIAL INVESTMENT Water Vs Air cooled screw chiller RS. CRORES -1.60 1.60

SAVINGS IN ENERGY COST Water cool Vs Air cool chiller RS. CRORES 5.92 NA

SAVINGS IN Water cool Chiller per year RS. CRORES 4.32 NA

CAPITAL AND OPERATING COST ANALYSIS + LIFE CYCLE COST ANALYSIS
SR. NO
DESCRIPTION
 Chilled water system 
SYSTEM
Water cooled