Professional Documents
Culture Documents
James Kimery
Director of Marketing
ni.com
Mission Statement
ni.com/5g
$1.29
OPERATIONS IN BILLION 35,000+ 16%
50+ COUNTRIES IN 2017 CUSTOMERS WORLDWIDE INVESTMENT IN R&D
$1,400
$1,200
$600
$400
$200
$0
'77 '78 '79 '80 '81 '82 '83 '84 '85 '86 '87 '88 '89 '90 '91 '92 '93 '94 '95 '96 '97 '98 '99 '00 '01 '02 '03 '04 '05 '06 '07 '08 '09 '10 '11 '12 '13 '14 '15 '16 '17
ONE-PLATFORM APPROACH
NI SERVICES AND SUPPORT
Community Support
THIRD-PARTY HARDWARE
THIRD-PARTY SOFTWARE
300,000+ Online Members 700+ Field Engineers
450+ User Groups NI PRODUCTIVE 700+ Support Engineers
9,000+ Code Examples DEVELOPMENT SOFTWARE 50+ Worldwide Offices
NI ECOSYSTEM
NI ECOSYSTEM
Academia Add-Ons
8,000+ Classrooms Worldwide 500+ Software Add-Ons
6M+ Tools Network Downloads
D/A 0
90
D/A
CPU FPGA
GPP DSP
A/D
0
A/D 90
PLL
Host Connection Baseband
VCO
Determines Streaming Converters
Bandwidth Ex. Gigabit
E-net, PCIe
ni.com
Wireless Lead User Program Research Areas
Massive MIMO mmWave Multi Radio Access Wireless Networks
Technologies (RAT)
ni.com | NI CONFIDENTIAL 9
SDR Platform Based Approach for 5G
Bristol: Spectrum Efficiency Record Verizon 5GTF
BT Field Trials 5G NR
1st 100 antenna
Massive MIMO
ni.com/5g
DARPA Spectrum Challenge
“Designing a test bed as massive in scale as Colosseum from scratch would have required several years
of engineering time. Simply put, the alternatives to using NI’s off-the-shelf software radio tools presented
too much risk and cost.”
—Paul Tilghman , Program Manager, DARPA Spectrum Collaboration Challenge
ni.com
Platforms for Enabling Advanced Wireless Research (PAWR)
Four “At Scale” Test Beds Planned for 4 different sites in the US- over $400M
ni.com | NI CONFIDENTIAL 16
5G NR
ni.com/5g
RP-180649
5G Timeline 3GPP TSG-RAN#80
2017
2017 2018
2018 2019
2019 2020
Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1
Rel-16
freeze
Rel-16
ASN.1
18
© 3GPP 2018 <RP-180504 NR Architecture Options 4 and 7 Analysis>
5G NR – New Generation of Standards
64-antenna
phased arrays
Beamsteering
28 / 39 GHz Interface
Horizontal
polarization mmWave TRX Head
28 / 39 GHz
mmWave TRX Head with
horn antenna
Vertical polarization
UE Interface with video 2x2 BB/IF
streaming Chassis
Fsdaklf;
EPC
eNodeB gNodeB
user
control
ni.com | NI CONFIDENTIAL 20
gNodeB Architecture for Option 3/3a/3x
IP
Data
Switch
5G NR Opt 3/3a/3x
NAS
LTE anchor
RRC RRC
RRC coordination
PDCP PDCP
Control Plane
User Plane
User Plane
RLC RLC
MAC MAC
PHY PHY
RF Front End RF Front End
LTE 5G NR
ni.com | NI CONFIDENTIAL 21
Splitting the User and Control Plane
• 5G proposes:
• Flexible numerologies, frame structure and TDD architectures
• Distribution control and intelligence
• Multiple RAT and coexistence
• PHY prototypes abstract control exploration – develop only “part” of the system
user plane
Internet
SGW PGW Service
MME
control plane
EPC
Edge computing
ni.com | NI CONFIDENTIAL 25
IIoT For Cellular
What is the E2E Latency?
Virtual Network
Edge computing
ni.com | NI CONFIDENTIAL 26
5G NR Numerology – PHY Latency
Controlle
Process
r
Feedbac
k
1 10
0
1 Latency Considerations for the PHY
… • Slot duration and relationship between SCS
2
• Self Contained Subframes
• HARQ – ack / nack
Symbol
SCS Slot Duration
Duration (us) Each slot can be UL or DL. TTI based on symbol
15 kHz 1000 us 71.43 timing and slot assignment.
30 kHz 500 us 33.33 Multi-RAT capability provides the
60 kHz 250 us 17.86 framework for lower latency
120 kHz
ni.com 125 us
| NI CONFIDENTIAL 8.93 27
IIoT For Cellular
What is the E2E Latency?
Edge computing
Latency is important
But the control topology may be more important
E2E latency is the round trip time
ni.com | NI CONFIDENTIAL 28
5G Research Evolution – A Platform Approach
Smart Network Smart
Applications V2X
Cities Optimization Factories
Augmented
Satellite
IoT Reality
Machine
5G NR MAC Learning
Implementatio
n
5G NR PHY AI
Technologies
ni.com | NI CONFIDENTIAL 30
www.ni.com/5g
www.ni.com/sdr
NI CONFIDENTIAL