You are on page 1of 1

Client: Consulting Engineer: Contractor:

JABATAN BEKALAN AIR LUAR BANDAR, SARAWAK G&P PROFESSIONALS (SARAWAK) SDN BHD BWS ENGINEERING SDN BHD
Project : THE PROPOSED MIRI WATER SUPPLY SOURCE DEVELOPMENT PHASE 2, MIRI DIVISION Contract No. : JBALB/HQ/K040/2019
SUMMARY OF PILE DRIVING (updated as of …....... / …....... / …....... )
General Location : - ☐ Site 1 - Btg Baram Intake | ☐ Site 2 - Bakong Intake | ☐ Site 3 - Pipe Route 1 (Btg Baram to Sg Karap) | ☐ Site 4 - Pipe Route 2 (Sg Karap to Sg Bakong)
Specific Location : CH0+100 to 434.663 Type of Pile : R.C. Square Pile Size of Pile : 250mm x 250mm
Item Total Supplied Length No. of
Date Driven Location / Chainage Gridline Ref. No. No. of Driven Piles Cut-off Level (m) Remarks
No. (m) Joints
B-RHS 24 4 6.17 3
CH0+175
A-LHS 24 4 6.17 3
CH0+178 A-LHS 24 4 6.177 3
8 18/11/2019
B-RHS 24 4 6.177 3
CH0+187
A-LHS 24 4 6.177 3
CH0+196 B-RHS 24 4 6.225 3
CH0+196 A-LHS 24 4 6.225 3
B-RHS 24 4 6.249 3
CH0+205
A-LHS 24 4 6.249 3
9 19/11/2019 B-RHS 24 4 6.272 3
CH0+214
A-LHS 24 4 6.272 3
B-RHS 24 4 6.28 3
CH0+217
A-LHS 24 4 6.28 3
B-RHS 24 4 6.303 3
CH0+226
A-LHS 24 4 6.303 3
B-RHS 24 4 6.327 3
10 20/11/2019 CH0+235
A-LHS 24 4 6.327 3
B-RHS 24 4 6.351 3
CH0+244
A-LHS 24 4 6.351 3
B-RHS 24 4 6.375 3
CH0+253
A-LHS 24 4 6.375 3
B-RHS 24 4 6.382 3
11 21/11/2019 CH0+256
A-LHS 24 4 6.382 3
B-RHS 24 4 6.406 3
CH0+265
A-LHS 24 4 6.406 3
B-RHS 24 4 6.43 3
CH0+274
12 22/11/2019 A-LHS 24 4 6.43 3
CH0+283 B-RHS 24 4 6.454 3
MWSP2-QAC/CS/004(a)
Page 1 of 1 Rev. 01