Dear Sir,
Sincerely,
Table of Contents
1 Introduction of PRDC...................................................................................................................... 1
2 Relevant Project Expereince .......................................................................................................... 3
3 Scope of Work ................................................................................................................................ 5
4 Approach & Methodology .............................................................................................................. 6
5 Proposed Team Members ............................................................................................................ 13
6 Time Frame & Deliverables .......................................................................................................... 14
7 Responsibilities of M/S IMP ......................................................................................................... 15
8 Price Schedule .............................................................................................................................. 16
9 Invoicing ....................................................................................................................................... 17
10 Payment-Terms ............................................................................................................................ 17
11 Taxes, Duties, other levies............................................................................................................ 17
12 Validity of the bid ......................................................................................................................... 17
13 Payment Mode and Bankers details ............................................................................................ 17
14 Acknowledgement ....................................................................................................................... 18
1 Introduction of PRDC
Power Research & Development Consultant Pvt Ltd (PRDC) an ISO 9001:2015 QMS certified
25 year old company. PRDC is one of the largest professional power systems consulting
service firm with seasoned power system experts having diverse experience. Core
competence of PRDC is in the area of power system consulting, power system analysis,
design and analysis, design & development of complete solutions for SCADA, Industrial
Automation & engineering simulation software and embedded system solutions.
PRDC’s global expertise enables it to provide multi-disciplinary services in power sector with
wide range of experience in Electrical utilities throughout the world. PRDC has worked on
various projects funded by international agencies like The World Bank, USAID, Japan
International Cooperation Agency (JICA) and Asian Development Bank (ADB). Area of
geographical operation is wide spread with varied socio-economic and cultural background.
This includes advanced countries like United Kingdom, France, Canada, Japan, Australia,
Switzerland, UAE and Qatar. At the same time PRDC has experience in working with
developing countries like Ghana, Senegal, Tanzania, Sudan, Sri Lanka, Indonesia, Mangolia,
Maldives, Fiji Islands etc. PRDC has resources with in-depth expertise in providing the
services to the Utilities and Industries.
PRDC has provided its services to many of the electricity utilities for analysis, study and
simulation of T&D network. PRDC has software division besides power system division to
cater to the internal and external needs. MiPower® – Flagship software product for Power
systems Analysis and Simulation is developed by PRDC and owns the complete IPR of the
same. There are other products for protection system database management (MiProtect™),
fully automated and integration fault analysis system (MiAFAS™), power distribution system
management system (MiPDAP™), hydro-thermal scheduling software (MiHTC™) and many
other products developed and owned by PRDC
PRDC is engaged with Electrical utilities Worldwide like Bhutan Power Corporation, National
Electricity Corporation Sudan, Zimbabwe Electricity Corporation, Barrick Gold Mines of
Tanzania, Saudi Electric Company, Qatar General Electricity & Water Corporation, Abu
Dhabi Water and Electricity Company, Electricity Authority of Indonesia, Power Grid
Corporation of India Ltd, almost all of the Indian power utilities such as HVPNL, KPTCL, CSEB,
TNEB, GRIDCO, RRVPNL, ASEB, WBSEB, GETCO, APSEB, MSETCL, PTUCL and other utilities
since many years for providing the power system consultancy services in the field of
Network planning, design and analysis.
PRDC has provided power system study services to many Electricity generation & Supply
utilities and private industries a few of them are listed below:
PRDC has also provided consultancy services directly to Power Regulatory Commissions like
Central Electricity Regulatory Commission (CERC), OERC, KERC and MERC in India.
PRDC is empanelled by Ministry of Power (PFC), Govt of India, for providing consultancy
services in system studies / planning / development/ implementation / operation in the
areas of Generation, Transmission and Distribution of electricity.
PRDC s specialized in training and capacity building in the utility and academic / research
sector. Following are some of the programs conducted by PRDC:
Power system protection training to Saudi Electric Company
Power System simulation and Analysis training for Engineers of Electricity
Compnay of Ghana (ECG) and National Electricity Corporation of Sudan.
DOP training conducted at Thimpu and Bangalore
BPC training conducted at Bangalore
Training on Wide Area Monitoring Systems (WAMS) to MSECTLs
Workshop conducted on Power system over voltage & Mitigation
Workshop on Intra State ABT& ABT mechanism for Distribution Company
Training conducted for Power Grid Engineers at Bangalore
Induction Program for Probationary AEEs of Mangalore Electricity Company.
Hundreds of training programs are conducted on power system for various
Industries, state electricity boards and academic institutions throughout the
world.
With this experience in the power utility sector and having handled diverse customers
across the globe, we strongly believe that PRDC has all qualities and expertise required in
executing this assignment
Consultancy Services for Conducting Root Cause Analysis for Transformer Failure for
DMRCL.
Consultancy Services for Study of Reactive Power Compensation in DMRC Network.
Consultancy services for carrying out Transformer failure analysis of 315 MVA,
400/220/33 Kv ICT at DTL, Bawana Substation, New Delhi for EMCO India Ltd
Consultancy Services for Failure analysis of dry-type transformer in wind farm for
M/s Gamesa Renewable Private Limited.
Power System Studies consisting for Load Flow Studies, Short Circuit Studies,
Transient Stability studies, Harmonic Analysis including Flicker measurement for
Aarti Steels Limited, Cuttack.
Power System Studies for 6.3 MTPA Vizag Steel Plant, RINL
Power System Studies for 6 MTPA Integrated Steel Plant Project at Kalinganagar,
Orissa for Tata Steel Ltd.
Power evacuation and system studies of proposed 2X150 MW + 2X330 MW power
project for Aarti Steels Ltd, Cuttack
Relay Coordination and PSS 3MT (Phase 1) integrated iron steel plant, M/s Bhushan
Steel Ltd, Orissa
Power System Studies for the proposed 2x660MW CPP at Godda, Jharkhand for
Jindal Power Ltd
Power system expansion study for Jindal Steel and Power Limited, Raigarh
2x250 MW System expansion studies for Jindal Tractebel Power Plant at Toranagallu
1x100 MW Power System Expansion Study for Jindal South West Power Private
Limited
Power System System in 220kV Network (4X135) Power evacuation study to CSEB
Grid for Jindal Steel & Power Ltd
Power System Studies for Bhilai Steel Plant, SAIL
Power System Studies for M/s. Visvesvaraya Iron and Steel Ltd. (VISL), a subsidiary of
Steel Authority of India Limited (SAIL)
Power system network study of NSPCL's 2x250MW power plant(PP-3) and BSP's
network for Bhilai Steel Plant, Bhilai
Page 3 of 18 Power Research & Development Consultants Pvt. Ltd.
#5, 11th Cross, 2nd Stage, West of Chord Road, Bangalore- 560 086
Telephone: +91-80-424 555 55 / 23192209, Fax: +91-80- 424 555 55 / 2319 2210
Website: www.prdcinfotech.com, info@prdcinfotech.com
Techno-Commerical Offer
Power System study for 7MTPA Expansion for JSW Steel Ltd
System studies for providing power supply to the integrated steel plant proposed to
be set up by AMIL near Ranchi, Jharkhand with 6 MTPA capacity in the initial stage
and 12 MTPA capacity in the final stage for M.N. Dastur & Company (P) Ltd
Power system studies for proposed 6.0 MTPA Steel Plant of JSPL at Angul in Orissa
Relay coordination Study for the 5.6MTPA Bhusan Steel Plant and Training on
LFA,SCS, RCD Modules for Bhushan Steel Limited
Insulation Coordination Study for 12261 9020 King Abdullah FC / Clemens Hogger
PSSS-P2 submitted to ABB, Switzerland
Over Voltage & Insulation Coordination study including switching over voltage
studies for Circuit Breakers, Earthing Switches and Isolaters for 380kV GIS at 9018
Substation for National Contracting Co. Ltd, Saudi Arabia
Consultancy Services for Power System Study, Relay Co-ordination &
Recommendation of Relay Setting for 2x270MW MPSTPP near Jamshedpur in the
state of Jharkhand.
Insulation Coordination & Ferro Resonance Study for Al-Kharj-2 380/132kV BSP
(#9028) Substation for Middle East Engineering Consulting, Egypt.
Consultancy Services for carrying out Power System Studies for Over Voltage Studies
and Insulation Coordination Studies for National Contracting Co. Ltd, Saudi Arabia
Over Voltage and insulation coordination study including all related studies / analysis
of PTS-09CN308 for the new 380/132/13.8kV GIS at Substation # 9017 Khashm Al.
Ann along with the study of requirement of surge arrestors on the neutral side of
132kV Bus Shunt reactors for National Contracting Co. Ltd. Kingdom of Saudi Arabia
Insulation Coordination Study Reinforcement of Juaymah 115 kV Substation for Al-
Fadhili
Over-voltage & Insulation Coordination Study Construction of New 115/13.8 kV Al –
Fursan Sub-station
Over Voltage & Insulation Coordination Study of 115kV Al-Masoudi Substation
Over-voltage & Insulation Coordination Study Construction of H.I.E 115/13.8 kV Sub-
station-2 (DG-108)
Insulation Coordination Study of Qadisiyyah 115 kV Sub-station
Over-voltage & Insulation Coordination Study Construction of New 115/13.8 kV
Saihat Sub-station
Over Voltage & Insulation Co-ordination for Al-Qaishi for ALFANAR, Saudi Arabia
Over Voltage & Insulation Co-ordination for HIE Substation for ALFANAR, Saudi
Arabia
Over Voltage & Insulation Co-ordination for SAIHATSubstation for ALFANAR, Saudi
Arabia
3 Scope of Work
i. To collect all relevant data of the 220/33 kV GIS HVPNL substation from
M/s IMP Powers Limited, based on the requirement of power system studies using
MiPower® Software.
ii. To conduct load flow study to bring out the real (MW) and reactive (MVAR) power
flows, bus voltage profile.
iii. To conduct short circuit studies to determine the 3-phase and single line to ground
faults currents in order to evaluate the breaker rating sufficiency.
iv. Protection review of transformers, busbars, overhead lines to determine and cross
check the existing relay settings & to suggest setting changes as required so that
same can be incorporated in the substation.
v. To check the possibility of occurrence of overvoltages at the transformer terminal
due to the external disturbances/lightning surges and also to check the adequacy
and location of surge arresters, the following studies will be conducted.
vi. Review of disturbance recorder files and event logs to analyse the provided DR
events.
Collection of relevant data of the 220/33kV GIS HVPNL Substation. The data
collection will be based on the requirement of studies.
All data pertaining to power system elements will be collected in prescribed
data formats.
The power system network will be modeled in “MiPower®” based on collected
data.
The study will bring out the real (MW) and reactive (MVAR) power flows and
bus voltage profiles and system losses.
Load flow studies are conducted to determine the voltage profile in the plant
for minimum and maximum voltage conditions of the Grid to arrive at adequate
tap positions for the transformers, real and reactive power losses and to
determine the reactive power compensation requirements.
The following parameters shall be determined for each of the short circuit studies:
Protection analysis and co-ordination study will be carried out for the electrical
power system.
Protection studies will calculate and predict the protection system response
from the inception of each fault to the complete cessation of the fault current
including both relay and circuit breaker tripping.
The relay co-ordination studies are conducted to determine and cross check the
existing relay settings and the type of relays.
Review of unit protection / individual protection settings (Transformer, busbar).
Sequence of powering up of substations in phases and any change in relay
coordination.
The changes in the settings as required will be indicated by PRDC so that same
can be incorporated for better co-ordination protection.
613kVp
881kVp
Sl. Years of
Name Designation Proposed Position
No. Experience
Sl. Years of
Name Designation Proposed Position
No. Experience
** Time Frame may vary depending on receipt of comments on reports and timely receipt
of payment
8 Price Schedule
T. Guru Charan Das
GM – PSS
October 24, 2019
Mr. P.K.Mishra
Vice President (Design)
IMP Powers Ltd.
Survey: 263/3/2/2, 264/1/2,
Village Sayli, Umerkuin Rd,
Silvassa - 396230, UT of D&N.H, India
Dear Sir,
*All the above quoted price is Exclusive of all the applicable Taxes & Duties. The same will be charged at
actuals at the time of billing. At present, GST@18% is applicable for technical consultancy services.
Please Note:
1. All the estimations are done based on the drawings & data provided.If any change in the data our
prices will vary accordingly
Thanking you,
Sincerely,
9 Invoicing
PRDC shall be entitled to transmit invoices electronically such as email, fax, internet etc. The
client agrees explicitly to accept invoices transmitted electronically and process it.
10 Payment-Terms
The following are the payment terms applicable for the consultancy services:
This quote does not include any withholding taxes or tax deducted at source that may be
applicable elsewhere. If any such taxes are applicable, it should be compensated by M/s IMP
Or a valid certificate ascertaining the deduction shall be arranged by M/s. IMP within 15
days of deduction.
Beneficiary's Account Name Power Research & Development Consultants Pvt. Ltd.
Power Research & Development Consultants
Beneficiary's Address
Pvt. Ltd.
#5, 11th Cross, West of Chord Road, II Stage,
Bangalore - 560086
Karnataka, INDIA
14 Acknowledgement
All the terms and conditions are presumed to be thoroughly read, understood and
acknowledged by the client and would be abided by both the parties unless there is any
change explicitly documented in writing dated later to the issuance of this document.