Professional Documents
Culture Documents
Page 1 of 10
Utkarsh India Limited
1. Scope
This standard Covers the requirement for zinc coating applied by hot dip
galvanizing on mild steel .
2. Procedure
Page 2 of 10
Utkarsh India Limited
f) Maintain temperature is ambient
g) Material Immersion time 7 to 10 min.
h) Degreasing solution parameter checking on regular basis.
i) Degreasing chemical filtering time after 3000 MT production
C. Acid Pickling
k) Check the assay and Sp. Gravity of raw hydrochloric acid on lot
basis.
l) Minimum production 450 MT. maximum production 550 MT.
m) Acid Discard in 5 % and transfer to ETP
Page 3 of 10
Utkarsh India Limited
Page 4 of 10
Utkarsh India Limited
D. Rinsing Water
Water rinsing is in two tanks
A. Rinsing water Tank 1
B. Rinsing water Tank 2
a. Rinsing Water Tank1
a) Tank size – (12500 X 1200 X 1250) mm
b) Chemical volume -13000 ltr.
c) Chemical preparation- 100 % R.O water or Raw water
d) Rinsing water must be filled from bottom portion and reject
water must be drain by overflow
e) Maintain the pH of water 3 to 5
f) Maintain temperature is ambient
g) Material Immersion time 1 to 2 min
h) Rinse water drain in pH below 3 and transfer to ETP
b. Rising Water Tank 2
a) Tank size – (12500 X 1200 X 1250) mm
b) Chemical volume -13000 ltr.
c) Chemical preparation- 100 % R.O water or Raw water
d) Rinsing water must be filled from bottom portion and reject
water must be drain by overflow
e) Maintain the pH of water 5 to 6
f) Maintain temperature is ambient
g) Material Immersion time 1 to 2 min
h) Rinse water drain in pH below 3 and transfer to ETP
Page 5 of 10
Utkarsh India Limited
E. Flux Solution
Page 6 of 10
Utkarsh India Limited
F. Drying Process
G. Zinc Bath
H. Quenching process
Page 7 of 10
Utkarsh India Limited
d) Quenching water must be filled through bottom portion and
excess overflowing water transfer to cooling tower.
e) Maintain temperature is up to 60oC by using of cooling
tower.
f) Material Immersion time 2 to 5 min (as per volume of
material) to cool down the materials
g) Tank must be cleaned on weekly basis.
h) Maintain TDS of Quenching water up to 500 ppm
(maximum) to protect the material from white rust, look ,pill
up of the zinc coating etc.
I. Passivation Process
Page 8 of 10
Utkarsh India Limited
c) Chemical preparation- Add 1.5 to 2 % Passivation
solution in D.M water
d) Maintain temperature is up to 30 to 50oC
e) Material Immersion time 1 to 2 min (as per volume of
material)
f) Maintain pH is 5 to 7
g) Tank must be cleaned on monthly basis.
h) Material used Lighting mast, lighting post and crash
barrier etc. .
i) Passivation solution parameter checking on regular basis.
j) Check the assay or Sp. Gravity pH of raw passivator
solution on lot basis
1. Furnace Oil
2. Zinc ingot
3. Lead
4. Zinc alloy
5. Nickel
6. Degreaser
7. Hydrochloride Acid
8. Raw Water
9. D.M water
10. Acid inhibitor
11. Ammonium Chloride
12. Zinc Chloride
13. Liq. Ammonia
14. Glycerin
15. Hydrogen per oxide
16. Potassium permanganate
17. Passivator solution
By product in galvanizing
1. Zinc dross
2. Zinc ash
Page 10 of 10