ECONOMIC CONTRACT
Party A:
Address:
Tax code:
Represented by:
Party B:
Address:
Tax code:
Represented by:
After discussing the two parties have mutually agreed to enter into this
contract with the terms as follows:
Payment method:
Payment of 35% of contract value right after signing the contract and Party
B receives a valid financial invoice of Party A.
Payment of 55% of the contract value immediately after Party A has
completed 300 frames at 100 locations and Party B receives the checking
reports as stated in Article II and the financial invoice of Party B.
The remaining (10%) will be paid after the expiration of mounting frames
for advertising framed pictures products of Party B
Article II: Responsibilities and powers of Party A
- Negotiating and installing the advertising frame pictures at the locations
that Party B has chosen (the list is enclosed in the contract appendix).
- Ensure construction time is 20 days since Party B selects the location
and approves the maquette.
- Report time after construction is 01 week from the date of completion of
construction.
- Prepare checking reports and send it to Party B right after completing
the construction of 100 locations. This report includes acceptance minutes
and photos of each advertising frame after being installed at each location.
- Ensure that the time limit for attached photo frames is 6 months from the
date of acceptance.
- Check the frame once a month to clean, clean, and check the presence
of advertising frames pictures
- Make sure that all frames at display locations are always in neatly and
clean situation during display time.
- During the validity of contract, if Party B find that Party A let advertising
frames in absent and broken situations at any 100 display locations, Party
A must have responsibility to fix, replace the new frames within 4 days
since Party B’s announcement. In case after 7-day-working, Party A hasn’t
fixed or replaced them, Party A will pay a fine which is equivalent 3 times
of frames price when Party A receives announcement.
- Party A should be responsible to replace new frames at new place in
case the old place meets the irresistible incidents.
- Have rights to full payment according to the agreed payment method.
Article III: Party B’s Responsibilities and Powers
- Settle for Party A full payment on time as mentioned in Article I
- Provide correctly advertising pictures for A to work and ensure that the
provided pictures don’t go backward of legal and social ethics.
- Construction acceptance:
Acceptance content: products obtain specifications as agreed at
Article I and meet the locations of Party B’ requirements.