TECHNICAL SPECIFICATION
INSTRUMENTATION
MGS-S-REF-I-30
Rev 1.00.00
This document is property of MOL Group. The use is only allowed with the written permission of MOL Group.
SLOVNAFT a.s. MGS-S-REF-I-30
R&M Division
TECHNICAL SPECIFICATION - INSTRUMENTATION Rev.: 1.00.00
30 Sample documentation of detail engineering documents for Date: 19.09.2011
instrumentation
Page/Pages: 2/4
Release list
Rev. Date Description Edited Verified Approved
0.00.01 12.12.2008 Updated
This document is property of MOL Group. The use is only allowed with the written permission of MOL Group.
SLOVNAFT a.s. MGS-S-REF-I-30
R&M Division
Contents
BOOK BREAKDOWN
Descriptions Identifier Rev.:
Sample documentation of detail engineering MGS-S-REF-I-30 1.00.00
documents for instrumentation
List of Contents, Declaration & Preamble Sheets of MGS-S-REF-I-30.1 1.00.00
Engineering Statement
Technical Description & Erection Instructions MGS-S-REF-I-30.2 1.00.00
Piping & Instrumentation (P&I) Diagrams MGS-S-REF-I-30.3 1.00.00
Summary Datasheet for Instrumentation (Schedule) MGS-S-REF-I-30.4 1.00.00
System Configuration Diagram of Instrumentation MGS-S-REF-I-30.5 1.00.00
Logic Diagrams MGS-S-REF-I-30.6 1.00.00
Shut-Down & Alarm Set-Points MGS-S-REF-I-30.7 1.00.00
Logic Narrative MGS-S-REF-I-30.8 1.00.00
Instrument Specifications MGS-S-REF-I-30.9 1.00.00
Temperature Measuring Instruments MGS-S-REF-I-30.9.1 1.00.00
Pressure Measuring Instruments MGS-S-REF-I-30.9.2 1.00.00
Grounding Diagram for Instrumentation System MGS-S-REF-I-30.10 1.00.00
Equipment Specifications MGS-S-REF-I-30.11 1.00.00
Specification of Erection Materials (cables, junction boxes) MGS-S-REF-I-30.12 1.00.00
Junction box specification MGS-S-REF-I-30.12.1 1.00.00
Instrument cable specification MGS-S-REF-I-30.12.2 1.00.00
List of Erection Materials MGS-S-REF-I-30.13 1.00.00
Loop Drawings MGS-S-REF-I-30.14 1.00.00
Cabling Diagrams MGS-S-REF-I-30.15 1.00.00
Cable Schedule MGS-S-REF-I-30.16 1.00.00
Wiring Diagrams MGS-S-REF-I-30.17 1.00.00
Control Room Layout & Cable Routing MGS-S-REF-I-30.18 1.00.00
Field Layout Drawings & Routings MGS-S-REF-I-30.19 1.00.00
Power Supply for Instrumentation MGS-S-REF-I-30.20 1.00.00
Hook-up Drawings MGS-S-REF-I-30.21 1.00.00
Instrument Air Supply MGS-S-REF-I-30.22 1.00.00
Instrumentation/Electric Interface MGS-S-REF-I-30.23 1.00.00
List of Process & Utility Connections MGS-S-REF-I-30.24 1.00.00
ICS I/O Assignment, ICS I/O List MGS-S-REF-I-30.25 1.00.00
Software Configuration Data Supply MGS-S-REF-I-30.26 1.00.00
Non-priced Requisition for Cost Estimation MGS-S-REF-I-30.27 1.00.00
MOL Group
TECHNICAL SPECIFICATION
INSTRUMENTATION
MGS-S-REF-I-30.1
Rev 1.00.00
This document is property of MOL Group. The use is only allowed with the written permission of MOL Group.
SLOVNAFT a.s. MGS-S-REF-I-30.1
R&M Division
TECHNICAL SPECIFICATION - INSTRUMENTATION Rev.: 1.00.00
30 Sample documentation of detail engineering documents for Date: 19.09.2011
instrumentation
1 List of Contents, Declaration & Preamble Sheets of Page/Pages: 2/5
Engineering Statement
Release list
This document is property of MOL Group. The use is only allowed with the written permission of MOL Group.
SLOVNAFT a.s. MGS-S-REF-I-30.1
R&M Division
Contents
ENGINEERING STATEMENT
Based on Rule No. 12/1986 (XI1.30.) EVM issued by the Ministry for the Building
Industry and Rule No. 9/1977 (V1.6.) NIM issued by the Ministry of Heavy Industry we
state that during the detail engineering work for
During detail design we followed the valid authority requirements and standards, and
deviations from these did not occur.
No exception from standard specifications and request for permissions for deviation
were necessary during the detail engineering work.
The technical solutions applied for the designed facility comply with the respective
regulations, codes and standards and rules referred to in the documentation.
.............................................. ..................................................
NAME NAME
Senior design engineer Checked by
Chamber of Engineers ID: CoE ID.:
BOOK BREAKDOWN
Descriptions Identifier Rev.:
Sample documentation of detail engineering documents for instrumentationMGS-S-REF-I-30 1.00.00
List of Contents, Declaration & Preamble Sheets of Engineering Statement MGS-S-REF-I-30.1 1.00.00
Technical Description & Erection Instructions MGS-S-REF-I-30.2 1.00.00
Piping & Instrumentation (P&I) Diagrams MGS-S-REF-I-30.3 1.00.00
Summary Datasheet for Instrumentation (Schedule) MGS-S-REF-I-30.4 1.00.00
System Configuration Diagram of Instrumentation MGS-S-REF-I-30.5 1.00.00
Logic Diagrams MGS-S-REF-I-30.6 1.00.00
Shut-Down & Alarm Set-Points MGS-S-REF-I-30.7 1.00.00
Logic Narrative MGS-S-REF-I-30.8 1.00.00
Instrument Specifications MGS-S-REF-I-30.9 1.00.00
Temperature Measuring Instruments MGS-S-REF-I-30.9.1 1.00.00
Pressure measuring Instruments MGS-S-REF-I-30.9.2 1.00.00
Grounding Diagram for Instrumentation System MGS-S-REF-I-30.10 1.00.00
Equipment Specifications MGS-S-REF-I-30.11 1.00.00
Specification of Erection Materials (cables, junction boxes) MGS-S-REF-I-30.12 1.00.00
Junction box specification MGS-S-REF-I-30.12.1 1.00.00
Instrument cable specification MGS-S-REF-I-30.12.2 1.00.00
List of Erection Materials MGS-S-REF-I-30.13 1.00.00
Loop Drawings MGS-S-REF-I-30.14 1.00.00
Cabling Diagrams MGS-S-REF-I-30.15 1.00.00
Cable Schedule MGS-S-REF-I-30.16 1.00.00
Wiring Diagrams MGS-S-REF-I-30.17 1.00.00
Control Room Layout & Cable Routing MGS-S-REF-I-30.18 1.00.00
Field Layout Drawings & Routings MGS-S-REF-I-30.19 1.00.00
Power Supply for Instrumentation MGS-S-REF-I-30.20 1.00.00
Hook-up Drawings MGS-S-REF-I-30.21 1.00.00
Instrument Air Supply MGS-S-REF-I-30.22 1.00.00
Instrumentation/Electric Interface MGS-S-REF-I-30.23 1.00.00
List of Process & Utility Connections MGS-S-REF-I-30.24 1.00.00
ICS I/O Assignment, ICS I/O List MGS-S-REF-I-30.25 1.00.00
Software Configuration Data Supply MGS-S-REF-I-30.26 1.00.00
Non-priced Requisition for Cost Estimation MGS-S-REF-I-30.27 1.00.00
MOL Group
TECHNICAL SPECIFICATION
INSTRUMENTATION
MGS-S-REF-I-30.2
Rev 1.00.00
This document is property of MOL Group. The use is only allowed with the written permission of MOL Group.
SLOVNAFT a.s. MGS-S-REF-I-30.2
R&M Division
TECHNICAL SPECIFICATION - INSTRUMENTATION Rev.: 1.00.00
30 Sample documentation of detail engineering documents for Date: 19.09.2011
instrumentation
2 Technical Description & Erection Instructions Page/Pages: 2/8
Release list
This document is property of MOL Group. The use is only allowed with the written permission of MOL Group.
SLOVNAFT a.s. MGS-S-REF-I-30.2
R&M Division
Contents
Technical description
1. Background:
This Engineering Documentation has been prepared on the basis of ……………
Project Number: ….
2. Documentation Contents
The objective of the documentation is to set forth the realization of control & operating functions (by DCS) for …
MOL Group … from Control Rooms.
Tag Number:
- limit value alarms - warning alarms, repeated signals of non-ESD such as:
- motor running signals
- limit value software alarms generated from analogue signals
- pre-alarms for ESD alarms
- ESD alarms:
These actuate ESD operations, such as the high-high level alarm …
6. Control System
…
7. Power Supply
230 VAC uninterrupted power will be supplied for DCS Cabinet C01 to be installed in Control Room…
Above power supplies are provided by newly procured 24VDC UPS and 230VAC UPS equipment to be installed in
Substation … (as part of the electric system)…
8. Grounding System
All the grounding busbars (one each for shock-protection, cable armouring and shielding) of the equipment
installed in Control Room are connected to one single point which is the common point (star point) of the electric
system…
Cable armouring have to be connected to structural steel elements in the field and to a grounding busbar in the
control room. Cable shields must be grounded only at one end in the control room. Cable shields have to be
connected to grounding busbar "cable shielding"…
All metal structures and equipment in the control building must be connected to the protective ground network. New
cable trays entering the control building must also be connected to the protective ground network…
Ground busbar "cable shielding" must be installed with proper insulation to separate it from other metal
structures…
Grounding lines are single-core stranded wires, wires are to be be commoned with crimped wire-clips…
9. Equipment's
…
Layout and cable routing design for Control Rooms … and … are considered existing in this documentation…
Cabling between Control Room and the Electric Substation is included in the Electric Documentation…
Single-line power supply diagrams and cable routings for the electric heat tracing of transmitters are contained in
the electric documentation…
Motorised valves marked with asterisks under Section 1.3.1 perform ESD functions as well upon tank high-high
level alarms. ESD motorised valves are connected to the field-bus by means of junction boxes installed adjacent to
these valves…
Cables are laid in closed galvanised cable trays. Galvanised TLX rails and 1" galvanised conduits are specified for
cable support near instruments…
1. Environmental Conditions
2. Standards
2. …..
3. …..
MOL Group
TECHNICAL SPECIFICATION
INSTRUMENTATION
MGS-S-REF-I-30.3
Rev 1.00.00
This document is property of MOL Group. The use is only allowed with the written permission of MOL Group.
SLOVNAFT a.s. MGS-S-REF-I-30.3
R&M Division
TECHNICAL SPECIFICATION - INSTRUMENTATION Rev.: 1.00.00
30 Sample documentation of detail engineering documents for Date: 19.09.2011
instrumentation
3 Piping & Instrumentation (P&I) Diagrams Page/Pages: 2/6
Release list
This document is property of MOL Group. The use is only allowed with the written permission of MOL Group.
SLOVNAFT a.s. MGS-S-REF-I-30.3
R&M Division
Contents
MGS-S-REF-I-30.3-4.dwg 4/6 -
Drwg. No. Sheet Cont.
MGS-S-REF-I-30.3-5.dwg 5/6 -
Drwg. No. Sheet Cont.
MGS-S-REF-I-30.3-6.dwg 6/6 -
SLOVNAFT a.s.
R&M Division
MOL Group
TECHNICAL SPECIFICATION
INSTRUMENTATION
MGS-S-REF-I-30.4
Rev 1.00.00
This document is property of MOL Group. The use is only allowed with the written permission of MOL Group.
SLOVNAFT a.s. MGS-S-REF-I-30.4
R&M Division
TECHNICAL SPECIFICATION - INSTRUMENTATION Rev.: 1.00.00
30 Sample documentation of detail engineering documents for Date: 19.09.2011
instrumentation
4 Summary Datasheet for Instrumentation (Schedule) Page/Pages: 2/4
Release list
This document is property of MOL Group. The use is only allowed with the written permission of MOL Group.
SLOVNAFT a.s. MGS-S-REF-I-30.4
R&M Division
Contents
- - - - - - - - - - - -
1 TI-001 x, y j. Heaters natural gas temperature natural gas ED-004 001 002
2 TE 001 Temperature sensor w. well, Pt100 SP/01 E EEx i F
3 TT 001 Temperature transmitter SP/02 E EEx i F 015
4 TXI 001 Intrinsic safety power supply E [EEx i] MC
5 TT 001 DCS analog input DCS
6 TI 001 DCS indication DCS
7
8 TIAHH-002, TZH-002 x j. Heater flue gas outlet temperature high flue gas ED-004 002 002
9 TE 002 Temperature sensor w. well, Pt100 SP/01 E EEx i F 020
10 TXI 002 Intrinsic safety power supply E [EEx i] MC
11 TT 002 FSC analog red. fail-saife input E FSC
12 TI 002 DCS indication DCS
13 TAHH 002 DCS max. alarm DCS
14 TZH 002 Interlock alarm (1oo2 voting) DCS 001
15
16 PICAH-003 x j. Heater fuel oil pressure control ED-004 001
17 PT 003 Pressure transmitter SP/03 E EExi F fuel oil 031 001 003 021 existing
18 PXI 003 Intrinsic safety power supply E EExi C
19 PT 003 DCS AI-R E DCS
20 PIC 003 Control DCS
21 PV 003 DCS AO-R DCS
22 PXO 003 Intrinsic safety isolating driver E EExi C
23 PY 003 Positioner SP/06 E/Pn EExi F 003 006
24 PV 003 Control valve 3-way Pn F 031 003 existing
SLOVNAFT a.s.
R&M Division
MOL Group
TECHNICAL SPECIFICATION
INSTRUMENTATION
MGS-S-REF-I-30.5
Rev 1.00.00
This document is property of MOL Group. The use is only allowed with the written permission of MOL Group.
SLOVNAFT a.s. MGS-S-REF-I-30.5
R&M Division
TECHNICAL SPECIFICATION - INSTRUMENTATION Rev.: 1.00.00
30 Sample documentation of detail engineering documents for Date: 19.09.2011
instrumentation
5 System Configuration Diagram of Instrumentation Page/Pages: 2/4
Release list
This document is property of MOL Group. The use is only allowed with the written permission of MOL Group.
SLOVNAFT a.s. MGS-S-REF-I-30.5
R&M Division
Contents
CS3000 Engineering
ATM
Ethernet Ethernet
HUB
T T
E net
T T
E net Vnet/IP Open / E net
router
Vnet/ Vnet/IP
ACG134 ACG132
router
VNet/IP
switch
V net V net
T T
Vnet/IP opto
BEK-4, REF-4 Ref 100
BEK-2, RH
V net opto
V net opto
RIO
FO link
CTBC CUNB MODBUS
T T T T
Vnet /IP
V net opto
V net opto
MODBUS
MODBUS
MODBUS
SCS0503 SCS0504 SCS0505 FCS0102 SCS0115 SCS0116 FCS0112 FCS0103
FCS0502
102 kem.+process 109 kem. 310-I, 310-IV kompr.
BEK-3
RIO
RED. MODBUS
CFBE CTBC
RED. MODBUS
RED. MODBUS
FCS0106
RED. MODBUS
RED. MODBUS
RED. MODBUS
FCS0110 SCS0118 SCS0119 FCS0109 FCS0111
RED. MODBUS
FO link
H-2 Water PPA
SLOVNAFT a.s.
R&M Division
MOL Group
TECHNICAL SPECIFICATION
INSTRUMENTATION
6. Logic Diagrams
MGS-S-REF-I-30.6
Rev 1.00.00
This document is property of MOL Group. The use is only allowed with the written permission of MOL Group.
SLOVNAFT a.s. MGS-S-REF-I-30.6
R&M Division
TECHNICAL SPECIFICATION - INSTRUMENTATION Rev.: 1.00.00
30 Sample documentation of detail engineering documents for Date: 19.09.2011
instrumentation
6 Logic Diagrams Page/Pages: 2/3
Release list
Rev. Date Description Edited Verified Approved
0.00.01 12.12.2008 Updated
This document is property of MOL Group. The use is only allowed with the written permission of MOL Group.
SLOVNAFT a.s. MGS-S-REF-I-30.6
R&M Division
Contents
MOL Group
TECHNICAL SPECIFICATION
INSTRUMENTATION
MGS-S-REF-I-30.7
Rev 1.00.00
This document is property of MOL Group. The use is only allowed with the written permission of MOL Group.
SLOVNAFT a.s. MGS-S-REF-I-30.7
R&M Division
TECHNICAL SPECIFICATION - INSTRUMENTATION Rev.: 1.00.00
30 Sample documentation of detail engineering documents for Date: 19.09.2011
instrumentation
7 Shut-Down & Alarm Set-Points Page/Pages: 2/5
Release list
This document is property of MOL Group. The use is only allowed with the written permission of MOL Group.
SLOVNAFT a.s. MGS-S-REF-I-30.7
R&M Division
Contents
1. Time delay for trip of ESD reseted state from the C310-IV compr. T1/353 40 min.
permission to start activation (if the compr. have not been started)
2. P441 crankcase oil pump prelube time T1/355 120 sec
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
Note: .
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
Note:
MOL Group
TECHNICAL SPECIFICATION
INSTRUMENTATION
8. Logic Narrative
MGS-S-REF-I-30.8
Rev 1.00.00
This document is property of MOL Group. The use is only allowed with the written permission of MOL Group.
SLOVNAFT a.s. MGS-S-REF-I-30.8
R&M Division
TECHNICAL SPECIFICATION - INSTRUMENTATION Rev.: 1.00.00
30 Sample documentation of detail engineering documents for Date: 19.09.2011
instrumentation
8 Logic Narrative Page/Pages: 2/5
Release list
This document is property of MOL Group. The use is only allowed with the written permission of MOL Group.
SLOVNAFT a.s. MGS-S-REF-I-30.8
R&M Division
Contents
Logic Narrative
1.1. Start conditions of the Nr. yyy compressor main motor
(Logic diagram Nr.: 005 sheet Logic group number: XIS-yy)
Note: - The extension letter "A" in tag numbers means: I/O is on local board,
"B" means: I/O is on main board or on DCS in control room.
- If no stated otherwise, for the listing of I/O’s, the Tag numbers of the DCS are used!
- Paaa or Pbbb cooling water pump run signal activated; XNA aaaB/bbbB
- Pre-heating run time of cooling water pump elapsed: XKAH aaa
Conditions:
Paaa or Pbbb cooling water pump run signal activated; XNA aaaB/bbbB
Nr. yyyy compressor cooling water supply temperature not low; XTALL nnn
Pre-heating run timer (T1/004) elapsed XKAH aaa
Note: The Pre-heating run timer elapsed signal can be overriden
by POS switch: XKSH aaa_POS
- Nr. yyyy compressor cooling water supply temp. not low; XTALL nnn
- Nr. yyyy compressor permission to start activated (ESD reseted): XHAH yyyB
- Nr. yyyy compressor purge gas inlet pressure not low; XPALL nnn
- Nr. yyyy compressor cooling water inlet pressure not low; XPALL nnn
- Nr. yyyy compressor crankcase lube oil level not low; XLZL nnn
- Pccc crankcase lube oil pump electric failure not activated; XEAH cccB
- Nr. yyyy compressor main motor electric failure not activated; XEAH yyyB
- Minimum 1 off cooling water pump electric failure not activated; XEAH aaaB/bbbB
- Nr. yyyy compressor crankcase lube oil temperature not low; XTALL nnn
- Minimum 1 of cooling water pump is in remote mode; XHSX aaa/bbb
- Nr. yyyy compressor 0% load selected signal is active; XJA0 yyyB
- Nr. yyyy compressor main motor not run; XNA yyyB
- Nr. yyyy compressor main motor restart blocking time (T2/004) elapsed; XKAH yyyB
(after compr. stop)
When the above conditions have been met, the;
”Nr. yyyy compressor start and ESD condítions OK”
signal will activate on the DCS; XXAHH yyyB
and on the local panel; XXAHH yyyA
1.2. Nr. yyyy compressor main motor start/stop 0
(Logic diagram Nr.: 006 sheet Logic group number: XIS-yyy)
1.2.1 Conditions for the main motor start:
- Nr. yyyy compressor start and ESD condítions OK; XXAHH yyyB
- Nr. yyyy compressor permission to start” (ESD reseted) signal active; XHAH yyyB
- Nr. yyyy compressor prelube is completed; XKAHH ccc
Conditions:
Pccc crankcase oil pump prelube time (T1/005) elapsed; XKAH ccc
Pccc crankcase oil pressure not low; XPZL nnn
OR
Nr. yyyy compressor post-lube is in progress; XKXH ccc
Pccc crankcase oil pressure not low-low; XPZL_nnn
- Nr. yyyy compr. main motor stop push button (from LB) is not activated; XHSL yyyA
- Nr. yyyy compr. main motor stop push button (from MCR) is not activated; XHSL yyyB
When the above conditions have been met, the;
”Nr. yyyy compressor main motor ready to start”
signal will activate on the DCS; XXAH yyyB
and on the local panel; XXAH yyyA
MOL Group
TECHNICAL SPECIFICATION
INSTRUMENTATION
9. Instrument Specifications
9.1. Temperature Measuring Instruments
MGS-S-REF-I-30.9.1
Rev 1.00.00
This document is property of MOL Group. The use is only allowed with the written permission of MOL Group.
SLOVNAFT a.s. MGS-S-REF-I-30.9.1
R&M Division
TECHNICAL SPECIFICATION - INSTRUMENTATION Rev.: 1.00.00
30 Sample documentation of detail engineering documents for Date: 19.09.2011
instrumentation
9 Instrument Specifications Page/Pages: 2/9
9.1 Temperature Measuring Instruments
Release list
Rev. Date Description Edited Verified Approved
0.00.01 12.12.2008 Updated
This document is property of MOL Group. The use is only allowed with the written permission of MOL Group.
SLOVNAFT a.s. MGS-S-REF-I-30.9.1
R&M Division
Contents
Required documentations:............................................................................................................................................4
Temperature measuring instruments............................................................................................................................5
1. General: ................................................................................................................................................................5
1.1 Deviations: ....................................................................................................................................................5
1.2 Protection:.....................................................................................................................................................5
1.3 Accuracy: ......................................................................................................................................................5
1.4 Governing Codes & Standards:....................................................................................................................5
2. Technical requirements ........................................................................................................................................5
2.1 Thermo wells ................................................................................................................................................6
2.2 Sensors.........................................................................................................................................................6
2.3 Head .............................................................................................................................................................6
2.4 Other .............................................................................................................................................................7
2.5 Temperature transmitters .............................................................................................................................7
2.6 Local thermometers ......................................................................................................................................7
2.7 Temperature switches ..................................................................................................................................8
2.8 Nameplates...................................................................................................................................................8
Required documentations:
1. Manufacturer’s certificate (with the model & serial number and the main data of instrument) (or according
to ISO 9001:2000).
2. Manual with contents according to IEC 278. Manual to contain also the following:
- Cross sectional drawings with list of parts.
- List of special tools.
- Electrical scheme, wiring diagrams.
3. The bid documentation shall include the following drawings:
Outline drawing with overall dimensions, type of connections, materials, rating.
11. Certificate of the construction materials for wetted parts. (EN 10204 3. 1B)
12. Confirmation of communication with FIMS version for smart instruments using HART protocol.
13. Certification of conformance with the requirements of Foundation Fieldbus standard. (IEC61158-2)
16. Certification according to IEC61508 (MTBF – Main Time Between Failure, DC – Diagnostic Coverage,
etc.).
1.1 Deviations:
Project Specifications may contain differences from or modifications of the requirements set forth herein.
Any deviations from the contents of this specification and project specifications shall be permitted only
with the written authorisation of MOL Group.
The specified materials shall be in accordance with the pipe class specification system, standards and
requirements of the project.
1.2 Protection:
The explosion-proof and IP protection of the instruments shall meet the requirements of Section (MGS-S-
REF-I-4),“Site Conditions and Required Protection Classes”.
1.3 Accuracy:
The accuracy of electronic analog temperature transmitters shall be 0.5% of calibrated span and includes
the effects of repeatability, hysteresis, and linearity. The accuracy of other temperature instruments shall
be at least 1%, except for local thermometers where the class accuracy shall be at least 2%.
The accuracy of Digital, micro-processor based temperature transmitters:
Digital accuracy < ± 0.28°C for RTDs and < ± 0.55°C for thermocouples.
Digital to Analog conversion accuracy for mA outputs shall be less than ± 0.05% of calibrated span.
Combined digital accuracy for a 28 °C change in ambient temperature < ± 0.55 °C for RTDs and < ±
1.1 °C for thermocouples.
Transmitter output shall be linear with temperature.
2. Technical requirements
1. The instruments installed shall conform to all mechanical and process requirements.
2. The signal ranges applied shall correspond to the requirements set forth in Section MGS-S-REF-I-
4, “Signal ranges, measuring ranges, scale data, accuracy requirements”.
3. The instrument shall conform to the requirements and specifications set by hazardous area
classification of the particular location.
2.2 Sensors
1. Up to 450°C operating temperature, for the purpose of temperature measuring and control functions
Platinum 100 resistance temperature detector (RTD) shall be used, in a four-wire system if possible.
2. In the case of Platinum 100 resistance temperature detector accuracy class “B” shall be usually
applied, except for custody measurements, where accuracy class “A” sensors shall be used.
3. Above 450°C operating temperatures thermocouples shall be used. Within a particular facility the
same type of thermocouples shall be used, unless prohibited by technical reasons.
4. The use of “K” type (Ni-Cr-Ni) thermocouples shall be preferred against other types, if there is no
technical reason against it.
5. In respect of design thermocouples shall be ungrounded, encased and hot junction type.
6. Tension-type sensors can be used as local temperature indicators and as sensors of local
temperature controllers.
7. Each thermocouple and RTD applied in control loop shall be dual element. The second one serves
as a spare Sensor for control shall not be used other service.
2.3 Head
1. The connection head and the cable gland shall provide protection against environmental effects and
in the case of intrinsically safe devices its enclosure shall be at least IP 65.
2. The connection head shall be robust mechanical construction.
3. For armoured cables double sealing cable gland shall be used that provides for grounding the
armouring of the cable to the instrument case and grips both the outside insulation of the cable and
the insulation inside the armour.
4. The Temperature sensor shall be connected by screw terminals secured against loosening.
5. The connection head shall be made of metal, and its cover shall be chained to the head.
6. The extension between the thermo well and the head shall make it possible to insulate the process
line or the equipment, and shall have a nipple-union-nipple connection.
2.4 Other
1. For the signal transmission of resistance temperature detectors cables with solid copper conductors
shall be used. The cross-section of conductors shall be selected according to the distances and the
2
instruments used, but shall not be less than 1.5 mm .
2. Three-wire resistance temperature detectors eventually used shall be connected to signal processing
devices with continuous cables.
3. Cable of four-wire resistance temperature detectors shall not be interrupted in field junction boxes.
4. The signal cables of the resistance temperature detectors shall correspond to the general
prescriptions of cables.
5. For the transmission of the signals of thermocouples, two-pair or multi-pair extension cables shall be
used.
6. In the erection of cables for thermocouples efforts shall be made to minimise the number of
interruption points. In general, no more interruption points shall be installed other than one indoors
input-marshalling cabinet and one outdoors terminal box.
7. The cables of the temperature sensors shall be twisted pairs or quad, armoured for mechanical
protection and shielded against interference.
8. Instrument head shall be connected to the equipotential earth system of the unit.
9. The use of capillary tubes shall be avoided. Where their use is necessary, flexible, stainless steel
PVC coated capillary tube shall be employed, with their length selected as required, but not shorter
than 1.5 m.
10. In the selection of the place of installation of temperature detectors ease of access and checking
shall be taken into consideration.
11. The design of temperature sensors shall provide resistance against harmful environmental vibrations.
Resistance temperature detectors shall be spring-loaded.
12. If allowed by operating conditions (temperature, vibration, etc.) head-mounted or temperature
transmitters adjacent to the sensor may be used.
2.8 Nameplates
Durable nameplates shall be provided for all temperature sensors (transmitters, switches), mounted in a
manner ensuring good readability during operation even with insulated installations.
Nameplates shall contain at least the following information:
name of the manufacturer
model number and serial number of the temperature sensor
protection/enclosure symbol
size and pressure rating of process connection
measuring range of temperature sensor
ID number (tag number) of temperature sensor
set-point in the case of temperature switches
Resistant Thermometer w. well and transmitter Rev Date Designer Date: 19.09.2011.
1 Function Area Class. Temperature measuring Zone 1 IIC T4 Rev.:
2 Manufacturer *
3 Model *
4 Enclosure min. IP 65
GENERAL 5 Explosion Proof For Use in IS System EEx ia IIC T4
6 Transient Protector None
7 See secondary Instrument Specification
8 Ambient Temperature -25...+45 °C
9
10 Element Type Accuracy class Pt100 (IEC 751) Class "B"
11 Element Material Leads Platinum By Manufacturer
ELEMENT 12 Outer sheet material 304 SST
13 Wire connection 1 x 4 wire Terminal Block with Spring
14 Element number Single
15 Well construction Material Drilled, Tapered 316 SST
16 Dimensions Wall thickness Diameter 26,5 /18 mm min. 6,5 mm
17 End Connection & Rating DN 50 Flanged See below
WELL 18 Spacer connection Size to well 1/2" NPT M
19 Fitting Configuration Lenght Nipple-Union-Nipple max. 130 mm (T)
20 Design range: °C See below bar-g See below
21
22 Head Material Cast Alloy
23 Construction See figure 1 Screwd Cover & Chain.
HEAD
24 Connection to the spacer 1/2" NPT F
25 Grounding connection Inside and outside too
26 Conduit Connection 1/2" NPT with Cable gland**
27
28 Manufacturer Model * *
29 Location Range In head See below
30 Power Supply 12...30V DC, Loop powered
31 Output Signal Communication 4...20 mA HART
32 Signal out characteristic Linear
33 at increased input signal Output signal is increasing
TRANSMITTER
34 Failure mode alarm None
35 Output Gage None
36 Accuracy < 0,5% of span
37 Turn Down Ratio 100:1 -
38 Local Span With HART
39 Stability -
40 Conduit Connection for signal In head
41
42 Complete Assembly Yes
OTHER
43 Vibration DIN EN 60751.4
44 Accessories SST Tag plate
45
Notes:
DN50 NPT1/2"
*: to be defined by vendor.
**: Double compression type cable gland
Operating
Pipe end
Design
Design
height
lenght
Well
MOL Group
TECHNICAL SPECIFICATION
INSTRUMENTATION
9. Instrument Specifications
9.2 Pressure Measuring Instruments
MGS-S-REF-I-30.9.2
Rev 1.00.00
This document is property of MOL Group. The use is only allowed with the written permission of MOL Group.
SLOVNAFT a.s. MGS-S-REF-I-30.9.2
R&M Division
TECHNICAL SPECIFICATION - INSTRUMENTATION Rev.: 1.00.00
30 Sample documentation of detail engineering documents for Date: 19.09.2011
instrumentation
9 Instrument Specifications Page/Pages: 2/11
9.2 Pressure Measuring Instruments
Release list
Rev. Date Description Edited Verified Approved
0.00.01 12.12.2008 Updated
This document is property of MOL Group. The use is only allowed with the written permission of MOL Group.
SLOVNAFT a.s. MGS-S-REF-I-30.9.2
R&M Division
Contents
Required documentations:............................................................................................................................................4
Pressure measuring instruments..................................................................................................................................5
1 General: ................................................................................................................................................................5
1.1 Deviations: ....................................................................................................................................................5
1.2 Protection:.....................................................................................................................................................5
1.3 Accuracy: ......................................................................................................................................................5
1.4 Applicable codes & standards: .....................................................................................................................5
2 Technical requirements ........................................................................................................................................6
2.1 Local Pressure Gauges ................................................................................................................................7
2.2 Pressure switches.........................................................................................................................................8
2.3 Local Pressure Controllers ...........................................................................................................................8
2.4 Nameplate.....................................................................................................................................................8
Required documentations:
1. Manufacturer’s certificate (with the model & serial number and the main data of instrument) (or according
to ISO 9001:2000).
2. Manual with contents according to IEC 278. Manual to contain also the following:
- Cross sectional drawings with list of parts.
- List of special tools.
- Electrical scheme, wiring diagrams.
11. Certificate of the construction materials for wetted parts. (EN 10204 3. 1B)
12. Confirmation of communication with FIMS version for smart instruments using HART protocol.
13. Certification of conformance with the requirements of Foundation Fieldbus standard. (IEC61158-2)
16. Certification according to IEC61508 (MTBF – Main Time Between Failure, DC – Diagnostic Coverage,
etc.).
1 General:
The present specification describes the basic design requirements regarding pressure measuring
instruments installed in production facilities.
1.1 Deviations:
Project Specifications may contain differences from or modifications of this requirements.
Any deviations from the contents of this specification and project specifications are subject to written
authorisation by MOL Group.
The specified materials shall be in accordance with the pipe class specification system, standards and
requirements of the project.
1.2 Protection:
The explosion-proof and IP protection of the instrument shall meet the requirements of Section (MGS-S-
REF-I-4), “Site conditions and specified protection classes”.
1.3 Accuracy:
The reference accuracy of the measuring instrument shall be less than ±0.15% of span.
Combined pressure and temperature effects (Total Performance) better than ±1.0%. of Span for a 28°C
temperature change, up to 70 barg.
Stability with relation to the measuring range and at least for 24 months shall be better than ±0.2%.
1.4 Applicable codes & standards:
acc. to appendix MGS-S-REF-I-4_2 items: 236, 237, 238
2 Technical requirements
1. The instruments installed shall conform to all mechanical and process requirements.
2. The signal ranges applied shall correspond to the requirements set forth in Section MGS-S-REF-I-4,
“Signal range, measuring range, scale data, accuracy requirements”.
3. The instrument shall conform to the requirements and specifications set by hazardous area
classification.
4. Pressure sensor elements shall be provided with overload protection keeping the shift of the
calibrated instrument scale within 0.5% at overpressures equal to minimum 1.3 times the upper
range limit or, in the case of vacuum measurement, at full vacuum regardless of range limits.
5. For pressure (absolute, gauge and diff. pressure) transmitters, the transmitter body shall have a
static pressure rating of 100 barg or 150% of the sensor upper range limit (URL) at the operating
temperature, whichever is greater.
6. Pressure and diff. pressure transmitters shall have a response time of 500 milliseconds or less.
7. Transmitters shall have an update rate at least as fast as below.
Pressure, Diff. pressure and flow (DP) measuring 125 msec*
Level (DP) 500 msec*
The table is based upon a transmitter up-date rate at least twice as fast as the proportional, integral,
derivative (PID) controller algorithm execution rate.
* Faster update rate/response time transmitters may be required for certain applications such as
compressor antisurge control systems. Slow update rate/response time transmitters may degrade
control performance.
8. For absolute pressure instruments the measurement inaccuracy caused by the change in the
atmospheric pressure shall be completely compensated.
9. The measuring element shall withstand pressures corresponding to the pressure rating of the
instrument case without any damage or zero shift exceeding 1% of the measuring range.
10. The measuring element shall be appropriately flexible, tempered and stress-relieved to ensure
minimal hysteresis.
11. The effect of ambient temperature shall be minimal for every measuring element. The measuring
element, the setting spring, etc. shall have a minimal thermo expansion coefficient.
12. The material of wetted components shall be at least SS 316, with the following exceptions:
The relevant specification sheet requires another material
In the case of instruments with integral diaphragm seal, but in this case the above requirement
applies to the diaphragm seal
In the case of very low pressures, e.g. draft measurement, or absolute pressure measuring
elements with barometric compensation, if alloy steel sensor is not available.
These exceptions shall be highlighted in the specification.
13. Case material shall be suitable for application in the refinery and made of at least stainless steel.
14. The seal material shall be able to endure the operational pressure and temperature even in the case
of the failure of the diaphragm or other pressure-tight components. The instrument shall be designed
to provide full protection for the operating personnel even in case of failures.
15. Pressure-tight components shall have confined seals (tongue and groove or ”O”-ring).
16. Range limits shall be smoothly adjustable in the full range and the adjusting device shall be lockable.
Instruments with facilities for wide range offset and range limit reduction, zero offset and suppression
are preferred.
17. Pressure transmitters – except for differential pressure transmitters used for level measurement –
shall provide increasing outputs at increasing inputs (i.e. shall be direct action).
18. Pressure measuring instruments shall have integral dial indicators ensuring good readability (see
MGS-S-REF-I-4). The integral indicator shall provide reading of the measured parameter in physical
value and indication of the unit of measure. In lack of integral indicator a local dial indicator shall be
installed in the close vicinity of the transmitter, if required.
19. Transmitters and separately installed local indicators shall be fitted with mounting yokes.
20. In case a seal diaphragm is required, it shall be integrated with the instrument and calibrated
together with it. The bottom part shall be removable for cleaning.
21. Capillary lines shall be filled with neutral pressure transmitting fluid suitable for the process
temperature and the instrument shall be calibrated together with the sensor element. The capillary
shall be made of stainless steel tubing with flexible guard (corrugated metal tube or PVC jacket), its
length shall be the shortest possible but never more than 10 meters.
22. For pressure measurements DN25 size flanged process block valves of appropriate pressure rating
shall be installed and blanked off with counter-flanges suitable for installing1/2” NPT or 3/4” NPT
female or socket–weld connections, if not required otherwise in the specification.
23. Pressure measuring elements connected to the process shall have ½” NPT threads, possibly with
additional oval flanges, and flat surfaces required for mounting.
24. For the measurement of fluctuating pressures installation of pulsation dampers may be required
upstream of the sensor element. Pulsation dampers shall be adjustable from the outside.
25. Provisions shall be provided for the venting during operation as well as the zero setting of all
pressure instruments installed and for the connection of control devices without disconnecting valves
or piping by installing a second block valve or three-way block valve between the pressure tap and
the instrument. Venting shall be designed so that the protection of the operating personnel will be
ensured. Aggressive or toxic fluids shall be drained or vented in a closed system. Valves and pipes
with minimum ½” sizes hall be used for draining or venting.
26. ½” seamless steel pipe shall be used for hook-up lines.
27. If sensor elements with diaphragm seal are used, provisions shall be made for their cleaning.
28. Provisions shall be made for checking and adjusting pressure instruments and pressure switches at
site by means of reference standards without dismounting.
29. Provisions shall be made for the local zero setting and adjustment of pressure instruments.
30. The instruments shall have integral over-voltage protection.
31. The signal lines of pressure instruments shall conform to the general requirements on cables.
32. The cables of the pressure instruments shall have stranded twisted pair, armoured for mechanical
protection and shielded against interference.
33. The instrument case and the cable gland shall provide protection against environmental effects and
in case of intrinsically safe devices their protection class shall be minimum IP 65.
34. For armored cables double sealing cable glands shall be used, ensuring the grounding of the armour
to the instrument case, gripping both the jacket of the cable and the insulation below the armour
(when armored cables are used)..
35. The instrument case shall be connected to the equipotential earth system of the plant.
36. Accessibility and ease of handling shall be considered in selecting the place of installation of
pressure instruments and process pressure taps.
7. For pressure gauges without measurement range compression, the operating range shall be
between 30…70% of the measuring range of the gauge.
8. The reference accuracy of local pressure gages shall be less than ±1.5% of span.
9. Pressure gauges that are accessories of other equipment (e.g. positioner, filter, controller, etc.) shall
conform to vendor standards. The dial diameter of these instruments shall be at least 60 mm.
10. For congealing or aggressive medium applications pressure gauge with diaphragm seal is
acceptable.
11. The local pressure gauges shall be connected to the technological part via isolating valve
(mechanical part) and via three-way test manometer valve.
2.4 Nameplate
All pressure detectors and transmitters shall be provided with durable nameplates easy to read during
operation even if insulated.
Nameplates shall contain at least the following information:
Name of the manufacturer
Model number and serial number of the pressure detectors and transmitters
Symbol of protection class
Nominal size and pressure rating of outdoors pressure detectors
Measuring range of pressure detectors and transmitters
ID (tag) number of pressure detectors and transmitters
Length of the capillary, data of filling liquid
Set-point for pressure switches
Operating
Operating
Design
Max.
Max.
No Tag No. P&I No. Service Fluid Line No. Adj. Range Set Range Note
pres. barg temp. °C barg barg
Feed water
1. PT-085 P3 water 600-CWS-3300 2,0 3,0 28 80 MFR 0-4
pressure
MOL Group 1.00.03 - - Doc. No: MGS-S-REF-I-30.9.2
Technical specifications for instrumentation 1.00.02 - - Project No:
Designer Specification sheets for instrumentation items 1.00.01 - - Page/Pages: 10/11
1.00.00 19.09.2011. S.Skalszky Revision: 1.00.00
Pressure measuring instruments
Pressure Switch Instruments Rev Date Designer Date: 19.09.2011.
1 Function Area Classification Pressure switch Zone 1 IIC T3 Rev.:
2 Manufacturer *
3 Model *
4 Construction Type By Manufacturer
5 Case Material Enclosure Cast Alloy min. IP65
GENERAL 6 Explosion Proof EEx ib IIC T3
7 Transient Protector In built
8 Mounting On 2" pipe with yoke
9 See secondary Instrument Specification -
10 Ambient Temperature -25...+45 °C
11 Design temperature, Pressure Hőm
12 Element Type Service Diaphragm Gage Pressure
13 Element Mat. 316 SST
14 Wetted parts material 316 SST
ELEMENT 15 Overpressure Rating 1,5 x range
16 Process Connection M20x1,5 (Male)
18 Connection Bottom
19 Rating PN 16
20 Tag Number Function
21 Manufacturer Model
22 Location Mounting In head of switch
23 Supply Accuracy No < 0,5%
24 Switching point adjustable Inside
26 Switching H = at Increasing signal
SWITCHES 26 Switching L = at Decreasing signal
26 Output Signal Connection 1 x SPDT Voltage free Terminal board
27 Switches load Surface 10 mA Gold plated
28 Hermetically seald Switches Yes
29 Dead Band minimum
30 Line fault detection outside Open circuit if I<100microA / Short circuit if I<6,5mA
31
32 Manufacturer Model .
DIAPHRAGM 33 Connection Size - - - -
SEAL
34 Capillary Lenght Material - -
35 Fill fluid -
36 Valve Manifold Material - -
37 Counter Flange and Seal
OPTIONS 38 Compensation .
39 Conduit Connection for signal with Cable glande **
40
Notes:
* To be defined by vendor.
** Double compression type cable gland
Required documentation: 1,2,3,4,5,10
No Tag No. P&I No. Service Fluid Pipe Line No. Max. Pres. Max. Temp. Adj. Range Set Range Note
barg °C barg barg
Operatin
Design
Design
g
No Tag No. P&I No. Service Fluid Line No. Adj. Range Set Range Note
pres. barg temp. °C barg barg
MOL Group
TECHNICAL SPECIFICATION
INSTRUMENTATION
9. Instrument Specifications
MGS-S-REF-I-30.9
Rev 1.00.00
This document is property of MOL Group. The use is only allowed with the written permission of MOL Group.
SLOVNAFT a.s. MGS-S-REF-I-30.9
R&M Division
TECHNICAL SPECIFICATION - INSTRUMENTATION Rev.: 1.00.00
30 Sample documentation of detail engineering documents for Date: 19.09.2011
instrumentation
9 Instrument Specifications Page/Pages: 2/3
Release list
Rev. Date Description Edited Verified Approved
0.00.01 12.12.2008 Updated
This document is property of MOL Group. The use is only allowed with the written permission of MOL Group.
SLOVNAFT a.s. MGS-S-REF-I-30.9
R&M Division
Book breakdown
MOL Group
TECHNICAL SPECIFICATION
INSTRUMENTATION
MGS-S-REF-I-30.10
Rev 1.00.00
This document is property of MOL Group. The use is only allowed with the written permission of MOL Group.
SLOVNAFT a.s. MGS-S-REF-I-30.10
R&M Division
TECHNICAL SPECIFICATION - INSTRUMENTATION Rev.: 1.00.00
30 Sample documentation of detail engineering documents for Date: 19.09.2011
instrumentation
10 Grounding Diagram for Instrumentation System Page/Pages: 2/6
Release list
This document is property of MOL Group. The use is only allowed with the written permission of MOL Group.
SLOVNAFT a.s. MGS-S-REF-I-30.10
R&M Division
Contents
MOL Group
TECHNICAL SPECIFICATION
INSTRUMENTATION
MGS-S-REF-I-30.11
Rev 1.00.00
This document is property of MOL Group. The use is only allowed with the written permission of MOL Group.
SLOVNAFT a.s. MGS-S-REF-I-30.11
R&M Division
TECHNICAL SPECIFICATION - INSTRUMENTATION Rev.: 1.00.00
30 Sample documentation of detail engineering documents for Date: 19.09.2011
instrumentation
11 Equipment Specifications Page/Pages: 2/14
Release list
This document is property of MOL Group. The use is only allowed with the written permission of MOL Group.
SLOVNAFT a.s. MGS-S-REF-I-30.11
R&M Division
Contents
1. General................................................................................................................................................................4
2. Alterations ...........................................................................................................................................................4
3. Governing codes and standards .........................................................................................................................4
4. Definitions............................................................................................................................................................4
4.1 Marshalling cabinet.......................................................................................................................................4
4.2 Relay cabinet ................................................................................................................................................4
4.3 Instrument cabinet, instrument panel ...........................................................................................................4
4.4 Local operating panel, field instrument cabinet ............................................................................................4
4.5 Power supply cabinet with instruments ........................................................................................................4
5. General evironmental conditions.........................................................................................................................5
5.1 Environmental conditions indoors:................................................................................................................5
5.2 Environmental conditions outdoors ..............................................................................................................5
6. General requirements for installation of equipment ............................................................................................5
6.1 Mechanical installation..................................................................................................................................5
6.2 Electrical installation, wiring..........................................................................................................................6
6.2.1 Line terminals........................................................................................................................................6
6.2.2 Wiring....................................................................................................................................................7
6.3 Other requirements.......................................................................................................................................7
6.4 Signal relays .................................................................................................................................................8
6.5 Cut-outs ........................................................................................................................................................8
6.6 Lights and switches ......................................................................................................................................8
6.7 Power supply units, redundancy...................................................................................................................8
6.8 Markings .......................................................................................................................................................8
6.9 Documentation..............................................................................................................................................9
7. Special requirements for equipment installation .................................................................................................9
7.1 Relay cabinets ..............................................................................................................................................9
7.1.1 Relays ...................................................................................................................................................9
7.1.2 POS – Process Override Switches .....................................................................................................10
7.1.3 MOS - Maintenance Override Switches .............................................................................................10
7.1.4 Client’s obligatory data provision ........................................................................................................10
7.1.5 Vendor’s obligatory data provision......................................................................................................10
Bill of materials for ASZ1 power cabinet.....................................................................................................................11
Power supply caninet layout (MGS-S-REF-I-30.11-4.dwg)........................................................................................12
Marshalling cabinet layout (MGS-S-REF-I-30.11-5.dwg) ...........................................................................................13
Local panel layout (MGS-S-REF-I-30.11-6.dwg).......................................................................................................14
1. General
The present specification includes the general technical requirements on the design and installation of
instrumentation equipment to be installed in the processing and utility facilities of MOL.
During the installation of a facility or plant, the actual Project Specification on the particular facility may
include differences from the present document. In the case of any differences, the provisions included in the
Project documentation shall prevail.
2. Alterations
In the case of plant reconstruction, the existing system shall be considered, and the provisions of the present
documentation applied considering the extent, depth of the reconstruction, as well as its operational, safety
and economical aspects.
4. Definitions
3. Cabinets and instrument panels shall be in accordance with the industrial environment. The sides of
the equipment shall be even, no dents, edges or burrs from production are allowed. The front panels
of the equipment—where the operating elements and instruments are to be installed—shall be in one
level, no light diffraction is allowed on them; any dents caused by the weight of the instruments shall
be avoided with braces.
4. The cabinets shall have lockable doors. The opening direction of the doors shall be specified in
accordance with the installation site and the opening direction of the other cabinets to be installed next
to them. The opened door of the cabinet must not make an obstruction in the traffic in the escape
route. The doors shall allow for at least 130 ° opening.
5. The bottom of the cabinets shall be made in closed design, and the sealing of the cables shall be
ensured. In the case of outdoor cabinets, the cable bushings shall be installed with stuffing box.
6. The inlet and outlet cables shall be fixed with cable clamp rails and clamps in the foot of the cabinet. In
the case of wall-installed cabinets, the cable clamp rails and clamps shall be installed inside the
cabinet or outside on a frame.
7. The installing plates for the installation of the parts shall be made of metal.
8. The individual equipment shall be installed considering the preliminary layout drawing provided by the
Client, as well as ensuring the possibility for service, checking and maintenance.
9. When installing the individual elements together, proper electrical connection shall be provided to
ensure grounding. Grounding connections shall be installed on the structural elements of the cabinets.
10. The cabinets shall be equipped with properly sized ventilation forced draught if the operating
temperature range of the electronic devices installed in the equipment cannot be ensured with natural
ventilation or the specification requires it.
11. If the instruments installed in outdoor equipment or the process medium requires it, the equipment
shall be equipped with properly sized and controlled electrical heating.
12. If necessary, the cabinets shall have fittings for transport, lifting and moving (for instance lifting eyes or
rollers).
13. Documentation holders of proper size shall be installed in the cabinets for the storage of the drawings,
instrument books, etc. of the equipment.
14. In the case of equipment installed in the environment of vibration generating rotary machines
(compressor houses, pump houses), if necessary, anti-vibrating fittings shall be used.
15. To use the proper quality cabinets, they shall be selected from the following brands:
Indoor cabinets: Rittal
Outdoor cabinets: Rittal, Intertec, or any other brand with the same quality.
6. The receipt of signals from electrical area (for instance electrical-.instrumentation connections) shall
also be solved with fused line terminals.
7. For intrinsically safe signals, light blue line terminals complying with the MSZ EN50020 standard shall
be used.
8. For the connection of the guard wire, PE line terminals shall be used.
9. The applied signal line terminals shall be able to receive wires and cable cords of a cross-section of
2
2.5 mm .
10. The shock protection of line terminals capable of receiving conductors of larger cross-section (for
instance power line terminals) shall be ensured with insulation covers.
6.2.2 Wiring
1. For power supply connections of different voltage level, or uninterrupted and not uninterrupted power
supply connections, different line terminal bars shall be provided. These shall be differentiated with
separate installation and title as well.
2. On the other side of the line terminals for the connection of inlet and outlet cables, individual wires
shall be used. The colour of the wires shall be selected as follows:
3. The wiring in the equipment shall be arranged fixed separated by voltage levels, in a wire-chase.
Loose wires are not allowed.
4. Intrinsically safe wiring—in accordance with BKI recommendations—shall be arranged in blue wire-
chases.
5. The connection of stranded wires and the commoning of the wires shall be solved with moulded wire
chucks or moulded binding eyes. Soldering the wires is prohibited.
6. The minimal applicable wire cross-section shall meet the values of the applied fuses and the load
2
data, but it shall be minimally 0.75 mm .
7. The wires of the instruments, displaying and operating units to be installed on the movable structural
elements of the equipment (for instance doors, swing rack frames) shall be conducted to the movable
structural element in a flexible goose neck. One end of the flexible goose neck shall be solidly fixed to
the stationary structural element, the other end to the movable one.
4. If the lightning at the installation site is not sufficient for the arrangement and connection work inside
the cabinet, or it is required by the specification of the particular equipment, the cabinets shall be
equipped with lightning units.
5. Service power point shall be installed in the cabinets if during the startup, operation, maintenance, or
extension, reconstruction or modification of the equipment, the use of electronic programmable unit or
configuration tool may be needed, or it is required by the specification of the particular equipment.
6.5 Cut-outs
1. Cut-outs equipped with protective contact shall be used for the distribution of 230V AC power supply
as well as for the protection of the equipment. When selecting the cut-outs, the stepping of the
nominal switching values shall be considered. The cut-outs shall be commoned with a common bus.
2. To ensure the use of cut-outs of proper quality, the selection shall be made from the following brands:
Moeller, ABB, Merlen-Gerin.
START(green),
STOP(red),
LIGHT TEST (blue),
3. Normal indicator light colours:
IN OPERATION(green),
ERROR(red),
6.8 Markings
1. The design mark of instruments, switches, cut-outs, power supply units, line terminals, and any
devices having identification, shall be labelled in a clearly apparent way.
2. Cable wires and individual wires shall be equipped with identification marks which shall refer to the
connection point.
3. The possible foreign voltage occurring in the equipment as well as the place of discharge shall be
labelled.
4. Wire chases with higher voltage level than that of the extra low voltage shall be equipped with a
warning label or mark, calling attention to the hazardous voltage level.
5. Intrinsically safe wire chases shall be equipped with the note referring to the Ex i protection besides
their normal blue colour.
6. In the front of the cabinets (in the case of two-sided cabinets, at the back as well), etched plate label
shall be placed, which shall include the design mark of the equipment. The size, design and text of the
label shall be in accordance with those of the existing equipment.
6.9 Documentation
1. Implementation (D-level) design documentation shall be supplied for the equipment in the number of
copies set forth in the contract. An additional copy of the implementation design shall be stored in the
equipment in an appropriate way.
2. The contents of the implementation documentation:
2.1. the external and internal layout drawings of the equipment, which include the following:
- overall and installation dimensions,
- item numbering,
2.2. material list which include the following in the order of item numbers given in the layout drawing:
- description,
- characteristic main parameters and dimensions,
- manufacturer,
- type,
- standard (for standard parts),
- quantity,
- other essential information as notes.
2.3. drawings of the title labels, indicating the textual information of each label,
2.7. configuration data sheets for instruments as well as their setting values
3. When handing over the equipment, vendor shall hand over to Client the manuals and certificates of
the instruments and parts (units) included in the particular equipment as well.
7.1Relay cabinets
7.1.1 Relays
The relays establishing the logic connections of the safety interlock systems shall be
airtight,
1.1 Equipment specification (Technical description, preliminary layout drawing, preliminary material
list),
1.3 Data provision for the preparation of the wiring and line terminal connection diagrams of the
equipment (for instance preliminary measuring circuit diagrams, cable or line terminal
connection diagrams, power supply diagrams.)
MOL Group
TECHNICAL SPECIFICATION
INSTRUMENTATION
MGS-S-REF-I-30.12.1
Rev 1.00.00
This document is property of MOL Group. The use is only allowed with the written permission of MOL Group.
SLOVNAFT a.s. MGS-S-REF-I-30.12.1
R&M Division
TECHNICAL SPECIFICATION - INSTRUMENTATION Rev.: 1.00.00
30 Sample documentation of detail engineering documents for Date: 19.09.2011
instrumentation
12 Specification of Erection Materials Page/Pages: 2/7
12.1 Junction Box Specification
Release list
This document is property of MOL Group. The use is only allowed with the written permission of MOL Group.
SLOVNAFT a.s. MGS-S-REF-I-30.12.1
R&M Division
Contents
1. General
This specification covers the basic requirements for junction boxes installed in the field.
1.1. Deviations
The Project Specification may include deviation or change from these specifications. Any deviations from
this specification and the project specifications are allowed by a written consent from MOL Group only.
2. Technical requirements
1. The field junction boxes are basically for connecting the individual cables of instrument elements and
actuators mounted in the field, with the multi core cables or field bus cables, providing the control
room connection. Generally, the use of junction boxes made of cast aluminium alloy or stainless steel
(according to the environmental conditions) are preferred.
2. Junction boxes may also be used in the following case:
Connecting the extension cable of instrument elements and individual instrument cable
Gathering signals from instrument elements located in the close vicinity of each other (e.g.
position limit switches) by a single cable
Connecting cable of a special quality (e.g. fire resistant or extreme flexibility) with general-
purpose cable outside the location requiring the special requirements.
In these cases junction boxes made of plastic (e.g.: polycarbonate) can be accepted.
3. The junction box and components used in it (construction and colour of terminal strip and cable
glands etc.) must comply with the requirements set by the Hazardous area classifications of the area.
4. Only cables of the same signal level must be connected within a junction box. Deviation is allowed in
justified cases only.
5. The junction box must be made in a corrosion resistant design.
6. The junction box construction, material and surface protection must ensure the prevention of
electrostatic charge.
7. The junction box must be fitted with earthing studs both outside and inside (for a non-conductive box
a bulkhead earthing bolt must be used).
8. The junction box must be fitted with a tag plate made of stainless steel, which is at least 50 x 20 mm
in size and 1 to 2 mm thick. The tag must be made by engraving or steel stamping in a 5 mm
character size at least. (Self-adhesive tape, sticker, or manual marking such as alcohol felt tip pen
are not allowed.)
9. The junction boxes must have at least 20 % spare capacity (for connecting extra individual cables)
per signal type, evenly distributed along the plant area.
10. Glands for the connecting cables must be located preferably at the bottom (in no way at the top) of
the box.
11. In line with its cable volume the box must be fitted with holes in sufficient number and size at the
workshop. The holes not used must be sealed using a plug with a counter nut.
12. The box specification must give the external and below armour insulation diameter of the cables to
be used (when double compression type of glands are used).
13. For new installations for armouring cables - in case of junction boxes made of metal - the use of
double compression (earthing) type cable glands are preferred, which can ensure earthing the cable
armouring to the junction box housing, and grips the external sheath and the below armour
insulation of the cable. The explosion proof protection of the glands must meet the protection of the
junction box. The proper galvanic contact between the enclosure and the cable gland shall be
ensured by the use of serrated washer and back-nut.
14. In case of enclosures provided with removable gland plates, the gland plate shall have an earthing
stud which shall be connected to the enclosure’s inner earthing stud by an earthing wire of 4 mm2
cross section at least.
15. The junction box must have a common isolated busbar (sufficient in size to the planned quantity of
the cables) for connecting the shield drain wires of the cables, and a common safety earthing busbar
if required. The outer earthing stud of the junction box shall be connected to the safety earth system
on the shortest possible rout.
16. The junction box shall be equipped with screw connection, feed-through type terminal blocks (in a
configuration suitable for the applied cable construction) mounted on a standard mounting rail. The
terminal blocks shall be numbered and their colour must be in accordance with the type of the
electric signal.
17. Linked terminal blocks with appropriate marking (e.g.: “Sh” /Shield/) can be applied instead of shield
busbar. (Links shall be the same make as the terminal blocks.)
18. All shield wires to be covered with insulating sleeves.
19. The junction box must have accessories necessary for its mounting in the field (mounting on a
support pipe, wall etc.).
20. Colour of junction boxes for Intrinsically safe (Ex i) signals shall be light blue (RAL 5015)
21. For preparing a junction box specification a sample is given on the following pages.
Required documentation:
See technical requirenments
Notes:
Front view
A C
1. JBAi-128 * B 12 1 0 0 0 4 0 0 0 0 32 * mm
2. JBAi-129 * B 12 1 0 0 0 4 0 0 0 0 32 * mm
3. JBAi-130 * B 12 1 0 0 0 4 0 0 0 0 32 * mm
4. JBAi-131 * B 12 1 0 0 0 4 0 0 0 0 32 * mm
MOL Group 1.00.03 - - MGS-S-REF-I-30.12.1
Technical specifications for instrumentation 1.00.02 - -
Required documentation:
See technical requirenments
Notes:
1. JBS-121 * B 12 1 0 0 0 3 0 0 0 0 45 * mm
2. JBS-122 * B 10 1 0 0 0 5 0 0 0 0 45 * mm
3. JBS-123 * B 10 1 0 0 0 5 0 0 0 0 45 * mm
4. JBS-124 * B 14 1 0 0 0 1 0 0 0 0 45 * mm
5. JBS-125 * B 12 1 0 0 0 3 0 0 0 0 45 * mm
6. JBS-126 * B 14 1 0 0 0 1 0 0 0 0 45 * mm
7. JBS-127 * B 10 1 0 0 0 5 0 0 0 0 45 * mm
8. JBS-128 * B 10 1 0 0 0 5 0 0 0 0 45 * mm
9. JBS-129 * B 14 1 0 0 0 1 0 0 0 0 45 * mm
10. JBS-130 * B 14 1 0 0 0 1 0 0 0 0 45 * mm
11. JBS-131 * B 14 1 0 0 0 1 0 0 0 0 45 * mm
SLOVNAFT a.s.
R&M Division
MOL Group
TECHNICAL SPECIFICATION
INSTRUMENTATION
MGS-S-REF-I-30.12.2
Rev 1.00.00
This document is property of MOL Group. The use is only allowed with the written permission of MOL Group.
SLOVNAFT a.s. MGS-S-REF-I-30.12.2
R&M Division
TECHNICAL SPECIFICATION - INSTRUMENTATION Rev.: 1.00.00
30 Sample documentation of detail engineering documents for Date: 19.09.2011
instrumentation
12 Specification of Erection Materials Page/Pages: 2/8
12.2 Instrument Cable Specification
Release list
This document is property of MOL Group. The use is only allowed with the written permission of MOL Group.
SLOVNAFT a.s. MGS-S-REF-I-30.12.2
R&M Division
Contents
1. General:
This specification covers the basic requirements for instrument cables.
1.1 Deviations
The Project Specification may include deviation or change from these specifications. Any deviations from
this specification and the project specifications are allowed by a written consent from MOL only.
2. Technical requirements
1. The material of the external sheath must be moisture-retardant, oil resistant and wear resistant, and
must have retarded burning properties (flame retardant – acc. to relevant standard) in line with the
environmental requirements. For a polyethylene cable sheath the flame retardancy is a must.
2. The construction of the armouring shall be spiral wound single wire armouring (SWA), braided steel
wire armour (SWB), or an armouring of min 0.2 mm thick galvanised steel band double wound with
25 % overlap.
3. The screening must meet the following:
must be metal wound and threaded lead, with a 25 % overlap
screening must be in an electrical contact with the copper drain wire
screening must be isolated on both the external and internal surface.
4. For cables with pairs, triples and quads the number of twists per meter shall be 15/meter minimum.
5. Thickness of radial wire insulation on intrinsically safe cables and other cables shall be min 0.2 mm
and 0.5 mm, respectively.
6. For intrinsically safe cables and other cables the insulation of each wire must resist min. 500 V and
min. 1000 V, respectively. The insulation resistance shall be min 60 M Ohm/km.
7. The required minimum operating temperature range shall be between –30 and +70 C.
8. The required minimum cable laying temperature range shall be between 0 and +50 C.
9. The cable must resist the voltage test of the following actual values:
between connected armouring and screenings, and between all wires connected:
for intrinsically safe cable 500 V
for other cable 1000 V
between core bundle made by connecting half of the wires, and core bundle made by
connecting the other half of the cores
for intrinsically safe cable 1000 V
for other cables 1500 V
10. The self inductivity value shall be approximately 0.4 mH/km for cables of 1 mm2 cross section.
11. Identification of cable cores shall be with colours and numbering. For cable construction of pairs,
triples or quads the number of the pairs etc. must be placed at least on the core of the same colour
in the pair etc.
12. Additional major specifications are covered in detail below, or on the data sheets.
13. Armoured self-extinguishing, flame-retardant cables (conforming to IEC Standards 60332-1 & 60332-
3-22) or, if necessary, fire-resistant cables (conforming to IEC Standards 60331-11 & 60331-21) with
PVC jackets shall be used outdoors
14. For individual instrumentation signal cable the use of stranded core (7 wires 1.5 mm2, or 0.8 mm2 for
more pairs), twisted pair (min 15 twists/meter), screened (spiral wounded with aluminium foil, with
tinned copper drain wire) cables is required.
15. For multicore instrumentation cable the use of stranded core (7 wires min 0.8 mm2), twisted pair (min
15 twists/meter), at least commonly screened (spiral wounded with aluminium foil with tinned copper
drain wire) cables with numbered wires is required.
16. For power supply and control, and atmosphere gas pollution detection cables the use of cable with at
least three solid cores (min 1.5 mm2 cross section) is required.
17. For cabling resistance thermometers the use of solid core (min 1.0 mm2 cross section) twisted pair
or in special cases twisted triple (min 15 twists/meter), screened (spiral wound with aluminium foil,
with tinned copper drain wire) cables is required.
18. For signal cabling of thermocouples the use of solid core (1.3 mm2, or for more pairs 0.8 mm2) cross
section), twisted pair (min 15 twists/meter), screened by pairs (spiral wound with aluminium foil, with
tinned copper drain wire) compensation cables is required. The material of the main core and the
colour of its insulation and the insulation for the external insulation must comply with the relevant
standards. Multi core cable must have a common screening.
19. In general the external insulation of the cables is PVC, and their temperature limit is 70 C. In case of
the ambient temperature is high, and the cable temperature exceeds 70 C, a high temperature
silicone cable must be used. The silicone cable may be changed to normal cable outside the high
temperature zone by installing a junction box.
3. Delivery conditions
1. The cables must be delivered wound up in a perfect condition on wooden drums. All drums must
contain specific lengths of cable as specifically indicated on attached data sheet.
2. Every drum must have the same type of cables wound on them. Each type of cable must be provided
with the following information by the supplier:
cable structure
outer diameter
diameter above armouring
armour thickness
cable weight (kg/km)
actual resistance at 20 C and 60 C
allowed constant current density at 20 C in case of underground installation
max manufacturing length
min bending radius
allowable strain
amount of cable to be wound on a cable drum
ambient temperature permitted at laying.
All types of cables must be supplied with a certificate.
6. Examination
1. For making destructive tests, supplier is obliged to provide the extra length necessary for the test in
addition to the ordered length.
2. All tests that demonstrate whether the cable meets the specifications, or any relevant standard must
be performed by the cable supplier, and the test results must be submitted on certificates.
3. For preparing the instrument cable specification a sample is provided on the pages below.
Notes:
Required documentation: See technical requirenments
Notes:
Required documentation: See technical requirenments
MOL Group
TECHNICAL SPECIFICATION
INSTRUMENTATION
MGS-S-REF-I-30.12
Rev 1.00.00
This document is property of MOL Group. The use is only allowed with the written permission of MOL Group.
SLOVNAFT a.s. MGS-S-REF-I-30.12
R&M Division
TECHNICAL SPECIFICATION - INSTRUMENTATION Rev.: 1.00.00
30 Sample documentation of detail engineering documents for Date: 19.09.2011
instrumentation
12 Specification of Erection Materials (cables, junction boxes) Page/Pages: 2/3
Release list
Rev. Date Description Edited Verified Approved
0.00.01 12.12.2008 Updated
This document is property of MOL Group. The use is only allowed with the written permission of MOL Group.
SLOVNAFT a.s. MGS-S-REF-I-30.12
R&M Division
Book Breakdown
Description Identification code Rev.:
Sample documentation of detail engineering documents for
Instrumentation MGS-S-REFI-30
Specification of Erection Materials MGS-S-REF-I-30.12 1.00.00
Junction box specification MGS-S-REF-I-30.12.1 1.00.00
Instrument cable specification MGS-S-REF-I-30.12.2 1.00.00
MOL Group
TECHNICAL SPECIFICATION
INSTRUMENTATION
MGS-S-REF-I-30.13
Rev 1.00.00
This document is property of MOL Group. The use is only allowed with the written permission of MOL Group.
SLOVNAFT a.s. MGS-S-REF-I-30.13
R&M Division
TECHNICAL SPECIFICATION - INSTRUMENTATION Rev.: 1.00.00
30 Sample documentation of detail engineering documents for Date: 19.09.2011
instrumentation
13 List of Erection Materials Page/Pages: 2/6
Release list
This document is property of MOL Group. The use is only allowed with the written permission of MOL Group.
SLOVNAFT a.s. MGS-S-REF-I-30.13
R&M Division
Contents
21 178 pcs Fitting-strip NPT 1/2 K/ 1/2 s. MSZ 120/1 St 37.0
L=75 mm
Wall Thickness 3,2 mm
MOL Group
TECHNICAL SPECIFICATION
INSTRUMENTATION
MGS-S-REF-I-30.14
Rev 1.00.00
This document is property of MOL Group. The use is only allowed with the written permission of MOL Group.
SLOVNAFT a.s. MGS-S-REF-I-30.14
R&M Division
TECHNICAL SPECIFICATION - INSTRUMENTATION Rev.: 1.00.00
30 Sample documentation of detail engineering documents for Date: 19.09.2011
instrumentation
14 Loop Drawings Page/Pages: 2/9
Release list
This document is property of MOL Group. The use is only allowed with the written permission of MOL Group.
SLOVNAFT a.s. MGS-S-REF-I-30.14
R&M Division
Contents
Tag List.................................................................................................................................................... 4
Loop Drawings...................................................................................................................................... 5-9
Tag list
MOL Group
TECHNICAL SPECIFICATION
INSTRUMENTATION
MGS-S-REF-I-30.15
Rev 1.00.00
This document is property of MOL Group. The use is only allowed with the written permission of MOL Group.
SLOVNAFT a.s. MGS-S-REF-I-30.15
R&M Division
TECHNICAL SPECIFICATION - INSTRUMENTATION Rev.: 1.00.00
30 Sample documentation of detail engineering documents for Date: 19.09.2011
instrumentation
15 Cabling Diagrams Page/Pages: 2/5
Release list
This document is property of MOL Group. The use is only allowed with the written permission of MOL Group.
SLOVNAFT a.s. MGS-S-REF-I-30.15
R&M Division
Contents
MOL Group
TECHNICAL SPECIFICATION
INSTRUMENTATION
MGS-S-REF-I-30.16
Rev 1.00.00
This document is property of MOL Group. The use is only allowed with the written permission of MOL Group.
SLOVNAFT a.s. MGS-S-REF-I-30.16
R&M Division
TECHNICAL SPECIFICATION - INSTRUMENTATION Rev.: 1.00.00
30 Sample documentation of detail engineering documents for Date: 19.09.2011
instrumentation
16 Cable Schedule Page/Pages: 2/4
Release list
This document is property of MOL Group. The use is only allowed with the written permission of MOL Group.
SLOVNAFT a.s. MGS-S-REF-I-30.16
R&M Division
Contents
MOL Group
TECHNICAL SPECIFICATION
INSTRUMENTATION
MGS-S-REF-I-30.17
Rev 1.00.00
This document is property of MOL Group. The use is only allowed with the written permission of MOL Group.
SLOVNAFT a.s. MGS-S-REF-I-30.17
R&M Division
TECHNICAL SPECIFICATION - INSTRUMENTATION Rev.: 1.00.00
30 Sample documentation of detail engineering documents for Date: 19.09.2011
instrumentation
17 Wiring Diagrams Page/Pages: 2/5
Release list
This document is property of MOL Group. The use is only allowed with the written permission of MOL Group.
SLOVNAFT a.s. MGS-S-REF-I-30.17
R&M Division
Contents
MOL Group
TECHNICAL SPECIFICATION
INSTRUMENTATION
MGS-S-REF-I-30.18
Rev 1.00.00
This document is property of MOL Group. The use is only allowed with the written permission of MOL Group.
SLOVNAFT a.s. MGS-S-REF-I-30.18
R&M Division
TECHNICAL SPECIFICATION - INSTRUMENTATION Rev.: 1.00.00
30 Sample documentation of detail engineering documents for Date: 19.09.2011
instrumentation
18 Control Room Layout & Cable Routings Page/Pages: 2/4
Release list
This document is property of MOL Group. The use is only allowed with the written permission of MOL Group.
SLOVNAFT a.s. MGS-S-REF-I-30.18
R&M Division
Contents
MOL Group
TECHNICAL SPECIFICATION
INSTRUMENTATION
MGS-S-REF-I-30.19
Rev 1.00.00
This document is property of MOL Group. The use is only allowed with the written permission of MOL Group.
SLOVNAFT a.s. MGS-S-REF-I-30.19
R&M Division
TECHNICAL SPECIFICATION - INSTRUMENTATION Rev.: 1.00.00
30 Sample documentation of detail engineering documents for Date: 19.09.2011
instrumentation
19 Field Layout Drawings & Routings Page/Pages: 2/4
Release list
This document is property of MOL Group. The use is only allowed with the written permission of MOL Group.
SLOVNAFT a.s. MGS-S-REF-I-30.19
R&M Division
Contents
MOL Group
TECHNICAL SPECIFICATION
INSTRUMENTATION
MGS-S-REF-I-30.20
Rev 1.00.00
This document is property of MOL Group. The use is only allowed with the written permission of MOL Group.
SLOVNAFT a.s. MGS-S-REF-I-30.20
R&M Division
TECHNICAL SPECIFICATION - INSTRUMENTATION Rev.: 1.00.00
30 Sample documentation of detail engineering documents for Date: 19.09.2011
instrumentation
20 Power Supply for Instrumentation Page/Pages: 2/4
Release list
This document is property of MOL Group. The use is only allowed with the written permission of MOL Group.
SLOVNAFT a.s. MGS-S-REF-I-30.20
R&M Division
Contents
MOL Group
TECHNICAL SPECIFICATION
INSTRUMENTATION
MGS-S-REF-I-30.21
Rev 1.00.00
This document is property of MOL Group. The use is only allowed with the written permission of MOL Group.
SLOVNAFT a.s. MGS-S-REF-I-30.21
R&M Division
TECHNICAL SPECIFICATION - INSTRUMENTATION Rev.: 1.00.00
30 Sample documentation of detail engineering documents for Date: 19.09.2011
instrumentation
21 Hook-Up Drawings Page/Pages: 2/4
Release list
This document is property of MOL Group. The use is only allowed with the written permission of MOL Group.
SLOVNAFT a.s. MGS-S-REF-I-30.21
R&M Division
Contents
MOL Group
TECHNICAL SPECIFICATION
INSTRUMENTATION
MGS-S-REF-I-30.22
Rev 1.00.00
This document is property of MOL Group. The use is only allowed with the written permission of MOL Group.
SLOVNAFT a.s. MGS-S-REF-I-30.22
R&M Division
TECHNICAL SPECIFICATION - INSTRUMENTATION Rev.: 1.00.00
30 Sample documentation of detail engineering documents for Date: 19.09.2011
instrumentation
22 Instrument Air Supply Page/Pages: 2/4
Release list
This document is property of MOL Group. The use is only allowed with the written permission of MOL Group.
SLOVNAFT a.s. MGS-S-REF-I-30.22
R&M Division
Contents
MOL Group
TECHNICAL SPECIFICATION
INSTRUMENTATION
MGS-S-REF-I-30.23
Rev 1.00.00
This document is property of MOL Group. The use is only allowed with the written permission of MOL Group.
SLOVNAFT a.s. MGS-S-REF-I-30.23
R&M Division
TECHNICAL SPECIFICATION - INSTRUMENTATION Rev.: 1.00.00
30 Sample documentation of detail engineering documents for Date: 19.09.2011
instrumentation
23 Instrumentation/Electric Interface Page/Pages: 2/4
Release list
This document is property of MOL Group. The use is only allowed with the written permission of MOL Group.
SLOVNAFT a.s. MGS-S-REF-I-30.23
R&M Division
Contents
MOL Group
TECHNICAL SPECIFICATION
INSTRUMENTATION
MGS-S-REF-I-30.24
Rev 1.00.00
This document is property of MOL Group. The use is only allowed with the written permission of MOL Group.
SLOVNAFT a.s. MGS-S-REF-I-30.24
R&M Division
TECHNICAL SPECIFICATION - INSTRUMENTATION Rev.: 1.00.00
30 Sample documentation of detail engineering documents for Date: 19.09.2011
instrumentation
24 List of Process & Utility Connections Page/Pages: 2/5
Release list
This document is property of MOL Group. The use is only allowed with the written permission of MOL Group.
SLOVNAFT a.s. MGS-S-REF-I-30.24
R&M Division
Contents
Rev.
(1) V: Vertical (3) B: Raised Face, (EN 1092-1) (5) N: New
H: Horizontal NF: Groove-Tongue R: Replaced
RTJ: Ring Type Joint
Direction:
A C U
DN/PN DN/PN
U DN/PN
H U DN/PN U DN/PN
H U
D
The process line is less than 6", it shall be enlarged to 6" near the temperature sensor.
Location Isometric Drawing No. Connection
Pressure Nominal PN
P&I Drawing Number
Construction
Tag Number
Pipe Line or
diameter
*** U (mm)
H (mm)
Face
Note
Item
Note
*
R002 DN 220
1 TE-253 100-P-5012 BRE32 100-P-5012 H* DN150DN50 PN40 B1 150* A*
100
R002 DN 220
2 TE-254 100-P-5013 BRE32 100-P-5013 H* DN150DN50 PN40 B1 150* A*
100
R002 DN 300
3 TE-251 250-P-5014 BRE31 250-P-5014 H* DN50 PN40 B1 150* A*
250
R002 DN 300
4 TE-252 250-P-5015 BRE31 250-P-5015 H* DN50 PN40 B1 150* A*
250
MOL Group 1.00.03 - - MGS-S-REF-I-30.24
Technical specification for Instrumentation 1.00.02 - -
Designer Detailed Engineering Documents for Instrumentation 1.00.01 - - Page/Pages 5/5
Sample 1.00.00 19.09.2011. T.Liptak Rev.: 1.00.00
List of Process and Utility Connection Rev Dátum / Date Tervező / Design. Date: 19.09.2011
Notes:
Rev.
(1) V: Vertical (3) B: Raised Face, (EN 1092-1) (5) 3-way control valve
H: Horizontal NF: Groove-Tongue
RTJ: Ring Type Joint
DN/PN
C
1. ábra
Figure 1 L D
D
E
Location Connection
Isometric Drawing No.
Pressure Nominal PN
P&I Drawing Number
Position
*** H (mm)
D (mm)
*** A (mm)
*** L (mm)
Heating
Face
Note
Item
Note
Note
P8501-ED EN 1092-1
(1)
(4)
250-P-5015- 250-P-
1. FV-203A R002 H* DN 250 DN100 PN40 B1 194 607 333 363 A
BRE31 5015
300-P-3020- 300-P-
2. FV-203B R002 H DN300 DN150 PN40 B1 229 849 536 417 A
BRE31 3020
100-P-5025- 100-P-
3. FV-204 R012 H DN100 DN40 PN40 B1 114 338 289 259 A
BRE32 5025
4. FV-206 R009 50-P-5031-PQE11 50-P-5031 H* DN50 DN25 PN40 B1 160 700 333 A
100-P-5030- 100-P-
5. LV-204 R009 H* DN100 DN40 PN40 B1 200 697 333 A
PPE11 5030
SLOVNAFT a.s.
R&M Division
MOL Group
TECHNICAL SPECIFICATION
INSTRUMENTATION
MGS-S-REF-I-30.25
Rev 1.00.00
This document is property of MOL Group. The use is only allowed with the written permission of MOL Group.
SLOVNAFT a.s. MGS-S-REF-I-30.25
R&M Division
TECHNICAL SPECIFICATION - INSTRUMENTATION Rev.: 1.00.00
30 Sample documentation of detail engineering documents for Date: 19.09.2011
instrumentation
25 ICS I/O Assignment, ICS I/O List Page/Pages: 2/7
Release list
This document is property of MOL Group. The use is only allowed with the written permission of MOL Group.
SLOVNAFT a.s. MGS-S-REF-I-30.25
R&M Division
Contents
Terminal AI - 01
1+ TI 001
1 REACTOR TEMPERATURE-1
1-
2+ TI 002
2 REACTOR TEMPERATURE-2
2-
3+ TI 003
3 REACTOR TEMPERATURE-3
3-
4+ TI 004
4 REACTOR TEMPERATURE-4
4-
5+ TI 005
5 REACTOR TEMPERATURE-5
5-
6+ TI 006
6 REACTOR TEMPERATURE-6
6-
7+ TI 007
7 REACTOR TEMPERATURE-7
7-
8+ TI 008
8 REACTOR TEMPERATURE-8
8-
Terminal AI - 01
1+ FI 001
9 FEED FLOW MEASURING
1-
2+ PI 001
10 FEED PRESSURE
2-
3+ FI 005
11 PRODUCT FLOW MEAS.
3-
4+ PI 005
12 PRODUCT PRESSURE
4-
5+ TI 012
13 REACTOR OVERHEAD TEMP.
5-
HEATEXCHANGER SHELL 6+ TC 025
14
OUTLET TEMP. 6-
7+ spare
15
7-
8+ spare
16
8-
DIGITAL INPUT
MGS-S-REF-I-
MOL Group 30.25
Technical Specification for Instrumentation
Detailed engineering documents for instrumentation Rev: 1.00.00
ICS I/O assignement Date: 19.09.2011
Page/Pages: 5/7
DIGITAL INPUT I/O: DI-01
IOP file nr.: 01
Type of Card: ......................... IOP Card slot nr.: 05
Location: ........................... IOP Card nr.: 05
Terminal DI - 01
1 + 24V DC
2 - 24V DC
3 GAO 001
1 FEED FLOW VALVE OPEN
4
5 GAC 001
2 FEED FLOW VALVE CLOSE
6
7 TH 002
3 TEMPERATURE MAXIMUM
8
9 TL 002
4 TEMPERATURE MINIMUM
10
11 TZL 004
5 PRESSURE MAXIMUM
12
13 GAO 005
6 VALVE OPEN
14
15 GAC 005
7 VALVE CLOSE
16
17 spare
8
18
19 spare
9
20
21 spare
10
22
23 spare
11
24
25 spare
12
26
27 spare
13
28
29 spare
14
30
31 spare
15
32
33 spare
16
34
MOL Group MGS-S-REF-I-30.25
Technical Specification for Instrumentation ICS I/O Page/Pages:6/7
DESIGNER
Detailed engineering documents for instrumentation - Sample ASSIGNEMENT Rev.: 1.00.00
PLC I/O ASSIGNEMENT Date: 19.09.2011
UNIT NAME SYSTEM FIELD FIELD FIELD FIELD AUX FIELD FIELD Blank
FTA Name.: FTADI0401 FTADI0403 FTADI0405 FTADI0407 FTADI0409 FTADI04011 FTADI0413 FTADI0415
Analog Output
Digital Output
P&I No.
Digital Input
Red.RTD/AI
Pos. Tagname Point Description Note
Red.TC/AI
RTD/MUX
TC/MUX
SERIAL
RTD/AI
Red.AI
mA/AI
TC/AI
1 FC 001 FEED FLOW CONTROL 001 1 1
MOL Group
TECHNICAL SPECIFICATION
INSTRUMENTATION
MGS-S-REF-I-30.26
Rev 1.00.00
This document is property of MOL Group. The use is only allowed with the written permission of MOL Group.
SLOVNAFT a.s. MGS-S-REF-I-30.26
R&M Division
TECHNICAL SPECIFICATION - INSTRUMENTATION Rev.: 1.00.00
30 Sample documentation of detail engineering documents for Date: 19.09.2011
instrumentation
26 Software configuration data supply Page/Pages: 2/17
Release list
This document is property of MOL Group. The use is only allowed with the written permission of MOL Group.
SLOVNAFT a.s. MGS-S-REF-I-30.26
R&M Division
Contents
TECHNICAL DESCRIPTION
1. Documentation Contents
This Engineering Documentation has been prepared on the basis of xxxx - MOL Engineering Contract
No.xxxxx executed between xxxxxx and MOL Plc.
In this technical description shall describe the base knowledge, which is necessary for the
configuration, the contents of the data supply and the information, which is not in the tables later. The
technical descriptions shall be contain the following parts:
2. General descriptions
Describe parts of the control system, which is relation of the configuration and the required changes.
In this part shall describe the steps of the configuration (in order of the configuration, if it is possible):
System configuration (Changes and specifications for the configuration works)
Point configuration (mark the differences from the general tagname-forming rules, description of
general parameter settings, abbreviations in point configuration tables and additional information of
point configuration)
exposition of complex controls and actuations (understandable description for configurating
engineer and for operator with pictures and documentation-references of the related logic drawings
and figures)
Configuration of operator interfaces (graphic picture building general specifications, differences
from that, information about location of operation groups, and time-scheduling of reports,
configuration parameters of trend data collection etc.)
This parts of the software configuration data supply is only a sample, it varies in the type of the control
system, the size and complexity of the work. The data supply shall always contain all of the
information needed for the configuration.
5 TI012 A TC_AI 1 1 1 1 5 REACTOR HEADER TEMP. 0,0 100,0 DEGC LINEAR 50/journal -
7 SPARE 1 1 1 1 7
8 SPARE 1 1 1 1 8
9 SPARE 1 1 1 1 9
10 SPARE 1 1 1 1 10
11 SPARE 1 1 1 1 11
12 SPARE 1 1 1 1 12
13 SPARE 1 1 1 1 13
14 SPARE 1 1 1 1 14
15 SPARE 1 1 1 1 15
16 SPARE 1 1 1 1 16
MOL Group MGS-S-REF-I-30.26
ANALOG
Technical Specifications for Instrumentation Page/Pages 6/17
Designer OUTPUT
Sample documentation of detail engineering documents for instr. Rev.: 1.00.00
POINTS Date: 19.09.2011
Software configuration data supply
Net Contr
Pos. Tagname Unit PNT Form File Card Ch. Point description PV_L0W PV_HIGH Eng_Unit OPTDIR Note
work Stn.
2 SPARE 1 1 1 2 2
3 SPARE 1 1 1 2 3
4 SPARE 1 1 1 2 4
5 SPARE 1 1 1 2 5
6 SPARE 1 1 1 2 6
7 SPARE 1 1 1 2 7
8 SPARE 1 1 1 2 8
9 SPARE 1 1 1 2 9
10 SPARE 1 1 1 2 10
11 SPARE 1 1 1 2 11
12 SPARE 1 1 1 2 12
13 SPARE 1 1 1 2 13
14 SPARE 1 1 1 2 14
15 SPARE 1 1 1 2 15
16 SPARE 1 1 1 2 16
MOL Group MGS-S-REF-I-30.26
Technical Specifications for Instrumentation Page/Pages 7/17
Designer KOMPLEX POINTS
Sample documentation of detail engineering documents for instrumentation Rev.: 1.00.00
Software configuration data supply Date: 19.09.2011
Net Contr
Pos. Tagname Unit PNT Form Point description PV_L0W PV_HIGH Eng_Unit Low_alm High_alm Algorithm Action Iinput Output Note
work Stn.
1 TC025 A PID 1 1 HEAT EXCHANGER OUTLET 0,0 400,0 DEGC 100/low PID1 REV TT025 TV025
FI001
2 FSW001 A SEL 1 1 BASE MATERIAL SELECTOR - - - - - SELECTOR - FI008
FI005
10
11
12
13
14
15
16
MOL Group MGS-S-REF-I-30.26
DIGITAL
Technical Specifications for Instrumentation Page/Pages 8/17
Designer INPUT
Sample documentation of detail engineering documents for instr. Rev.: 1.00.00
POINTS
Software configuration data supply Date: 19.09.2011
Net Contr
Pos. Tagname Unit PNT Form File Card Ch. Point description U_Box L_Box U_Color L_Color Alarm State Alarm Pri. Inp.dir Note
work Stn.
1 GAO001 A DI 1 1 1 3 1 BASE MAT. VALVE END POS. OPEN N_OPEN GREEN RED - - DIR
2 GAC001 A DI 1 1 1 3 2 BASE MAT. VALVE END POS. CLOSED N_CLOSED RED GREEN - - DIR
3 GAO002 A DI 1 1 1 3 3 K203 STABLE VALVE OPEN OPEN N_OPEN GREEN RED - - DIR
4 GAC002 A DI 1 1 1 3 4 K203 STABLE VALVE CLOSED CLOSED N_CLOSED RED GREEN - - DIR
5 HDSA3601 B DI 1 1 1 3 5 PUMP FAILURE ALARM NORMAL RED GREEN ALARM LOW REV
6 EA001 B DI 1 1 1 3 6 POWER SUPPLY FAILURE ALARM NORMAL RED GREEN ALARM HIGH REV
7 EA002 A DI 1 1 1 3 7 VENTILATOR FAILURE ALARM NORMAL RED GREEN ALARM HIGH REV
8 SPARE 1 1 1 3 8
9 LH005 A DI 1 1 1 3 9 LEVEL MAXIMUM MAXIMUM NORMAL RED GREEN MAXIMUM HIGH REV
10 NA004 B DI 1 1 1 3 10 PUMP RUNNING RUN STOP GREEN RED STOP LOW DIR
11 SPARE 1 1 1 3 11
12 SPARE 1 1 1 3 12
13 SPARE 1 1 1 3 13
14 SPARE 1 1 1 3 14
15 SPARE 1 1 1 3 15
16 SPARE 1 1 1 3 16
MOL Group MGS-S-REF-I-30.26
DIGITAL
Technical Specifications for Instrumentation Page/Pages 9/17
Designer OUTPUT
Sample documentation of detail engineering documents for instr. Rev.: 1.00.00
POINTS
Software configuration data supply Date: 19.09.2011
Net Contr
Pos. Tagname Unit PNT Form File Card Ch. Point description U_Box (S1) L_Box (S0) U_Color L_Color Note
work Stn.
5 SPARE 1 1 1 4 5
6 SPARE 1 1 1 4 6
7 SPARE 1 1 1 4 7
8 SPARE 1 1 1 4 8
9 SPARE 1 1 1 4 9
10 SPARE 1 1 1 4 10
11 SPARE 1 1 1 4 11
12 SPARE 1 1 1 4 12
13 SPARE 1 1 1 4 13
14 SPARE 1 1 1 4 14
15 SPARE 1 1 1 4 15
16 SPARE 1 1 1 4 16
MOL Group MGS-S-REF-I-30.26
Technical Specifications for Instrumentation SERIAL Page/Pages 10/17
Designer
Sample documentation of detail engineering documents for instr. Software POINTS Rev.: 1.00.00
configuration data supply Date: 19.09.2011
10
11
12
13
14
15
16
MOL Group MGS-S-REF-I-30.26
Technical Specifications for Instrumentation OPERATION Page/Pages 11/17
Designer
Sample documentation of detail engineering documents for instr. GROUPS Rev.: 1.00.00
Software configuration data supply Date: 19.09.2011
PDI1003 M
X.XX bar
TI1014 M
SI_E10 M
XXX m/s
TI1013B M E50
XXX Cfok XXX Cfok
TI1007 M
XXX Cfok
E10
PI1014 M
XXX barg
LALL1004
P1A/B PALL1014 TI1015A M TI1015B M
FC1011 M M XXX Cfok XXX Cfok
XXX Nm3/h COOLING WATER
20
PDI1002 M
X.XX bar AI1012 M
TI1002 XXX %
XXX Cfok 1
B1-böl PIC01
LC1006 M
XXX %
PDI2002 M FI2003 M FI2005 M
XXX barg XXX Nm3/h XXX Nm3/h
LALL1005 PIC20
BATTERY LIMIT
PI2001 M
XXX barg TI2004 M PI2006 M
P2A/B
HEATER START-UP, LEAK TEST
TI0001A TI0001B
UAH0014 OK
XXX CFOK XXX CFOK
NOT OK
KAH0011 HOLD
STOP
UAH0010
STOP KI0011
0XAHH0011 READY
NORM
XAH0011 ALARM
NORM
XAHH0001A_1 ALARM
NORM
XAHH0001A_3 ALARM
NORM
KI0005
PI1001
PIALH1001
PDIAH1001
MOL Group MGS-S-REF-I-30.26
Technical Specifications for Instrumentation Page/Pages 16/17
Designer REPORTS
Sample documentation of detail engineering documents for instr. Rev.: 1.00.00
Software configuration data supply Date: 19.09.2011
-------------------- --------------------
MADE BY INSPECTOR
MOL Group MGS-S-REF-I-30.26
Technical Specifications for Instrumentation SIS (ESD) Page/Pages 17/17
Designer Sample documentation of detail engineering documents for instr. Software taglist Rev.: 1.00.00
configuration data supply Date: 19.09.2011
1 UZL0001_1 TECHNOLOGICAL INTERLOCK FLAG SIS2 - - - DIR OPEN N_OPEN 001 HIGH
2 UZL0001_2 PB. INTERLOCK COMMAND FLAG SIS2 - - - DIR CLOSED N_CLOSED 001 HIGH
3 HAH0001B START ENABLED FLAG SIS2 - - - DIR ALLOW FORBID. 002 JOURNAL
4 KAH0002 START TIME ELAPSED FLAG SIS2 - - - DIR ALARM NORMAL 002 LOW
5 XAHH0002B STRT AND ESD COND. NOT OK FLAG SIS2 - - - DIR ALARM NORMAL 002 LOW
8 VZH0005_FO MOTOR VIBRATION FO FLAG SIS2 - - - DIR ALARM NORMAL 021 HIGH
9 LZL0006_FO OIL LEVEL FO FLAG SIS2 - - - DIR ALARM NORMAL 021 HIGH
10 LZHH1001 SUNC. VESSEL LEVEL MAX. FLAG SIS2 - - - REV MAXIMUM NORMAL 005 HIGH
HH: 80,
11 LI1001A SUNCTION VESSEL LEVEL AI SIS2 100,0 0,0 % - - - 005
LL: 20
HH: 80,
12 LI1001B SUNCTION VESSEL LEVEL AI SIS2 100,0 0,0 % - - - 005
LL: 20
HH: 80,
13 LI1001C SUNCTION VESSEL LEVEL AI SIS2 100,0 0,0 % - - - 005
LL: 20
14 KI0002 REMAINING START TIME TIMER SIS2 120 0 SEC - - - 002 -
15
16
SLOVNAFT a.s.
R&M Division
MOL Group
TECHNICAL SPECIFICATION
INSTRUMENTATION
MGS-S-REF-I-30.27
Rev 1.00.00
This document is property of MOL Group. The use is only allowed with the written permission of MOL Group.
SLOVNAFT a.s. MGS-S-REF-I-30.27
R&M Division
Release list
This document is property of MOL Group. The use is only allowed with the written permission of MOL Group.
SLOVNAFT a.s. MGS-S-REF-I-30.27
R&M Division
Contents
7LWOH02/*URXS6DPSOHXQLW
3DJH3DJHV
02/*URXS 0*665(),
6DPSOHSODQ 3DJH3DJHV
%RRN
02/*URXS 0*665(),
6DPSOHSODQ 3DJH3DJHV
%RRN
02/*URXS
0*665(),
6DPSOHSODQ
3DJH3DJHV
%RRN
02/*URXS
0*665(),
6DPSOHSODQ
3DJH3DJHV
%RRN
02/*URXS 0*665(),
6DPSOHSODQ 3DJH3DJHV
%RRN
02/*URXS
0*665(),
6DPSOHSODQ
3DJH3DJHV
%RRN
02/*URXS 0*665(),
6DPSOHSODQ 3DJH3DJHV
%RRN
02/*URXS
0*665(),
6DPSOHSODQ
3DJH3DJHV
%RRN
02/*URXS 0*665(),
6DPSOHSODQ 3DJH3DJHV
%RRN
02/*URXS 0*665(),
6DPSOHSODQ 3DJH3DJHV
%RRN