You are on page 1of 2

Petroleum Planning & Analysis Cell

Gas Pipeline Network as on 01.04.2018


Design Average flow % Capacity
Length
Network/Region Entity Capacity Pipeline Size 2017-18 (P) utilisation 2017-
(Kms)
(mmscmd) (mmscmd) 18 (P)

Hazira-Vijaipur-Jagdishpur Pipeline/Gas
rehabilitation and expansion project GAIL 4554 53.0 36" 29.52 56%
pipeline/Dahej-Vijaipur Pipeline & spur/ Vijaipur-
Dadri Pipeline
DVPL-GREP upgradation (DVPL-II & VDPL) GAIL 1385 54.0 48" 35.92 67%
*Chhainsa-Jhajjar-Hissar Pipeline (CJPL) (Including
spur lines) commisioned up to Sultanpur, Jhajjar- GAIL 310 5.0 36" /16" 1.01 20%
Hissar under hold (111 Km)
Dahej-Uran-Panvel Pipeline (DUPL/ DPPL) GAIL 928 19.9 30"/18" 13.94 70%
including spur lines
*Dadri- Bawana-Nangal Pipeline (DBPL), Dadri-
Bawana: 106 Km, Bawana-Nangal: 501 KM, spur GAIL 852 31.0 36"/30"/24"/18" 5.49 18%
line of BNPL: 196 Km
Dabhol-Bengaluru Pipeline (Including spur) Phase GAIL 1116 16.0 36"/4" 1.27 8%
-1- 997 km, Phase 2 - 114.6 km
GAIL 48 6.0 16"/4" 2.29 38%
Kochi-Koottanad-Bengaluru-Mangalore (Phase-1)
Tripura (Agartala) GAIL 60 2.3 12" 1.30 57%
Gujarat# GAIL 685 8.3 24"/16"/12" 4.37 53%
Rajasthan (Focus Energy) GAIL 151 2.4 12" 1.35 57%
Mumbai (Uran-Thal-Usar & Trombay-RCF) GAIL 131 7.0 26" 6.43 91%
KG Basin (including RLNG+RIL) GAIL 884 16.0 18" 5.40 34%
Cauvery Basin GAIL 306 8.7 18" 3.25 38%
East- West Pipeline (RGTIL) Reliance 1480 80.0 48" 17.00 21%
Shahdol-Phulpur Pipeline (RGPL) Reliance 304 3.5 16" 0.53 15%
GSPL network including spur lines GSPL 2618 43.0 Assorted 25.33 59%
Assam Regional Network AGCL, DNPL 817 3.2 16" and others 2.25 69%
Dadri-Panipat IOCL 140 9.5 30"/10" 4.34 46%
Total 16770 369
Source: Pipeline operating companies
Note:
*CJPL and DBPL pipelines are the extension of DVPL-II / VDPL.
#GAIL's Ahmedabad, Bharuch, Vadodara (Undera) pipelines have been clubbed under Gujarat network
GAIL's Assam (Lakwa) pipeline network is in the process of being transferred to AGCL
ONGCL Uran-Trombay pipeline is for internal use
Petroleum Planning & Analysis Cell

Gas Pipeline under Execution / Construction as on 01.04.2018


Design Status of
Length
NETWORK/REGION Entity Capacity Pipeline Size Pipeline laid
in Kms
(mmscmd) (Km)
Kochi - Kottanad - Bengaluru - Mangalore GAIL(India) Ltd. 1056 16.0 24"/18"/12" 240

Dabhol -Bengaluru (DBPL) Spur Lines,


Phase-2
GAIL(India) Ltd. 302 16.0 36"/30"/24"/18" Only LMC pipelines
are being
constructed

Authorization of
Surat - Paradip GAIL(India) Ltd. 2112 74.8 36"/24"/18" this pipeline has
been cancelled
Jagdishpur- Haldia-Bokaro-Dhamra
(JHBDPL) (Phase-I, 755 Km, 7.44 MMSCMD GAIL(India) Ltd. 2539 16.0 30”/24"/18"/12”/8”/4” 577
Capacity)

Mallavaram - Bhilwada* GSPC India Transco Ltd. 2042 78.3 42”/36"/30"/24"/18"/12” 0


Mehsana - Bathinda * GSPC India Gasnet Ltd. 2052 77.1 36”/24”/18”/12” 170
Bathinda -Jammu-Srinagar* GSPC India Gasnet Ltd. 725 42.4 24”/18”/16”/12”/8”/6” 71
Kakinada - Vizag-Srikakulam * AP Gas Distribution Corporation. 391 90.0 24”/18 0

Ennore- Nellore* Gas Transmission India Pvt. Ltd. 250 36.0 24”/18” 0
Ennore-Thiruvallur-Bengaluru-Puducherry-
Indian Oil Corporation Ltd. 1385 84.7 28"/24”/16”/12"/10" 0
Nagapattinam-Madurai-Tuticorin*
Jaigarh-Mangalore* H-Energy Pvt. Ltd. 635 17.0 24" 0
Total 11377
Source : PNGRB, GAIL(India) Ltd., Pipeline authorised companies
*Competitive Bidding