NARMADA OFFSHORE 

 
 

PROVEN TRACK/EXPERIENCE RECORD FOR THE LAST 10 YEARS 

Year  Client  Dia  Length  Scope of Work Location


(Inches)  (Kms) 
PRE‐COMMISSIONING & CLEANING PIGGING ACTIVITIES 
2020  KSS / GAIL / MECON  36”  165 Hydrotesting, dewatering, swabbing and  Guna, Madhya 
drying of 36” dia x 165 kms long Vijaypur  Pradesh 
Auraiya Pipeline (Part‐A) project 
2020  ONGC  6” to 42” 5000  Annual Maintenance contract for cleaning  Mumbai High,
  Nos.  pigging of offshore pipelines for a period  Maharashtra 
of 3 years. Approx. 5000 nos of pigging 
done in a single contract. 
2020  Advance/ MEIL /GIGL  30”  100 Hydrotesting, dewatering and swabbing  of  Ajmer, Rajasthan 
30” dia x 100 kms long Mehsana Bhatinda  
Pipeline (PH‐II) project 
2020  ILFS / GAIL / MECON  24”  78 Vacuum drying and nitrogen purging of  Kasargod, Kerala
24” dia x 78 kms long Kochi‐Koottanad 
Pipeline Project at Kasargod 
2020  Advance Infra / GAIL  36”  185 Hydrotesting, dewatering, swabbing and  Jhansi, Uttar 
drying of 36” dia x 185 kms long Vijaypur  Pradesh 
Auraiya Pipeline (Part‐B) project 
2020  H‐Energy / EIL  30”  38 Pre‐commissioning including vacuum  Ratnagiri, 
drying and nitrogen purging of Jaigarh‐ Maharashtra 
Dabhol pipelines. 
2020  MbpT/Sapura  42”  4.350 Pre‐commissioning of Fifth Oil Berth  Mumbai, 
Project at Jawahar Deep at Mumbai Port  Maharashtra 
Trust (42” dia x 4 Kms Offshore section 
and 350 meters in Onshore Section) 
2019  DPS/IOCL  42”  25 De‐commissioning,  Pre‐commissioning  Vadinar, Gujarat
services cleaning, pigging, hydro‐testing, 
dewatering, swabbing, vacuum drying and 
nitrogen packing of IOCL’ 42” dia x 25 kms 
Vadinar pipeline project.   
2019  GAIL/ Mastek/ Raj  18”  25.8 Vacuum drying and nitrogen purging of  Gadepan, Rajasthan
Enterprise  Borreri‐CFCL‐III Gadepan Gas pipeline 
project  of M/s. GAIL 
2019  Power Mech/IOCL  16  22 Vacuum drying and nitrogen purging of  Ennore, Tamil Nadu
Ennore to NFL Manali, Chennai project of 
M/s. IOCL 
2019  BGEIPL  16  12 Cleaning, gauging, pigging,  MFL, EGP,  Panna Field
4  5  Dewatering, swabbing, drying and nitrogen 
  purging operations for 16” dia x 4” dia 
pipelines at Panna Field. 
2020 &  Sapura / ONGC  6”  3.50 Flooding, Cleaning, Gauging &  ONGC, Mumbai 
2019  8”  35  Hydrotesting of Subsea Pipelines for PRP‐V  High 
10”  18  Season‐1 & 2 Pipeline Project 
12”  16 
2019  Kreuz Subsea/ONGC  10”  10 Flooding, Cleaning, Gauging &  ONGC, Mumbai 
12”  27  Hydrotesting of Subsea Pipelines for PRP‐ High 
14”  9  IV Pipeline Project 
16”  11 
18”  10 
2019  Allied / IGL  8”  10 Hydrotesting works of city gas pipeline  Delhi
project 
2018  Kreuz Subsea/ONGC  24  36 Flooding, Cleaning, Gauging &  ONGC, Mumbai 
NARMADA OFFSHORE 
 
 

18  19 Hydrotesting of Subsea Pipelines for  High


  12    32  Daman Development Pipeline Project 
8  20 
2018  GAIL/MECON/JSIW  30  95 Cleaning, Gauging, Water filling,  Varanasi
Infrastructure    Hydrotesting, Dewatering, Swabbing and 
vacuum drying of Phulpur Haldia Pipeline  
cross country pipeline Project Phase‐1B. 
2018  McDermott / ONGC  14  94 Flooding, cleaning, gauging, Hydrotesting, ,  Andhra Pradesh
dewatering, MEG swabbing, Nitrogen 
packing of the complete pipeline sections 
from onshore to offshore pipelines and 
Umbilical testing & Flowline testing of 
subsea pipelines for Vashistha & S1 Field 
Development project at Odaleruvu for 
M/s.ONGC. 
2017  Sapura Kenkana /ONGC  16  60 Flooding, Cleaning, Gauging, Hydrotesting  ONGC, Mumbai 
14  2.5  of 11 pipelines & , Dewatering, Swabbing,  High  
8  45  drying, Nitrogen packing of Subsea 
6  8  Pipelines for B‐127 Pipeline Project 
2016  VM (Gulf) /ONGC  6  5 Flooding, Cleaning, Gauging, Hydrotesting  ONGC, Mumbai 
8  15  of 5 pipelines &, Dewatering, Swabbing,  High & Basin filed. 
20  69  drying, Nitrogen packing of Subsea 
Pipelines for 20” x 78 Kms long for 
MHNRD‐PH‐III Project 
2016  BGEIPL  10  4.5 Decommissioning of Tapti wellhead STA,  Tapti Field
12  4.3  STB, STC, STD & MTA topsides and 
20  21.9  pipelines in Tapti Field. 
2016  B&R/GAIL  16  58 Flooding, Cleaning, Gauging, Hydrotesting,  Bhilwara, Rajasthan
Dewatering, Swabbing& vacuum drying of 
GAIL’s VKPL project at Rajasthan 
2015  GAIL  30  608 Cleaning pigging of DUPL‐DPPL‐UTPL  Maharashtra & 
26  20  pipelines  Gujarat Region 
24  32 
2015  GAIL  24  95 Cleaning pigging of GAIL‐KG Basin Pipelines  KG Basin, 
20  41  on ARC Basis  Andhra Pradesh 
18  307 
16  45 
14  9 
12  20 
4 to 8  142 
2015  GAIL  18  83 Hydrotesting, Air Drying, Vacuum Drying  KG Basin, 
16  36  and Nitrogen purging of pipelines  Andhra Pradesh 
14  17 
12  10 
10  10 
4 ‐ 8  57 
2015  GAIL   12  2324 Cleaning pigging of VSPL Vizag region  Vizag, 
pipelines on ARC Basis  Andhra Pradesh 
2015  GAIL  10  1476 Cleaning pigging of VSPL Cherlappally  Cherlappally, 
region pipelines on ARC Basis  Andhra Pradesh 
2015  GAIL  12  2004 Cleaning pigging of VSPL G. Konduru  K. Cheruvu, Andhra 
10  1339  region pipelines on ARC Basis  Pradesh 
8  127 
2015  CAIRN ENERGY  24  48 Dewatering of pipelines at Bhogat  Bhogat, Gujarat
 
 
NARMADA OFFSHORE 
 
 

2015  L&T Sapura Kencana    Pipeline Jacket flooding services for Vasai  Mumbai High


East Project of ONGC. 
 
2015  Sapura Kencana  6”  2.90 Flooding, cleaning, gauging and  Mumbai High
8”  15.40  hydrotesting of pipelines. 
18"  17.26 
2014  GAIL (India) Ltd  8”,  842 De‐commissioning of pipeline by nitrogen,  K.G. Basin, 
12,  Water filling, Hydrotesting, dewatering, Air  Kakinada, 
14”  Pigging, Air Drying, Vacuum drying,  Andhra Pradesh 
16”  Swabbing and Nitrogen Purging 
18” 
2014  BPCL / Punj Lloyd  10”  28 Hydrotesting, Pre‐commissioning,  Mumbai, India
Commissioning,Dewatering and EGP 
survey of Pipelines (Onshore & Offshore 
Sections). 
 
2014  Supreme/British Gas  10”  5.7 Hydrotesting of pipelines Panna‐Mukthafield, 
India 
2014  ONGC/Leighton  6”  7.78 Flooding, Cleaning, Gauging and  Mumbai High, India
12”  38.50  Hydrotesting.  
16”  18.55 
18” &  13.08 
20”  11.26 
2014  GSPC/Punj Lloyd   20” & 10” 25 & Flooding, Cleaning, Gauging, Hydrotesting,  Kakinada, Andhra 
17  Dewatering, Swabbing, drying, Nitrogen  Pradesh 
packing & Slug Cather activities (Onshore   
to Offshore) 
2013  ESSAR/BG  12” & SPM 3.0 Pigging, Hydro‐Testing, System Leak Test  New Panna Field, 
Mumbai High 
2013  OMPL/Toyo   14”  6 Pigging Mangalore / India
10”  6 
8”  10 
6”  13 
2013  PETRONET/TOYO  10”,  3.2 Pigging Dahej/India
32”(2 lines) 
2013  BPCL‐Mumbai  24”  11 De‐Commissioning,  Uran‐JNPT / India
Filling, Hydro‐Testing, De‐Watering   
2013  MRPL‐GOL Offshore  SPM  System Leak Testing of SPM Mangalore/ India
2013  RELIANCE  6”  30 Pigging Mumbai / India
2013  Subsea 7 Singapore  8”  3 Flooding, Cleaning, Gauging, Hydro‐ Kakinada / India
Contracting Pte Ltd /  10”  52  testing, De‐watering, Swabbing, Drying, 
ONGC  Nitrogen Purging 

2012  Punj Lloyd Ltd. / British  12”  3 Flooding, Cleaning, Gauging & Hydro‐ India


Gas   testing 
2012  Swiber Offshore  12”  6 Flooding, Cleaning, Gauging & Hydro‐ India
Construction Pte. Ltd. /  14”  9  testing 
ONGC  16”  1.5 
2012  Swiber Offshore  8”  7 Flooding, Cleaning, Gauging & Hydro‐ India
Construction Pte. Ltd. /  10”  16  testing 
ONGC  12”  65 
16”  28 
2012  Valentine Maritime Ltd  8”  32 De‐watering Drying & N2 Purging of  India
& Valentine Maritime  10”  Subsea Pipelines 
Mauritius Ltd. / ONGC  14” 
16” 
NARMADA OFFSHORE 
 
 

2011  Swiber Offshore / ONGC  18”  30 Flooding, Cleaning, Gauging & Hydro‐ India


  testing 
 
2011  Swiber Offshore  6”  90 Flooding, Cleaning, Gauging & Hydro‐ India
Construction Pte. Ltd. /  8”  testing 
ONGC  10” 
12” 
14” 
(Total 14 
Segments) 
2011  Leighton / ONGC  4”  1.85 Initial Health Check‐Up, Flooding,  India
8”  7.2  Cleaning, Gauging, EGP Survey and 
10:  45  Hydrotesting.  
2011  Fernas Constructions /  48”  270 Bulk Dewatering, Swabbing, Drying,  Onshore, India
GAIL (India) Ltd.  Caliper Survey and Vacuum Drying 
 
2011  Swiber Offshore  14”  7.5 Flooding, Cleaning, Gauging, Hydro‐ Panna Field, West 
Construction Pte. Ltd. /  4”  7.5  testing, De‐watering, Swabbing, Drying &  Coast, India 
British Gas  1.25”x2 lines  15  Nitrogen Packing 
2011  Leighton / ONGC  14”  11.8 Flooding, Cleaning, Gauging, Hydro‐testing  Bombay High Field, 
12”  18.5  and Preservation  India 
10”  45 
6”  4.5 
2010  Leighton Contractors /  48”  5.5 Flooding, Cleaning, Gauging,  Vizag, India 
Hindustan Petroleum  Hydrotesting & Leak Test of complete 
System 
 

Year  Client  Dia  Length  Scope of Work  Location 


(Inches)  (Kms) 
CONSTRUCTION ACTIVITIES – MECHANICAL,CIVIL, STRUCTURAL, ELECTRICAL AND 
INSTRUMENTATION WORKS 
2020  JSW / VCS  4”  4 Pipeline laying and associated facilities at JSW,  Dolvi, Maharashtra
Dolvi, Maharashtra.  
2020  Tata Projects Ltd /    Piping and Fabrication work at ONGC,  Odaleruvu, Andhra 
ONGC  Odaleruvu, Andhra Pradesh.   Pradesh 
2020  Tata Projects Ltd /    Civil and Structural Fabrication work at ONGC,  Odaleruvu, Andhra 
ONGC  Odaleruvu, Andhra Pradesh.   Pradesh 
2020  Idemitsu Lube Oil ‐  10”/12”  3 EPC Contract for Lube Oil Blending System  Mumbai, 
Mumbai  including plant piping at Patalganga Plant   Maharashtra 
2019  HPCL – Mumbai  24”  3.5 Pipeline re‐routing works for Vishaka New  Vizag, Andhra 
white Oil Terminal at  Vizag  Pradesh 
2017  HPCL ‐ Mumbai  14”  8 Pipes Pipe replacement project for Mumbai Solapur  Mumbai, 
Pipeline sections under MPSPL project   Maharashtra 
2017  McDermott / ONGC  Cofferdam  Constructions of Cofferdam and beach pull  Odaleruvu, Andhra 
construction  support for ONGC’s Vashishtha & S1 Filed  Pradesh 
work  Development Project 
2015  IOCL ‐Mumbai  Structural  Miscellaneous  structural work at Railway  Paradip,
work  Gantry  Area at Paradip including    Odisha 
Procurement, Fabrication and erection of 750 
MT Structural Steel.
2016  HPCL‐ Mumbai  Pump  Composite works for Mainline Pump  Mumbai,
Installation  installation at Khopoli Booster Station  Maharashtra 
under MPSPL project. 
2014  HPCL‐ Mumbai  1” to 12” 1.2 Km CSW works at Khopholi Booster  Mumbai,
NARMADA OFFSHORE 
 
 

StationFabrication, installation work  Maharashtra
including Mech., Civil and Pump 
foundation works 
2014  GAIL ‐ Rajahmundry    Fabrication and Erection works for 20” KGVKPL  KG Basin, 
Terminal works   Andhra Pradesh 
2013  DAS / IOCL  2” to 36” 30 Km Combined Station works for FF  Paradip,
Augmentation project at Tank Farm area   Odisha 
at Paradip, which comprising Mechanical, 
Piping, Civil, Structural & Architectural, 
Electrical & Instrumentation works   
2012  HYUNDAI / IOCL   2” to 42” 40 Km Combined Station Works for  Paradip,
augmentation of Fire water system at   Odisha  
Paradip Crude Oil Tank farm area which 
comprising procurement, installation and 
erection of  civil, structural, architectural, 
mechanical & piping, electrical and 
instrumentation works  including supply 
of new 20 KL FRP tanks, 5 KL SS tanks and 
modification of fire water tanks etc  for 
M/s.Das Offshore Engineering Pvt. Ltd. 
for M/s.Indian Oil Corporation Ltd., 
Paradip 
2011  HPCL‐Mumbai  12”  950 M Re‐routing of Black Oil Pipeline laying and  Mumbai,
associated works  Maharashtra 
 

You might also like