You are on page 1of 23

PROFILE

MARDIGU
WOWIEK
PRASANTYO

1
FORMAL EDUCATION
• Bachelor degree SFSU San Fransisco State University,
Master Applied Psychology in Criminal mind & Forensic Investigators

PROFESIONAL WORKING EXPERIENCE


• Panin Bank, Treasury Manager 1990-1993

• PT Megasino Investama, Director 1993-1999

• Interogator dan investigator for extra ordinary crime (esp : teroris) 2006 - 2011

• Mengajar di sekolah tinggi Intelegen Nasional, Sandha,, BIN, BAIS – Present

• KEIN Pokja energy 2015 - Present

• Staf ahli Anstra Kemenhan – 2015 - Present

BUSINESS EXPERIENCE

MARDIGU •


Owner & founder PT Titis Sampurna Oil & Gas company (sold)

Owner & Founder PT Laksel company

WOWIEK • Owner & Founder PT Cipta lintang Investment company

PRASANTYO
• Owner & Founder PT Narapatih Inspiratama Business

• Consultant Company

2
Company
Overview

3
major
experiences
in GAS
PIPELINES
East Java Gas Transmission System O&M
(1997 – 2007)

• Acting as an Operations and Maintenance (“O&M”)


contractor for PERTAMINA for a 440 km gas pipeline
(28” onshore & offshore), from Pagerungan Island to
Gersik with 200 MMSCFD Gas Flow Rate.

• Pipeline capacity : 600 mmscfd with SCADA control


system

4
Grissik - Duri Gas
Transmission System
O&M (1997 – 2003)

• In Cooperation with Nova


TransCanada Pipelines, Titis
Sampurna acting as an O&M
contractor for PT Perusahaan
Gas Negara (PGN) for 536 km
28” gas pipeline, from Grissik to
Duri (Central Sumatera) with 310
MMSCFD Gas Flow Rate.

5
West Natuna to Singapore Gas
Transmission System (2000)

Supervision, Verification and Certification of EPC and


Offshore Pipeline Installation and Testing for 656 Km
28”, 22”, 16” and 15” gas pipeline. The Pipeline is a cross-
border between Indonesia and Singapore start from
Block B - Conoco, Block A – Premier, Block Kakap – Gulf
(Indonesia) to Sakra Island (Singapore).

West Natuna to Malaysia Gas


Transmission System (2001)

Supervision, Verification and Certification of EPC and


Offshore Pipeline Installation and Testing for 135 Km
12”, 14”, 18” gas pipeline. The Pipeline is a cross-border
between Indonesia and Malaysia start from Kijing Field -
Keong Field – Hangtuah Platform (Conoco-Indonesia) to
Duyong Central Processing Platform (Petronas-Malaysia)

6
KM 53 - Bontang Gas Transmission System
(Start 2000), Own Investment

• The project (BOO) comprises of a 13 km 20” gas


pipeline in Bontang, East Kalimantan including
supporting facilities with 165 – 300 MMSCFD gas flow
rate.

• The gas is supplied by PERTAMINA and consumed by


Mitsui and Mitsubishi (Ammonia Plant).

• EPC were done by Titis Sampurna

7
major
experiences in
ENGINEERING &
CONSTRUCTION
Sub-sea Control System
Project Pagerungan Block C,
ARCO (1995 – 1996)

• Engineering Design, Fabrication &


Installation of the Sub-sea Control
System and associated equipment
to the existing Pagerungan-C Facility,
including the interfaces with existing
Facilities.

• The Work including the onshore and


offshore equipment such as: Sub-sea
Control System, Chemical Injection
System, Sub-sea Service Umbilicals,
Sub-sea Venturi Meter

8
Poleng Gas Field Re-activation
Project, East Java (1996 - 1999)
• An EPC and turnkey project for re-activating
and enhancing of five offshore’ wells name
Poleng Field of KODECO Energy.

• Scope of Work : Detailed Engineer,


Fabricate, Install, Hook-up and pre
commission the new facilities

Kamojang Geothermal Power


Plant
• Front End Engineering Design (FEED) 2004

Lahendong Geothermal Power


Plant
• Front End Engineering Design (FEED) 2005

• Project Management Consultant 2006

9
PROJECT
LOCATION
AIR SERDANG

27.5 km 10” Gas Pipeline 3 X 1500 HP Gas


14 MMSCFD Flowrate Compressors &
32.5 km 8” Gas Pipeline Dehydration Unit
22 MMSCFD Flowrate

Prabumulih
BERINGIN

LIMAU TIMUR
4 X 1500 HP Gas
Compressors &
Dehydration Unit
LPG Plant (200 MTD LPG,
1500BBLD Condensate)
& CO2 Removal

Project
Location

10
south sumatera
GAS UTILIZATION
Gas Transmission System- 60 km
Gas Compressor Stations - 7 x 1500 hp
Gas Extraction Facility (36 MMSCFD Feed Natural Gas)
• CO2 Removal

• LPG Plant (200 MTD LPG, 1500 BBLD Stabilized Condensate)

11
LIMAU TIMUR
LPG extraction
plant + co2
removal

12
SEMANGGI BLOCK,
central java REMBANG SURABAYA
Flared Gas Utilization PATI
For CNG Business 82 km from
Mother
KUDUS Station

97 km from
DEMAK Mother
Station

120 km from
Mother
Station

BLORA

Semanggi
Gas Field
1- 5 mmscfd

CEPU
CNG Mother
Station

13
CNG FACILITIES,
central java

14
Gas Supply
To Tambak
Lorok Ccgt
Power Plant
Central Java

Investment of 140 km 20

gas pipeline with 6,000 hp

compressorsfrom gundih area

to tambak lorok power plant,

central java

15
PROJECT
LOCATION

Gas Delivery Point

Gas Compressor
Station

Gas Receiving Station

Proposed 20”
130km Gas Pipeline

16

GAS LOCATION
ARRA
AMANDARU
HOTEL CEPU 17
ARRA LEMBAH
PINUS HOTEL
CILOTO PUNCAK
18
NUSA PENIDA
CRYSTAL BAY 19
AREA 247
KETAPANG
BANYUWANGI 20
21
stay
connected

fb.com/wowiek

mardiguwp

mardiguwp
W W W . CY R O N I U M . C O M

23

You might also like