Professional Documents
Culture Documents
PREPARE
BY
CONTRACTOR
PREPARE
BY
CONTRACTOR
PT.BUDI RIDES CEMERLAND
JOB LIST FOR PT.BUDI RIDES CEMERLANG
Man Power
NO JOB DISCRIPTION Area Total Manpower
Formen Fitter Welder Helper Skafolding
1 Manpower jeti Jeti Office 11 1 3 3 12
2 intall pipe WHP Formen 5 1 2 2 4
3 Fabrication ramdor portebel log Workshop BRC Fitter 1 2 2 9
stalking
4 install plat from VE Welder 1 2 1 3
5 Install pipe hidran 3" RC Helper 2 1 4
6 Painting RB Skafolding 1 4 6
7 install skafolding PDM 1 6
TOTAL 16 6 15 9 44 0
PREPARE
BY
CONTRACTOR
PT.BUDI RIDES CEMERLAND
UDI RIDES CEMERLANG
Up date : 26.Nov.2018
Man Power
Remarks
Total PIC
19 Mario
9 Hendi
14 Mario
7 Rudi
7 Hendri
11 Gusti
7 Endi
0
0
0
0
0
0
0
0
0
74