17 Mould Health Report

No. Of No. of Cavities Reason for


S.No. Mold No/Product cavities active blockage Corrective action plan Target date Remarks

Gate size correction has cone in all 12 cavity to Done


1 Double Mint Fresh Wrigley Mould (12 Cavities) - IM 845 12 12 Improve Gate point Problem

O- Ring of Cavity Insert changed.At slider area Done


provision of Nipple discussed with mold maker to
2 Dabur Stream Cutter T3488 B01-B48 48C 48 48 prevent Leakage

Under
15-Mar-24
Mold Body Water line has got Crack .Send to Mold Process
3 750ml Head & Shoulder Bottle 2+2 Cavity 2/1 to 2/4 2+2 2+2 Maker for Correction

Done
4 IM 1043 Focus Cap 75 S5/01 TO S5/08 8C 12 12 Flash at stipper area correcton Done

Done
5 100gm Kissan Jar IML Mould 8 Cavity B1-B8 IM-817 8 8 Flash at stipper area correcton Done

Done
6 100gm Kissan Jar IML Mould 8 Cavity B1-B8 IM-928 8 8 Bacl flow from Menifold area correction Done

BO GH ATL PEARL WH PTEN SHM 750ML IN A2429A / Shoulder pinchoff cutting area got Bullged which laser Done
7 B2429B 2+2 2+2 2+2 welding and Matching Done

Done
8 Tamper Evident TE Cap Green 48 48 Mold PM done for improve cooling problem

Heater Flash at stipper area correcton Done .New Local Done


9 50gm NRCT New Cap - Light Blue 16 14 Problem Heater unde process to run all 16 Acvity

TINDER 30GM CAP (12 CAVITY) Done


10 12 12 One Main Core replace to Improve flash Problem
18 MOLD MAINTAINTENCE REPOR
From Date : 01/Feb/2024 To Date : 29/Feb/2024

Break Complaint Time Machine No Prod. User Maint. User Reason Comp-HO-Diff Production Comments Maintenance Comments
DownTime

Mould STIPPER INNER CLEAN AND


2/1/2024 2/1/2024 IM 11 Subham Naresh problem 30 KISSAN TUB OUTER FLASH VENTING

Mould WATER LEAKAHE IN H&S MOLD CHANGED WITH


2/4/2024 2/4/2024 BM 02 PRADEEP SACHIN problem 120 750ML OTHER CAVITY

Mould POLISHING DONE AND NEW


2/7/2024 2/7/2024 IM 09 RAISHAV Naresh problem 120 RUNNER CATCHING SPRING FITTED

SHORT COMPOMENT THREAD SLIDER CLEANING AND


2/7/2024 2/7/2024 IM 19 Subham Naresh MOLDING 120 CUT POLISHING

Mould CAVITY PLATE OPEN CLEAN


2/12/2024 2/12/2024 IM 9 Subham Naresh problem 150 FILLING PROBLEM & POLISHING DONE

Mould
2/13/2024 2/13/2024 IM 5 RAISHAV Naresh problem 120 LIMIT BOLT BROKEN NEW LIMIT BOLT FITTED

Mould CAVITY REPLACE AND


2/16/2024 2/16/2024 IM 17 Subham Naresh problem 130 FLASH PROBLEM CORRECTION DONE

NOZZLE CLEANIG AND NOZZLE


2/17/2024 2/17/2024 IM21 Subham Naresh PROBLEM 120 MATERIAL LEAKAGE RADIUS DONE