You are on page 1of 3

1- PE ESTIMATED

HOUSES 820 no

n 25 yr

PE 17168 cap

2- QIN calc.
Qavg 7107.552 m3/day

30 PF 3

QIN 21322.656 M3/day

888.444 M3/HR

14.807 M3/MIN

0.247 M3/SEC

3- Find Storage Tank

300 W 3 m

300 L 3 m

340 D 3.4 m

Vin 30.60 m

Tfill 2.07 min

ok

4- Find Empty Rate


Tempty 2 min

2110 Q empty 21.1 m3/min

Vout 42.2 m3

Vin 60.21 m3

or Q empty 30.1074 m3/min

5- TC 4.0665343004 MIN

C/HR 14.75

OK
6- GENERL DATA

GL 3

PIPE INLET INV 0

SHALLOW ST INV 1.75

6- STORAGE FACILITIES DIM AND CAPACITIES

1- WETWELL under inlet pipe

31 W 3.1 M

31 L 3.1 M

18 H bellow inlet pipe 1.8 M

V BELLOW INLET PIPE 17.298 M

capacity kept 17.298

volume flooded 13.302

Hahead inlet pipe 0.71

V ahead pipe 6.8231

capacity kept 6.8231

volume flooded 6.4789

flood hight= 0.6741831426 m

2- inlet pipe

Lenth 30 m

9D 710 m

18 S 0.0018

A 0.3957185 m2

Vfull 1.2111737978 m/sec

Qfull 0.4792838785 m3/sec

Qin= 0.24679 m3/sec

Qin/Qfull 0.5149140438

dw/Dpipe 0.510602875

dw= 0.3625280412 m

water flood high 0.6741831426 m


water back flow

2 WETWELL ONLLY

INLET PIPE +WELL PART+MANHOLE PART+ SCREEN CH BESIDES PIPE

WETWELL+SCREEN CHAMBER+INLET MANHOLE+INLET PIPE

1- START PUMPS LEVEL UNDER INLETPIPE CROWN

2- MAXWL=INPCRWNL

3- HWL(STARTL)=

You might also like