Terminology

ANTI-CLIMBING DEVICE CONDITION ASSESSMENT EASEMENT PAYMENT


Guards fitted to all steel towers as a Visit to tower to make assessment For pipelines and cables this is
deterrent to unauthorized climbing. of all parts for future maintenance calculated on a ‘per metre run’
programmes. basis, related to the value of the
AGI affected land and the width of the
Above ground installation – CONSENT LETTER easement required. For overhead
for gas equipment. A pre-entry agreement prior to lines, this is by multiplier of the
completion of the legal Deed of annual wayleave payment.
ANGLE/DEVIATION TOWER Grant. The form contains details of
Tower where a horizontal insulator the pipeline specification, payment EASEMENT STRIP
string attaches the conductors. due and is accompanied by a plan Area covered by easement
Deviation or ‘angle’ towers are used of the proposed route. The Consent agreement.
at points where the overhead line Form also permits access to land for
route changes direction. construction. ELECTRICAL SAFETY
CLEARANCES
BOREHOLE SURVEY CUT-OFF DRAINAGE Specified minimum safety clearances
Used to determine soil and ground Cut-off drainage is designed to that must be maintained between
suitability for directional drilling and ensure those existing drainage overhead lines, the ground, buildings,
tower foundations. systems outside the pipeline roads and railways etc.
or underground cable working
BULK TRANSPORTATION ENVIRONMENTAL IMPACT
strip function properly during the
SYSTEM ASSESSMENT (EIA)
construction period.
National high pressure cross-country A statutory procedure for undertaking
gas pipelines up to 48 inches DEED OF GRANT OF an assessment of a project’s likely
in diameter. EASEMENT/ DEED OF significant environmental effects.
CABLE SERVITUDE (IN SCOTLAND)
A legal right in perpetuity granting ENVIRONMENTAL
An insulated conductor designed for STATEMENT
National Grid the right to install,
underground electricity transmission A statement describing the likely
use and maintain its equipment.
or distribution. significant effects of development
An easement is granted in exchange
on the environment and proposed
CABLE RESERVE for a one-off capital payment.
The legal right is granted by mitigation measures.
The corridor (swathe) of land within
which underground cables are laid formal documentation. FARMERS’ OPEN MEETING
in the ground. An informal meeting where National
EARTH WIRE
Grid and its main contractor inform
CLA Wire strung between the tops of
towers used for lightening and all affected owners and occupiers
Country Land and Business
system protection. May also be used about the proposals and answer any
Association.
to carry telecommunications signals. questions or concerns raised.

APRIL 2018/VER3/DH
GRANTOR PRE-SANCTION SUBSTATIONS
An owner or occupier of land ENGINEERING WORKS Transforming or switching stations
where National Grid transmission Surveys to assess work needed. to control the voltage and direction
equipment is sited. of electricity.
PROPERTY PLATE
GRANTOR CODE Identity plate on tower giving SUSPENSION TOWER
Unique identification number for each tower number and emergency Tower where conductors are
grantor in the National Grid grantor telephone number. suspended by a vertical insulator
records and payments system. string. Suspension towers support
PYLON/TOWER the conductors on straight stretches
HIGH PRESSURE PIPELINE Overhead line structure used to carry of overhead line.
A pipeline operating at above 7 bar overhead electrical conductors,
or approximately 102 psi. insulators and fittings. They are TERMINAL TOWER
commonly known as pylons and are Towers erected at the end of the
INSULATORS of a lattice steel construction. overhead line to terminate the line
Used to attach the conductors to at substations or where overhead
the towers, preventing electrical RECORD OF CONDITION lines are connected to underground
discharge to the steel work. Document detailing land condition cables. Because of the uneven load
before works begin. on one side of the tower, much
INJURIOUS AFFECTION
deeper and heavier foundations are
Devaluation of property caused by REFERENCING
required on the unloaded side.
presence of apparatus. The gathering of information
relating to land ownership and TOWER PAINTING
LETTER OF UNDERTAKING tenancies along the route of the Application of a protective coating to
Statement of commitment to pipeline corridor. tower steel work, generally by brush,
landowners where high pressure gas
to protect from weathering and
pipelines are to be installed. Explains RUNNING TRACK
corrosion.
what we will do before, during and Land immediately adjacent to the
after the construction of the pipeline. pipeline trench contained within the TRANSMISSION LINE
working width for the use of vehicles A National Grid overhead line which
LINE PATROL required during construction. transmits electricity between National
A team who carry out visual
Grid’s substations.
inspections of an overhead line SRPBA
which can be done on foot or by Scottish Rural Property and WAYLEAVE AGREEMENT
helicopter to check tower structures, Business Association. A licence granted by the owner and
insulators, fittings and tree growth occupier of land giving National Grid
etc. in the vicinity of the overhead SEALING-END COMPOUND
the right to install, use and maintain
line. Helicopters may hover near the High voltage sealing-ends installed
its equipment. Terms of the Wayleave
tower for 5 to 10 minutes. in large compounds of about half an
Agreement provide for the annual
acre containing terminal towers and
rental and compensation payments
NFU / NFUS / FUW other equipment. They are required
to be made.
National Farmers’ Union / National where underground cables are
Farmers’ Union of Scotland / connected to overhead lines. WORKING STRIP
Farmers’ Union of Wales. The temporary area required to
SPAN
facilitate the construction of a pipeline.
(OVERHEAD) CONDUCTORS The distance from one tower to
These are generally twice the width of
Metallic wires strung from tower to the next.
the easement rights strip.
tower to carry the electronic current.
SITES OF SPECIAL
OVERHEAD LINE SCIENTIFIC INTEREST (SSSI)
REFURBISHMENT SSSIs are the country’s very best
Repair and renewal of conductors, wildlife and geological sites.
earthwire, fittings and insulators and,
where necessary, remedial works to
the pylon and foundations.

To find out more go to National Grid – Land, Planning & Development –


www.nationalgrid.com/uk/about-grid/our-networks-and-assets/land-planning-and-development