Price Template - Rajasthan Refinery Project (PART-A)

S.No. Description Nos Rate Total category


1 Man day 55 10000 550000
2 Travel cost 8 7000 56000 4 Visits for 2 experts are conside
3 Local conveyance 10 500 5000
4 Stay 20 2500 50000 10 days stay for 2 experts for the
5 Food 20 500 10000
6 Lumsump 1 80000 80000 Subcontracting
7 Total 751000
8 OH 20% 150200
9 Gross 901200
10 Profit 25% 225300
11 Price to Quote 1126500

Price Template - Rajasthan Refinery Project (PART-B)


S.No. Description Nos Rate Total category
1 Man day 55 10000 550000
2 Travel cost 8 7000 56000 4 Visits for 2 experts are conside
3 Local conveyance 9 500 4500
4 Stay 18 2500 45000 9 days stay for 2 experts for the
5 Food 18 500 9000
6 Lumsump 1 80000 80000 Subcontracting
7 Total 744500
8 OH 20% 148900
9 Gross 893400
10 Profit 25% 223350
11 Price to Quote 1116750
4 Visits for 2 experts are considered to Chennai - 1 expert from Bangalore & other from Mumbai/Delhi.

10 days stay for 2 experts for the workshop is considered

4 Visits for 2 experts are considered to Chennai - 1 expert from Bangalore & other from Mumbai/Delhi.

9 days stay for 2 experts for the workshop is considered


Major travel trips
Contingency

Travel Rate
Travel days
Mandays
Ofsite
Onsite
Activities

XXXX HAZOP & QRA Studies

SCOPE

KICK OF MEETING
HAZOP study for identifying Major Accident Event
PSI data collection 1 1
HAZOP Workshop 3 3
Draft report 2 2
Final report 1 1
0
QRA Study 0
Data collection & doc review - onsite 1 1
HAZARD IDENTIFICATION - Major Hazards Identification based on Hazop study in
the form of Isolatable Sections basis Two types of accident scenarios - low
frequency high consequence case and the other is of high frequency low 0
consequence case

Identify Scenarios - Assumptions Register 1 1


Input sheet preparation for software model development and software 1 1
running and result extraction

Event Tree and Frequency Analysis -


Event tree: The event trees determine the outcome frequencies that will 1 1
be input into the risk summation process
Frequency analysis: By utilising suitable data sources and modifiers, the
likelihood of failure of each scenario is determined as part of the QRA.
Consequence Modelling
Consequence modelling evaluates the resulting effects if the accidents
occur, and their impact on personnel, equipment and structures, the
environment or business.
TÜV SÜD utilises industry standard software that is approved by 1 1
authorities in Singapore for the consequences modelling. The outcome of
modelling will define the harm distances and harm footprints required.
QRA Analysis -Risk Assessment results (LSIR, IRPA, F-N Curve (based on
CPR 18 E (Purple book), Committee for the Prevention of Disasters,
Netherlands (Edition: PGS 3, 2005).
1 1 2
Consequence modeling results are interpreted in the form of toxicity,
thermal loading (fire) or blast overpressure (explosion).

Risk results are assessed in the form of Individual risk and shall be
accounted for injury / fatality to people (onsite & offsite) as well as
escalation off-site.Recommendations (showing ALARP criteria has met)
and report writing
ALARP Demonstration - Appropriate controls (preventive or mitigation)
shall be taken into consideration to keep the risk As Low as Reasonably
Practicable (ALARP).
The purpose of this approach is to identify potential improvements and/or
to demonstrate that the risks associated with scenarios classified as
“ALARP” are reduced as low as reasonably achievable from a technical
point of view and economic.

Comments incorporation post draft report review. 1 1


Final report 1 1

Total Man-days = Offsite + Onsite + contingency= 8 10 0 18


0
F
i
e
l
d

&
Fiel Fiel Fiel Fiel
Fiel
d& d& d& d&
Ld&
Lay Lay Lay Lay Field &
a Lay
out out out out Layout
y out
Re Re Re Re Review
o Revi
vie vie vie vie
u ew
w w w w
t
R
e
v
i
e
Field & Layout Review w

F
i
r
e

a
n
d

E
Fire Fire Fire Fire
x Fire
and and and and
p and
Exp Exp Exp Exp
l Expl Fire and
losi losi losi losi
Fire and Explosion Analysis o osio Explosion
on on on on
s n Analysis
An An An An
i Anal
aly aly aly aly
o ysis
sis sis sis sis
n

A
n
a
l
y
s
i
s
G
a
s
a
n
d

S
m
o
Ga Ga Ga Ga k
s s s s e
Gas
and and and and
and
Sm Sm Sm Sm D
Smo
oke oke oke oke i Gas and
ke
Dis Dis Dis Dis s Smoke
Gas and Smoke Dispersion Analysis Disp
per per per per p Dispersio
ersi
sio sio sio sio e n Analysis
on
n n n n r
Anal
An An An An s
ysis
aly aly aly aly i
sis sis sis sis o
n

A
n
a
l
y
s
i
s
N
o
n

P
r
o
c
No No No No
e
n n n n
s
Pro Pro Pro Pro Non
s
ces ces ces ces Proc
H Non
s s s s ess
a Process
Non Process Hazards Analysis Ha Ha Ha Ha Haz
z Hazards
zar zar zar zar ards
a Analysis
ds ds ds ds Anal
r
An An An An ysis
d
aly aly aly aly
s
sis sis sis sis
A
n
a
l
y
s
i
s

E
m
e
r
g
e
Em Em Em Em n
erg erg erg erg c
Eme
enc enc enc enc y
rgen
y y y y S
cy Emergenc
Sys Sys Sys Sys y
Emergency Systems Review Syst y Systems
tem tem tem tem s
ems Review
s s s s t
Revi
Re Re Re Re e
ew
vie vie vie vie m
w w w w s
R
e
v
i
e
w
l
y
s
i
s
c
o
v
e
Imp Imp Imp Imp r
act act act act i
An An An An n
aly aly aly aly g Imp
sis sis sis sis act
cov cov cov cov s Anal
erin erin erin erin h ysis Impact
g g g g i cove Analysis
shi shi shi shi p ring covering
p p p p ship ship
Impact Analysis covering ship collision and dropped objects
colli colli colli colli c colli collision
sio sio sio sio o sion and
n n n n ll and dropped
and and and and i drop objects
dro dro dro dro s ped
ppe ppe ppe ppe i obje
d d d d o cts
obj obj obj obj n
ect ect ect ect
s s s s a
n
d

d
r
o
p
p
e

A
s
s
u
m
p
Ass Ass Ass Ass ti
Ass
um um um um o
ump Assumpti
ptio ptio ptio ptio n
Assumption register tion on
n n n n
regi register
regi regi regi regi r
ster
ster ster ster ster e
g
i
s
t
e
r
R
i
s
k
r
e
d
Ris Ris Ris Ris
u
k k k k Risk
c
red red red red redu
ti Risk
ucti ucti ucti ucti ction
Risk reduction measures o reduction
on on on on mea
n measures
me me me me sure
asu asu asu asu s
m
res res res res
e
a
s
u
r
e
s

A
l
a
r
Ala Ala Ala Ala m Alar
rm rm rm rm m Alarm
Alarm Report
Re Re Re Re R Rep Report
port port port port e ort
p
o
r
t
C
r
it
i
c
a
l
Crit Crit Crit Crit c
Criti
ical ical ical ical o
cal
con con con con n Critical
cont
Critical controls report trol trol trol trol t controls
rols
s s s s r report
repo
rep rep rep rep o
rt
ort ort ort ort l
s
r
e
p
o
r
t

C
o
n
s
e
q
u
Co Co Co Co
e Con
nse nse nse nse
n seq
que que que que Conseque
c uen
Consequence analysis nce nce nce nce nce
e ce
ana ana ana ana analysis
anal
lysi lysi lysi lysi
a ysis
s s s s
n
a
l
y
s
i
s
a
l
y
s
i
s
c
o
v
Imp Imp Imp Imp e
act act act act r
ana ana ana ana i
lysi lysi lysi lysi n Imp
s s s s g act
cov cov cov cov anal
erin erin erin erin s ysis Impact
g g g g h cove analysis
shi shi shi shi i ring covering
Impact analysis covering ship collision and drop objects p p p p p ship ship
colli colli colli colli colli collision
sio sio sio sio c sion and drop
n n n n o and objects
and and and and ll drop
dro dro dro dro i obje
p p p p s cts
obj obj obj obj i
ect ect ect ect o
s s s s n

a
n
d

d
r
o
p
a
p
e

,
E
v
a
c
u
a
Esc Esc Esc Esc ti
ape ape ape ape o
Esc
,Ev ,Ev ,Ev ,Ev n
ape
acu acu acu acu
,Eva
atio atio atio atio a
cuati Escape
n n n n n
on ,Evacuati
and and and and d
and on and
Escape ,Evacuation and Rescue Analysis [EERA] Re Re Re Re
Res Rescue
scu scu scu scu R
cue Analysis
e e e e e
Anal [EERA]
An An An An s
ysis
aly aly aly aly c
[EE
sis sis sis sis u
RA]
[EE [EE [EE [EE e
RA] RA] RA] RA]
A
n
a
l
y
s
i
s
[
E
E
F
i
r
e

a
n
d
Fire Fire Fire Fire
and and and and G Fire
Ga Ga Ga Ga a and
Fire and
s s s s s Gas
Gas
Fire and Gas Mapping Study Ma Ma Ma Ma M Map
Mapping
ppi ppi ppi ppi a ping
Study
ng ng ng ng p Stud
Stu Stu Stu Stu py
dy dy dy dy i
n
g

S
t
u
d
y
we we we we p Sub
en en en en e sea
12” 12” 12” 12” li inter
HM HM HM HM n con
-HX -HX -HX -HX e necti
Fre Fre Fre Fre on
e e e e w betw Finalize
Ga Ga Ga Ga it een the
s s s s h 12” location
Pip Pip Pip Pip HM- for
elin elin elin elin 1 HX Subsea
e e e e 2 Free interconn
wit wit wit wit ” Gas ection
h h h h F Pipe between
12” 12” 12” 12” r line 12” HM-
Fre Fre Fre Fre e with HX Free
e e e e e 12” Gas
Ga Ga Ga Ga Free Pipeline
Finalize the location for Subsea interconnection between 12” HM-HX Free
s s s s G Gas with 12”
Gas Pipeline with 12” Free Gas pipeline from HY and 14” HX-HRA Free
pip pip pip pip a pipel Free Gas
Gas Pipeline with 10” Free Gas pipeline from HV based on QRA
elin elin elin elin s ine pipeline
e e e e p from from HY
fro fro fro fro i HY and 14”
m m m m p and HX-HRA
HY HY HY HY e 14” Free Gas
and and and and li HX- Pipeline
14” 14” 14” 14” n HRA with 10”
HX- HX- HX- HX- e Free Free Gas
HR HR HR HR Gas pipeline
A A A A f Pipe from HV
Fre Fre Fre Fre r line based on
e e e e o with QRA
Ga Ga Ga Ga m 10”
s s s s Free
Pip Pip Pip Pip H Gas
elin elin elin elin Y pipel
e e e e ine
wit wit wit wit a from
Local Travel Taxi

Sojorn

Hotel Stay Days

Stay Rate
Out of pocket expense
Manday Rate
Fees (In INR)
NPC
Sub con
F
i
e
l
d

&
Field
L&
Field & Field & Field & Field &
a Layou Field & Layout Field & Layout Field & Layout
Layout Layout Layout Layout
y t Review Review Review
Review Review Review Review
o Revie
uw
t
R
e
v
i
e
w

F
i
r
e

a
n
d

E
x
Fire
p
Fire and and
Fire and Fire and l Fire and Fire and Fire and
Explosio Explo Fire and Explosion
Explosion Explosion o Explosion Explosion Explosion
n sion Analysis
Analysis Analysis s Analysis Analysis Analysis
Analysis Analy
i
sis
o
n

A
n
a
l
y
s
i
s
G
a
s
a
n
d

S
m
o
k
e
Gas
D and
Gas and
Gas and Gas and i Smok Gas and Gas and Gas and
Smoke
Smoke Smoke s e Gas and Smoke Smoke Smoke Smoke
Dispersi
Dispersio Dispersio p Dispe Dispersion Analysis Dispersion Dispersion Dispersion
on
n Analysis n Analysis e rsion Analysis Analysis Analysis
Analysis
r Analy
s sis
i
o
n

A
n
a
l
y
s
i
s
N
o
n

P
r
o
c
e
s
Non
s
Proce
Non Non Non H Non
ss Non Process Non Process
Process Process Process a Non Process Process
Hazar Hazards Hazards
Hazards Hazards Hazards z Hazards Analysis Hazards
ds Analysis Analysis
Analysis Analysis Analysis a Analysis
Analy
r
sis
d
s
A
n
a
l
y
s
i
s

E
m
e
r
g
e
n
c
y Emer
Emerge S gency
Emergenc Emergenc Emergency Emergency Emergency
ncy y Syste Emergency Systems
y Systems y Systems Systems Systems Systems
Systems s ms Review
Review Review Review Review Review
Review t Revie
ew
m
s
R
e
v
i
e
w
l
y
s
i
s
c
o
v
e
r
i
n
g Impac
t
s Analy
Impact Impact Impact h sis Impact
Analysis Analysis Analysis i coveri Impact Analysis Impact
covering covering covering p ng Impact Analysis Analysis covering Analysis
ship ship ship ship covering ship covering ship ship covering ship
collision collision collision c collisi collision and dropped collision and collision collision and
and and and o on objects dropped and dropped
dropped dropped dropped ll and objects dropped objects
objects objects objects i dropp objects
s ed
i object
os
n

a
n
d

d
r
o
p
p
e

A
s
s
u
m
p
ti
Assu
o
Assump Assumpti Assumpti mptio
n Assumption Assumption Assumption
tion on on n Assumption register
register register register
register register register regist
r
er
e
g
i
s
t
e
r
R
i
s
k
r
e
d
u
Risk c Risk
reductio Risk Risk ti reduc Risk
Risk reduction Risk reduction Risk reduction
n reduction reduction o tion reduction
measures measures measures
measur measures measures n meas measures
es ures
m
e
a
s
u
r
e
s

A
l
a
r
m
Alarm
Alarm Alarm Alarm Alarm
Repor Alarm Report Alarm Report Alarm Report
Report Report Report R Report
t
e
p
o
r
t
C
r
it
i
c
a
l
c
o Critic
Critical Critical Critical n al Critical
Critical controls Critical Critical
controls controls controls t contr controls
report controls report controls report
report report report r ols report
o report
l
s
r
e
p
o
r
t

C
o
n
s
e
q
u
e
Cons
n
Conseq Conseque Conseque eque
c Consequence Consequence Consequen Consequence
uence nce nce nce
e analysis analysis ce analysis analysis
analysis analysis analysis analy
sis
a
n
a
l
y
s
i
s
a
l
y
s
i
s
c
o
v
e
r
i
n Impac
gt
analy
Impact
Impact Impact s sis Impact
analysis
analysis analysis h coveri Impact analysis Impact
covering Impact analysis
covering covering i ng analysis covering analysis
ship covering ship
ship ship p ship covering ship ship covering ship
collision collision and drop
collision collision collisi collision and collision collision and
and objects
and drop and drop c on drop objects and drop drop objects
drop
objects objects o and objects
objects
ll drop
i object
s s
i
o
n

a
n
d

d
r
o
p
a
p
e

,
E
v
a
c
u
a
ti
o
n Esca
pe
a ,Evac
Escape Escape Escape Escape
n uation Escape Escape
,Evacua ,Evacuati ,Evacuati ,Evacuation
d and Escape ,Evacuation ,Evacuation ,Evacuation
tion and on and on and and
Resc and Rescue Analysis and Rescue and Rescue
Rescue Rescue Rescue Rescue
R ue [EERA] Analysis Analysis
Analysis Analysis Analysis Analysis
e Analy [EERA] [EERA]
[EERA] [EERA] [EERA] [EERA]
s sis
c [EER
u A]
e

A
n
a
l
y
s
i
s
[
E
E
F
i
r
e

a
n
d

G
Fire
a
Fire and Fire and Fire and and Fire and
s Fire and Gas Fire and Gas
Gas Gas Gas Gas Fire and Gas Gas
M Mapping Mapping
Mapping Mapping Mapping Mappi Mapping Study Mapping
a Study Study
Study Study Study ng Study
p
Study
p
i
n
g

S
t
u
d
y
p
Subs
e
ea
li
interc
n
onnec
e
Finalize tion
the betwe
Finalize Finalize w
location en
the the it
for 12” Finalize the
location location h
Subsea HM- location for
for for
intercon HX Subsea
Subsea Subsea 1
nection Free Finalize the interconnec Finalize the
interconn interconn 2
between Gas location for tion location for
ection ection ”
12” HM- Pipeli Subsea between Subsea
between between F Finalize the location
HX Free ne interconnectio 12” HM-HX interconnectio
12” HM- 12” HM- r for Subsea
Gas with n between 12” Free Gas n between 12”
HX Free HX Free e interconnection
Pipeline 12” HM-HX Free Pipeline HM-HX Free
Gas Gas e between 12” HM-HX
with 12” Free Gas Pipeline with 12” Gas Pipeline
Pipeline Pipeline Free Gas Pipeline
Free Gas with 12” Free Free Gas with 12” Free
with 12” with 12” G with 12” Free Gas
Gas pipeli Gas pipeline pipeline Gas pipeline
Free Gas Free Gas a pipeline from HY and
pipeline ne from HY and from HY from HY and
pipeline pipeline s 14” HX-HRA Free
from HY from 14” HX-HRA and 14” 14” HX-HRA
from HY from HY p Gas Pipeline with 10”
and 14” HY Free Gas HX-HRA Free Gas
and 14” and 14” i Free Gas pipeline
HX-HRA and Pipeline with Free Gas Pipeline with
HX-HRA HX-HRA p from HV based on
Free 14” 10” Free Gas Pipeline 10” Free Gas
Free Gas Free Gas e QRA
Gas HX- pipeline from with 10” pipeline from
Pipeline Pipeline li
Pipeline HRA HV based on Free Gas HV based on
with 10” with 10” n
with 10” Free QRA pipeline QRA
Free Gas Free Gas e
Free Gas from HV
pipeline pipeline
Gas Pipeli based on
from HV from HV f
pipeline ne QRA
based on based on r
from HV with
QRA QRA o
based 10”
m
on QRA Free
Gas
H
pipeli
Y
ne
from
a
Project Details
REQUEST FOR QUOTATION SAFETY STUDIES UNDER NEW WATER INJECTION SOUTH - R (NWIS-R) PROJECT - ONGC / L&T HC T
major Processing Equipment / Facilities are as follows:
• Design Processing Capacity of 3,50,000 BWPD of raw sea water to render it suitable for
injection into the reservoir on continuous basis with all associated Process System, Utility
System, Telecom / Info-com Systems, Fire Detection & Suppression System, Helideck, lifesaving
systems/ equipment and other Support System.
• One (01) GTG of minimum load capacity of 8.4 MW.
• Living Quarters Facility:
SOW 100 persons
The deliverables thatwith
shallpartial dormitory
be produced type
by the arrangement.
Contractor shall include but are not
• Low Salinity Water injection
limited to the(LSWI) system of 1,25,000 BWIPD.
following:
There shall be modification/dismantling
 Safety Studies Projectwork on existing
Execution WIS,
Plan and BHS andThis
Schedule. SLQshall
platform Further
include details
project
on Scope of Work procedures
have been provided in Part-IV
such as Quality covered(including
Assurance in Vol. II Management of Change) and
Management of Assumption register, Management of HAZID Actions and
Management of Risk Reduction Actions.
 Safety Studies Plan and Safety Studies Methodology documents for the project.
 Initial high level review of modifications to existing facilities to ensure no
unacceptable risks are introduced.
 Hazards Identification workshops for the Works.
 Hazards Register and Hazards Identification documents with actions list. The
Hazards Register shall be maintained and updated periodically through the project.
 Internal and external safety audits
 Coarse QRA with feedback sessions into the design process team at earliest
timeframe. The coarse QRA report shall document the process, key assumptions,
and results. The coarse QRA shall be robust and provide sufficient information to
allow early design decisions on a risk based approach.
 Completion of the detailed Safety Studies:
- Fire and Explosion Analysis
- Gas and Smoke Dispersion Analysis
- Non Process Hazards Analysis
- Emergency Systems Review
- Escape and Rescue Analysis
- Quantitative Risk Assessment (Updated form Coarse QRA)
- Impact analysis covering ship collision and drop objects
 Develop and maintain relevant documentation registers. These include but are not
limited to:
- Assumptions Register
- Safety Studies Comments Register Complete and document the required HAZOPs for the detailed design ph
The
HAZOP report should document process and outcomes. The contractor shall be
responsible for closeout.
 Document demonstration of Critical Controls through use of Bowtie diagrams (or
similar)
 Complete and document an ALARP workshop to identify potential risk reduction
measures for the phase of the project. At this stage the emphasis would be on
hardware changes. The ALARP sessions shall be workshop based.
 Develop and maintain a Risk Reduction Measures (RRMs) register for tracking of
actions throughout the project. This shall be used for documenting the
identification, tracking and closeout of actions.
 Documentation recording audits of the project closeout process for each of the
HAZOP, HAZID and RRM actions.
 Complete and document a HAZID for the construction, installation, transportation
and commissioning phases. The HAZID shall be used to identify Major Accident
Event potential and shall put in place prevention/mitigation plans.
 Develop and maintain a Risk Reduction Measures (RRMs) register for tracking of
actions throughout the project. This shall be used for documenting the
identification, tracking and closeout of actions.
 Documentation recording audits of the project closeout process for each of the
HAZOP, HAZID and RRM actions.
 Complete and document a HAZID for the construction, installation, transportation
and commissioning phases. The HAZID shall be used to identify Major Accident
Event potential and shall put in place prevention/mitigation plans.
Construction, Transportation, Installation and Commissioning Phases
To discuss and as per ONGC Requirement
ER INJECTION SOUTH - R (NWIS-R) PROJECT - ONGC / L&T HC The

ter to render it suitable for


ated Process System, Utility
ssion System, Helideck, lifesaving

eype arrangement.
Contractor shall include but are not
PD.
,chedule.
BHS andThis
SLQshall
platform Further
include details
project
l.ing
II Management of Change) and
ement of HAZID Actions and

hodology documents for the project.


existing facilities to ensure no

orks.
documents with actions list. The
dated periodically through the project.
e design process team at earliest
ment the process, key assumptions,
nd provide sufficient information to
pproach.

m Coarse QRA)
drop objects
tion registers. These include but are not

e and document the required HAZOPs for the detailed design phase.

outcomes. The contractor shall be

ls through use of Bowtie diagrams (or

op to identify potential risk reduction


s stage the emphasis would be on
be workshop based.
asures (RRMs) register for tracking of
used for documenting the
ns.
ject closeout process for each of the

onstruction, installation, transportation


be used to identify Major Accident
tion/mitigation plans.
asures (RRMs) register for tracking of
used for documenting the
ns.
ject closeout process for each of the

onstruction, installation, transportation


be used to identify Major Accident
tion/mitigation plans.
Field & Field & Field &
Field & Layout
Layout Layout Layout
Review
Review Review Review

Fire and Fire and Fire and Fire and


Explosion Explosion Explosion Explosion
Analysis Analysis Analysis Analysis
Gas and Gas and Gas and
Gas and Smoke
Smoke Smoke Smoke
Dispersion
Dispersio Dispersio Dispersion
Analysis
n Analysis n Analysis Analysis
Non Non Non
Non Process Process Process Process
Hazards Analysis Hazards Hazards Hazards
Analysis Analysis Analysis

Emergenc Emergenc Emergency


Emergency
y Systems y Systems Systems
Systems Review
Review Review Review
Impact Impact Impact
Analysis Analysis Analysis
Impact Analysis covering covering covering
covering ship ship ship ship
collision and collision collision collision
dropped objects and and and
dropped dropped dropped
objects objects objects

Assumpti Assumpti
Assumption Assumptio
on on
register n register
register register
Risk Risk Risk
Risk reduction
reduction reduction reduction
measures
measures measures measures

Alarm Alarm Alarm


Alarm Report
Report Report Report
Critical Critical Critical
Critical controls
controls controls controls
report
report report report

Conseque Conseque
Consequence Consequen
nce nce
analysis ce analysis
analysis analysis
Impact Impact Impact
analysis analysis analysis
Impact analysis
covering covering covering
covering ship
ship ship ship
collision and drop
collision collision collision
objects
and drop and drop and drop
objects objects objects
Escape Escape Escape
Escape ,Evacuati ,Evacuati ,Evacuatio
,Evacuation and on and on and n and
Rescue Analysis Rescue Rescue Rescue
[EERA] Analysis Analysis Analysis
[EERA] [EERA] [EERA]
Fire and Fire and Fire and
Fire and Gas Gas Gas Gas
Mapping Study Mapping Mapping Mapping
Study Study Study
Finalize Finalize
the the
Finalize the
location location
location for
for for
Subsea
Subsea Subsea
interconne
interconn interconn
Finalize the ction
ection ection
location for between
between between
Subsea 12” HM-HX
12” HM- 12” HM-
interconnection Free Gas
HX Free HX Free
between 12” HM- Pipeline
Gas Gas
HX Free Gas with 12”
Pipeline Pipeline
Pipeline with 12” Free Gas
with 12” with 12”
Free Gas pipeline
Free Gas Free Gas
pipeline from HY from HY
pipeline pipeline
and 14” HX-HRA and 14”
from HY from HY
Free Gas HX-HRA
and 14” and 14”
Pipeline with 10” Free Gas
HX-HRA HX-HRA
Free Gas Pipeline
Free Gas Free Gas
pipeline from HV with 10”
Pipeline Pipeline
based on QRA Free Gas
with 10” with 10”
pipeline
Free Gas Free Gas
from HV
pipeline pipeline
based on
from HV from HV
QRA
based on based on
QRA QRA

and Commissioning Phases


Field & Field & Field & Field & Field & Field & Field & Field & Field & Field &
Layout Layout Layout Layout Layout Layout Layout Layout Layout Layout
Review Review Review Review Review Review Review Review Review Review

Fire and Fire and Fire and Fire and Fire and Fire and Fire and Fire and Fire and Fire and
Explosion Explosion Explosion Explosion Explosion Explosion Explosion Explosion Explosion Explosion
Analysis Analysis Analysis Analysis Analysis Analysis Analysis Analysis Analysis Analysis
Gas and Gas and Gas and Gas and Gas and Gas and Gas and Gas and Gas and Gas and
Smoke Smoke Smoke Smoke Smoke Smoke Smoke Smoke Smoke Smoke
Dispersio Dispersio Dispersio Dispersio Dispersio Dispersio Dispersio Dispersio Dispersio Dispersio
n Analysis n Analysis n Analysis n Analysis n Analysis n Analysis n Analysis n Analysis n Analysis n Analysis
Non Non Non Non Non Non Non Non Non Non
Process Process Process Process Process Process Process Process Process Process
Hazards Hazards Hazards Hazards Hazards Hazards Hazards Hazards Hazards Hazards
Analysis Analysis Analysis Analysis Analysis Analysis Analysis Analysis Analysis Analysis

Emergenc Emergenc Emergenc Emergenc Emergenc Emergenc Emergenc Emergenc Emergenc Emergenc
y Systems y Systems y Systems y Systems y Systems y Systems y Systems y Systems y Systems y Systems
Review Review Review Review Review Review Review Review Review Review
Impact Impact Impact Impact Impact Impact Impact Impact Impact Impact
Analysis Analysis Analysis Analysis Analysis Analysis Analysis Analysis Analysis Analysis
covering covering covering covering covering covering covering covering covering covering
ship ship ship ship ship ship ship ship ship ship
collision collision collision collision collision collision collision collision collision collision
and and and and and and and and and and
dropped dropped dropped dropped dropped dropped dropped dropped dropped dropped
objects objects objects objects objects objects objects objects objects objects

Assumpti Assumpti Assumpti Assumpti Assumpti Assumpti Assumpti Assumpti Assumpti Assumpti
on on on on on on on on on on
register register register register register register register register register register
Risk Risk Risk Risk Risk Risk Risk Risk Risk Risk
reduction reduction reduction reduction reduction reduction reduction reduction reduction reduction
measures measures measures measures measures measures measures measures measures measures

Alarm Alarm Alarm Alarm Alarm Alarm Alarm Alarm Alarm Alarm
Report Report Report Report Report Report Report Report Report Report
Critical Critical Critical Critical Critical Critical Critical Critical Critical Critical
controls controls controls controls controls controls controls controls controls controls
report report report report report report report report report report

Conseque Conseque Conseque Conseque Conseque Conseque Conseque Conseque Conseque Conseque
nce nce nce nce nce nce nce nce nce nce
analysis analysis analysis analysis analysis analysis analysis analysis analysis analysis
Impact Impact Impact Impact Impact Impact Impact Impact Impact Impact
analysis analysis analysis analysis analysis analysis analysis analysis analysis analysis
covering covering covering covering covering covering covering covering covering covering
ship ship ship ship ship ship ship ship ship ship
collision collision collision collision collision collision collision collision collision collision
and drop and drop and drop and drop and drop and drop and drop and drop and drop and drop
objects objects objects objects objects objects objects objects objects objects
Escape Escape Escape Escape Escape Escape Escape Escape Escape Escape
,Evacuati ,Evacuati ,Evacuati ,Evacuati ,Evacuati ,Evacuati ,Evacuati ,Evacuati ,Evacuati ,Evacuati
on and on and on and on and on and on and on and on and on and on and
Rescue Rescue Rescue Rescue Rescue Rescue Rescue Rescue Rescue Rescue
Analysis Analysis Analysis Analysis Analysis Analysis Analysis Analysis Analysis Analysis
[EERA] [EERA] [EERA] [EERA] [EERA] [EERA] [EERA] [EERA] [EERA] [EERA]
Fire and Fire and Fire and Fire and Fire and Fire and Fire and Fire and Fire and Fire and
Gas Gas Gas Gas Gas Gas Gas Gas Gas Gas
Mapping Mapping Mapping Mapping Mapping Mapping Mapping Mapping Mapping Mapping
Study Study Study Study Study Study Study Study Study Study
Finalize Finalize Finalize Finalize Finalize Finalize Finalize Finalize Finalize Finalize
the the the the the the the the the the
location location location location location location location location location location
for for for for for for for for for for
Subsea Subsea Subsea Subsea Subsea Subsea Subsea Subsea Subsea Subsea
interconn interconn interconn interconn interconn interconn interconn interconn interconn interconn
ection ection ection ection ection ection ection ection ection ection
between between between between between between between between between between
12” HM- 12” HM- 12” HM- 12” HM- 12” HM- 12” HM- 12” HM- 12” HM- 12” HM- 12” HM-
HX Free HX Free HX Free HX Free HX Free HX Free HX Free HX Free HX Free HX Free
Gas Gas Gas Gas Gas Gas Gas Gas Gas Gas
Pipeline Pipeline Pipeline Pipeline Pipeline Pipeline Pipeline Pipeline Pipeline Pipeline
with 12” with 12” with 12” with 12” with 12” with 12” with 12” with 12” with 12” with 12”
Free Gas Free Gas Free Gas Free Gas Free Gas Free Gas Free Gas Free Gas Free Gas Free Gas
pipeline pipeline pipeline pipeline pipeline pipeline pipeline pipeline pipeline pipeline
from HY from HY from HY from HY from HY from HY from HY from HY from HY from HY
and 14” and 14” and 14” and 14” and 14” and 14” and 14” and 14” and 14” and 14”
HX-HRA HX-HRA HX-HRA HX-HRA HX-HRA HX-HRA HX-HRA HX-HRA HX-HRA HX-HRA
Free Gas Free Gas Free Gas Free Gas Free Gas Free Gas Free Gas Free Gas Free Gas Free Gas
Pipeline Pipeline Pipeline Pipeline Pipeline Pipeline Pipeline Pipeline Pipeline Pipeline
with 10” with 10” with 10” with 10” with 10” with 10” with 10” with 10” with 10” with 10”
Free Gas Free Gas Free Gas Free Gas Free Gas Free Gas Free Gas Free Gas Free Gas Free Gas
pipeline pipeline pipeline pipeline pipeline pipeline pipeline pipeline pipeline pipeline
from HV from HV from HV from HV from HV from HV from HV from HV from HV from HV
based on based on based on based on based on based on based on based on based on based on
QRA QRA QRA QRA QRA QRA QRA QRA QRA QRA
Field & Field & Field & Field & Field & Field & Field & Field & Field & Field &
Layout Layout Layout Layout Layout Layout Layout Layout Layout Layout
Review Review Review Review Review Review Review Review Review Review

Fire and Fire and Fire and Fire and Fire and Fire and Fire and Fire and Fire and Fire and
Explosion Explosion Explosion Explosion Explosion Explosion Explosion Explosion Explosion Explosion
Analysis Analysis Analysis Analysis Analysis Analysis Analysis Analysis Analysis Analysis
Gas and Gas and Gas and Gas and Gas and Gas and Gas and Gas and Gas and Gas and
Smoke Smoke Smoke Smoke Smoke Smoke Smoke Smoke Smoke Smoke
Dispersio Dispersio Dispersio Dispersio Dispersio Dispersio Dispersio Dispersio Dispersio Dispersio
n Analysis n Analysis n Analysis n Analysis n Analysis n Analysis n Analysis n Analysis n Analysis n Analysis
Non Non Non Non Non Non Non Non Non Non
Process Process Process Process Process Process Process Process Process Process
Hazards Hazards Hazards Hazards Hazards Hazards Hazards Hazards Hazards Hazards
Analysis Analysis Analysis Analysis Analysis Analysis Analysis Analysis Analysis Analysis

Emergenc Emergenc Emergenc Emergenc Emergenc Emergenc Emergenc Emergenc Emergenc Emergenc
y Systems y Systems y Systems y Systems y Systems y Systems y Systems y Systems y Systems y Systems
Review Review Review Review Review Review Review Review Review Review
Impact Impact Impact Impact Impact Impact Impact Impact Impact Impact
Analysis Analysis Analysis Analysis Analysis Analysis Analysis Analysis Analysis Analysis
covering covering covering covering covering covering covering covering covering covering
ship ship ship ship ship ship ship ship ship ship
collision collision collision collision collision collision collision collision collision collision
and and and and and and and and and and
dropped dropped dropped dropped dropped dropped dropped dropped dropped dropped
objects objects objects objects objects objects objects objects objects objects

Assumpti Assumpti Assumpti Assumpti Assumpti Assumpti Assumpti Assumpti Assumpti Assumpti
on on on on on on on on on on
register register register register register register register register register register
Risk Risk Risk Risk Risk Risk Risk Risk Risk Risk
reduction reduction reduction reduction reduction reduction reduction reduction reduction reduction
measures measures measures measures measures measures measures measures measures measures

Alarm Alarm Alarm Alarm Alarm Alarm Alarm Alarm Alarm Alarm
Report Report Report Report Report Report Report Report Report Report
Critical Critical Critical Critical Critical Critical Critical Critical Critical Critical
controls controls controls controls controls controls controls controls controls controls
report report report report report report report report report report

Conseque Conseque Conseque Conseque Conseque Conseque Conseque Conseque Conseque Conseque
nce nce nce nce nce nce nce nce nce nce
analysis analysis analysis analysis analysis analysis analysis analysis analysis analysis
Impact Impact Impact Impact Impact Impact Impact Impact Impact Impact
analysis analysis analysis analysis analysis analysis analysis analysis analysis analysis
covering covering covering covering covering covering covering covering covering covering
ship ship ship ship ship ship ship ship ship ship
collision collision collision collision collision collision collision collision collision collision
and drop and drop and drop and drop and drop and drop and drop and drop and drop and drop
objects objects objects objects objects objects objects objects objects objects
Escape Escape Escape Escape Escape Escape Escape Escape Escape Escape
,Evacuati ,Evacuati ,Evacuati ,Evacuati ,Evacuati ,Evacuati ,Evacuati ,Evacuati ,Evacuati ,Evacuati
on and on and on and on and on and on and on and on and on and on and
Rescue Rescue Rescue Rescue Rescue Rescue Rescue Rescue Rescue Rescue
Analysis Analysis Analysis Analysis Analysis Analysis Analysis Analysis Analysis Analysis
[EERA] [EERA] [EERA] [EERA] [EERA] [EERA] [EERA] [EERA] [EERA] [EERA]
Fire and Fire and Fire and Fire and Fire and Fire and Fire and Fire and Fire and Fire and
Gas Gas Gas Gas Gas Gas Gas Gas Gas Gas
Mapping Mapping Mapping Mapping Mapping Mapping Mapping Mapping Mapping Mapping
Study Study Study Study Study Study Study Study Study Study
Finalize Finalize Finalize Finalize Finalize Finalize Finalize Finalize Finalize Finalize
the the the the the the the the the the
location location location location location location location location location location
for for for for for for for for for for
Subsea Subsea Subsea Subsea Subsea Subsea Subsea Subsea Subsea Subsea
interconn interconn interconn interconn interconn interconn interconn interconn interconn interconn
ection ection ection ection ection ection ection ection ection ection
between between between between between between between between between between
12” HM- 12” HM- 12” HM- 12” HM- 12” HM- 12” HM- 12” HM- 12” HM- 12” HM- 12” HM-
HX Free HX Free HX Free HX Free HX Free HX Free HX Free HX Free HX Free HX Free
Gas Gas Gas Gas Gas Gas Gas Gas Gas Gas
Pipeline Pipeline Pipeline Pipeline Pipeline Pipeline Pipeline Pipeline Pipeline Pipeline
with 12” with 12” with 12” with 12” with 12” with 12” with 12” with 12” with 12” with 12”
Free Gas Free Gas Free Gas Free Gas Free Gas Free Gas Free Gas Free Gas Free Gas Free Gas
pipeline pipeline pipeline pipeline pipeline pipeline pipeline pipeline pipeline pipeline
from HY from HY from HY from HY from HY from HY from HY from HY from HY from HY
and 14” and 14” and 14” and 14” and 14” and 14” and 14” and 14” and 14” and 14”
HX-HRA HX-HRA HX-HRA HX-HRA HX-HRA HX-HRA HX-HRA HX-HRA HX-HRA HX-HRA
Free Gas Free Gas Free Gas Free Gas Free Gas Free Gas Free Gas Free Gas Free Gas Free Gas
Pipeline Pipeline Pipeline Pipeline Pipeline Pipeline Pipeline Pipeline Pipeline Pipeline
with 10” with 10” with 10” with 10” with 10” with 10” with 10” with 10” with 10” with 10”
Free Gas Free Gas Free Gas Free Gas Free Gas Free Gas Free Gas Free Gas Free Gas Free Gas
pipeline pipeline pipeline pipeline pipeline pipeline pipeline pipeline pipeline pipeline
from HV from HV from HV from HV from HV from HV from HV from HV from HV from HV
based on based on based on based on based on based on based on based on based on based on
QRA QRA QRA QRA QRA QRA QRA QRA QRA QRA
Field & Field & Field & Field & Field & Field & Field & Field & Field & Field &
Layout Layout Layout Layout Layout Layout Layout Layout Layout Layout
Review Review Review Review Review Review Review Review Review Review

Fire and Fire and Fire and Fire and Fire and Fire and Fire and Fire and Fire and Fire and
Explosion Explosion Explosion Explosion Explosion Explosion Explosion Explosion Explosion Explosion
Analysis Analysis Analysis Analysis Analysis Analysis Analysis Analysis Analysis Analysis
Gas and Gas and Gas and Gas and Gas and Gas and Gas and Gas and Gas and Gas and
Smoke Smoke Smoke Smoke Smoke Smoke Smoke Smoke Smoke Smoke
Dispersio Dispersio Dispersio Dispersio Dispersio Dispersio Dispersio Dispersio Dispersio Dispersio
n Analysis n Analysis n Analysis n Analysis n Analysis n Analysis n Analysis n Analysis n Analysis n Analysis
Non Non Non Non Non Non Non Non Non Non
Process Process Process Process Process Process Process Process Process Process
Hazards Hazards Hazards Hazards Hazards Hazards Hazards Hazards Hazards Hazards
Analysis Analysis Analysis Analysis Analysis Analysis Analysis Analysis Analysis Analysis

Emergenc Emergenc Emergenc Emergenc Emergenc Emergenc Emergenc Emergenc Emergenc Emergenc
y Systems y Systems y Systems y Systems y Systems y Systems y Systems y Systems y Systems y Systems
Review Review Review Review Review Review Review Review Review Review
Impact Impact Impact Impact Impact Impact Impact Impact Impact Impact
Analysis Analysis Analysis Analysis Analysis Analysis Analysis Analysis Analysis Analysis
covering covering covering covering covering covering covering covering covering covering
ship ship ship ship ship ship ship ship ship ship
collision collision collision collision collision collision collision collision collision collision
and and and and and and and and and and
dropped dropped dropped dropped dropped dropped dropped dropped dropped dropped
objects objects objects objects objects objects objects objects objects objects

Assumpti Assumpti Assumpti Assumpti Assumpti Assumpti Assumpti Assumpti Assumpti Assumpti
on on on on on on on on on on
register register register register register register register register register register
Risk Risk Risk Risk Risk Risk Risk Risk Risk Risk
reduction reduction reduction reduction reduction reduction reduction reduction reduction reduction
measures measures measures measures measures measures measures measures measures measures

Alarm Alarm Alarm Alarm Alarm Alarm Alarm Alarm Alarm Alarm
Report Report Report Report Report Report Report Report Report Report
Critical Critical Critical Critical Critical Critical Critical Critical Critical Critical
controls controls controls controls controls controls controls controls controls controls
report report report report report report report report report report

Conseque Conseque Conseque Conseque Conseque Conseque Conseque Conseque Conseque Conseque
nce nce nce nce nce nce nce nce nce nce
analysis analysis analysis analysis analysis analysis analysis analysis analysis analysis
Impact Impact Impact Impact Impact Impact Impact Impact Impact Impact
analysis analysis analysis analysis analysis analysis analysis analysis analysis analysis
covering covering covering covering covering covering covering covering covering covering
ship ship ship ship ship ship ship ship ship ship
collision collision collision collision collision collision collision collision collision collision
and drop and drop and drop and drop and drop and drop and drop and drop and drop and drop
objects objects objects objects objects objects objects objects objects objects
Escape Escape Escape Escape Escape Escape Escape Escape Escape Escape
,Evacuati ,Evacuati ,Evacuati ,Evacuati ,Evacuati ,Evacuati ,Evacuati ,Evacuati ,Evacuati ,Evacuati
on and on and on and on and on and on and on and on and on and on and
Rescue Rescue Rescue Rescue Rescue Rescue Rescue Rescue Rescue Rescue
Analysis Analysis Analysis Analysis Analysis Analysis Analysis Analysis Analysis Analysis
[EERA] [EERA] [EERA] [EERA] [EERA] [EERA] [EERA] [EERA] [EERA] [EERA]
Fire and Fire and Fire and Fire and Fire and Fire and Fire and Fire and Fire and Fire and
Gas Gas Gas Gas Gas Gas Gas Gas Gas Gas
Mapping Mapping Mapping Mapping Mapping Mapping Mapping Mapping Mapping Mapping
Study Study Study Study Study Study Study Study Study Study
Finalize Finalize Finalize Finalize Finalize Finalize Finalize Finalize Finalize Finalize
the the the the the the the the the the
location location location location location location location location location location
for for for for for for for for for for
Subsea Subsea Subsea Subsea Subsea Subsea Subsea Subsea Subsea Subsea
interconn interconn interconn interconn interconn interconn interconn interconn interconn interconn
ection ection ection ection ection ection ection ection ection ection
between between between between between between between between between between
12” HM- 12” HM- 12” HM- 12” HM- 12” HM- 12” HM- 12” HM- 12” HM- 12” HM- 12” HM-
HX Free HX Free HX Free HX Free HX Free HX Free HX Free HX Free HX Free HX Free
Gas Gas Gas Gas Gas Gas Gas Gas Gas Gas
Pipeline Pipeline Pipeline Pipeline Pipeline Pipeline Pipeline Pipeline Pipeline Pipeline
with 12” with 12” with 12” with 12” with 12” with 12” with 12” with 12” with 12” with 12”
Free Gas Free Gas Free Gas Free Gas Free Gas Free Gas Free Gas Free Gas Free Gas Free Gas
pipeline pipeline pipeline pipeline pipeline pipeline pipeline pipeline pipeline pipeline
from HY from HY from HY from HY from HY from HY from HY from HY from HY from HY
and 14” and 14” and 14” and 14” and 14” and 14” and 14” and 14” and 14” and 14”
HX-HRA HX-HRA HX-HRA HX-HRA HX-HRA HX-HRA HX-HRA HX-HRA HX-HRA HX-HRA
Free Gas Free Gas Free Gas Free Gas Free Gas Free Gas Free Gas Free Gas Free Gas Free Gas
Pipeline Pipeline Pipeline Pipeline Pipeline Pipeline Pipeline Pipeline Pipeline Pipeline
with 10” with 10” with 10” with 10” with 10” with 10” with 10” with 10” with 10” with 10”
Free Gas Free Gas Free Gas Free Gas Free Gas Free Gas Free Gas Free Gas Free Gas Free Gas
pipeline pipeline pipeline pipeline pipeline pipeline pipeline pipeline pipeline pipeline
from HV from HV from HV from HV from HV from HV from HV from HV from HV from HV
based on based on based on based on based on based on based on based on based on based on
QRA QRA QRA QRA QRA QRA QRA QRA QRA QRA
Field & Field & Field & Field & Field & Field & Field & Field & Field & Field &
Layout Layout Layout Layout Layout Layout Layout Layout Layout Layout
Review Review Review Review Review Review Review Review Review Review

Fire and Fire and Fire and Fire and Fire and Fire and Fire and Fire and Fire and Fire and
Explosion Explosion Explosion Explosion Explosion Explosion Explosion Explosion Explosion Explosion
Analysis Analysis Analysis Analysis Analysis Analysis Analysis Analysis Analysis Analysis
Gas and Gas and Gas and Gas and Gas and Gas and Gas and Gas and Gas and Gas and
Smoke Smoke Smoke Smoke Smoke Smoke Smoke Smoke Smoke Smoke
Dispersio Dispersio Dispersio Dispersio Dispersio Dispersio Dispersio Dispersio Dispersio Dispersio
n Analysis n Analysis n Analysis n Analysis n Analysis n Analysis n Analysis n Analysis n Analysis n Analysis
Non Non Non Non Non Non Non Non Non Non
Process Process Process Process Process Process Process Process Process Process
Hazards Hazards Hazards Hazards Hazards Hazards Hazards Hazards Hazards Hazards
Analysis Analysis Analysis Analysis Analysis Analysis Analysis Analysis Analysis Analysis

Emergenc Emergenc Emergenc Emergenc Emergenc Emergenc Emergenc Emergenc Emergenc Emergenc
y Systems y Systems y Systems y Systems y Systems y Systems y Systems y Systems y Systems y Systems
Review Review Review Review Review Review Review Review Review Review
Impact Impact Impact Impact Impact Impact Impact Impact Impact Impact
Analysis Analysis Analysis Analysis Analysis Analysis Analysis Analysis Analysis Analysis
covering covering covering covering covering covering covering covering covering covering
ship ship ship ship ship ship ship ship ship ship
collision collision collision collision collision collision collision collision collision collision
and and and and and and and and and and
dropped dropped dropped dropped dropped dropped dropped dropped dropped dropped
objects objects objects objects objects objects objects objects objects objects

Assumpti Assumpti Assumpti Assumpti Assumpti Assumpti Assumpti Assumpti Assumpti Assumpti
on on on on on on on on on on
register register register register register register register register register register
Risk Risk Risk Risk Risk Risk Risk Risk Risk Risk
reduction reduction reduction reduction reduction reduction reduction reduction reduction reduction
measures measures measures measures measures measures measures measures measures measures

Alarm Alarm Alarm Alarm Alarm Alarm Alarm Alarm Alarm Alarm
Report Report Report Report Report Report Report Report Report Report
Critical Critical Critical Critical Critical Critical Critical Critical Critical Critical
controls controls controls controls controls controls controls controls controls controls
report report report report report report report report report report

Conseque Conseque Conseque Conseque Conseque Conseque Conseque Conseque Conseque Conseque
nce nce nce nce nce nce nce nce nce nce
analysis analysis analysis analysis analysis analysis analysis analysis analysis analysis
Impact Impact Impact Impact Impact Impact Impact Impact Impact Impact
analysis analysis analysis analysis analysis analysis analysis analysis analysis analysis
covering covering covering covering covering covering covering covering covering covering
ship ship ship ship ship ship ship ship ship ship
collision collision collision collision collision collision collision collision collision collision
and drop and drop and drop and drop and drop and drop and drop and drop and drop and drop
objects objects objects objects objects objects objects objects objects objects
Escape Escape Escape Escape Escape Escape Escape Escape Escape Escape
,Evacuati ,Evacuati ,Evacuati ,Evacuati ,Evacuati ,Evacuati ,Evacuati ,Evacuati ,Evacuati ,Evacuati
on and on and on and on and on and on and on and on and on and on and
Rescue Rescue Rescue Rescue Rescue Rescue Rescue Rescue Rescue Rescue
Analysis Analysis Analysis Analysis Analysis Analysis Analysis Analysis Analysis Analysis
[EERA] [EERA] [EERA] [EERA] [EERA] [EERA] [EERA] [EERA] [EERA] [EERA]
Fire and Fire and Fire and Fire and Fire and Fire and Fire and Fire and Fire and Fire and
Gas Gas Gas Gas Gas Gas Gas Gas Gas Gas
Mapping Mapping Mapping Mapping Mapping Mapping Mapping Mapping Mapping Mapping
Study Study Study Study Study Study Study Study Study Study
Finalize Finalize Finalize Finalize Finalize Finalize Finalize Finalize Finalize Finalize
the the the the the the the the the the
location location location location location location location location location location
for for for for for for for for for for
Subsea Subsea Subsea Subsea Subsea Subsea Subsea Subsea Subsea Subsea
interconn interconn interconn interconn interconn interconn interconn interconn interconn interconn
ection ection ection ection ection ection ection ection ection ection
between between between between between between between between between between
12” HM- 12” HM- 12” HM- 12” HM- 12” HM- 12” HM- 12” HM- 12” HM- 12” HM- 12” HM-
HX Free HX Free HX Free HX Free HX Free HX Free HX Free HX Free HX Free HX Free
Gas Gas Gas Gas Gas Gas Gas Gas Gas Gas
Pipeline Pipeline Pipeline Pipeline Pipeline Pipeline Pipeline Pipeline Pipeline Pipeline
with 12” with 12” with 12” with 12” with 12” with 12” with 12” with 12” with 12” with 12”
Free Gas Free Gas Free Gas Free Gas Free Gas Free Gas Free Gas Free Gas Free Gas Free Gas
pipeline pipeline pipeline pipeline pipeline pipeline pipeline pipeline pipeline pipeline
from HY from HY from HY from HY from HY from HY from HY from HY from HY from HY
and 14” and 14” and 14” and 14” and 14” and 14” and 14” and 14” and 14” and 14”
HX-HRA HX-HRA HX-HRA HX-HRA HX-HRA HX-HRA HX-HRA HX-HRA HX-HRA HX-HRA
Free Gas Free Gas Free Gas Free Gas Free Gas Free Gas Free Gas Free Gas Free Gas Free Gas
Pipeline Pipeline Pipeline Pipeline Pipeline Pipeline Pipeline Pipeline Pipeline Pipeline
with 10” with 10” with 10” with 10” with 10” with 10” with 10” with 10” with 10” with 10”
Free Gas Free Gas Free Gas Free Gas Free Gas Free Gas Free Gas Free Gas Free Gas Free Gas
pipeline pipeline pipeline pipeline pipeline pipeline pipeline pipeline pipeline pipeline
from HV from HV from HV from HV from HV from HV from HV from HV from HV from HV
based on based on based on based on based on based on based on based on based on based on
QRA QRA QRA QRA QRA QRA QRA QRA QRA QRA
Field & Field & Field & Field & Field & Field & Field & Field & Field & Field &
Layout Layout Layout Layout Layout Layout Layout Layout Layout Layout
Review Review Review Review Review Review Review Review Review Review

Fire and Fire and Fire and Fire and Fire and Fire and Fire and Fire and Fire and Fire and
Explosion Explosion Explosion Explosion Explosion Explosion Explosion Explosion Explosion Explosion
Analysis Analysis Analysis Analysis Analysis Analysis Analysis Analysis Analysis Analysis
Gas and Gas and Gas and Gas and Gas and Gas and Gas and Gas and Gas and Gas and
Smoke Smoke Smoke Smoke Smoke Smoke Smoke Smoke Smoke Smoke
Dispersio Dispersio Dispersio Dispersio Dispersio Dispersio Dispersio Dispersio Dispersio Dispersio
n Analysis n Analysis n Analysis n Analysis n Analysis n Analysis n Analysis n Analysis n Analysis n Analysis
Non Non Non Non Non Non Non Non Non Non
Process Process Process Process Process Process Process Process Process Process
Hazards Hazards Hazards Hazards Hazards Hazards Hazards Hazards Hazards Hazards
Analysis Analysis Analysis Analysis Analysis Analysis Analysis Analysis Analysis Analysis

Emergenc Emergenc Emergenc Emergenc Emergenc Emergenc Emergenc Emergenc Emergenc Emergenc
y Systems y Systems y Systems y Systems y Systems y Systems y Systems y Systems y Systems y Systems
Review Review Review Review Review Review Review Review Review Review
Impact Impact Impact Impact Impact Impact Impact Impact Impact Impact
Analysis Analysis Analysis Analysis Analysis Analysis Analysis Analysis Analysis Analysis
covering covering covering covering covering covering covering covering covering covering
ship ship ship ship ship ship ship ship ship ship
collision collision collision collision collision collision collision collision collision collision
and and and and and and and and and and
dropped dropped dropped dropped dropped dropped dropped dropped dropped dropped
objects objects objects objects objects objects objects objects objects objects

Assumpti Assumpti Assumpti Assumpti Assumpti Assumpti Assumpti Assumpti Assumpti Assumpti
on on on on on on on on on on
register register register register register register register register register register
Risk Risk Risk Risk Risk Risk Risk Risk Risk Risk
reduction reduction reduction reduction reduction reduction reduction reduction reduction reduction
measures measures measures measures measures measures measures measures measures measures

Alarm Alarm Alarm Alarm Alarm Alarm Alarm Alarm Alarm Alarm
Report Report Report Report Report Report Report Report Report Report
Critical Critical Critical Critical Critical Critical Critical Critical Critical Critical
controls controls controls controls controls controls controls controls controls controls
report report report report report report report report report report

Conseque Conseque Conseque Conseque Conseque Conseque Conseque Conseque Conseque Conseque
nce nce nce nce nce nce nce nce nce nce
analysis analysis analysis analysis analysis analysis analysis analysis analysis analysis
Impact Impact Impact Impact Impact Impact Impact Impact Impact Impact
analysis analysis analysis analysis analysis analysis analysis analysis analysis analysis
covering covering covering covering covering covering covering covering covering covering
ship ship ship ship ship ship ship ship ship ship
collision collision collision collision collision collision collision collision collision collision
and drop and drop and drop and drop and drop and drop and drop and drop and drop and drop
objects objects objects objects objects objects objects objects objects objects
Escape Escape Escape Escape Escape Escape Escape Escape Escape Escape
,Evacuati ,Evacuati ,Evacuati ,Evacuati ,Evacuati ,Evacuati ,Evacuati ,Evacuati ,Evacuati ,Evacuati
on and on and on and on and on and on and on and on and on and on and
Rescue Rescue Rescue Rescue Rescue Rescue Rescue Rescue Rescue Rescue
Analysis Analysis Analysis Analysis Analysis Analysis Analysis Analysis Analysis Analysis
[EERA] [EERA] [EERA] [EERA] [EERA] [EERA] [EERA] [EERA] [EERA] [EERA]
Fire and Fire and Fire and Fire and Fire and Fire and Fire and Fire and Fire and Fire and
Gas Gas Gas Gas Gas Gas Gas Gas Gas Gas
Mapping Mapping Mapping Mapping Mapping Mapping Mapping Mapping Mapping Mapping
Study Study Study Study Study Study Study Study Study Study
Finalize Finalize Finalize Finalize Finalize Finalize Finalize Finalize Finalize Finalize
the the the the the the the the the the
location location location location location location location location location location
for for for for for for for for for for
Subsea Subsea Subsea Subsea Subsea Subsea Subsea Subsea Subsea Subsea
interconn interconn interconn interconn interconn interconn interconn interconn interconn interconn
ection ection ection ection ection ection ection ection ection ection
between between between between between between between between between between
12” HM- 12” HM- 12” HM- 12” HM- 12” HM- 12” HM- 12” HM- 12” HM- 12” HM- 12” HM-
HX Free HX Free HX Free HX Free HX Free HX Free HX Free HX Free HX Free HX Free
Gas Gas Gas Gas Gas Gas Gas Gas Gas Gas
Pipeline Pipeline Pipeline Pipeline Pipeline Pipeline Pipeline Pipeline Pipeline Pipeline
with 12” with 12” with 12” with 12” with 12” with 12” with 12” with 12” with 12” with 12”
Free Gas Free Gas Free Gas Free Gas Free Gas Free Gas Free Gas Free Gas Free Gas Free Gas
pipeline pipeline pipeline pipeline pipeline pipeline pipeline pipeline pipeline pipeline
from HY from HY from HY from HY from HY from HY from HY from HY from HY from HY
and 14” and 14” and 14” and 14” and 14” and 14” and 14” and 14” and 14” and 14”
HX-HRA HX-HRA HX-HRA HX-HRA HX-HRA HX-HRA HX-HRA HX-HRA HX-HRA HX-HRA
Free Gas Free Gas Free Gas Free Gas Free Gas Free Gas Free Gas Free Gas Free Gas Free Gas
Pipeline Pipeline Pipeline Pipeline Pipeline Pipeline Pipeline Pipeline Pipeline Pipeline
with 10” with 10” with 10” with 10” with 10” with 10” with 10” with 10” with 10” with 10”
Free Gas Free Gas Free Gas Free Gas Free Gas Free Gas Free Gas Free Gas Free Gas Free Gas
pipeline pipeline pipeline pipeline pipeline pipeline pipeline pipeline pipeline pipeline
from HV from HV from HV from HV from HV from HV from HV from HV from HV from HV
based on based on based on based on based on based on based on based on based on based on
QRA QRA QRA QRA QRA QRA QRA QRA QRA QRA
Field & Field & Field & Field & Field & Field & Field & Field & Field & Field &
Layout Layout Layout Layout Layout Layout Layout Layout Layout Layout
Review Review Review Review Review Review Review Review Review Review

Fire and Fire and Fire and Fire and Fire and Fire and Fire and Fire and Fire and Fire and
Explosion Explosion Explosion Explosion Explosion Explosion Explosion Explosion Explosion Explosion
Analysis Analysis Analysis Analysis Analysis Analysis Analysis Analysis Analysis Analysis
Gas and Gas and Gas and Gas and Gas and Gas and Gas and Gas and Gas and Gas and
Smoke Smoke Smoke Smoke Smoke Smoke Smoke Smoke Smoke Smoke
Dispersio Dispersio Dispersio Dispersio Dispersio Dispersio Dispersio Dispersio Dispersio Dispersio
n Analysis n Analysis n Analysis n Analysis n Analysis n Analysis n Analysis n Analysis n Analysis n Analysis
Non Non Non Non Non Non Non Non Non Non
Process Process Process Process Process Process Process Process Process Process
Hazards Hazards Hazards Hazards Hazards Hazards Hazards Hazards Hazards Hazards
Analysis Analysis Analysis Analysis Analysis Analysis Analysis Analysis Analysis Analysis

Emergenc Emergenc Emergenc Emergenc Emergenc Emergenc Emergenc Emergenc Emergenc Emergenc
y Systems y Systems y Systems y Systems y Systems y Systems y Systems y Systems y Systems y Systems
Review Review Review Review Review Review Review Review Review Review
Impact Impact Impact Impact Impact Impact Impact Impact Impact Impact
Analysis Analysis Analysis Analysis Analysis Analysis Analysis Analysis Analysis Analysis
covering covering covering covering covering covering covering covering covering covering
ship ship ship ship ship ship ship ship ship ship
collision collision collision collision collision collision collision collision collision collision
and and and and and and and and and and
dropped dropped dropped dropped dropped dropped dropped dropped dropped dropped
objects objects objects objects objects objects objects objects objects objects

Assumpti Assumpti Assumpti Assumpti Assumpti Assumpti Assumpti Assumpti Assumpti Assumpti
on on on on on on on on on on
register register register register register register register register register register
Risk Risk Risk Risk Risk Risk Risk Risk Risk Risk
reduction reduction reduction reduction reduction reduction reduction reduction reduction reduction
measures measures measures measures measures measures measures measures measures measures

Alarm Alarm Alarm Alarm Alarm Alarm Alarm Alarm Alarm Alarm
Report Report Report Report Report Report Report Report Report Report
Critical Critical Critical Critical Critical Critical Critical Critical Critical Critical
controls controls controls controls controls controls controls controls controls controls
report report report report report report report report report report

Conseque Conseque Conseque Conseque Conseque Conseque Conseque Conseque Conseque Conseque
nce nce nce nce nce nce nce nce nce nce
analysis analysis analysis analysis analysis analysis analysis analysis analysis analysis
Impact Impact Impact Impact Impact Impact Impact Impact Impact Impact
analysis analysis analysis analysis analysis analysis analysis analysis analysis analysis
covering covering covering covering covering covering covering covering covering covering
ship ship ship ship ship ship ship ship ship ship
collision collision collision collision collision collision collision collision collision collision
and drop and drop and drop and drop and drop and drop and drop and drop and drop and drop
objects objects objects objects objects objects objects objects objects objects
Escape Escape Escape Escape Escape Escape Escape Escape Escape Escape
,Evacuati ,Evacuati ,Evacuati ,Evacuati ,Evacuati ,Evacuati ,Evacuati ,Evacuati ,Evacuati ,Evacuati
on and on and on and on and on and on and on and on and on and on and
Rescue Rescue Rescue Rescue Rescue Rescue Rescue Rescue Rescue Rescue
Analysis Analysis Analysis Analysis Analysis Analysis Analysis Analysis Analysis Analysis
[EERA] [EERA] [EERA] [EERA] [EERA] [EERA] [EERA] [EERA] [EERA] [EERA]
Fire and Fire and Fire and Fire and Fire and Fire and Fire and Fire and Fire and Fire and
Gas Gas Gas Gas Gas Gas Gas Gas Gas Gas
Mapping Mapping Mapping Mapping Mapping Mapping Mapping Mapping Mapping Mapping
Study Study Study Study Study Study Study Study Study Study
Finalize Finalize Finalize Finalize Finalize Finalize Finalize Finalize Finalize Finalize
the the the the the the the the the the
location location location location location location location location location location
for for for for for for for for for for
Subsea Subsea Subsea Subsea Subsea Subsea Subsea Subsea Subsea Subsea
interconn interconn interconn interconn interconn interconn interconn interconn interconn interconn
ection ection ection ection ection ection ection ection ection ection
between between between between between between between between between between
12” HM- 12” HM- 12” HM- 12” HM- 12” HM- 12” HM- 12” HM- 12” HM- 12” HM- 12” HM-
HX Free HX Free HX Free HX Free HX Free HX Free HX Free HX Free HX Free HX Free
Gas Gas Gas Gas Gas Gas Gas Gas Gas Gas
Pipeline Pipeline Pipeline Pipeline Pipeline Pipeline Pipeline Pipeline Pipeline Pipeline
with 12” with 12” with 12” with 12” with 12” with 12” with 12” with 12” with 12” with 12”
Free Gas Free Gas Free Gas Free Gas Free Gas Free Gas Free Gas Free Gas Free Gas Free Gas
pipeline pipeline pipeline pipeline pipeline pipeline pipeline pipeline pipeline pipeline
from HY from HY from HY from HY from HY from HY from HY from HY from HY from HY
and 14” and 14” and 14” and 14” and 14” and 14” and 14” and 14” and 14” and 14”
HX-HRA HX-HRA HX-HRA HX-HRA HX-HRA HX-HRA HX-HRA HX-HRA HX-HRA HX-HRA
Free Gas Free Gas Free Gas Free Gas Free Gas Free Gas Free Gas Free Gas Free Gas Free Gas
Pipeline Pipeline Pipeline Pipeline Pipeline Pipeline Pipeline Pipeline Pipeline Pipeline
with 10” with 10” with 10” with 10” with 10” with 10” with 10” with 10” with 10” with 10”
Free Gas Free Gas Free Gas Free Gas Free Gas Free Gas Free Gas Free Gas Free Gas Free Gas
pipeline pipeline pipeline pipeline pipeline pipeline pipeline pipeline pipeline pipeline
from HV from HV from HV from HV from HV from HV from HV from HV from HV from HV
based on based on based on based on based on based on based on based on based on based on
QRA QRA QRA QRA QRA QRA QRA QRA QRA QRA
Field & Field & Field & Field & Field & Field & Field & Field & Field & Field &
Layout Layout Layout Layout Layout Layout Layout Layout Layout Layout
Review Review Review Review Review Review Review Review Review Review

Fire and Fire and Fire and Fire and Fire and Fire and Fire and Fire and Fire and Fire and
Explosion Explosion Explosion Explosion Explosion Explosion Explosion Explosion Explosion Explosion
Analysis Analysis Analysis Analysis Analysis Analysis Analysis Analysis Analysis Analysis
Gas and Gas and Gas and Gas and Gas and Gas and Gas and Gas and Gas and Gas and
Smoke Smoke Smoke Smoke Smoke Smoke Smoke Smoke Smoke Smoke
Dispersio Dispersio Dispersio Dispersio Dispersio Dispersio Dispersio Dispersio Dispersio Dispersio
n Analysis n Analysis n Analysis n Analysis n Analysis n Analysis n Analysis n Analysis n Analysis n Analysis
Non Non Non Non Non Non Non Non Non Non
Process Process Process Process Process Process Process Process Process Process
Hazards Hazards Hazards Hazards Hazards Hazards Hazards Hazards Hazards Hazards
Analysis Analysis Analysis Analysis Analysis Analysis Analysis Analysis Analysis Analysis

Emergenc Emergenc Emergenc Emergenc Emergenc Emergenc Emergenc Emergenc Emergenc Emergenc
y Systems y Systems y Systems y Systems y Systems y Systems y Systems y Systems y Systems y Systems
Review Review Review Review Review Review Review Review Review Review
Impact Impact Impact Impact Impact Impact Impact Impact Impact Impact
Analysis Analysis Analysis Analysis Analysis Analysis Analysis Analysis Analysis Analysis
covering covering covering covering covering covering covering covering covering covering
ship ship ship ship ship ship ship ship ship ship
collision collision collision collision collision collision collision collision collision collision
and and and and and and and and and and
dropped dropped dropped dropped dropped dropped dropped dropped dropped dropped
objects objects objects objects objects objects objects objects objects objects

Assumpti Assumpti Assumpti Assumpti Assumpti Assumpti Assumpti Assumpti Assumpti Assumpti
on on on on on on on on on on
register register register register register register register register register register
Risk Risk Risk Risk Risk Risk Risk Risk Risk Risk
reduction reduction reduction reduction reduction reduction reduction reduction reduction reduction
measures measures measures measures measures measures measures measures measures measures

Alarm Alarm Alarm Alarm Alarm Alarm Alarm Alarm Alarm Alarm
Report Report Report Report Report Report Report Report Report Report
Critical Critical Critical Critical Critical Critical Critical Critical Critical Critical
controls controls controls controls controls controls controls controls controls controls
report report report report report report report report report report

Conseque Conseque Conseque Conseque Conseque Conseque Conseque Conseque Conseque Conseque
nce nce nce nce nce nce nce nce nce nce
analysis analysis analysis analysis analysis analysis analysis analysis analysis analysis
Impact Impact Impact Impact Impact Impact Impact Impact Impact Impact
analysis analysis analysis analysis analysis analysis analysis analysis analysis analysis
covering covering covering covering covering covering covering covering covering covering
ship ship ship ship ship ship ship ship ship ship
collision collision collision collision collision collision collision collision collision collision
and drop and drop and drop and drop and drop and drop and drop and drop and drop and drop
objects objects objects objects objects objects objects objects objects objects
Escape Escape Escape Escape Escape Escape Escape Escape Escape Escape
,Evacuati ,Evacuati ,Evacuati ,Evacuati ,Evacuati ,Evacuati ,Evacuati ,Evacuati ,Evacuati ,Evacuati
on and on and on and on and on and on and on and on and on and on and
Rescue Rescue Rescue Rescue Rescue Rescue Rescue Rescue Rescue Rescue
Analysis Analysis Analysis Analysis Analysis Analysis Analysis Analysis Analysis Analysis
[EERA] [EERA] [EERA] [EERA] [EERA] [EERA] [EERA] [EERA] [EERA] [EERA]
Fire and Fire and Fire and Fire and Fire and Fire and Fire and Fire and Fire and Fire and
Gas Gas Gas Gas Gas Gas Gas Gas Gas Gas
Mapping Mapping Mapping Mapping Mapping Mapping Mapping Mapping Mapping Mapping
Study Study Study Study Study Study Study Study Study Study
Finalize Finalize Finalize Finalize Finalize Finalize Finalize Finalize Finalize Finalize
the the the the the the the the the the
location location location location location location location location location location
for for for for for for for for for for
Subsea Subsea Subsea Subsea Subsea Subsea Subsea Subsea Subsea Subsea
interconn interconn interconn interconn interconn interconn interconn interconn interconn interconn
ection ection ection ection ection ection ection ection ection ection
between between between between between between between between between between
12” HM- 12” HM- 12” HM- 12” HM- 12” HM- 12” HM- 12” HM- 12” HM- 12” HM- 12” HM-
HX Free HX Free HX Free HX Free HX Free HX Free HX Free HX Free HX Free HX Free
Gas Gas Gas Gas Gas Gas Gas Gas Gas Gas
Pipeline Pipeline Pipeline Pipeline Pipeline Pipeline Pipeline Pipeline Pipeline Pipeline
with 12” with 12” with 12” with 12” with 12” with 12” with 12” with 12” with 12” with 12”
Free Gas Free Gas Free Gas Free Gas Free Gas Free Gas Free Gas Free Gas Free Gas Free Gas
pipeline pipeline pipeline pipeline pipeline pipeline pipeline pipeline pipeline pipeline
from HY from HY from HY from HY from HY from HY from HY from HY from HY from HY
and 14” and 14” and 14” and 14” and 14” and 14” and 14” and 14” and 14” and 14”
HX-HRA HX-HRA HX-HRA HX-HRA HX-HRA HX-HRA HX-HRA HX-HRA HX-HRA HX-HRA
Free Gas Free Gas Free Gas Free Gas Free Gas Free Gas Free Gas Free Gas Free Gas Free Gas
Pipeline Pipeline Pipeline Pipeline Pipeline Pipeline Pipeline Pipeline Pipeline Pipeline
with 10” with 10” with 10” with 10” with 10” with 10” with 10” with 10” with 10” with 10”
Free Gas Free Gas Free Gas Free Gas Free Gas Free Gas Free Gas Free Gas Free Gas Free Gas
pipeline pipeline pipeline pipeline pipeline pipeline pipeline pipeline pipeline pipeline
from HV from HV from HV from HV from HV from HV from HV from HV from HV from HV
based on based on based on based on based on based on based on based on based on based on
QRA QRA QRA QRA QRA QRA QRA QRA QRA QRA
Field & Field & Field & Field & Field & Field & Field & Field & Field & Field &
Layout Layout Layout Layout Layout Layout Layout Layout Layout Layout
Review Review Review Review Review Review Review Review Review Review

Fire and Fire and Fire and Fire and Fire and Fire and Fire and Fire and Fire and Fire and
Explosion Explosion Explosion Explosion Explosion Explosion Explosion Explosion Explosion Explosion
Analysis Analysis Analysis Analysis Analysis Analysis Analysis Analysis Analysis Analysis
Gas and Gas and Gas and Gas and Gas and Gas and Gas and Gas and Gas and Gas and
Smoke Smoke Smoke Smoke Smoke Smoke Smoke Smoke Smoke Smoke
Dispersio Dispersio Dispersio Dispersio Dispersio Dispersio Dispersio Dispersio Dispersio Dispersio
n Analysis n Analysis n Analysis n Analysis n Analysis n Analysis n Analysis n Analysis n Analysis n Analysis
Non Non Non Non Non Non Non Non Non Non
Process Process Process Process Process Process Process Process Process Process
Hazards Hazards Hazards Hazards Hazards Hazards Hazards Hazards Hazards Hazards
Analysis Analysis Analysis Analysis Analysis Analysis Analysis Analysis Analysis Analysis

Emergenc Emergenc Emergenc Emergenc Emergenc Emergenc Emergenc Emergenc Emergenc Emergenc
y Systems y Systems y Systems y Systems y Systems y Systems y Systems y Systems y Systems y Systems
Review Review Review Review Review Review Review Review Review Review
Impact Impact Impact Impact Impact Impact Impact Impact Impact Impact
Analysis Analysis Analysis Analysis Analysis Analysis Analysis Analysis Analysis Analysis
covering covering covering covering covering covering covering covering covering covering
ship ship ship ship ship ship ship ship ship ship
collision collision collision collision collision collision collision collision collision collision
and and and and and and and and and and
dropped dropped dropped dropped dropped dropped dropped dropped dropped dropped
objects objects objects objects objects objects objects objects objects objects

Assumpti Assumpti Assumpti Assumpti Assumpti Assumpti Assumpti Assumpti Assumpti Assumpti
on on on on on on on on on on
register register register register register register register register register register
Risk Risk Risk Risk Risk Risk Risk Risk Risk Risk
reduction reduction reduction reduction reduction reduction reduction reduction reduction reduction
measures measures measures measures measures measures measures measures measures measures

Alarm Alarm Alarm Alarm Alarm Alarm Alarm Alarm Alarm Alarm
Report Report Report Report Report Report Report Report Report Report
Critical Critical Critical Critical Critical Critical Critical Critical Critical Critical
controls controls controls controls controls controls controls controls controls controls
report report report report report report report report report report

Conseque Conseque Conseque Conseque Conseque Conseque Conseque Conseque Conseque Conseque
nce nce nce nce nce nce nce nce nce nce
analysis analysis analysis analysis analysis analysis analysis analysis analysis analysis
Impact Impact Impact Impact Impact Impact Impact Impact Impact Impact
analysis analysis analysis analysis analysis analysis analysis analysis analysis analysis
covering covering covering covering covering covering covering covering covering covering
ship ship ship ship ship ship ship ship ship ship
collision collision collision collision collision collision collision collision collision collision
and drop and drop and drop and drop and drop and drop and drop and drop and drop and drop
objects objects objects objects objects objects objects objects objects objects
Escape Escape Escape Escape Escape Escape Escape Escape Escape Escape
,Evacuati ,Evacuati ,Evacuati ,Evacuati ,Evacuati ,Evacuati ,Evacuati ,Evacuati ,Evacuati ,Evacuati
on and on and on and on and on and on and on and on and on and on and
Rescue Rescue Rescue Rescue Rescue Rescue Rescue Rescue Rescue Rescue
Analysis Analysis Analysis Analysis Analysis Analysis Analysis Analysis Analysis Analysis
[EERA] [EERA] [EERA] [EERA] [EERA] [EERA] [EERA] [EERA] [EERA] [EERA]
Fire and Fire and Fire and Fire and Fire and Fire and Fire and Fire and Fire and Fire and
Gas Gas Gas Gas Gas Gas Gas Gas Gas Gas
Mapping Mapping Mapping Mapping Mapping Mapping Mapping Mapping Mapping Mapping
Study Study Study Study Study Study Study Study Study Study
Finalize Finalize Finalize Finalize Finalize Finalize Finalize Finalize Finalize Finalize
the the the the the the the the the the
location location location location location location location location location location
for for for for for for for for for for
Subsea Subsea Subsea Subsea Subsea Subsea Subsea Subsea Subsea Subsea
interconn interconn interconn interconn interconn interconn interconn interconn interconn interconn
ection ection ection ection ection ection ection ection ection ection
between between between between between between between between between between
12” HM- 12” HM- 12” HM- 12” HM- 12” HM- 12” HM- 12” HM- 12” HM- 12” HM- 12” HM-
HX Free HX Free HX Free HX Free HX Free HX Free HX Free HX Free HX Free HX Free
Gas Gas Gas Gas Gas Gas Gas Gas Gas Gas
Pipeline Pipeline Pipeline Pipeline Pipeline Pipeline Pipeline Pipeline Pipeline Pipeline
with 12” with 12” with 12” with 12” with 12” with 12” with 12” with 12” with 12” with 12”
Free Gas Free Gas Free Gas Free Gas Free Gas Free Gas Free Gas Free Gas Free Gas Free Gas
pipeline pipeline pipeline pipeline pipeline pipeline pipeline pipeline pipeline pipeline
from HY from HY from HY from HY from HY from HY from HY from HY from HY from HY
and 14” and 14” and 14” and 14” and 14” and 14” and 14” and 14” and 14” and 14”
HX-HRA HX-HRA HX-HRA HX-HRA HX-HRA HX-HRA HX-HRA HX-HRA HX-HRA HX-HRA
Free Gas Free Gas Free Gas Free Gas Free Gas Free Gas Free Gas Free Gas Free Gas Free Gas
Pipeline Pipeline Pipeline Pipeline Pipeline Pipeline Pipeline Pipeline Pipeline Pipeline
with 10” with 10” with 10” with 10” with 10” with 10” with 10” with 10” with 10” with 10”
Free Gas Free Gas Free Gas Free Gas Free Gas Free Gas Free Gas Free Gas Free Gas Free Gas
pipeline pipeline pipeline pipeline pipeline pipeline pipeline pipeline pipeline pipeline
from HV from HV from HV from HV from HV from HV from HV from HV from HV from HV
based on based on based on based on based on based on based on based on based on based on
QRA QRA QRA QRA QRA QRA QRA QRA QRA QRA
Field & Field & Field & Field & Field & Field & Field & Field & Field & Field &
Layout Layout Layout Layout Layout Layout Layout Layout Layout Layout
Review Review Review Review Review Review Review Review Review Review

Fire and Fire and Fire and Fire and Fire and Fire and Fire and Fire and Fire and Fire and
Explosion Explosion Explosion Explosion Explosion Explosion Explosion Explosion Explosion Explosion
Analysis Analysis Analysis Analysis Analysis Analysis Analysis Analysis Analysis Analysis
Gas and Gas and Gas and Gas and Gas and Gas and Gas and Gas and Gas and Gas and
Smoke Smoke Smoke Smoke Smoke Smoke Smoke Smoke Smoke Smoke
Dispersio Dispersio Dispersio Dispersio Dispersio Dispersio Dispersio Dispersio Dispersio Dispersio
n Analysis n Analysis n Analysis n Analysis n Analysis n Analysis n Analysis n Analysis n Analysis n Analysis
Non Non Non Non Non Non Non Non Non Non
Process Process Process Process Process Process Process Process Process Process
Hazards Hazards Hazards Hazards Hazards Hazards Hazards Hazards Hazards Hazards
Analysis Analysis Analysis Analysis Analysis Analysis Analysis Analysis Analysis Analysis

Emergenc Emergenc Emergenc Emergenc Emergenc Emergenc Emergenc Emergenc Emergenc Emergenc
y Systems y Systems y Systems y Systems y Systems y Systems y Systems y Systems y Systems y Systems
Review Review Review Review Review Review Review Review Review Review
Impact Impact Impact Impact Impact Impact Impact Impact Impact Impact
Analysis Analysis Analysis Analysis Analysis Analysis Analysis Analysis Analysis Analysis
covering covering covering covering covering covering covering covering covering covering
ship ship ship ship ship ship ship ship ship ship
collision collision collision collision collision collision collision collision collision collision
and and and and and and and and and and
dropped dropped dropped dropped dropped dropped dropped dropped dropped dropped
objects objects objects objects objects objects objects objects objects objects

Assumpti Assumpti Assumpti Assumpti Assumpti Assumpti Assumpti Assumpti Assumpti Assumpti
on on on on on on on on on on
register register register register register register register register register register
Risk Risk Risk Risk Risk Risk Risk Risk Risk Risk
reduction reduction reduction reduction reduction reduction reduction reduction reduction reduction
measures measures measures measures measures measures measures measures measures measures

Alarm Alarm Alarm Alarm Alarm Alarm Alarm Alarm Alarm Alarm
Report Report Report Report Report Report Report Report Report Report
Critical Critical Critical Critical Critical Critical Critical Critical Critical Critical
controls controls controls controls controls controls controls controls controls controls
report report report report report report report report report report

Conseque Conseque Conseque Conseque Conseque Conseque Conseque Conseque Conseque Conseque
nce nce nce nce nce nce nce nce nce nce
analysis analysis analysis analysis analysis analysis analysis analysis analysis analysis
Impact Impact Impact Impact Impact Impact Impact Impact Impact Impact
analysis analysis analysis analysis analysis analysis analysis analysis analysis analysis
covering covering covering covering covering covering covering covering covering covering
ship ship ship ship ship ship ship ship ship ship
collision collision collision collision collision collision collision collision collision collision
and drop and drop and drop and drop and drop and drop and drop and drop and drop and drop
objects objects objects objects objects objects objects objects objects objects
Escape Escape Escape Escape Escape Escape Escape Escape Escape Escape
,Evacuati ,Evacuati ,Evacuati ,Evacuati ,Evacuati ,Evacuati ,Evacuati ,Evacuati ,Evacuati ,Evacuati
on and on and on and on and on and on and on and on and on and on and
Rescue Rescue Rescue Rescue Rescue Rescue Rescue Rescue Rescue Rescue
Analysis Analysis Analysis Analysis Analysis Analysis Analysis Analysis Analysis Analysis
[EERA] [EERA] [EERA] [EERA] [EERA] [EERA] [EERA] [EERA] [EERA] [EERA]
Fire and Fire and Fire and Fire and Fire and Fire and Fire and Fire and Fire and Fire and
Gas Gas Gas Gas Gas Gas Gas Gas Gas Gas
Mapping Mapping Mapping Mapping Mapping Mapping Mapping Mapping Mapping Mapping
Study Study Study Study Study Study Study Study Study Study
Finalize Finalize Finalize Finalize Finalize Finalize Finalize Finalize Finalize Finalize
the the the the the the the the the the
location location location location location location location location location location
for for for for for for for for for for
Subsea Subsea Subsea Subsea Subsea Subsea Subsea Subsea Subsea Subsea
interconn interconn interconn interconn interconn interconn interconn interconn interconn interconn
ection ection ection ection ection ection ection ection ection ection
between between between between between between between between between between
12” HM- 12” HM- 12” HM- 12” HM- 12” HM- 12” HM- 12” HM- 12” HM- 12” HM- 12” HM-
HX Free HX Free HX Free HX Free HX Free HX Free HX Free HX Free HX Free HX Free
Gas Gas Gas Gas Gas Gas Gas Gas Gas Gas
Pipeline Pipeline Pipeline Pipeline Pipeline Pipeline Pipeline Pipeline Pipeline Pipeline
with 12” with 12” with 12” with 12” with 12” with 12” with 12” with 12” with 12” with 12”
Free Gas Free Gas Free Gas Free Gas Free Gas Free Gas Free Gas Free Gas Free Gas Free Gas
pipeline pipeline pipeline pipeline pipeline pipeline pipeline pipeline pipeline pipeline
from HY from HY from HY from HY from HY from HY from HY from HY from HY from HY
and 14” and 14” and 14” and 14” and 14” and 14” and 14” and 14” and 14” and 14”
HX-HRA HX-HRA HX-HRA HX-HRA HX-HRA HX-HRA HX-HRA HX-HRA HX-HRA HX-HRA
Free Gas Free Gas Free Gas Free Gas Free Gas Free Gas Free Gas Free Gas Free Gas Free Gas
Pipeline Pipeline Pipeline Pipeline Pipeline Pipeline Pipeline Pipeline Pipeline Pipeline
with 10” with 10” with 10” with 10” with 10” with 10” with 10” with 10” with 10” with 10”
Free Gas Free Gas Free Gas Free Gas Free Gas Free Gas Free Gas Free Gas Free Gas Free Gas
pipeline pipeline pipeline pipeline pipeline pipeline pipeline pipeline pipeline pipeline
from HV from HV from HV from HV from HV from HV from HV from HV from HV from HV
based on based on based on based on based on based on based on based on based on based on
QRA QRA QRA QRA QRA QRA QRA QRA QRA QRA
Field & Field & Field & Field & Field & Field & Field & Field & Field & Field &
Layout Layout Layout Layout Layout Layout Layout Layout Layout Layout
Review Review Review Review Review Review Review Review Review Review

Fire and Fire and Fire and Fire and Fire and Fire and Fire and Fire and Fire and Fire and
Explosion Explosion Explosion Explosion Explosion Explosion Explosion Explosion Explosion Explosion
Analysis Analysis Analysis Analysis Analysis Analysis Analysis Analysis Analysis Analysis
Gas and Gas and Gas and Gas and Gas and Gas and Gas and Gas and Gas and Gas and
Smoke Smoke Smoke Smoke Smoke Smoke Smoke Smoke Smoke Smoke
Dispersio Dispersio Dispersio Dispersio Dispersio Dispersio Dispersio Dispersio Dispersio Dispersio
n Analysis n Analysis n Analysis n Analysis n Analysis n Analysis n Analysis n Analysis n Analysis n Analysis
Non Non Non Non Non Non Non Non Non Non
Process Process Process Process Process Process Process Process Process Process
Hazards Hazards Hazards Hazards Hazards Hazards Hazards Hazards Hazards Hazards
Analysis Analysis Analysis Analysis Analysis Analysis Analysis Analysis Analysis Analysis

Emergenc Emergenc Emergenc Emergenc Emergenc Emergenc Emergenc Emergenc Emergenc Emergenc
y Systems y Systems y Systems y Systems y Systems y Systems y Systems y Systems y Systems y Systems
Review Review Review Review Review Review Review Review Review Review
Impact Impact Impact Impact Impact Impact Impact Impact Impact Impact
Analysis Analysis Analysis Analysis Analysis Analysis Analysis Analysis Analysis Analysis
covering covering covering covering covering covering covering covering covering covering
ship ship ship ship ship ship ship ship ship ship
collision collision collision collision collision collision collision collision collision collision
and and and and and and and and and and
dropped dropped dropped dropped dropped dropped dropped dropped dropped dropped
objects objects objects objects objects objects objects objects objects objects

Assumpti Assumpti Assumpti Assumpti Assumpti Assumpti Assumpti Assumpti Assumpti Assumpti
on on on on on on on on on on
register register register register register register register register register register
Risk Risk Risk Risk Risk Risk Risk Risk Risk Risk
reduction reduction reduction reduction reduction reduction reduction reduction reduction reduction
measures measures measures measures measures measures measures measures measures measures

Alarm Alarm Alarm Alarm Alarm Alarm Alarm Alarm Alarm Alarm
Report Report Report Report Report Report Report Report Report Report
Critical Critical Critical Critical Critical Critical Critical Critical Critical Critical
controls controls controls controls controls controls controls controls controls controls
report report report report report report report report report report

Conseque Conseque Conseque Conseque Conseque Conseque Conseque Conseque Conseque Conseque
nce nce nce nce nce nce nce nce nce nce
analysis analysis analysis analysis analysis analysis analysis analysis analysis analysis
Impact Impact Impact Impact Impact Impact Impact Impact Impact Impact
analysis analysis analysis analysis analysis analysis analysis analysis analysis analysis
covering covering covering covering covering covering covering covering covering covering
ship ship ship ship ship ship ship ship ship ship
collision collision collision collision collision collision collision collision collision collision
and drop and drop and drop and drop and drop and drop and drop and drop and drop and drop
objects objects objects objects objects objects objects objects objects objects
Escape Escape Escape Escape Escape Escape Escape Escape Escape Escape
,Evacuati ,Evacuati ,Evacuati ,Evacuati ,Evacuati ,Evacuati ,Evacuati ,Evacuati ,Evacuati ,Evacuati
on and on and on and on and on and on and on and on and on and on and
Rescue Rescue Rescue Rescue Rescue Rescue Rescue Rescue Rescue Rescue
Analysis Analysis Analysis Analysis Analysis Analysis Analysis Analysis Analysis Analysis
[EERA] [EERA] [EERA] [EERA] [EERA] [EERA] [EERA] [EERA] [EERA] [EERA]
Fire and Fire and Fire and Fire and Fire and Fire and Fire and Fire and Fire and Fire and
Gas Gas Gas Gas Gas Gas Gas Gas Gas Gas
Mapping Mapping Mapping Mapping Mapping Mapping Mapping Mapping Mapping Mapping
Study Study Study Study Study Study Study Study Study Study
Finalize Finalize Finalize Finalize Finalize Finalize Finalize Finalize Finalize Finalize
the the the the the the the the the the
location location location location location location location location location location
for for for for for for for for for for
Subsea Subsea Subsea Subsea Subsea Subsea Subsea Subsea Subsea Subsea
interconn interconn interconn interconn interconn interconn interconn interconn interconn interconn
ection ection ection ection ection ection ection ection ection ection
between between between between between between between between between between
12” HM- 12” HM- 12” HM- 12” HM- 12” HM- 12” HM- 12” HM- 12” HM- 12” HM- 12” HM-
HX Free HX Free HX Free HX Free HX Free HX Free HX Free HX Free HX Free HX Free
Gas Gas Gas Gas Gas Gas Gas Gas Gas Gas
Pipeline Pipeline Pipeline Pipeline Pipeline Pipeline Pipeline Pipeline Pipeline Pipeline
with 12” with 12” with 12” with 12” with 12” with 12” with 12” with 12” with 12” with 12”
Free Gas Free Gas Free Gas Free Gas Free Gas Free Gas Free Gas Free Gas Free Gas Free Gas
pipeline pipeline pipeline pipeline pipeline pipeline pipeline pipeline pipeline pipeline
from HY from HY from HY from HY from HY from HY from HY from HY from HY from HY
and 14” and 14” and 14” and 14” and 14” and 14” and 14” and 14” and 14” and 14”
HX-HRA HX-HRA HX-HRA HX-HRA HX-HRA HX-HRA HX-HRA HX-HRA HX-HRA HX-HRA
Free Gas Free Gas Free Gas Free Gas Free Gas Free Gas Free Gas Free Gas Free Gas Free Gas
Pipeline Pipeline Pipeline Pipeline Pipeline Pipeline Pipeline Pipeline Pipeline Pipeline
with 10” with 10” with 10” with 10” with 10” with 10” with 10” with 10” with 10” with 10”
Free Gas Free Gas Free Gas Free Gas Free Gas Free Gas Free Gas Free Gas Free Gas Free Gas
pipeline pipeline pipeline pipeline pipeline pipeline pipeline pipeline pipeline pipeline
from HV from HV from HV from HV from HV from HV from HV from HV from HV from HV
based on based on based on based on based on based on based on based on based on based on
QRA QRA QRA QRA QRA QRA QRA QRA QRA QRA
Field & Field & Field & Field & Field & Field & Field & Field & Field & Field &
Layout Layout Layout Layout Layout Layout Layout Layout Layout Layout
Review Review Review Review Review Review Review Review Review Review

Fire and Fire and Fire and Fire and Fire and Fire and Fire and Fire and Fire and Fire and
Explosion Explosion Explosion Explosion Explosion Explosion Explosion Explosion Explosion Explosion
Analysis Analysis Analysis Analysis Analysis Analysis Analysis Analysis Analysis Analysis
Gas and Gas and Gas and Gas and Gas and Gas and Gas and Gas and Gas and Gas and
Smoke Smoke Smoke Smoke Smoke Smoke Smoke Smoke Smoke Smoke
Dispersio Dispersio Dispersio Dispersio Dispersio Dispersio Dispersio Dispersio Dispersio Dispersio
n Analysis n Analysis n Analysis n Analysis n Analysis n Analysis n Analysis n Analysis n Analysis n Analysis
Non Non Non Non Non Non Non Non Non Non
Process Process Process Process Process Process Process Process Process Process
Hazards Hazards Hazards Hazards Hazards Hazards Hazards Hazards Hazards Hazards
Analysis Analysis Analysis Analysis Analysis Analysis Analysis Analysis Analysis Analysis

Emergenc Emergenc Emergenc Emergenc Emergenc Emergenc Emergenc Emergenc Emergenc Emergenc
y Systems y Systems y Systems y Systems y Systems y Systems y Systems y Systems y Systems y Systems
Review Review Review Review Review Review Review Review Review Review
Impact Impact Impact Impact Impact Impact Impact Impact Impact Impact
Analysis Analysis Analysis Analysis Analysis Analysis Analysis Analysis Analysis Analysis
covering covering covering covering covering covering covering covering covering covering
ship ship ship ship ship ship ship ship ship ship
collision collision collision collision collision collision collision collision collision collision
and and and and and and and and and and
dropped dropped dropped dropped dropped dropped dropped dropped dropped dropped
objects objects objects objects objects objects objects objects objects objects

Assumpti Assumpti Assumpti Assumpti Assumpti Assumpti Assumpti Assumpti Assumpti Assumpti
on on on on on on on on on on
register register register register register register register register register register
Risk Risk Risk Risk Risk Risk Risk Risk Risk Risk
reduction reduction reduction reduction reduction reduction reduction reduction reduction reduction
measures measures measures measures measures measures measures measures measures measures

Alarm Alarm Alarm Alarm Alarm Alarm Alarm Alarm Alarm Alarm
Report Report Report Report Report Report Report Report Report Report
Critical Critical Critical Critical Critical Critical Critical Critical Critical Critical
controls controls controls controls controls controls controls controls controls controls
report report report report report report report report report report

Conseque Conseque Conseque Conseque Conseque Conseque Conseque Conseque Conseque Conseque
nce nce nce nce nce nce nce nce nce nce
analysis analysis analysis analysis analysis analysis analysis analysis analysis analysis
Impact Impact Impact Impact Impact Impact Impact Impact Impact Impact
analysis analysis analysis analysis analysis analysis analysis analysis analysis analysis
covering covering covering covering covering covering covering covering covering covering
ship ship ship ship ship ship ship ship ship ship
collision collision collision collision collision collision collision collision collision collision
and drop and drop and drop and drop and drop and drop and drop and drop and drop and drop
objects objects objects objects objects objects objects objects objects objects
Escape Escape Escape Escape Escape Escape Escape Escape Escape Escape
,Evacuati ,Evacuati ,Evacuati ,Evacuati ,Evacuati ,Evacuati ,Evacuati ,Evacuati ,Evacuati ,Evacuati
on and on and on and on and on and on and on and on and on and on and
Rescue Rescue Rescue Rescue Rescue Rescue Rescue Rescue Rescue Rescue
Analysis Analysis Analysis Analysis Analysis Analysis Analysis Analysis Analysis Analysis
[EERA] [EERA] [EERA] [EERA] [EERA] [EERA] [EERA] [EERA] [EERA] [EERA]
Fire and Fire and Fire and Fire and Fire and Fire and Fire and Fire and Fire and Fire and
Gas Gas Gas Gas Gas Gas Gas Gas Gas Gas
Mapping Mapping Mapping Mapping Mapping Mapping Mapping Mapping Mapping Mapping
Study Study Study Study Study Study Study Study Study Study
Finalize Finalize Finalize Finalize Finalize Finalize Finalize Finalize Finalize Finalize
the the the the the the the the the the
location location location location location location location location location location
for for for for for for for for for for
Subsea Subsea Subsea Subsea Subsea Subsea Subsea Subsea Subsea Subsea
interconn interconn interconn interconn interconn interconn interconn interconn interconn interconn
ection ection ection ection ection ection ection ection ection ection
between between between between between between between between between between
12” HM- 12” HM- 12” HM- 12” HM- 12” HM- 12” HM- 12” HM- 12” HM- 12” HM- 12” HM-
HX Free HX Free HX Free HX Free HX Free HX Free HX Free HX Free HX Free HX Free
Gas Gas Gas Gas Gas Gas Gas Gas Gas Gas
Pipeline Pipeline Pipeline Pipeline Pipeline Pipeline Pipeline Pipeline Pipeline Pipeline
with 12” with 12” with 12” with 12” with 12” with 12” with 12” with 12” with 12” with 12”
Free Gas Free Gas Free Gas Free Gas Free Gas Free Gas Free Gas Free Gas Free Gas Free Gas
pipeline pipeline pipeline pipeline pipeline pipeline pipeline pipeline pipeline pipeline
from HY from HY from HY from HY from HY from HY from HY from HY from HY from HY
and 14” and 14” and 14” and 14” and 14” and 14” and 14” and 14” and 14” and 14”
HX-HRA HX-HRA HX-HRA HX-HRA HX-HRA HX-HRA HX-HRA HX-HRA HX-HRA HX-HRA
Free Gas Free Gas Free Gas Free Gas Free Gas Free Gas Free Gas Free Gas Free Gas Free Gas
Pipeline Pipeline Pipeline Pipeline Pipeline Pipeline Pipeline Pipeline Pipeline Pipeline
with 10” with 10” with 10” with 10” with 10” with 10” with 10” with 10” with 10” with 10”
Free Gas Free Gas Free Gas Free Gas Free Gas Free Gas Free Gas Free Gas Free Gas Free Gas
pipeline pipeline pipeline pipeline pipeline pipeline pipeline pipeline pipeline pipeline
from HV from HV from HV from HV from HV from HV from HV from HV from HV from HV
based on based on based on based on based on based on based on based on based on based on
QRA QRA QRA QRA QRA QRA QRA QRA QRA QRA
Field & Field & Field & Field & Field & Field & Field & Field & Field & Field &
Layout Layout Layout Layout Layout Layout Layout Layout Layout Layout
Review Review Review Review Review Review Review Review Review Review

Fire and Fire and Fire and Fire and Fire and Fire and Fire and Fire and Fire and Fire and
Explosion Explosion Explosion Explosion Explosion Explosion Explosion Explosion Explosion Explosion
Analysis Analysis Analysis Analysis Analysis Analysis Analysis Analysis Analysis Analysis
Gas and Gas and Gas and Gas and Gas and Gas and Gas and Gas and Gas and Gas and
Smoke Smoke Smoke Smoke Smoke Smoke Smoke Smoke Smoke Smoke
Dispersio Dispersio Dispersio Dispersio Dispersio Dispersio Dispersio Dispersio Dispersio Dispersio
n Analysis n Analysis n Analysis n Analysis n Analysis n Analysis n Analysis n Analysis n Analysis n Analysis
Non Non Non Non Non Non Non Non Non Non
Process Process Process Process Process Process Process Process Process Process
Hazards Hazards Hazards Hazards Hazards Hazards Hazards Hazards Hazards Hazards
Analysis Analysis Analysis Analysis Analysis Analysis Analysis Analysis Analysis Analysis

Emergenc Emergenc Emergenc Emergenc Emergenc Emergenc Emergenc Emergenc Emergenc Emergenc
y Systems y Systems y Systems y Systems y Systems y Systems y Systems y Systems y Systems y Systems
Review Review Review Review Review Review Review Review Review Review
Impact Impact Impact Impact Impact Impact Impact Impact Impact Impact
Analysis Analysis Analysis Analysis Analysis Analysis Analysis Analysis Analysis Analysis
covering covering covering covering covering covering covering covering covering covering
ship ship ship ship ship ship ship ship ship ship
collision collision collision collision collision collision collision collision collision collision
and and and and and and and and and and
dropped dropped dropped dropped dropped dropped dropped dropped dropped dropped
objects objects objects objects objects objects objects objects objects objects

Assumpti Assumpti Assumpti Assumpti Assumpti Assumpti Assumpti Assumpti Assumpti Assumpti
on on on on on on on on on on
register register register register register register register register register register
Risk Risk Risk Risk Risk Risk Risk Risk Risk Risk
reduction reduction reduction reduction reduction reduction reduction reduction reduction reduction
measures measures measures measures measures measures measures measures measures measures

Alarm Alarm Alarm Alarm Alarm Alarm Alarm Alarm Alarm Alarm
Report Report Report Report Report Report Report Report Report Report
Critical Critical Critical Critical Critical Critical Critical Critical Critical Critical
controls controls controls controls controls controls controls controls controls controls
report report report report report report report report report report

Conseque Conseque Conseque Conseque Conseque Conseque Conseque Conseque Conseque Conseque
nce nce nce nce nce nce nce nce nce nce
analysis analysis analysis analysis analysis analysis analysis analysis analysis analysis
Impact Impact Impact Impact Impact Impact Impact Impact Impact Impact
analysis analysis analysis analysis analysis analysis analysis analysis analysis analysis
covering covering covering covering covering covering covering covering covering covering
ship ship ship ship ship ship ship ship ship ship
collision collision collision collision collision collision collision collision collision collision
and drop and drop and drop and drop and drop and drop and drop and drop and drop and drop
objects objects objects objects objects objects objects objects objects objects
Escape Escape Escape Escape Escape Escape Escape Escape Escape Escape
,Evacuati ,Evacuati ,Evacuati ,Evacuati ,Evacuati ,Evacuati ,Evacuati ,Evacuati ,Evacuati ,Evacuati
on and on and on and on and on and on and on and on and on and on and
Rescue Rescue Rescue Rescue Rescue Rescue Rescue Rescue Rescue Rescue
Analysis Analysis Analysis Analysis Analysis Analysis Analysis Analysis Analysis Analysis
[EERA] [EERA] [EERA] [EERA] [EERA] [EERA] [EERA] [EERA] [EERA] [EERA]
Fire and Fire and Fire and Fire and Fire and Fire and Fire and Fire and Fire and Fire and
Gas Gas Gas Gas Gas Gas Gas Gas Gas Gas
Mapping Mapping Mapping Mapping Mapping Mapping Mapping Mapping Mapping Mapping
Study Study Study Study Study Study Study Study Study Study
Finalize Finalize Finalize Finalize Finalize Finalize Finalize Finalize Finalize Finalize
the the the the the the the the the the
location location location location location location location location location location
for for for for for for for for for for
Subsea Subsea Subsea Subsea Subsea Subsea Subsea Subsea Subsea Subsea
interconn interconn interconn interconn interconn interconn interconn interconn interconn interconn
ection ection ection ection ection ection ection ection ection ection
between between between between between between between between between between
12” HM- 12” HM- 12” HM- 12” HM- 12” HM- 12” HM- 12” HM- 12” HM- 12” HM- 12” HM-
HX Free HX Free HX Free HX Free HX Free HX Free HX Free HX Free HX Free HX Free
Gas Gas Gas Gas Gas Gas Gas Gas Gas Gas
Pipeline Pipeline Pipeline Pipeline Pipeline Pipeline Pipeline Pipeline Pipeline Pipeline
with 12” with 12” with 12” with 12” with 12” with 12” with 12” with 12” with 12” with 12”
Free Gas Free Gas Free Gas Free Gas Free Gas Free Gas Free Gas Free Gas Free Gas Free Gas
pipeline pipeline pipeline pipeline pipeline pipeline pipeline pipeline pipeline pipeline
from HY from HY from HY from HY from HY from HY from HY from HY from HY from HY
and 14” and 14” and 14” and 14” and 14” and 14” and 14” and 14” and 14” and 14”
HX-HRA HX-HRA HX-HRA HX-HRA HX-HRA HX-HRA HX-HRA HX-HRA HX-HRA HX-HRA
Free Gas Free Gas Free Gas Free Gas Free Gas Free Gas Free Gas Free Gas Free Gas Free Gas
Pipeline Pipeline Pipeline Pipeline Pipeline Pipeline Pipeline Pipeline Pipeline Pipeline
with 10” with 10” with 10” with 10” with 10” with 10” with 10” with 10” with 10” with 10”
Free Gas Free Gas Free Gas Free Gas Free Gas Free Gas Free Gas Free Gas Free Gas Free Gas
pipeline pipeline pipeline pipeline pipeline pipeline pipeline pipeline pipeline pipeline
from HV from HV from HV from HV from HV from HV from HV from HV from HV from HV
based on based on based on based on based on based on based on based on based on based on
QRA QRA QRA QRA QRA QRA QRA QRA QRA QRA
Field & Field & Field & Field & Field & Field & Field & Field & Field & Field &
Layout Layout Layout Layout Layout Layout Layout Layout Layout Layout
Review Review Review Review Review Review Review Review Review Review

Fire and Fire and Fire and Fire and Fire and Fire and Fire and Fire and Fire and Fire and
Explosion Explosion Explosion Explosion Explosion Explosion Explosion Explosion Explosion Explosion
Analysis Analysis Analysis Analysis Analysis Analysis Analysis Analysis Analysis Analysis
Gas and Gas and Gas and Gas and Gas and Gas and Gas and Gas and Gas and Gas and
Smoke Smoke Smoke Smoke Smoke Smoke Smoke Smoke Smoke Smoke
Dispersio Dispersio Dispersio Dispersio Dispersio Dispersio Dispersio Dispersio Dispersio Dispersio
n Analysis n Analysis n Analysis n Analysis n Analysis n Analysis n Analysis n Analysis n Analysis n Analysis
Non Non Non Non Non Non Non Non Non Non
Process Process Process Process Process Process Process Process Process Process
Hazards Hazards Hazards Hazards Hazards Hazards Hazards Hazards Hazards Hazards
Analysis Analysis Analysis Analysis Analysis Analysis Analysis Analysis Analysis Analysis

Emergenc Emergenc Emergenc Emergenc Emergenc Emergenc Emergenc Emergenc Emergenc Emergenc
y Systems y Systems y Systems y Systems y Systems y Systems y Systems y Systems y Systems y Systems
Review Review Review Review Review Review Review Review Review Review
Impact Impact Impact Impact Impact Impact Impact Impact Impact Impact
Analysis Analysis Analysis Analysis Analysis Analysis Analysis Analysis Analysis Analysis
covering covering covering covering covering covering covering covering covering covering
ship ship ship ship ship ship ship ship ship ship
collision collision collision collision collision collision collision collision collision collision
and and and and and and and and and and
dropped dropped dropped dropped dropped dropped dropped dropped dropped dropped
objects objects objects objects objects objects objects objects objects objects

Assumpti Assumpti Assumpti Assumpti Assumpti Assumpti Assumpti Assumpti Assumpti Assumpti
on on on on on on on on on on
register register register register register register register register register register
Risk Risk Risk Risk Risk Risk Risk Risk Risk Risk
reduction reduction reduction reduction reduction reduction reduction reduction reduction reduction
measures measures measures measures measures measures measures measures measures measures

Alarm Alarm Alarm Alarm Alarm Alarm Alarm Alarm Alarm Alarm
Report Report Report Report Report Report Report Report Report Report
Critical Critical Critical Critical Critical Critical Critical Critical Critical Critical
controls controls controls controls controls controls controls controls controls controls
report report report report report report report report report report

Conseque Conseque Conseque Conseque Conseque Conseque Conseque Conseque Conseque Conseque
nce nce nce nce nce nce nce nce nce nce
analysis analysis analysis analysis analysis analysis analysis analysis analysis analysis
Impact Impact Impact Impact Impact Impact Impact Impact Impact Impact
analysis analysis analysis analysis analysis analysis analysis analysis analysis analysis
covering covering covering covering covering covering covering covering covering covering
ship ship ship ship ship ship ship ship ship ship
collision collision collision collision collision collision collision collision collision collision
and drop and drop and drop and drop and drop and drop and drop and drop and drop and drop
objects objects objects objects objects objects objects objects objects objects
Escape Escape Escape Escape Escape Escape Escape Escape Escape Escape
,Evacuati ,Evacuati ,Evacuati ,Evacuati ,Evacuati ,Evacuati ,Evacuati ,Evacuati ,Evacuati ,Evacuati
on and on and on and on and on and on and on and on and on and on and
Rescue Rescue Rescue Rescue Rescue Rescue Rescue Rescue Rescue Rescue
Analysis Analysis Analysis Analysis Analysis Analysis Analysis Analysis Analysis Analysis
[EERA] [EERA] [EERA] [EERA] [EERA] [EERA] [EERA] [EERA] [EERA] [EERA]
Fire and Fire and Fire and Fire and Fire and Fire and Fire and Fire and Fire and Fire and
Gas Gas Gas Gas Gas Gas Gas Gas Gas Gas
Mapping Mapping Mapping Mapping Mapping Mapping Mapping Mapping Mapping Mapping
Study Study Study Study Study Study Study Study Study Study
Finalize Finalize Finalize Finalize Finalize Finalize Finalize Finalize Finalize Finalize
the the the the the the the the the the
location location location location location location location location location location
for for for for for for for for for for
Subsea Subsea Subsea Subsea Subsea Subsea Subsea Subsea Subsea Subsea
interconn interconn interconn interconn interconn interconn interconn interconn interconn interconn
ection ection ection ection ection ection ection ection ection ection
between between between between between between between between between between
12” HM- 12” HM- 12” HM- 12” HM- 12” HM- 12” HM- 12” HM- 12” HM- 12” HM- 12” HM-
HX Free HX Free HX Free HX Free HX Free HX Free HX Free HX Free HX Free HX Free
Gas Gas Gas Gas Gas Gas Gas Gas Gas Gas
Pipeline Pipeline Pipeline Pipeline Pipeline Pipeline Pipeline Pipeline Pipeline Pipeline
with 12” with 12” with 12” with 12” with 12” with 12” with 12” with 12” with 12” with 12”
Free Gas Free Gas Free Gas Free Gas Free Gas Free Gas Free Gas Free Gas Free Gas Free Gas
pipeline pipeline pipeline pipeline pipeline pipeline pipeline pipeline pipeline pipeline
from HY from HY from HY from HY from HY from HY from HY from HY from HY from HY
and 14” and 14” and 14” and 14” and 14” and 14” and 14” and 14” and 14” and 14”
HX-HRA HX-HRA HX-HRA HX-HRA HX-HRA HX-HRA HX-HRA HX-HRA HX-HRA HX-HRA
Free Gas Free Gas Free Gas Free Gas Free Gas Free Gas Free Gas Free Gas Free Gas Free Gas
Pipeline Pipeline Pipeline Pipeline Pipeline Pipeline Pipeline Pipeline Pipeline Pipeline
with 10” with 10” with 10” with 10” with 10” with 10” with 10” with 10” with 10” with 10”
Free Gas Free Gas Free Gas Free Gas Free Gas Free Gas Free Gas Free Gas Free Gas Free Gas
pipeline pipeline pipeline pipeline pipeline pipeline pipeline pipeline pipeline pipeline
from HV from HV from HV from HV from HV from HV from HV from HV from HV from HV
based on based on based on based on based on based on based on based on based on based on
QRA QRA QRA QRA QRA QRA QRA QRA QRA QRA
Field & Field & Field & Field & Field & Field & Field & Field & Field & Field &
Layout Layout Layout Layout Layout Layout Layout Layout Layout Layout
Review Review Review Review Review Review Review Review Review Review

Fire and Fire and Fire and Fire and Fire and Fire and Fire and Fire and Fire and Fire and
Explosion Explosion Explosion Explosion Explosion Explosion Explosion Explosion Explosion Explosion
Analysis Analysis Analysis Analysis Analysis Analysis Analysis Analysis Analysis Analysis
Gas and Gas and Gas and Gas and Gas and Gas and Gas and Gas and Gas and Gas and
Smoke Smoke Smoke Smoke Smoke Smoke Smoke Smoke Smoke Smoke
Dispersio Dispersio Dispersio Dispersio Dispersio Dispersio Dispersio Dispersio Dispersio Dispersio
n Analysis n Analysis n Analysis n Analysis n Analysis n Analysis n Analysis n Analysis n Analysis n Analysis
Non Non Non Non Non Non Non Non Non Non
Process Process Process Process Process Process Process Process Process Process
Hazards Hazards Hazards Hazards Hazards Hazards Hazards Hazards Hazards Hazards
Analysis Analysis Analysis Analysis Analysis Analysis Analysis Analysis Analysis Analysis

Emergenc Emergenc Emergenc Emergenc Emergenc Emergenc Emergenc Emergenc Emergenc Emergenc
y Systems y Systems y Systems y Systems y Systems y Systems y Systems y Systems y Systems y Systems
Review Review Review Review Review Review Review Review Review Review
Impact Impact Impact Impact Impact Impact Impact Impact Impact Impact
Analysis Analysis Analysis Analysis Analysis Analysis Analysis Analysis Analysis Analysis
covering covering covering covering covering covering covering covering covering covering
ship ship ship ship ship ship ship ship ship ship
collision collision collision collision collision collision collision collision collision collision
and and and and and and and and and and
dropped dropped dropped dropped dropped dropped dropped dropped dropped dropped
objects objects objects objects objects objects objects objects objects objects

Assumpti Assumpti Assumpti Assumpti Assumpti Assumpti Assumpti Assumpti Assumpti Assumpti
on on on on on on on on on on
register register register register register register register register register register
Risk Risk Risk Risk Risk Risk Risk Risk Risk Risk
reduction reduction reduction reduction reduction reduction reduction reduction reduction reduction
measures measures measures measures measures measures measures measures measures measures

Alarm Alarm Alarm Alarm Alarm Alarm Alarm Alarm Alarm Alarm
Report Report Report Report Report Report Report Report Report Report
Critical Critical Critical Critical Critical Critical Critical Critical Critical Critical
controls controls controls controls controls controls controls controls controls controls
report report report report report report report report report report

Conseque Conseque Conseque Conseque Conseque Conseque Conseque Conseque Conseque Conseque
nce nce nce nce nce nce nce nce nce nce
analysis analysis analysis analysis analysis analysis analysis analysis analysis analysis
Impact Impact Impact Impact Impact Impact Impact Impact Impact Impact
analysis analysis analysis analysis analysis analysis analysis analysis analysis analysis
covering covering covering covering covering covering covering covering covering covering
ship ship ship ship ship ship ship ship ship ship
collision collision collision collision collision collision collision collision collision collision
and drop and drop and drop and drop and drop and drop and drop and drop and drop and drop
objects objects objects objects objects objects objects objects objects objects
Escape Escape Escape Escape Escape Escape Escape Escape Escape Escape
,Evacuati ,Evacuati ,Evacuati ,Evacuati ,Evacuati ,Evacuati ,Evacuati ,Evacuati ,Evacuati ,Evacuati
on and on and on and on and on and on and on and on and on and on and
Rescue Rescue Rescue Rescue Rescue Rescue Rescue Rescue Rescue Rescue
Analysis Analysis Analysis Analysis Analysis Analysis Analysis Analysis Analysis Analysis
[EERA] [EERA] [EERA] [EERA] [EERA] [EERA] [EERA] [EERA] [EERA] [EERA]
Fire and Fire and Fire and Fire and Fire and Fire and Fire and Fire and Fire and Fire and
Gas Gas Gas Gas Gas Gas Gas Gas Gas Gas
Mapping Mapping Mapping Mapping Mapping Mapping Mapping Mapping Mapping Mapping
Study Study Study Study Study Study Study Study Study Study
Finalize Finalize Finalize Finalize Finalize Finalize Finalize Finalize Finalize Finalize
the the the the the the the the the the
location location location location location location location location location location
for for for for for for for for for for
Subsea Subsea Subsea Subsea Subsea Subsea Subsea Subsea Subsea Subsea
interconn interconn interconn interconn interconn interconn interconn interconn interconn interconn
ection ection ection ection ection ection ection ection ection ection
between between between between between between between between between between
12” HM- 12” HM- 12” HM- 12” HM- 12” HM- 12” HM- 12” HM- 12” HM- 12” HM- 12” HM-
HX Free HX Free HX Free HX Free HX Free HX Free HX Free HX Free HX Free HX Free
Gas Gas Gas Gas Gas Gas Gas Gas Gas Gas
Pipeline Pipeline Pipeline Pipeline Pipeline Pipeline Pipeline Pipeline Pipeline Pipeline
with 12” with 12” with 12” with 12” with 12” with 12” with 12” with 12” with 12” with 12”
Free Gas Free Gas Free Gas Free Gas Free Gas Free Gas Free Gas Free Gas Free Gas Free Gas
pipeline pipeline pipeline pipeline pipeline pipeline pipeline pipeline pipeline pipeline
from HY from HY from HY from HY from HY from HY from HY from HY from HY from HY
and 14” and 14” and 14” and 14” and 14” and 14” and 14” and 14” and 14” and 14”
HX-HRA HX-HRA HX-HRA HX-HRA HX-HRA HX-HRA HX-HRA HX-HRA HX-HRA HX-HRA
Free Gas Free Gas Free Gas Free Gas Free Gas Free Gas Free Gas Free Gas Free Gas Free Gas
Pipeline Pipeline Pipeline Pipeline Pipeline Pipeline Pipeline Pipeline Pipeline Pipeline
with 10” with 10” with 10” with 10” with 10” with 10” with 10” with 10” with 10” with 10”
Free Gas Free Gas Free Gas Free Gas Free Gas Free Gas Free Gas Free Gas Free Gas Free Gas
pipeline pipeline pipeline pipeline pipeline pipeline pipeline pipeline pipeline pipeline
from HV from HV from HV from HV from HV from HV from HV from HV from HV from HV
based on based on based on based on based on based on based on based on based on based on
QRA QRA QRA QRA QRA QRA QRA QRA QRA QRA
Field & Field & Field & Field & Field & Field & Field & Field & Field & Field &
Layout Layout Layout Layout Layout Layout Layout Layout Layout Layout
Review Review Review Review Review Review Review Review Review Review

Fire and Fire and Fire and Fire and Fire and Fire and Fire and Fire and Fire and Fire and
Explosion Explosion Explosion Explosion Explosion Explosion Explosion Explosion Explosion Explosion
Analysis Analysis Analysis Analysis Analysis Analysis Analysis Analysis Analysis Analysis
Gas and Gas and Gas and Gas and Gas and Gas and Gas and Gas and Gas and Gas and
Smoke Smoke Smoke Smoke Smoke Smoke Smoke Smoke Smoke Smoke
Dispersio Dispersio Dispersio Dispersio Dispersio Dispersio Dispersio Dispersio Dispersio Dispersio
n Analysis n Analysis n Analysis n Analysis n Analysis n Analysis n Analysis n Analysis n Analysis n Analysis
Non Non Non Non Non Non Non Non Non Non
Process Process Process Process Process Process Process Process Process Process
Hazards Hazards Hazards Hazards Hazards Hazards Hazards Hazards Hazards Hazards
Analysis Analysis Analysis Analysis Analysis Analysis Analysis Analysis Analysis Analysis

Emergenc Emergenc Emergenc Emergenc Emergenc Emergenc Emergenc Emergenc Emergenc Emergenc
y Systems y Systems y Systems y Systems y Systems y Systems y Systems y Systems y Systems y Systems
Review Review Review Review Review Review Review Review Review Review
Impact Impact Impact Impact Impact Impact Impact Impact Impact Impact
Analysis Analysis Analysis Analysis Analysis Analysis Analysis Analysis Analysis Analysis
covering covering covering covering covering covering covering covering covering covering
ship ship ship ship ship ship ship ship ship ship
collision collision collision collision collision collision collision collision collision collision
and and and and and and and and and and
dropped dropped dropped dropped dropped dropped dropped dropped dropped dropped
objects objects objects objects objects objects objects objects objects objects

Assumpti Assumpti Assumpti Assumpti Assumpti Assumpti Assumpti Assumpti Assumpti Assumpti
on on on on on on on on on on
register register register register register register register register register register
Risk Risk Risk Risk Risk Risk Risk Risk Risk Risk
reduction reduction reduction reduction reduction reduction reduction reduction reduction reduction
measures measures measures measures measures measures measures measures measures measures

Alarm Alarm Alarm Alarm Alarm Alarm Alarm Alarm Alarm Alarm
Report Report Report Report Report Report Report Report Report Report
Critical Critical Critical Critical Critical Critical Critical Critical Critical Critical
controls controls controls controls controls controls controls controls controls controls
report report report report report report report report report report

Conseque Conseque Conseque Conseque Conseque Conseque Conseque Conseque Conseque Conseque
nce nce nce nce nce nce nce nce nce nce
analysis analysis analysis analysis analysis analysis analysis analysis analysis analysis
Impact Impact Impact Impact Impact Impact Impact Impact Impact Impact
analysis analysis analysis analysis analysis analysis analysis analysis analysis analysis
covering covering covering covering covering covering covering covering covering covering
ship ship ship ship ship ship ship ship ship ship
collision collision collision collision collision collision collision collision collision collision
and drop and drop and drop and drop and drop and drop and drop and drop and drop and drop
objects objects objects objects objects objects objects objects objects objects
Escape Escape Escape Escape Escape Escape Escape Escape Escape Escape
,Evacuati ,Evacuati ,Evacuati ,Evacuati ,Evacuati ,Evacuati ,Evacuati ,Evacuati ,Evacuati ,Evacuati
on and on and on and on and on and on and on and on and on and on and
Rescue Rescue Rescue Rescue Rescue Rescue Rescue Rescue Rescue Rescue
Analysis Analysis Analysis Analysis Analysis Analysis Analysis Analysis Analysis Analysis
[EERA] [EERA] [EERA] [EERA] [EERA] [EERA] [EERA] [EERA] [EERA] [EERA]
Fire and Fire and Fire and Fire and Fire and Fire and Fire and Fire and Fire and Fire and
Gas Gas Gas Gas Gas Gas Gas Gas Gas Gas
Mapping Mapping Mapping Mapping Mapping Mapping Mapping Mapping Mapping Mapping
Study Study Study Study Study Study Study Study Study Study
Finalize Finalize Finalize Finalize Finalize Finalize Finalize Finalize Finalize Finalize
the the the the the the the the the the
location location location location location location location location location location
for for for for for for for for for for
Subsea Subsea Subsea Subsea Subsea Subsea Subsea Subsea Subsea Subsea
interconn interconn interconn interconn interconn interconn interconn interconn interconn interconn
ection ection ection ection ection ection ection ection ection ection
between between between between between between between between between between
12” HM- 12” HM- 12” HM- 12” HM- 12” HM- 12” HM- 12” HM- 12” HM- 12” HM- 12” HM-
HX Free HX Free HX Free HX Free HX Free HX Free HX Free HX Free HX Free HX Free
Gas Gas Gas Gas Gas Gas Gas Gas Gas Gas
Pipeline Pipeline Pipeline Pipeline Pipeline Pipeline Pipeline Pipeline Pipeline Pipeline
with 12” with 12” with 12” with 12” with 12” with 12” with 12” with 12” with 12” with 12”
Free Gas Free Gas Free Gas Free Gas Free Gas Free Gas Free Gas Free Gas Free Gas Free Gas
pipeline pipeline pipeline pipeline pipeline pipeline pipeline pipeline pipeline pipeline
from HY from HY from HY from HY from HY from HY from HY from HY from HY from HY
and 14” and 14” and 14” and 14” and 14” and 14” and 14” and 14” and 14” and 14”
HX-HRA HX-HRA HX-HRA HX-HRA HX-HRA HX-HRA HX-HRA HX-HRA HX-HRA HX-HRA
Free Gas Free Gas Free Gas Free Gas Free Gas Free Gas Free Gas Free Gas Free Gas Free Gas
Pipeline Pipeline Pipeline Pipeline Pipeline Pipeline Pipeline Pipeline Pipeline Pipeline
with 10” with 10” with 10” with 10” with 10” with 10” with 10” with 10” with 10” with 10”
Free Gas Free Gas Free Gas Free Gas Free Gas Free Gas Free Gas Free Gas Free Gas Free Gas
pipeline pipeline pipeline pipeline pipeline pipeline pipeline pipeline pipeline pipeline
from HV from HV from HV from HV from HV from HV from HV from HV from HV from HV
based on based on based on based on based on based on based on based on based on based on
QRA QRA QRA QRA QRA QRA QRA QRA QRA QRA
Field & Field & Field & Field & Field & Field & Field & Field & Field & Field &
Layout Layout Layout Layout Layout Layout Layout Layout Layout Layout
Review Review Review Review Review Review Review Review Review Review

Fire and Fire and Fire and Fire and Fire and Fire and Fire and Fire and Fire and Fire and
Explosion Explosion Explosion Explosion Explosion Explosion Explosion Explosion Explosion Explosion
Analysis Analysis Analysis Analysis Analysis Analysis Analysis Analysis Analysis Analysis
Gas and Gas and Gas and Gas and Gas and Gas and Gas and Gas and Gas and Gas and
Smoke Smoke Smoke Smoke Smoke Smoke Smoke Smoke Smoke Smoke
Dispersio Dispersio Dispersio Dispersio Dispersio Dispersio Dispersio Dispersio Dispersio Dispersio
n Analysis n Analysis n Analysis n Analysis n Analysis n Analysis n Analysis n Analysis n Analysis n Analysis
Non Non Non Non Non Non Non Non Non Non
Process Process Process Process Process Process Process Process Process Process
Hazards Hazards Hazards Hazards Hazards Hazards Hazards Hazards Hazards Hazards
Analysis Analysis Analysis Analysis Analysis Analysis Analysis Analysis Analysis Analysis

Emergenc Emergenc Emergenc Emergenc Emergenc Emergenc Emergenc Emergenc Emergenc Emergenc
y Systems y Systems y Systems y Systems y Systems y Systems y Systems y Systems y Systems y Systems
Review Review Review Review Review Review Review Review Review Review
Impact Impact Impact Impact Impact Impact Impact Impact Impact Impact
Analysis Analysis Analysis Analysis Analysis Analysis Analysis Analysis Analysis Analysis
covering covering covering covering covering covering covering covering covering covering
ship ship ship ship ship ship ship ship ship ship
collision collision collision collision collision collision collision collision collision collision
and and and and and and and and and and
dropped dropped dropped dropped dropped dropped dropped dropped dropped dropped
objects objects objects objects objects objects objects objects objects objects

Assumpti Assumpti Assumpti Assumpti Assumpti Assumpti Assumpti Assumpti Assumpti Assumpti
on on on on on on on on on on
register register register register register register register register register register
Risk Risk Risk Risk Risk Risk Risk Risk Risk Risk
reduction reduction reduction reduction reduction reduction reduction reduction reduction reduction
measures measures measures measures measures measures measures measures measures measures

Alarm Alarm Alarm Alarm Alarm Alarm Alarm Alarm Alarm Alarm
Report Report Report Report Report Report Report Report Report Report
Critical Critical Critical Critical Critical Critical Critical Critical Critical Critical
controls controls controls controls controls controls controls controls controls controls
report report report report report report report report report report

Conseque Conseque Conseque Conseque Conseque Conseque Conseque Conseque Conseque Conseque
nce nce nce nce nce nce nce nce nce nce
analysis analysis analysis analysis analysis analysis analysis analysis analysis analysis
Impact Impact Impact Impact Impact Impact Impact Impact Impact Impact
analysis analysis analysis analysis analysis analysis analysis analysis analysis analysis
covering covering covering covering covering covering covering covering covering covering
ship ship ship ship ship ship ship ship ship ship
collision collision collision collision collision collision collision collision collision collision
and drop and drop and drop and drop and drop and drop and drop and drop and drop and drop
objects objects objects objects objects objects objects objects objects objects
Escape Escape Escape Escape Escape Escape Escape Escape Escape Escape
,Evacuati ,Evacuati ,Evacuati ,Evacuati ,Evacuati ,Evacuati ,Evacuati ,Evacuati ,Evacuati ,Evacuati
on and on and on and on and on and on and on and on and on and on and
Rescue Rescue Rescue Rescue Rescue Rescue Rescue Rescue Rescue Rescue
Analysis Analysis Analysis Analysis Analysis Analysis Analysis Analysis Analysis Analysis
[EERA] [EERA] [EERA] [EERA] [EERA] [EERA] [EERA] [EERA] [EERA] [EERA]
Fire and Fire and Fire and Fire and Fire and Fire and Fire and Fire and Fire and Fire and
Gas Gas Gas Gas Gas Gas Gas Gas Gas Gas
Mapping Mapping Mapping Mapping Mapping Mapping Mapping Mapping Mapping Mapping
Study Study Study Study Study Study Study Study Study Study
Finalize Finalize Finalize Finalize Finalize Finalize Finalize Finalize Finalize Finalize
the the the the the the the the the the
location location location location location location location location location location
for for for for for for for for for for
Subsea Subsea Subsea Subsea Subsea Subsea Subsea Subsea Subsea Subsea
interconn interconn interconn interconn interconn interconn interconn interconn interconn interconn
ection ection ection ection ection ection ection ection ection ection
between between between between between between between between between between
12” HM- 12” HM- 12” HM- 12” HM- 12” HM- 12” HM- 12” HM- 12” HM- 12” HM- 12” HM-
HX Free HX Free HX Free HX Free HX Free HX Free HX Free HX Free HX Free HX Free
Gas Gas Gas Gas Gas Gas Gas Gas Gas Gas
Pipeline Pipeline Pipeline Pipeline Pipeline Pipeline Pipeline Pipeline Pipeline Pipeline
with 12” with 12” with 12” with 12” with 12” with 12” with 12” with 12” with 12” with 12”
Free Gas Free Gas Free Gas Free Gas Free Gas Free Gas Free Gas Free Gas Free Gas Free Gas
pipeline pipeline pipeline pipeline pipeline pipeline pipeline pipeline pipeline pipeline
from HY from HY from HY from HY from HY from HY from HY from HY from HY from HY
and 14” and 14” and 14” and 14” and 14” and 14” and 14” and 14” and 14” and 14”
HX-HRA HX-HRA HX-HRA HX-HRA HX-HRA HX-HRA HX-HRA HX-HRA HX-HRA HX-HRA
Free Gas Free Gas Free Gas Free Gas Free Gas Free Gas Free Gas Free Gas Free Gas Free Gas
Pipeline Pipeline Pipeline Pipeline Pipeline Pipeline Pipeline Pipeline Pipeline Pipeline
with 10” with 10” with 10” with 10” with 10” with 10” with 10” with 10” with 10” with 10”
Free Gas Free Gas Free Gas Free Gas Free Gas Free Gas Free Gas Free Gas Free Gas Free Gas
pipeline pipeline pipeline pipeline pipeline pipeline pipeline pipeline pipeline pipeline
from HV from HV from HV from HV from HV from HV from HV from HV from HV from HV
based on based on based on based on based on based on based on based on based on based on
QRA QRA QRA QRA QRA QRA QRA QRA QRA QRA
Field & Field & Field & Field & Field & Field & Field & Field & Field & Field &
Layout Layout Layout Layout Layout Layout Layout Layout Layout Layout
Review Review Review Review Review Review Review Review Review Review

Fire and Fire and Fire and Fire and Fire and Fire and Fire and Fire and Fire and Fire and
Explosion Explosion Explosion Explosion Explosion Explosion Explosion Explosion Explosion Explosion
Analysis Analysis Analysis Analysis Analysis Analysis Analysis Analysis Analysis Analysis
Gas and Gas and Gas and Gas and Gas and Gas and Gas and Gas and Gas and Gas and
Smoke Smoke Smoke Smoke Smoke Smoke Smoke Smoke Smoke Smoke
Dispersio Dispersio Dispersio Dispersio Dispersio Dispersio Dispersio Dispersio Dispersio Dispersio
n Analysis n Analysis n Analysis n Analysis n Analysis n Analysis n Analysis n Analysis n Analysis n Analysis
Non Non Non Non Non Non Non Non Non Non
Process Process Process Process Process Process Process Process Process Process
Hazards Hazards Hazards Hazards Hazards Hazards Hazards Hazards Hazards Hazards
Analysis Analysis Analysis Analysis Analysis Analysis Analysis Analysis Analysis Analysis

Emergenc Emergenc Emergenc Emergenc Emergenc Emergenc Emergenc Emergenc Emergenc Emergenc
y Systems y Systems y Systems y Systems y Systems y Systems y Systems y Systems y Systems y Systems
Review Review Review Review Review Review Review Review Review Review
Impact Impact Impact Impact Impact Impact Impact Impact Impact Impact
Analysis Analysis Analysis Analysis Analysis Analysis Analysis Analysis Analysis Analysis
covering covering covering covering covering covering covering covering covering covering
ship ship ship ship ship ship ship ship ship ship
collision collision collision collision collision collision collision collision collision collision
and and and and and and and and and and
dropped dropped dropped dropped dropped dropped dropped dropped dropped dropped
objects objects objects objects objects objects objects objects objects objects

Assumpti Assumpti Assumpti Assumpti Assumpti Assumpti Assumpti Assumpti Assumpti Assumpti
on on on on on on on on on on
register register register register register register register register register register
Risk Risk Risk Risk Risk Risk Risk Risk Risk Risk
reduction reduction reduction reduction reduction reduction reduction reduction reduction reduction
measures measures measures measures measures measures measures measures measures measures

Alarm Alarm Alarm Alarm Alarm Alarm Alarm Alarm Alarm Alarm
Report Report Report Report Report Report Report Report Report Report
Critical Critical Critical Critical Critical Critical Critical Critical Critical Critical
controls controls controls controls controls controls controls controls controls controls
report report report report report report report report report report

Conseque Conseque Conseque Conseque Conseque Conseque Conseque Conseque Conseque Conseque
nce nce nce nce nce nce nce nce nce nce
analysis analysis analysis analysis analysis analysis analysis analysis analysis analysis
Impact Impact Impact Impact Impact Impact Impact Impact Impact Impact
analysis analysis analysis analysis analysis analysis analysis analysis analysis analysis
covering covering covering covering covering covering covering covering covering covering
ship ship ship ship ship ship ship ship ship ship
collision collision collision collision collision collision collision collision collision collision
and drop and drop and drop and drop and drop and drop and drop and drop and drop and drop
objects objects objects objects objects objects objects objects objects objects
Escape Escape Escape Escape Escape Escape Escape Escape Escape Escape
,Evacuati ,Evacuati ,Evacuati ,Evacuati ,Evacuati ,Evacuati ,Evacuati ,Evacuati ,Evacuati ,Evacuati
on and on and on and on and on and on and on and on and on and on and
Rescue Rescue Rescue Rescue Rescue Rescue Rescue Rescue Rescue Rescue
Analysis Analysis Analysis Analysis Analysis Analysis Analysis Analysis Analysis Analysis
[EERA] [EERA] [EERA] [EERA] [EERA] [EERA] [EERA] [EERA] [EERA] [EERA]
Fire and Fire and Fire and Fire and Fire and Fire and Fire and Fire and Fire and Fire and
Gas Gas Gas Gas Gas Gas Gas Gas Gas Gas
Mapping Mapping Mapping Mapping Mapping Mapping Mapping Mapping Mapping Mapping
Study Study Study Study Study Study Study Study Study Study
Finalize Finalize Finalize Finalize Finalize Finalize Finalize Finalize Finalize Finalize
the the the the the the the the the the
location location location location location location location location location location
for for for for for for for for for for
Subsea Subsea Subsea Subsea Subsea Subsea Subsea Subsea Subsea Subsea
interconn interconn interconn interconn interconn interconn interconn interconn interconn interconn
ection ection ection ection ection ection ection ection ection ection
between between between between between between between between between between
12” HM- 12” HM- 12” HM- 12” HM- 12” HM- 12” HM- 12” HM- 12” HM- 12” HM- 12” HM-
HX Free HX Free HX Free HX Free HX Free HX Free HX Free HX Free HX Free HX Free
Gas Gas Gas Gas Gas Gas Gas Gas Gas Gas
Pipeline Pipeline Pipeline Pipeline Pipeline Pipeline Pipeline Pipeline Pipeline Pipeline
with 12” with 12” with 12” with 12” with 12” with 12” with 12” with 12” with 12” with 12”
Free Gas Free Gas Free Gas Free Gas Free Gas Free Gas Free Gas Free Gas Free Gas Free Gas
pipeline pipeline pipeline pipeline pipeline pipeline pipeline pipeline pipeline pipeline
from HY from HY from HY from HY from HY from HY from HY from HY from HY from HY
and 14” and 14” and 14” and 14” and 14” and 14” and 14” and 14” and 14” and 14”
HX-HRA HX-HRA HX-HRA HX-HRA HX-HRA HX-HRA HX-HRA HX-HRA HX-HRA HX-HRA
Free Gas Free Gas Free Gas Free Gas Free Gas Free Gas Free Gas Free Gas Free Gas Free Gas
Pipeline Pipeline Pipeline Pipeline Pipeline Pipeline Pipeline Pipeline Pipeline Pipeline
with 10” with 10” with 10” with 10” with 10” with 10” with 10” with 10” with 10” with 10”
Free Gas Free Gas Free Gas Free Gas Free Gas Free Gas Free Gas Free Gas Free Gas Free Gas
pipeline pipeline pipeline pipeline pipeline pipeline pipeline pipeline pipeline pipeline
from HV from HV from HV from HV from HV from HV from HV from HV from HV from HV
based on based on based on based on based on based on based on based on based on based on
QRA QRA QRA QRA QRA QRA QRA QRA QRA QRA
Field & Field & Field & Field & Field & Field & Field & Field & Field & Field &
Layout Layout Layout Layout Layout Layout Layout Layout Layout Layout
Review Review Review Review Review Review Review Review Review Review

Fire and Fire and Fire and Fire and Fire and Fire and Fire and Fire and Fire and Fire and
Explosion Explosion Explosion Explosion Explosion Explosion Explosion Explosion Explosion Explosion
Analysis Analysis Analysis Analysis Analysis Analysis Analysis Analysis Analysis Analysis
Gas and Gas and Gas and Gas and Gas and Gas and Gas and Gas and Gas and Gas and
Smoke Smoke Smoke Smoke Smoke Smoke Smoke Smoke Smoke Smoke
Dispersio Dispersio Dispersio Dispersio Dispersio Dispersio Dispersio Dispersio Dispersio Dispersio
n Analysis n Analysis n Analysis n Analysis n Analysis n Analysis n Analysis n Analysis n Analysis n Analysis
Non Non Non Non Non Non Non Non Non Non
Process Process Process Process Process Process Process Process Process Process
Hazards Hazards Hazards Hazards Hazards Hazards Hazards Hazards Hazards Hazards
Analysis Analysis Analysis Analysis Analysis Analysis Analysis Analysis Analysis Analysis

Emergenc Emergenc Emergenc Emergenc Emergenc Emergenc Emergenc Emergenc Emergenc Emergenc
y Systems y Systems y Systems y Systems y Systems y Systems y Systems y Systems y Systems y Systems
Review Review Review Review Review Review Review Review Review Review
Impact Impact Impact Impact Impact Impact Impact Impact Impact Impact
Analysis Analysis Analysis Analysis Analysis Analysis Analysis Analysis Analysis Analysis
covering covering covering covering covering covering covering covering covering covering
ship ship ship ship ship ship ship ship ship ship
collision collision collision collision collision collision collision collision collision collision
and and and and and and and and and and
dropped dropped dropped dropped dropped dropped dropped dropped dropped dropped
objects objects objects objects objects objects objects objects objects objects

Assumpti Assumpti Assumpti Assumpti Assumpti Assumpti Assumpti Assumpti Assumpti Assumpti
on on on on on on on on on on
register register register register register register register register register register
Risk Risk Risk Risk Risk Risk Risk Risk Risk Risk
reduction reduction reduction reduction reduction reduction reduction reduction reduction reduction
measures measures measures measures measures measures measures measures measures measures

Alarm Alarm Alarm Alarm Alarm Alarm Alarm Alarm Alarm Alarm
Report Report Report Report Report Report Report Report Report Report
Critical Critical Critical Critical Critical Critical Critical Critical Critical Critical
controls controls controls controls controls controls controls controls controls controls
report report report report report report report report report report

Conseque Conseque Conseque Conseque Conseque Conseque Conseque Conseque Conseque Conseque
nce nce nce nce nce nce nce nce nce nce
analysis analysis analysis analysis analysis analysis analysis analysis analysis analysis
Impact Impact Impact Impact Impact Impact Impact Impact Impact Impact
analysis analysis analysis analysis analysis analysis analysis analysis analysis analysis
covering covering covering covering covering covering covering covering covering covering
ship ship ship ship ship ship ship ship ship ship
collision collision collision collision collision collision collision collision collision collision
and drop and drop and drop and drop and drop and drop and drop and drop and drop and drop
objects objects objects objects objects objects objects objects objects objects
Escape Escape Escape Escape Escape Escape Escape Escape Escape Escape
,Evacuati ,Evacuati ,Evacuati ,Evacuati ,Evacuati ,Evacuati ,Evacuati ,Evacuati ,Evacuati ,Evacuati
on and on and on and on and on and on and on and on and on and on and
Rescue Rescue Rescue Rescue Rescue Rescue Rescue Rescue Rescue Rescue
Analysis Analysis Analysis Analysis Analysis Analysis Analysis Analysis Analysis Analysis
[EERA] [EERA] [EERA] [EERA] [EERA] [EERA] [EERA] [EERA] [EERA] [EERA]
Fire and Fire and Fire and Fire and Fire and Fire and Fire and Fire and Fire and Fire and
Gas Gas Gas Gas Gas Gas Gas Gas Gas Gas
Mapping Mapping Mapping Mapping Mapping Mapping Mapping Mapping Mapping Mapping
Study Study Study Study Study Study Study Study Study Study
Finalize Finalize Finalize Finalize Finalize Finalize Finalize Finalize Finalize Finalize
the the the the the the the the the the
location location location location location location location location location location
for for for for for for for for for for
Subsea Subsea Subsea Subsea Subsea Subsea Subsea Subsea Subsea Subsea
interconn interconn interconn interconn interconn interconn interconn interconn interconn interconn
ection ection ection ection ection ection ection ection ection ection
between between between between between between between between between between
12” HM- 12” HM- 12” HM- 12” HM- 12” HM- 12” HM- 12” HM- 12” HM- 12” HM- 12” HM-
HX Free HX Free HX Free HX Free HX Free HX Free HX Free HX Free HX Free HX Free
Gas Gas Gas Gas Gas Gas Gas Gas Gas Gas
Pipeline Pipeline Pipeline Pipeline Pipeline Pipeline Pipeline Pipeline Pipeline Pipeline
with 12” with 12” with 12” with 12” with 12” with 12” with 12” with 12” with 12” with 12”
Free Gas Free Gas Free Gas Free Gas Free Gas Free Gas Free Gas Free Gas Free Gas Free Gas
pipeline pipeline pipeline pipeline pipeline pipeline pipeline pipeline pipeline pipeline
from HY from HY from HY from HY from HY from HY from HY from HY from HY from HY
and 14” and 14” and 14” and 14” and 14” and 14” and 14” and 14” and 14” and 14”
HX-HRA HX-HRA HX-HRA HX-HRA HX-HRA HX-HRA HX-HRA HX-HRA HX-HRA HX-HRA
Free Gas Free Gas Free Gas Free Gas Free Gas Free Gas Free Gas Free Gas Free Gas Free Gas
Pipeline Pipeline Pipeline Pipeline Pipeline Pipeline Pipeline Pipeline Pipeline Pipeline
with 10” with 10” with 10” with 10” with 10” with 10” with 10” with 10” with 10” with 10”
Free Gas Free Gas Free Gas Free Gas Free Gas Free Gas Free Gas Free Gas Free Gas Free Gas
pipeline pipeline pipeline pipeline pipeline pipeline pipeline pipeline pipeline pipeline
from HV from HV from HV from HV from HV from HV from HV from HV from HV from HV
based on based on based on based on based on based on based on based on based on based on
QRA QRA QRA QRA QRA QRA QRA QRA QRA QRA
Field & Field & Field & Field & Field & Field & Field & Field & Field & Field &
Layout Layout Layout Layout Layout Layout Layout Layout Layout Layout
Review Review Review Review Review Review Review Review Review Review

Fire and Fire and Fire and Fire and Fire and Fire and Fire and Fire and Fire and Fire and
Explosion Explosion Explosion Explosion Explosion Explosion Explosion Explosion Explosion Explosion
Analysis Analysis Analysis Analysis Analysis Analysis Analysis Analysis Analysis Analysis
Gas and Gas and Gas and Gas and Gas and Gas and Gas and Gas and Gas and Gas and
Smoke Smoke Smoke Smoke Smoke Smoke Smoke Smoke Smoke Smoke
Dispersio Dispersio Dispersio Dispersio Dispersio Dispersio Dispersio Dispersio Dispersio Dispersio
n Analysis n Analysis n Analysis n Analysis n Analysis n Analysis n Analysis n Analysis n Analysis n Analysis
Non Non Non Non Non Non Non Non Non Non
Process Process Process Process Process Process Process Process Process Process
Hazards Hazards Hazards Hazards Hazards Hazards Hazards Hazards Hazards Hazards
Analysis Analysis Analysis Analysis Analysis Analysis Analysis Analysis Analysis Analysis

Emergenc Emergenc Emergenc Emergenc Emergenc Emergenc Emergenc Emergenc Emergenc Emergenc
y Systems y Systems y Systems y Systems y Systems y Systems y Systems y Systems y Systems y Systems
Review Review Review Review Review Review Review Review Review Review
Impact Impact Impact Impact Impact Impact Impact Impact Impact Impact
Analysis Analysis Analysis Analysis Analysis Analysis Analysis Analysis Analysis Analysis
covering covering covering covering covering covering covering covering covering covering
ship ship ship ship ship ship ship ship ship ship
collision collision collision collision collision collision collision collision collision collision
and and and and and and and and and and
dropped dropped dropped dropped dropped dropped dropped dropped dropped dropped
objects objects objects objects objects objects objects objects objects objects

Assumpti Assumpti Assumpti Assumpti Assumpti Assumpti Assumpti Assumpti Assumpti Assumpti
on on on on on on on on on on
register register register register register register register register register register
Risk Risk Risk Risk Risk Risk Risk Risk Risk Risk
reduction reduction reduction reduction reduction reduction reduction reduction reduction reduction
measures measures measures measures measures measures measures measures measures measures

Alarm Alarm Alarm Alarm Alarm Alarm Alarm Alarm Alarm Alarm
Report Report Report Report Report Report Report Report Report Report
Critical Critical Critical Critical Critical Critical Critical Critical Critical Critical
controls controls controls controls controls controls controls controls controls controls
report report report report report report report report report report

Conseque Conseque Conseque Conseque Conseque Conseque Conseque Conseque Conseque Conseque
nce nce nce nce nce nce nce nce nce nce
analysis analysis analysis analysis analysis analysis analysis analysis analysis analysis
Impact Impact Impact Impact Impact Impact Impact Impact Impact Impact
analysis analysis analysis analysis analysis analysis analysis analysis analysis analysis
covering covering covering covering covering covering covering covering covering covering
ship ship ship ship ship ship ship ship ship ship
collision collision collision collision collision collision collision collision collision collision
and drop and drop and drop and drop and drop and drop and drop and drop and drop and drop
objects objects objects objects objects objects objects objects objects objects
Escape Escape Escape Escape Escape Escape Escape Escape Escape Escape
,Evacuati ,Evacuati ,Evacuati ,Evacuati ,Evacuati ,Evacuati ,Evacuati ,Evacuati ,Evacuati ,Evacuati
on and on and on and on and on and on and on and on and on and on and
Rescue Rescue Rescue Rescue Rescue Rescue Rescue Rescue Rescue Rescue
Analysis Analysis Analysis Analysis Analysis Analysis Analysis Analysis Analysis Analysis
[EERA] [EERA] [EERA] [EERA] [EERA] [EERA] [EERA] [EERA] [EERA] [EERA]
Fire and Fire and Fire and Fire and Fire and Fire and Fire and Fire and Fire and Fire and
Gas Gas Gas Gas Gas Gas Gas Gas Gas Gas
Mapping Mapping Mapping Mapping Mapping Mapping Mapping Mapping Mapping Mapping
Study Study Study Study Study Study Study Study Study Study
Finalize Finalize Finalize Finalize Finalize Finalize Finalize Finalize Finalize Finalize
the the the the the the the the the the
location location location location location location location location location location
for for for for for for for for for for
Subsea Subsea Subsea Subsea Subsea Subsea Subsea Subsea Subsea Subsea
interconn interconn interconn interconn interconn interconn interconn interconn interconn interconn
ection ection ection ection ection ection ection ection ection ection
between between between between between between between between between between
12” HM- 12” HM- 12” HM- 12” HM- 12” HM- 12” HM- 12” HM- 12” HM- 12” HM- 12” HM-
HX Free HX Free HX Free HX Free HX Free HX Free HX Free HX Free HX Free HX Free
Gas Gas Gas Gas Gas Gas Gas Gas Gas Gas
Pipeline Pipeline Pipeline Pipeline Pipeline Pipeline Pipeline Pipeline Pipeline Pipeline
with 12” with 12” with 12” with 12” with 12” with 12” with 12” with 12” with 12” with 12”
Free Gas Free Gas Free Gas Free Gas Free Gas Free Gas Free Gas Free Gas Free Gas Free Gas
pipeline pipeline pipeline pipeline pipeline pipeline pipeline pipeline pipeline pipeline
from HY from HY from HY from HY from HY from HY from HY from HY from HY from HY
and 14” and 14” and 14” and 14” and 14” and 14” and 14” and 14” and 14” and 14”
HX-HRA HX-HRA HX-HRA HX-HRA HX-HRA HX-HRA HX-HRA HX-HRA HX-HRA HX-HRA
Free Gas Free Gas Free Gas Free Gas Free Gas Free Gas Free Gas Free Gas Free Gas Free Gas
Pipeline Pipeline Pipeline Pipeline Pipeline Pipeline Pipeline Pipeline Pipeline Pipeline
with 10” with 10” with 10” with 10” with 10” with 10” with 10” with 10” with 10” with 10”
Free Gas Free Gas Free Gas Free Gas Free Gas Free Gas Free Gas Free Gas Free Gas Free Gas
pipeline pipeline pipeline pipeline pipeline pipeline pipeline pipeline pipeline pipeline
from HV from HV from HV from HV from HV from HV from HV from HV from HV from HV
based on based on based on based on based on based on based on based on based on based on
QRA QRA QRA QRA QRA QRA QRA QRA QRA QRA
Field & Field & Field & Field & Field & Field & Field & Field & Field & Field &
Layout Layout Layout Layout Layout Layout Layout Layout Layout Layout
Review Review Review Review Review Review Review Review Review Review

Fire and Fire and Fire and Fire and Fire and Fire and Fire and Fire and Fire and Fire and
Explosion Explosion Explosion Explosion Explosion Explosion Explosion Explosion Explosion Explosion
Analysis Analysis Analysis Analysis Analysis Analysis Analysis Analysis Analysis Analysis
Gas and Gas and Gas and Gas and Gas and Gas and Gas and Gas and Gas and Gas and
Smoke Smoke Smoke Smoke Smoke Smoke Smoke Smoke Smoke Smoke
Dispersio Dispersio Dispersio Dispersio Dispersio Dispersio Dispersio Dispersio Dispersio Dispersio
n Analysis n Analysis n Analysis n Analysis n Analysis n Analysis n Analysis n Analysis n Analysis n Analysis
Non Non Non Non Non Non Non Non Non Non
Process Process Process Process Process Process Process Process Process Process
Hazards Hazards Hazards Hazards Hazards Hazards Hazards Hazards Hazards Hazards
Analysis Analysis Analysis Analysis Analysis Analysis Analysis Analysis Analysis Analysis

Emergenc Emergenc Emergenc Emergenc Emergenc Emergenc Emergenc Emergenc Emergenc Emergenc
y Systems y Systems y Systems y Systems y Systems y Systems y Systems y Systems y Systems y Systems
Review Review Review Review Review Review Review Review Review Review
Impact Impact Impact Impact Impact Impact Impact Impact Impact Impact
Analysis Analysis Analysis Analysis Analysis Analysis Analysis Analysis Analysis Analysis
covering covering covering covering covering covering covering covering covering covering
ship ship ship ship ship ship ship ship ship ship
collision collision collision collision collision collision collision collision collision collision
and and and and and and and and and and
dropped dropped dropped dropped dropped dropped dropped dropped dropped dropped
objects objects objects objects objects objects objects objects objects objects

Assumpti Assumpti Assumpti Assumpti Assumpti Assumpti Assumpti Assumpti Assumpti Assumpti
on on on on on on on on on on
register register register register register register register register register register
Risk Risk Risk Risk Risk Risk Risk Risk Risk Risk
reduction reduction reduction reduction reduction reduction reduction reduction reduction reduction
measures measures measures measures measures measures measures measures measures measures

Alarm Alarm Alarm Alarm Alarm Alarm Alarm Alarm Alarm Alarm
Report Report Report Report Report Report Report Report Report Report
Critical Critical Critical Critical Critical Critical Critical Critical Critical Critical
controls controls controls controls controls controls controls controls controls controls
report report report report report report report report report report

Conseque Conseque Conseque Conseque Conseque Conseque Conseque Conseque Conseque Conseque
nce nce nce nce nce nce nce nce nce nce
analysis analysis analysis analysis analysis analysis analysis analysis analysis analysis
Impact Impact Impact Impact Impact Impact Impact Impact Impact Impact
analysis analysis analysis analysis analysis analysis analysis analysis analysis analysis
covering covering covering covering covering covering covering covering covering covering
ship ship ship ship ship ship ship ship ship ship
collision collision collision collision collision collision collision collision collision collision
and drop and drop and drop and drop and drop and drop and drop and drop and drop and drop
objects objects objects objects objects objects objects objects objects objects
Escape Escape Escape Escape Escape Escape Escape Escape Escape Escape
,Evacuati ,Evacuati ,Evacuati ,Evacuati ,Evacuati ,Evacuati ,Evacuati ,Evacuati ,Evacuati ,Evacuati
on and on and on and on and on and on and on and on and on and on and
Rescue Rescue Rescue Rescue Rescue Rescue Rescue Rescue Rescue Rescue
Analysis Analysis Analysis Analysis Analysis Analysis Analysis Analysis Analysis Analysis
[EERA] [EERA] [EERA] [EERA] [EERA] [EERA] [EERA] [EERA] [EERA] [EERA]
Fire and Fire and Fire and Fire and Fire and Fire and Fire and Fire and Fire and Fire and
Gas Gas Gas Gas Gas Gas Gas Gas Gas Gas
Mapping Mapping Mapping Mapping Mapping Mapping Mapping Mapping Mapping Mapping
Study Study Study Study Study Study Study Study Study Study
Finalize Finalize Finalize Finalize Finalize Finalize Finalize Finalize Finalize Finalize
the the the the the the the the the the
location location location location location location location location location location
for for for for for for for for for for
Subsea Subsea Subsea Subsea Subsea Subsea Subsea Subsea Subsea Subsea
interconn interconn interconn interconn interconn interconn interconn interconn interconn interconn
ection ection ection ection ection ection ection ection ection ection
between between between between between between between between between between
12” HM- 12” HM- 12” HM- 12” HM- 12” HM- 12” HM- 12” HM- 12” HM- 12” HM- 12” HM-
HX Free HX Free HX Free HX Free HX Free HX Free HX Free HX Free HX Free HX Free
Gas Gas Gas Gas Gas Gas Gas Gas Gas Gas
Pipeline Pipeline Pipeline Pipeline Pipeline Pipeline Pipeline Pipeline Pipeline Pipeline
with 12” with 12” with 12” with 12” with 12” with 12” with 12” with 12” with 12” with 12”
Free Gas Free Gas Free Gas Free Gas Free Gas Free Gas Free Gas Free Gas Free Gas Free Gas
pipeline pipeline pipeline pipeline pipeline pipeline pipeline pipeline pipeline pipeline
from HY from HY from HY from HY from HY from HY from HY from HY from HY from HY
and 14” and 14” and 14” and 14” and 14” and 14” and 14” and 14” and 14” and 14”
HX-HRA HX-HRA HX-HRA HX-HRA HX-HRA HX-HRA HX-HRA HX-HRA HX-HRA HX-HRA
Free Gas Free Gas Free Gas Free Gas Free Gas Free Gas Free Gas Free Gas Free Gas Free Gas
Pipeline Pipeline Pipeline Pipeline Pipeline Pipeline Pipeline Pipeline Pipeline Pipeline
with 10” with 10” with 10” with 10” with 10” with 10” with 10” with 10” with 10” with 10”
Free Gas Free Gas Free Gas Free Gas Free Gas Free Gas Free Gas Free Gas Free Gas Free Gas
pipeline pipeline pipeline pipeline pipeline pipeline pipeline pipeline pipeline pipeline
from HV from HV from HV from HV from HV from HV from HV from HV from HV from HV
based on based on based on based on based on based on based on based on based on based on
QRA QRA QRA QRA QRA QRA QRA QRA QRA QRA
Field & Field & Field & Field & Field & Field & Field & Field & Field & Field &
Layout Layout Layout Layout Layout Layout Layout Layout Layout Layout
Review Review Review Review Review Review Review Review Review Review

Fire and Fire and Fire and Fire and Fire and Fire and Fire and Fire and Fire and Fire and
Explosion Explosion Explosion Explosion Explosion Explosion Explosion Explosion Explosion Explosion
Analysis Analysis Analysis Analysis Analysis Analysis Analysis Analysis Analysis Analysis
Gas and Gas and Gas and Gas and Gas and Gas and Gas and Gas and Gas and Gas and
Smoke Smoke Smoke Smoke Smoke Smoke Smoke Smoke Smoke Smoke
Dispersio Dispersio Dispersio Dispersio Dispersio Dispersio Dispersio Dispersio Dispersio Dispersio
n Analysis n Analysis n Analysis n Analysis n Analysis n Analysis n Analysis n Analysis n Analysis n Analysis
Non Non Non Non Non Non Non Non Non Non
Process Process Process Process Process Process Process Process Process Process
Hazards Hazards Hazards Hazards Hazards Hazards Hazards Hazards Hazards Hazards
Analysis Analysis Analysis Analysis Analysis Analysis Analysis Analysis Analysis Analysis

Emergenc Emergenc Emergenc Emergenc Emergenc Emergenc Emergenc Emergenc Emergenc Emergenc
y Systems y Systems y Systems y Systems y Systems y Systems y Systems y Systems y Systems y Systems
Review Review Review Review Review Review Review Review Review Review
Impact Impact Impact Impact Impact Impact Impact Impact Impact Impact
Analysis Analysis Analysis Analysis Analysis Analysis Analysis Analysis Analysis Analysis
covering covering covering covering covering covering covering covering covering covering
ship ship ship ship ship ship ship ship ship ship
collision collision collision collision collision collision collision collision collision collision
and and and and and and and and and and
dropped dropped dropped dropped dropped dropped dropped dropped dropped dropped
objects objects objects objects objects objects objects objects objects objects

Assumpti Assumpti Assumpti Assumpti Assumpti Assumpti Assumpti Assumpti Assumpti Assumpti
on on on on on on on on on on
register register register register register register register register register register
Risk Risk Risk Risk Risk Risk Risk Risk Risk Risk
reduction reduction reduction reduction reduction reduction reduction reduction reduction reduction
measures measures measures measures measures measures measures measures measures measures

Alarm Alarm Alarm Alarm Alarm Alarm Alarm Alarm Alarm Alarm
Report Report Report Report Report Report Report Report Report Report
Critical Critical Critical Critical Critical Critical Critical Critical Critical Critical
controls controls controls controls controls controls controls controls controls controls
report report report report report report report report report report

Conseque Conseque Conseque Conseque Conseque Conseque Conseque Conseque Conseque Conseque
nce nce nce nce nce nce nce nce nce nce
analysis analysis analysis analysis analysis analysis analysis analysis analysis analysis
Impact Impact Impact Impact Impact Impact Impact Impact Impact Impact
analysis analysis analysis analysis analysis analysis analysis analysis analysis analysis
covering covering covering covering covering covering covering covering covering covering
ship ship ship ship ship ship ship ship ship ship
collision collision collision collision collision collision collision collision collision collision
and drop and drop and drop and drop and drop and drop and drop and drop and drop and drop
objects objects objects objects objects objects objects objects objects objects
Escape Escape Escape Escape Escape Escape Escape Escape Escape Escape
,Evacuati ,Evacuati ,Evacuati ,Evacuati ,Evacuati ,Evacuati ,Evacuati ,Evacuati ,Evacuati ,Evacuati
on and on and on and on and on and on and on and on and on and on and
Rescue Rescue Rescue Rescue Rescue Rescue Rescue Rescue Rescue Rescue
Analysis Analysis Analysis Analysis Analysis Analysis Analysis Analysis Analysis Analysis
[EERA] [EERA] [EERA] [EERA] [EERA] [EERA] [EERA] [EERA] [EERA] [EERA]
Fire and Fire and Fire and Fire and Fire and Fire and Fire and Fire and Fire and Fire and
Gas Gas Gas Gas Gas Gas Gas Gas Gas Gas
Mapping Mapping Mapping Mapping Mapping Mapping Mapping Mapping Mapping Mapping
Study Study Study Study Study Study Study Study Study Study
Finalize Finalize Finalize Finalize Finalize Finalize Finalize Finalize Finalize Finalize
the the the the the the the the the the
location location location location location location location location location location
for for for for for for for for for for
Subsea Subsea Subsea Subsea Subsea Subsea Subsea Subsea Subsea Subsea
interconn interconn interconn interconn interconn interconn interconn interconn interconn interconn
ection ection ection ection ection ection ection ection ection ection
between between between between between between between between between between
12” HM- 12” HM- 12” HM- 12” HM- 12” HM- 12” HM- 12” HM- 12” HM- 12” HM- 12” HM-
HX Free HX Free HX Free HX Free HX Free HX Free HX Free HX Free HX Free HX Free
Gas Gas Gas Gas Gas Gas Gas Gas Gas Gas
Pipeline Pipeline Pipeline Pipeline Pipeline Pipeline Pipeline Pipeline Pipeline Pipeline
with 12” with 12” with 12” with 12” with 12” with 12” with 12” with 12” with 12” with 12”
Free Gas Free Gas Free Gas Free Gas Free Gas Free Gas Free Gas Free Gas Free Gas Free Gas
pipeline pipeline pipeline pipeline pipeline pipeline pipeline pipeline pipeline pipeline
from HY from HY from HY from HY from HY from HY from HY from HY from HY from HY
and 14” and 14” and 14” and 14” and 14” and 14” and 14” and 14” and 14” and 14”
HX-HRA HX-HRA HX-HRA HX-HRA HX-HRA HX-HRA HX-HRA HX-HRA HX-HRA HX-HRA
Free Gas Free Gas Free Gas Free Gas Free Gas Free Gas Free Gas Free Gas Free Gas Free Gas
Pipeline Pipeline Pipeline Pipeline Pipeline Pipeline Pipeline Pipeline Pipeline Pipeline
with 10” with 10” with 10” with 10” with 10” with 10” with 10” with 10” with 10” with 10”
Free Gas Free Gas Free Gas Free Gas Free Gas Free Gas Free Gas Free Gas Free Gas Free Gas
pipeline pipeline pipeline pipeline pipeline pipeline pipeline pipeline pipeline pipeline
from HV from HV from HV from HV from HV from HV from HV from HV from HV from HV
based on based on based on based on based on based on based on based on based on based on
QRA QRA QRA QRA QRA QRA QRA QRA QRA QRA
Field & Field & Field & Field & Field & Field & Field & Field & Field & Field &
Layout Layout Layout Layout Layout Layout Layout Layout Layout Layout
Review Review Review Review Review Review Review Review Review Review

Fire and Fire and Fire and Fire and Fire and Fire and Fire and Fire and Fire and Fire and
Explosion Explosion Explosion Explosion Explosion Explosion Explosion Explosion Explosion Explosion
Analysis Analysis Analysis Analysis Analysis Analysis Analysis Analysis Analysis Analysis
Gas and Gas and Gas and Gas and Gas and Gas and Gas and Gas and Gas and Gas and
Smoke Smoke Smoke Smoke Smoke Smoke Smoke Smoke Smoke Smoke
Dispersio Dispersio Dispersio Dispersio Dispersio Dispersio Dispersio Dispersio Dispersio Dispersio
n Analysis n Analysis n Analysis n Analysis n Analysis n Analysis n Analysis n Analysis n Analysis n Analysis
Non Non Non Non Non Non Non Non Non Non
Process Process Process Process Process Process Process Process Process Process
Hazards Hazards Hazards Hazards Hazards Hazards Hazards Hazards Hazards Hazards
Analysis Analysis Analysis Analysis Analysis Analysis Analysis Analysis Analysis Analysis

Emergenc Emergenc Emergenc Emergenc Emergenc Emergenc Emergenc Emergenc Emergenc Emergenc
y Systems y Systems y Systems y Systems y Systems y Systems y Systems y Systems y Systems y Systems
Review Review Review Review Review Review Review Review Review Review
Impact Impact Impact Impact Impact Impact Impact Impact Impact Impact
Analysis Analysis Analysis Analysis Analysis Analysis Analysis Analysis Analysis Analysis
covering covering covering covering covering covering covering covering covering covering
ship ship ship ship ship ship ship ship ship ship
collision collision collision collision collision collision collision collision collision collision
and and and and and and and and and and
dropped dropped dropped dropped dropped dropped dropped dropped dropped dropped
objects objects objects objects objects objects objects objects objects objects

Assumpti Assumpti Assumpti Assumpti Assumpti Assumpti Assumpti Assumpti Assumpti Assumpti
on on on on on on on on on on
register register register register register register register register register register
Risk Risk Risk Risk Risk Risk Risk Risk Risk Risk
reduction reduction reduction reduction reduction reduction reduction reduction reduction reduction
measures measures measures measures measures measures measures measures measures measures

Alarm Alarm Alarm Alarm Alarm Alarm Alarm Alarm Alarm Alarm
Report Report Report Report Report Report Report Report Report Report
Critical Critical Critical Critical Critical Critical Critical Critical Critical Critical
controls controls controls controls controls controls controls controls controls controls
report report report report report report report report report report

Conseque Conseque Conseque Conseque Conseque Conseque Conseque Conseque Conseque Conseque
nce nce nce nce nce nce nce nce nce nce
analysis analysis analysis analysis analysis analysis analysis analysis analysis analysis
Impact Impact Impact Impact Impact Impact Impact Impact Impact Impact
analysis analysis analysis analysis analysis analysis analysis analysis analysis analysis
covering covering covering covering covering covering covering covering covering covering
ship ship ship ship ship ship ship ship ship ship
collision collision collision collision collision collision collision collision collision collision
and drop and drop and drop and drop and drop and drop and drop and drop and drop and drop
objects objects objects objects objects objects objects objects objects objects
Escape Escape Escape Escape Escape Escape Escape Escape Escape Escape
,Evacuati ,Evacuati ,Evacuati ,Evacuati ,Evacuati ,Evacuati ,Evacuati ,Evacuati ,Evacuati ,Evacuati
on and on and on and on and on and on and on and on and on and on and
Rescue Rescue Rescue Rescue Rescue Rescue Rescue Rescue Rescue Rescue
Analysis Analysis Analysis Analysis Analysis Analysis Analysis Analysis Analysis Analysis
[EERA] [EERA] [EERA] [EERA] [EERA] [EERA] [EERA] [EERA] [EERA] [EERA]
Fire and Fire and Fire and Fire and Fire and Fire and Fire and Fire and Fire and Fire and
Gas Gas Gas Gas Gas Gas Gas Gas Gas Gas
Mapping Mapping Mapping Mapping Mapping Mapping Mapping Mapping Mapping Mapping
Study Study Study Study Study Study Study Study Study Study
Finalize Finalize Finalize Finalize Finalize Finalize Finalize Finalize Finalize Finalize
the the the the the the the the the the
location location location location location location location location location location
for for for for for for for for for for
Subsea Subsea Subsea Subsea Subsea Subsea Subsea Subsea Subsea Subsea
interconn interconn interconn interconn interconn interconn interconn interconn interconn interconn
ection ection ection ection ection ection ection ection ection ection
between between between between between between between between between between
12” HM- 12” HM- 12” HM- 12” HM- 12” HM- 12” HM- 12” HM- 12” HM- 12” HM- 12” HM-
HX Free HX Free HX Free HX Free HX Free HX Free HX Free HX Free HX Free HX Free
Gas Gas Gas Gas Gas Gas Gas Gas Gas Gas
Pipeline Pipeline Pipeline Pipeline Pipeline Pipeline Pipeline Pipeline Pipeline Pipeline
with 12” with 12” with 12” with 12” with 12” with 12” with 12” with 12” with 12” with 12”
Free Gas Free Gas Free Gas Free Gas Free Gas Free Gas Free Gas Free Gas Free Gas Free Gas
pipeline pipeline pipeline pipeline pipeline pipeline pipeline pipeline pipeline pipeline
from HY from HY from HY from HY from HY from HY from HY from HY from HY from HY
and 14” and 14” and 14” and 14” and 14” and 14” and 14” and 14” and 14” and 14”
HX-HRA HX-HRA HX-HRA HX-HRA HX-HRA HX-HRA HX-HRA HX-HRA HX-HRA HX-HRA
Free Gas Free Gas Free Gas Free Gas Free Gas Free Gas Free Gas Free Gas Free Gas Free Gas
Pipeline Pipeline Pipeline Pipeline Pipeline Pipeline Pipeline Pipeline Pipeline Pipeline
with 10” with 10” with 10” with 10” with 10” with 10” with 10” with 10” with 10” with 10”
Free Gas Free Gas Free Gas Free Gas Free Gas Free Gas Free Gas Free Gas Free Gas Free Gas
pipeline pipeline pipeline pipeline pipeline pipeline pipeline pipeline pipeline pipeline
from HV from HV from HV from HV from HV from HV from HV from HV from HV from HV
based on based on based on based on based on based on based on based on based on based on
QRA QRA QRA QRA QRA QRA QRA QRA QRA QRA
Field & Field & Field & Field & Field & Field & Field & Field & Field & Field &
Layout Layout Layout Layout Layout Layout Layout Layout Layout Layout
Review Review Review Review Review Review Review Review Review Review

Fire and Fire and Fire and Fire and Fire and Fire and Fire and Fire and Fire and Fire and
Explosion Explosion Explosion Explosion Explosion Explosion Explosion Explosion Explosion Explosion
Analysis Analysis Analysis Analysis Analysis Analysis Analysis Analysis Analysis Analysis
Gas and Gas and Gas and Gas and Gas and Gas and Gas and Gas and Gas and Gas and
Smoke Smoke Smoke Smoke Smoke Smoke Smoke Smoke Smoke Smoke
Dispersio Dispersio Dispersio Dispersio Dispersio Dispersio Dispersio Dispersio Dispersio Dispersio
n Analysis n Analysis n Analysis n Analysis n Analysis n Analysis n Analysis n Analysis n Analysis n Analysis
Non Non Non Non Non Non Non Non Non Non
Process Process Process Process Process Process Process Process Process Process
Hazards Hazards Hazards Hazards Hazards Hazards Hazards Hazards Hazards Hazards
Analysis Analysis Analysis Analysis Analysis Analysis Analysis Analysis Analysis Analysis

Emergenc Emergenc Emergenc Emergenc Emergenc Emergenc Emergenc Emergenc Emergenc Emergenc
y Systems y Systems y Systems y Systems y Systems y Systems y Systems y Systems y Systems y Systems
Review Review Review Review Review Review Review Review Review Review
Impact Impact Impact Impact Impact Impact Impact Impact Impact Impact
Analysis Analysis Analysis Analysis Analysis Analysis Analysis Analysis Analysis Analysis
covering covering covering covering covering covering covering covering covering covering
ship ship ship ship ship ship ship ship ship ship
collision collision collision collision collision collision collision collision collision collision
and and and and and and and and and and
dropped dropped dropped dropped dropped dropped dropped dropped dropped dropped
objects objects objects objects objects objects objects objects objects objects

Assumpti Assumpti Assumpti Assumpti Assumpti Assumpti Assumpti Assumpti Assumpti Assumpti
on on on on on on on on on on
register register register register register register register register register register
Risk Risk Risk Risk Risk Risk Risk Risk Risk Risk
reduction reduction reduction reduction reduction reduction reduction reduction reduction reduction
measures measures measures measures measures measures measures measures measures measures

Alarm Alarm Alarm Alarm Alarm Alarm Alarm Alarm Alarm Alarm
Report Report Report Report Report Report Report Report Report Report
Critical Critical Critical Critical Critical Critical Critical Critical Critical Critical
controls controls controls controls controls controls controls controls controls controls
report report report report report report report report report report

Conseque Conseque Conseque Conseque Conseque Conseque Conseque Conseque Conseque Conseque
nce nce nce nce nce nce nce nce nce nce
analysis analysis analysis analysis analysis analysis analysis analysis analysis analysis
Impact Impact Impact Impact Impact Impact Impact Impact Impact Impact
analysis analysis analysis analysis analysis analysis analysis analysis analysis analysis
covering covering covering covering covering covering covering covering covering covering
ship ship ship ship ship ship ship ship ship ship
collision collision collision collision collision collision collision collision collision collision
and drop and drop and drop and drop and drop and drop and drop and drop and drop and drop
objects objects objects objects objects objects objects objects objects objects
Escape Escape Escape Escape Escape Escape Escape Escape Escape Escape
,Evacuati ,Evacuati ,Evacuati ,Evacuati ,Evacuati ,Evacuati ,Evacuati ,Evacuati ,Evacuati ,Evacuati
on and on and on and on and on and on and on and on and on and on and
Rescue Rescue Rescue Rescue Rescue Rescue Rescue Rescue Rescue Rescue
Analysis Analysis Analysis Analysis Analysis Analysis Analysis Analysis Analysis Analysis
[EERA] [EERA] [EERA] [EERA] [EERA] [EERA] [EERA] [EERA] [EERA] [EERA]
Fire and Fire and Fire and Fire and Fire and Fire and Fire and Fire and Fire and Fire and
Gas Gas Gas Gas Gas Gas Gas Gas Gas Gas
Mapping Mapping Mapping Mapping Mapping Mapping Mapping Mapping Mapping Mapping
Study Study Study Study Study Study Study Study Study Study
Finalize Finalize Finalize Finalize Finalize Finalize Finalize Finalize Finalize Finalize
the the the the the the the the the the
location location location location location location location location location location
for for for for for for for for for for
Subsea Subsea Subsea Subsea Subsea Subsea Subsea Subsea Subsea Subsea
interconn interconn interconn interconn interconn interconn interconn interconn interconn interconn
ection ection ection ection ection ection ection ection ection ection
between between between between between between between between between between
12” HM- 12” HM- 12” HM- 12” HM- 12” HM- 12” HM- 12” HM- 12” HM- 12” HM- 12” HM-
HX Free HX Free HX Free HX Free HX Free HX Free HX Free HX Free HX Free HX Free
Gas Gas Gas Gas Gas Gas Gas Gas Gas Gas
Pipeline Pipeline Pipeline Pipeline Pipeline Pipeline Pipeline Pipeline Pipeline Pipeline
with 12” with 12” with 12” with 12” with 12” with 12” with 12” with 12” with 12” with 12”
Free Gas Free Gas Free Gas Free Gas Free Gas Free Gas Free Gas Free Gas Free Gas Free Gas
pipeline pipeline pipeline pipeline pipeline pipeline pipeline pipeline pipeline pipeline
from HY from HY from HY from HY from HY from HY from HY from HY from HY from HY
and 14” and 14” and 14” and 14” and 14” and 14” and 14” and 14” and 14” and 14”
HX-HRA HX-HRA HX-HRA HX-HRA HX-HRA HX-HRA HX-HRA HX-HRA HX-HRA HX-HRA
Free Gas Free Gas Free Gas Free Gas Free Gas Free Gas Free Gas Free Gas Free Gas Free Gas
Pipeline Pipeline Pipeline Pipeline Pipeline Pipeline Pipeline Pipeline Pipeline Pipeline
with 10” with 10” with 10” with 10” with 10” with 10” with 10” with 10” with 10” with 10”
Free Gas Free Gas Free Gas Free Gas Free Gas Free Gas Free Gas Free Gas Free Gas Free Gas
pipeline pipeline pipeline pipeline pipeline pipeline pipeline pipeline pipeline pipeline
from HV from HV from HV from HV from HV from HV from HV from HV from HV from HV
based on based on based on based on based on based on based on based on based on based on
QRA QRA QRA QRA QRA QRA QRA QRA QRA QRA
Field &
Layout
Review

Fire and
Explosion
Analysis
Gas and
Smoke
Dispersio
n Analysis
Non
Process
Hazards
Analysis

Emergenc
y Systems
Review
Impact
Analysis
covering
ship
collision
and
dropped
objects

Assumpti
on
register
Risk
reduction
measures

Alarm
Report
Critical
controls
report

Conseque
nce
analysis
Impact
analysis
covering
ship
collision
and drop
objects
Escape
,Evacuati
on and
Rescue
Analysis
[EERA]
Fire and
Gas
Mapping
Study
Finalize
the
location
for
Subsea
interconn
ection
between
12” HM-
HX Free
Gas
Pipeline
with 12”
Free Gas
pipeline
from HY
and 14”
HX-HRA
Free Gas
Pipeline
with 10”
Free Gas
pipeline
from HV
based on
QRA
Hazard Identification / Identification of scenarios : (5 days) 9000 CHF (define the hazards, identify all significant inventories o
Consequence modelling : (4 days) 7000 CHF (modelling the scenarios with EFFECTS)
Frequency Analysis : (4 days) 7000 CHF
Definition of the risk curves : (3 days) 5000 CHF (cost of the software Risk Curve)
Writing of the report : (5.5 days) 10000 CHF (according to the guideline Submission format)
Risk Reduction workshop : 0.5 day) 900 CHF
ALARP Demonstration : (0.5 day – 1 day) 900 CHF to 1800 CHF (in function of the number of measures)
l significant inventories of hazardous materials)
No of
Activity per CNG station
working
days
1 PSI data co --
2 PSI data re 0.5
3 PHA reports -
4 Review sta 0.5
5 MOC process -
6 MOC proces 0.5

Safety,
Operating
and
Emergenc
y
7 procedure -
s-data
collection
(in
advance
offline)

Review of
Safety,
operating
and
8 1.5
emergenc
y
procedure
s

9 Global data 1

Draft
report
submissio
10 n to client -
for review
(offline)-
2 days

11 Final report (offline)-


- 1 day
Total onsit 4
Major travel trips
Contingency

Travel days

Travel Rate
Mandays
Ofsite
Onsite
Activities

Document collection 0 0
0

Constrcutability Studies (HAZID during construction)


Doc review & Preparation - Engineer 1 1 ###
HAZID Worshop Days - Engineer (Scribe) 1 1 ###
Draft Report prepration 1 1
Comments & discussions 0 0
Final report 0 0
HAZOP
Doc review, Node Markup & Preparation - Engineer 2 2 ###
HAZOP Worshop Days - Engineer (Scribe) 4 4
Draft Report prepration 2 2
Comments & discussions 1 1
Final report 0 0
HAZAN
Document collection 0 0
Document Review & Assumptions 1 1 ###
Hazard Identification 2 2
Consequence modeling 10 10
Draft Report prepration 3 3
Comments & discussion 2 2
Final report 0 0
Fire & Gas Detection and Alarm System (2D)
Doc review 1 1 ###
Analysis 3 3
Client Meeting / Discussion 1 1
F&G Mapping on Layout 2 2
Draft Report prepration 2 2
Comments & discussions 1 1
Final report 0 0
PHSER
Doc review, Methodology, Data Collection & Preparation - Engineer 3 3 ###
PHSER Worshop Days - Engineer (Scribe) 4 4
Draft Report prepration 3 3
Comments & discussions 2 2
Final report 1 1
Sub Con (HAZID/HAZOP/SIL/CHAZOP Chairman)
Sub-Total Fees (In INR)
Out of pocket expense
Local Travel Taxi

Hotel Stay Days

Stay Rate
Sojorn
Manday Rate Fees (In INR) NPC Sub con

10000 0

10000 0

10000 10000
10000 10000
10000 10000
10000 0
10000 0

10000 20000
10000 40000
10000 20000
10000 10000
10000 0

10000 0
10000 10000
10000 20000
10000 100000
10000 30000
10000 20000
10000 0

10000 10000
10000 30000
10000 10000
10000 20000
10000 20000
10000 10000
10000 0

10000 30000 80000


10000 40000
10000 30000
10000 20000
10000 10000

530000 80000
Project Details
Risk & Safety Studies for “INTERMEDIATE & PRODUCT STORAGE TANKS INCLUDING TANK PADS AND ASSOCIATED CIVIL WOR
( Part A & B)"

Scope of Work “ INTERMEDIATE & PRODUCT STORAGE TANKS INCLUDING TANK PADS AND ASSOCIATED CIVIL WORKS ( Part
(SOW) B) "
1) HAZOP,
2) Fire & Gas Detection and Alarm System,
3) PHSER
4) Constructability Studies
5) Hazan studies

3 phases - Engineering, Construction & Before Commissioning


GE TANKS INCLUDING TANK PADS AND ASSOCIATED CIVIL WORKS

KS INCLUDING TANK PADS AND ASSOCIATED CIVIL WORKS ( Part A &


Major travel trips
Contingency

Travel days

Travel Rate
Mandays
Ofsite
Onsite
Activities

Document collection 0 0
0

Constrcutability Studies (HAZID during construction)


Doc review & Preparation - Engineer 1 1 ###
HAZID Worshop Days - Engineer (Scribe) 1 1 ###
Draft Report prepration 1 1
Comments & discussions 0 0
Final report 0 0
HAZOP
Doc review, Node Markup & Preparation - Engineer 2 2 ###
HAZOP Worshop Days - Engineer (Scribe) 3 3
Draft Report prepration 2 2
Comments & discussions 1 1
Final report 0 0
HAZAN
Document collection 0 0
Document Review & Assumptions 1 1 ###
Hazard Identification 2 2
Consequence modeling 10 10
Draft Report prepration 3 3
Comments & discussion 2 2
Final report 0 0
Fire & Gas Detection and Alarm System (2D)
Doc review 1 1 ###
Analysis 3 3
Client Meeting / Discussion 1 1
F&G Mapping on Layout 2 2
Draft Report prepration 2 2
Comments & discussions 1 1
Final report 0 0
PHSER
Doc review, Methodology, Data Collection & Preparation - Engineer 3 3 ###
PHSER Worshop Days - Engineer (Scribe) 4 4
Draft Report prepration 3 3
Comments & discussions 2 2
Final report 1 1
Sub Con (HAZID/HAZOP/SIL/CHAZOP Chairman)
Sub-Total Fees (In INR)
Out of pocket expense
Local Travel Taxi

Hotel Stay Days

Stay Rate
Sojorn
Manday Rate Fees (In INR) NPC Sub con

10000 0

10000 0

10000 10000
10000 10000
10000 10000
10000 0
10000 0

10000 20000
10000 30000
10000 20000
10000 10000
10000 0

10000 0
10000 10000
10000 20000
10000 100000
10000 30000
10000 20000
10000 0

10000 10000
10000 30000
10000 10000
10000 20000
10000 20000
10000 10000
10000 0

10000 30000 80000


10000 40000
10000 30000
10000 20000
10000 10000

520000 80000
Project Details
Risk & Safety Studies for “INTERMEDIATE & PRODUCT STORAGE TANKS INCLUDING TANK PADS AND ASSOCIATED CIVIL WOR
( Part A & B)"

Scope of Work “ INTERMEDIATE & PRODUCT STORAGE TANKS INCLUDING TANK PADS AND ASSOCIATED CIVIL WORKS ( Part
(SOW) B) "
1) HAZOP,
2) Fire & Gas Detection and Alarm System,
3) PHSER
4) Constructability Studies
5) Hazan studies

3 phases - Engineering, Construction & Before Commissioning


GE TANKS INCLUDING TANK PADS AND ASSOCIATED CIVIL WORKS

KS INCLUDING TANK PADS AND ASSOCIATED CIVIL WORKS ( Part A &


SAFETY STUDIES

“ INTERMEDIATE & PRODUCT STORAGE TANKS INCLUDING TANK PADS AND ASSOCIATED CIVIL WORKS (
1) HAZOP,
2) Fire & Gas Detection and Alarm System,
3) PHSER
4) Constructability Studies
5) Hazan studies

Part-A inclues 35 Tanks Storage, Pumping & Transfer Facilities


Part-B inclues 28 Tanks Storage, Pumping & Transfer Facilities
D ASSOCIATED CIVIL WORKS ( Part A & B) "