TIPPL-GRD (JV)

RFI SUMMARY SHEET


Name of the Project :- Development of NH-31 to 4 lane configuration from km 551.360 to km 563.260 (Ghoshpukur to Bihar More, Bagdogra) in Darjeeling District,West Bengal under EPC Mode''
(Project length-11.90 km.)
RFI SUMMARY DATE :
Submission Chainage Chainage Proposed Proposed
Sl No. RFI No. Side Description of Work Submitted By Status
Date (Km) (Km) Inspection Inspection
5957 TIPPLGRDJV/NH-31/HW/ 5931 7-Dec-19 LHS HIGHWAY BC Tack Coat MR. SATYAKI SARKAR 9-Dec-19 11:30
5958 TIPPLGRDJV/NH-31/HW/ 5932 7-Dec-19 LHS HIGHWAY BC BC MR. SATYAKI SARKAR 9-Dec-19 12:30
5959 TIPPLGRDJV/NH-31/HW/ 5933 7-Dec-19 LHS HIGHWAY MEDIAN Kerb Laying MR. SATYAKI SARKAR 9-Dec-19 12:30
5960 TIPPLGRDJV/NH-31/HW/ 5934 7-Dec-19 RHS HIGHWAY BUS BYE Laying 1st MR. SATYAKI SARKAR 9-Dec-19 01:30
5961 TIPPLGRDJV/NH-31/HW/ 5935 7-Dec-19 RHS HIGHWAY BUS BYE wmm 1st MR. SATYAKI SARKAR 9-Dec-19 02:30
5962 TIPPLGRDJV/NH-31/STR/ 5936 7-Dec-19 552+480 LHS Reinforcement checking of RE Pannel STRUCTURE RE PANNEL concreting of RE Pannel MR. ARINDAM SINHA 9-Dec-19 12:30
5963 TIPPLGRDJV/NH-31/STR/ 5937 7-Dec-19 552+480 LHS Concreting of RE Pannel STRUCTURE RE PANNEL PCC MR. ARINDAM SINHA 9-Dec-19 01:30
Reinforcement and shuttering RETAINING
5964 TIPPLGRDJV/NH-31/STR/ 5938 7-Dec-19 553+870 553+940 70 RHS STRUCTURE reinf. Of raft of ret. Wall MR. ARINDAM SINHA 9-Dec-19 02:30
checking of raft of ret. Wall WALL
RETAINING concreting of raft of ret.
5965 TIPPLGRDJV/NH-31/STR/ 5939 7-Dec-19 553+870 553+940 70 RHS Concreting of raft of ret. Wall STRUCTURE MR. ARINDAM SINHA 9-Dec-19 02:45
WALL Wall
Reinforcement & Shuttering checking
5966 TIPPLGRDJV/NH-31/STR/ 5940 7-Dec-19 553+697 RHS of Abutment Shaft 2nd Lift of A-2 STRUCTURE Minor Bridge Reinf. Of shaft 2nd lift MR. ARINDAM SINHA 9-Dec-19 03:00
(MCW)
Concreting of Abutment -2 Shaft 2nd Concreting of shaft 2nd
5967 TIPPLGRDJV/NH-31/STR/ 5941 7-Dec-19 553+697 RHS STRUCTURE Minor Bridge MR. ARINDAM SINHA 9-Dec-19 03:15
lift of MCW lift.
Reinforcement & Shuttering Checking
5968 TIPPLGRDJV/NH-31/STR/ 5942 7-Dec-19 554+050 RHS STRUCTURE LVUP reinf. Of deck slab MR. ARINDAM SINHA 9-Dec-19 04:15
of Deck Slab with Bracket of LVUP
Concreting of Deck slab with bracket CONCRETING OF DECK
5969 TIPPLGRDJV/NH-31/STR/ 5943 7-Dec-19 554+050 RHS STRUCTURE LVUP MR. ARINDAM SINHA 9-Dec-19 04:20
of LVUP SLAB
RETAINING
5970 TIPPLGRDJV/NH-31/STR/ 5944 7-Dec-19 555+066 555+086 20 RHS Excavation for PCC of Ret. Wall STRUCTURE Excavation MR. ARINDAM SINHA 9-Dec-19 04:15
WALL
RETAINING
5971 TIPPLGRDJV/NH-31/STR/ 5945 7-Dec-19 555+066 555+086 20 RHS PCC of Ret. Wall STRUCTURE PCC MR. ARINDAM SINHA 9-Dec-19 04:20
WALL
Excavation for foundation A-2 of
5972 TIPPLGRDJV/NH-31/STR/ 5946 7-Dec-19 559+982 LHS STRUCTURE Minor Bridge Excavation MR. ARINDAM SINHA 9-Dec-19 02:15
MNB
Reinforcement and Shuttering RETAINING
5973 TIPPLGRDJV/NH-31/STR/ 5947 7-Dec-19 560+654 LHS STRUCTURE reinf. Of ret. wall 2nd lift MR. ARINDAM SINHA 9-Dec-19 02:40
checking of ret. Wall 2nd lift WALL
RETAINING concreting of ret. wall 2nd
5974 TIPPLGRDJV/NH-31/STR/ 5948 7-Dec-19 560+654 LHS Concreting of ret. Wall 2nd lift STRUCTURE MR. ARINDAM SINHA 9-Dec-19 03:15
WALL lift
Level checking of PCC and Layout of
5975 TIPPLGRDJV/NH-31/STR/ 5949 7-Dec-19 562+020 562+030 10 LHS STRUCTURE DRAIN Layout of raft MR. ARINDAM SINHA 9-Dec-19 03:50
Raft of side DRAIN
Reinforcement and shuttering
5976 TIPPLGRDJV/NH-31/STR/ 5950 7-Dec-19 562+020 562+030 10 LHS STRUCTURE DRAIN Reinf. Of raft MR. ARINDAM SINHA 9-Dec-19 04:15
checking of raft of side Drain
5977 TIPPLGRDJV/NH-31/STR/ 5951 7-Dec-19 562+020 562+030 10 LHS Concreting of raft of side drain STRUCTURE DRAIN Concreting of raft MR. ARINDAM SINHA 9-Dec-19 04:40
Reinforcement and shuttering
5978 TIPPLGRDJV/NH-31/STR/ 5952 7-Dec-19 553+697 LHS checking of Pedestal of B-3 Type STRUCTURE Minor Bridge Reinf. Of Pedestal MR. ARINDAM SINHA 9-Dec-19 05:00
Bearing Abutment 1&2
Concreting of Pedestal of B-3 type
5979 TIPPLGRDJV/NH-31/STR/ 5953 7-Dec-19 553+697 LHS STRUCTURE Minor Bridge Concreting of Pedestal MR. ARINDAM SINHA 9-Dec-19 05:15
Bearing of Abutment-1&2