Professional Documents
Culture Documents
TechVidhya:India's No 1. Professional
1
Telecom Training Institute
Objectives
After this chapter the participants will be able to:
1. Describe the LTE system from an overview level
2. Describe on an overview level the RBS 6000 Platform and
hardware
3. Explain the Commissioning steps of RBS 6000
TechVidhya:India's No 1. Professional
2
Telecom Training Institute
History
1G FDMA (NMT, AMPS, TACS) 80’s
- Voice (analog traffic, digital signaling)
4G IMT Advanced
TechVidhya:India's No 1. Professional
3
Telecom Training Institute
Simplified Network Architecture
WCDMA LTE/SAE
GGSN
SAE CN (EPC)
CN
P/S-GW
SGSN
A flat architecture for
optimized performance and Moving RNC functions to
cost efficiency e-NodeB
RNC RNC
UE UE
TechVidhya:India's No 1. Professional
4
Telecom Training Institute
LTE – Targets
High data rates
– Downlink: >100 Mbps
– Uplink: >50 Mbps
– Cell-edge data rates 2-3 x HSPA Rel. 6 (@ 2006)
Low delay/latency
– User plane RTT: < 10 ms RAN RTT (fewer nodes, shorter TTI)
– Channel set-up: < 100 ms idle-to-active (fewer nodes, shorter messages, quicker node
resp.)
High spectral efficiency
– Targeting 3 X HSPA Rel. 6 (@ 2006 )
Spectrum flexibility
– Operation in a wide-range of spectrum allocations, new and existing
– Wide range of Bandwidth: 1.4, 3, 5, 10, 15 and 20 MHz, FDD and TDD
Simplicity – Less signaling, Auto Configuration e-NodeB
– ”PnP”, ”Simple as an Apple”
Cost-effective migration from current/future 3G systems
State-of-the-art towards 4G
Focus on services from the packet-switched domain
TechVidhya:India's No 1. Professional
5
Telecom Training Institute
LTE and SAE logical interfaces
Other
TEMS
S1 S1 Mul Mun
S1
RBS
X2 RBS Uu
X2
RBS
Radio Access
Network
TechVidhya:India's No 1. Professional
6
Telecom Training Institute
RBS 6000 Overview
RBS 6102 RBS 6101 RBS 6201 RBS 6601 RRU RBS 6301
TechVidhya:India's No 1. Professional
7
Telecom Training Institute
Typical Radio Site
TechVidhya:India's No 1. Professional
8
Telecom Training Institute
RBS 6000 Units
DPU
E1
EC
GPS
Debug
I
O
I TN link
Sec
TN link
Sec Eth
1
RU
GSM
RU
RU
E1
WCDMA
E1
Site
Site
EC
EC
GPS
G PS
Debug
F
O
O
I
Sec
TN link
Eth Sec
Eth
RU1
1
RU2
RU3 RU
RU4 RU
RU5 RU
RU
RU6
RU
E1
LTE
DUL RUS
TechVidhya:India's No 1. Professional
9
Telecom Training Institute
RBS 6102 Hardware Architecture
•Radio Unit (RU)
•Tranceiver (TRX)
•Amplification
•Duplexing
•Filtering
•VSWR
TechVidhya:India's No 1. Professional
10
Telecom Training Institute
Radio Shelf in RBS 6000
Digital Unit
(DU)
TechVidhya:India's No 1. Professional
11
Telecom Training Institute
HW Architecture : HW units
TechVidhya:India's No 1. Professional
12
Telecom Training Institute
Digital Unit for LTE (DUL)
• 2x2 MIMO
• 64QAM DL & UL
Prepared for the future Interfaces
Power
• Support for LTE System Architecture Evolution GPS
• Support for multiple digital units & redundancy EC-buss × 2 (~climate)
LMT (Local
• Multistandard ready mgmt terminal)
• Main unit Site LAN/LMT/sync
Eth × 2
Capacity LED × 3
• Up to 50 users DUL-DUL
• Up to 173 Mbps throughput DL CPRI × 6
• Up to 56 Mbps throughput UL
IP transmission capability
• All IP architecture with full non-blocking connectivity
• 100/1000BASE-T
• SFP slot for 1000BASE-X
TechVidhya:India's No 1. Professional
13
Telecom Training Institute
Digital Unit LTE Interfaces
TechVidhya:India's No 1. Professional
14
Telecom Training Institute
Radio Unit LTE
TechVidhya:India's No 1. Professional
15
Telecom Training Institute
Radio Unit LTE Interfaces
TechVidhya:India's No 1. Professional
16
Telecom Training Institute
RBS6000 Commissioning Flow
1. 2. 3. 4. 5. 6. 7.
8.
Site Site Site Define Define S1 Add Radio Unlock Make
Installation Basic Equipment RBS6000 and X2 Network Cells
file file file TN test call
in OSS-RC definitions
OSS-RC Server
On-site engineer
TechVidhya:India's No 1. Professional
17
Telecom Training Institute
LTE RBS 6000 Commissioning
TechVidhya:India's No 1. Professional
18
Telecom Training Institute
Objectives
TechVidhya:India's No 1. Professional
19
Telecom Training Institute
Element Manager
requirements
– Web browser (Netscape, Microsoft Internet Explorer or Mozilla Firefox)
– CPP Nodes operating on L10 level software require a Element Manager
running on JRE version 1.5.0_12 or later, see
http://java.sun.com/products/archive
– Windows Vista, English Version, Windows 2000, Service Pack 2, English
Version or Windows XP, English Version
– Local Administrative rights
– Ethernet connection for 10/100 BaseT
– FTP Client for functions such as retrieving Product Inventory log files,
Uploading basic software to a node or retrieving the dump from the flash
disk of the node. Some examples of FTP Clients are FileZilla, FTPPro.
– Any kind of Network Time Protocol, NTP, client.
TechVidhya:India's No 1. Professional
20
Telecom Training Institute
Java Run Time Environment (JRE)
TechVidhya:India's No 1. Professional
21
Telecom Training Institute
Serial Cable pin-out
1
6
2
7
3
8
4
9
5
Product number:
RPM 919 732/05000
TechVidhya:India's No 1. Professional
22
Telecom Training Institute
Command Line
Interface - CLI
• CPP-specific administrative interface.
CPP: Connectivity Packet Platform
• A Set of shell commands which are handled by a UNIX
shell-like command interpreter.
• Some examples of CLI commands:
– ifconfig Check the RBS IP address
– formathd Format the Hard Disk
– vii Display Visual Indicator (LED) Status
– vols Display the volumes information
TechVidhya:India's No 1. Professional
23
Telecom Training Institute
Hyper Terminal Configuration (RS232)
TechVidhya:India's No 1. Professional
24
Telecom Training Institute
Commands
TechVidhya:India's No 1. Professional
25
Telecom Training Institute
CLI – Examples (cv cu)
TechVidhya:India's No 1. Professional
26
Telecom Training Institute
CLI - Examples (vii)
TechVidhya:India's No 1. Professional
27
Telecom Training Institute
RBS 6000 Site LAN
connection in DUL
TechVidhya:India's No 1. Professional
28
Telecom Training Institute
Element Manager Tasks
• Configuration Management
• Fault Management
• Performance Management
• Software Management
• Hardware Management
TechVidhya:India's No 1. Professional
29
Telecom Training Institute
1 of 2 Preparing the PC
TechVidhya:India's No 1. Professional
30
Telecom Training Institute
2 of 2 Preparing the PC
TechVidhya:India's No 1. Professional
31
Telecom Training Institute
Downloading EM installation package
http://<node Ip address>/em/index.html
RBS O&M IP adress: 169.254.1.10
TechVidhya:India's No 1. Professional
32
Telecom Training Institute
Installing EM software
TechVidhya:India's No 1. Professional
33
Telecom Training Institute
Connecting the EM to
eNodeB
TechVidhya:India's No 1. Professional
34
Telecom Training Institute
Element Manager Main Window
TechVidhya:India's No 1. Professional
35
Telecom Training Institute
Equipment View
TechVidhya:India's No 1. Professional
36
Telecom Training Institute
IP View
TechVidhya:India's No 1. Professional
37
Telecom Training Institute
Software View
TechVidhya:India's No 1. Professional
38
Telecom Training Institute
Radio Network View
TechVidhya:India's No 1. Professional
39
Telecom Training Institute
Licensing view, license information
TechVidhya:India's No 1. Professional
40
Telecom Training Institute
Supervision Menu
TechVidhya:India's No 1. Professional
41
Telecom Training Institute
Alarms
TechVidhya:India's No 1. Professional
42
Telecom Training Institute
Other logs for detailed trouble shooting:
• Event log
• Trace & Error log
• HW log
• Restart log
• System log
• Audit Trail log
TechVidhya:India's No 1. Professional
43
Telecom Training Institute
LTE RBS 6000 Commissioning
TechVidhya:India's No 1. Professional
44
Telecom Training Institute
Objectives
After this chapter the participants will be able to:
• Perform the commissioning of the RBS
–Power Up RBS
–Check the RBS Status
–Connect the Client
–Select Integration Scenario
–Integrate RBSs Manually
–Autointegrate RBSs using Site Installation Files
–Monitor RBS Integration
–Verify External Alarms
–Check Hardware Status
–Testing User Plane Traffic
–Complete and Store Integration Reports
TechVidhya:India's No 1. Professional
45
Telecom Training Institute
Power Up the RBS
• Check and power up the RBS according to the
”Installing RBS” document
• Checking RBS status
On digital units and radio units check that the green
Power indicators are on.
Connecting Client
• Connect the client computer with a crossed Ethernet cable to the Fast
Ethernet port labelled LMT B on the Digital Unit (DU) of the RBS
• Start the Integrate RBS application, from the Start menu.
TechVidhya:India's No 1. Professional
46
Telecom Training Institute
Connecting the Client
RBS 6000 Site LAN Connection in DUL
TechVidhya:India's No 1. Professional
47
Telecom Training Institute
Connecting Start
thetheClient
Integrate RBS tool
Start the Integrate RBS tool.
Enter the RBS O&M address as requested.
For an RBS that is not yet configured the IP
address is: 169.254.1.10
TechVidhya:India's No 1. Professional
48
Telecom Training Institute
Connecting the Client
Choose the correct eNodeB
TechVidhya:India's No 1. Professional
49
Telecom Training Institute
Select Integration
Do you have the needed files?
Scenario
Manual Integration Autointegration (full)
• Site Installation file • Site Installation File
• Site Basic File
• Site Equipment File
• (License Key File)
• (Upgrade Package File)
TechVidhya:India's No 1. Professional
50
Telecom Training Institute
Select Integration Site Installation File
Scenario Manual
- Node IP-address
Auto
Site Basic Configuration File OSS
Summary File
- OSS IP-address - Site Basic File
- Server IP-addresses (NTP,SLS, Alex etc) - Site Equipment File
- Gigabit ethernet and synchronization - (License Key File)
- (Upgrade Package File)
License Management
- Install capacity and feature license keys Configuration Validation
- Verify External alarms
- Check Hardware status
Software Upgrade - Perform Test Calls
- If needed, install a new Upgrade package and - Complete and store the Integration Report
upgrade the node
TechVidhya:India's No 1. Professional
51
Telecom Training Institute
Selecting the Site
Installation File
TechVidhya:India's No 1. Professional
52
Telecom Training Institute
Site Installation File – Advanced
View
TechVidhya:India's No 1. Professional
53
Telecom Training Institute
Site Installation File
example
<RbsSiteInstallationFile>
<Format revision="D"/>
<InstallationData logicalName="kienb2003"
vlanId="1023" dhcpClientIdentifier="">
<OamIpConfigurationData ipAddress="10.62.4.13" subnetMask="255.255.255.0"
defaultRouter0="10.62.4.1" defDomainName="enodeb.example.com">
<DnsServer ipAddress="10.64.208.236"/>
</OamIpConfigurationData>
<SmrsData address="10.75.24.41"
summaryFilePath="/home/timtmjo/Summary.xml"/>
</InstallationData>
</RbsSiteInstallationFile>
TechVidhya:India's No 1. Professional
54
Telecom Training Institute
Manual Integration
Site Installation File
- Node IP-address
Manual Auto
Site Basic Configuration File OSS
Summary File
- OSS IP-address - Site Basic File
- Server IP-addresses (NTP,SLS, Alex etc) - Site Equipment File
- Gigabit ethernet and synchronization - (License Key File)
- (Upgrade Package File)
License Management
- Install capacity and feature license keys Configuration Validation
- Verify External alarms
- Check Hardware status
Software Upgrade - Perform Test Calls
- If needed, install a new Upgrade package and - Complete and store the Integration Report
upgrade the node
TechVidhya:India's No 1. Professional
55
Telecom Training Institute
Manual Integration
Select Configuration Files
TechVidhya:India's No 1. Professional
56
Telecom Training Institute
Manual Integration Site Installation File
- Node IP-address
Manual Auto
Site Basic Configuration File OSS
Summary File
- OSS IP-address - Site Basic File
- Server IP-addresses (NTP,SLS, Alex etc) - Site Equipment File
- Gigabit ethernet and synchronization - (License Key File)
- (Upgrade Package File)
License Management
- Install capacity and feature license keys Configuration Validation
- Verify External alarms
- Check Hardware status
Software Upgrade - Perform Test Calls
- If needed, install a new Upgrade package and - Complete and store the Integration Report
upgrade the node
TechVidhya:India's No 1. Professional
57
Telecom Training Institute
License Management
TechVidhya:India's No 1. Professional
58
Telecom Training Institute
Manual Integration Site Installation File
- Node IP-address
Manual Auto
Site Basic Configuration File OSS
Summary File
- OSS IP-address - Site Basic File
- Server IP-addresses (NTP,SLS, Alex etc) - Site Equipment File
- Gigabit ethernet and synchronization - (License Key File)
- (Upgrade Package File)
License Management
- Install capacity and feature license keys Configuration Validation
- Verify External alarms
- Check Hardware status
Software Upgrade - Perform Test Calls
- If needed, install a new Upgrade package and - Complete and store the Integration Report
upgrade the node
TechVidhya:India's No 1. Professional
59
Telecom Training Institute
Upgrade Package
TechVidhya:India's No 1. Professional
60
Telecom Training Institute
Start Integration
TechVidhya:India's No 1. Professional
61
Telecom Training Institute
Integration of RBS, Progress view
TechVidhya:India's No 1. Professional
62
Telecom Training Institute
Integration of RBS, Progress view
TechVidhya:India's No 1. Professional
63
Telecom Training Institute
Manual Integration
Site Installation File
- Node IP-address
Manual Auto
Site Basic Configuration File OSS
Summary File
- OSS IP-address - Site Basic File
- Server IP-addresses (NTP,SLS, Alex etc) - Site Equipment File
- Gigabit ethernet and synchronization - (License Key File)
- (Upgrade Package File)
License Management
- Install capacity and feature license keys Configuration Validation
- Verify External alarms
- Check Hardware status
Software Upgrade - Perform Test Calls
- If needed, install a new Upgrade package and - Complete and store the Integration Report
upgrade the node
TechVidhya:India's No 1. Professional
64
Telecom Training Institute
Auto Integration RBS
summary File
example
<AutoIntegrationRbsSummaryFile>
<Format revision="B"/>
<ConfigurationFiles siteBasicFilePath="eNodeB1283/siteBasic.xml"
siteEquipmentFilePath="eNodeB1283/siteEquipment.xml"
licensingKeyFilePath="licenses/eNodeBs/"
upgradePackageFilePath="swPackages/CXP102051%1_R10E30/CXP102051%
1_R10E30.xml"/>
</AutoIntegrationRbsSummaryFile>
TechVidhya:India's No 1. Professional
65
Telecom Training Institute
Integrate RBS
TechVidhya:India's No 1. Professional
66
Telecom Training Institute
Monitoring RBS Integration (½)
TechVidhya:India's No 1. Professional
67
Telecom Training Institute
TechVidhya:India's No 1. Professional
68
Telecom Training Institute
Manual Integration - Node IP-address
Manual Auto
License Management
- Install capacity and feature license keys Configuration Validation
- Verify External alarms
- Check Hardware status
Software Upgrade - Perform Test Calls
- If needed, install a new Upgrade package and - Complete and store the Integration Report
upgrade the node
TechVidhya:India's No 1. Professional
69
Telecom Training Institute
After integration, check
the CV
TechVidhya:India's No 1. Professional
70
Telecom Training Institute
Create Integrate RBS
report
• In the Integrate RBS, click the View menu, then click
”Report file for RBS...”
TechVidhya:India's No 1. Professional
71
Telecom Training Institute
Testing external alarms
• Alarm
– Generate external alarm(s)
– Verify with Element Manager
TechVidhya:India's No 1. Professional
72
Telecom Training Institute
Testing User Plane
Traffic
Recommended tests:
• Originating session: Sending and receiving high speed data in at least one cell.
• Terminating session: Sending and receiving high speed data in at least one
cell.
TechVidhya:India's No 1. Professional
73
Telecom Training Institute
Complete and Storing Integration Reports
1. In Integrate RBS, click the View menu, and open the previously stored
report.
2. To enter the report edit mode, click the Edit menu, and then click
Enable Edit.
3. Update the report with the results of the verification, the test calls and
any other information.
4. Save the updated report on the client.
5. To upload the report to the Software Management Repository Server
(SMRS), click the Tools menu, and then click ”Upload to FTP server....”
TechVidhya:India's No 1. Professional
74
Telecom Training Institute
Checklist
3 IntegrationreportstoredontheSMRS
server?
4 Integrationreportstoredontheclient?
5 ExternalalarmsOK?
6 OriginatingcallOKforallcells?
7 TerminatingcallOKforonecell?
8 GeneralconcludingRoutinesare
performed?
Notes:
TechVidhya:India's No 1. Professional
75
Telecom Training Institute