TO LPC - 1-150KVA TRANSFORMER
a 01 3P.60HZ, 13.8KV/230V
M
Sc
kW-Hr
B METER G
10000
B
LAUNDRY
AREA LAUNDRY AREA
GROUND
b
2 SECOND FLOOR LIGHTING AND POWER LAYOUT 3 RISER DIAGRAM
5000
E-2 E-2
a
PANEL BOARD "LPC"
A Sab
1 GROUND FLOOR LIGHTING AND POWER LAYOUT
E-2
FEEDER CONDUCTOR 1 I FC USE :2 - 8MM² THHN + 1 - 5.5mm² TW (G)
IN 25mmØ RIGID STEEL CONDUCT (RSC) PPE
I FC @ 85% of =(3870)(0.85) / 230 1 - 30 AT 2P 50AF 240VAC 60HZ 10 KAIC CIRCUIT
=14.30 AMPERES BREAKER AS MAIN
OVER CURRENT PROTECTION I
I OCP =(14.30)(1.25)
=17.88 AMPERES
PREPARED: PROJECT NAME AND LOCATION : SHEET CONTENTS: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
GROUND FLOOR LIGHTING AND POWER LAYOUT
MICHAEL D. CO
(AS-BUILT PLAN)
CONSTRUCTION OF EVACUATION CENTER AT BRGY. MATTI,
SECOND FLOOR LIGHTING AND POWER LAYOUT REPUBLIC OF THE PHILIPPINES ELMER C. CAPILI ROWENA P. JAMITO JOSELITO B. CABALLERO ALLAN S. BORROMEO, CESO IV E-2
RISER DIAGRAM
2
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
AUTHORIZED MANAGING OFFICER DIGOS CITY, DAVAO DEL SUR PROJECT ENGINEER CHIEF, MAINTENANCE DIVISION ASSISTANT REGIONAL DIRECTOR REGIONAL DIRECTOR
LOAD SCHEDULE REGIONAL OFFICE XI
DATE :___________ RAMON MAGSAYSAY AVE., DAVAO CITY
DATE :_________________ DATE :_________________ DATE :_________________ DATE :_________________