IMPLEMENTATION
2 May 2006 REVISION DATE 16January 2012 1 of23
DATE
TABLE OF CONTENTS
THIS DOCUMENT IS A PROPRIETARY AND CONFIDENTIAL PROPERTY OF OPUS GROUP BERHAD. PLEASE CHECK THE MASTER LIST AND
VERIFY THAT THIS IS THE CORRECT VERSION BEFOREUSE.
PRIVATE & CONFIDENTIAL
MANUAL TITLE NETWORK MAINTENANCE MANAGEMENT PROJECT
REVISION HISTORY
THIS DOCUMENT IS A PROPRIETARY AND CONFIDENTIAL PROPERTY OF OPUS GROUP BERHAD. PLEASE CHECK THE MASTER LIST AND
THIS DOCUMENT IS A PROPRIETARY AND CONFIDENTIAL
VERIFY PROPERTY
THAT THIS IS THE OF VERSION
CORRECT OPUS GROUP BERHAD. PLEASE CHECK THE HIS IS THE
BEFOREUSE.
COVERBEFOREUSE.
PRIVATE & CONFIDENTIAL
MANUAL TITLE NETWORK MAINTENANCE MANAGEMENT PROJECT
THIS DOCUMENT IS A PROPRIETARY AND CONFIDENTIAL PROPERTY OF OPUS GROUP BERHAD. PLEASE CHECK THE MASTER LIST AND
THIS DOCUMENT IS A PROPRIETARY AND CONFIDENTIAL
VERIFY PROPERTY
THAT THIS IS THE OF VERSION
CORRECT OPUS GROUP BERHAD. PLEASE CHECK THE HIS IS THE
BEFOREUSE.
COVERBEFOREUSE.
PRIVATE & CONFIDENTIAL
MANUAL TITLE NETWORK MAINTENANCE MANAGEMENT PROJECT
THIS DOCUMENT IS A PROPRIETARY AND CONFIDENTIAL PROPERTY OF OPUS GROUP BERHAD. PLEASE CHECK THE MASTER LIST AND
THIS DOCUMENT IS A PROPRIETARY AND CONFIDENTIAL
VERIFY PROPERTY
THAT THIS IS THE OF VERSION
CORRECT OPUS GROUP BERHAD. PLEASE CHECK THE HIS IS THE
BEFOREUSE.
COVERBEFOREUSE.
PRIVATE & CONFIDENTIAL
MANUAL TITLE NETWORK MAINTENANCE MANAGEMENT PROJECT
THIS DOCUMENT IS A PROPRIETARY AND CONFIDENTIAL PROPERTY OF OPUS GROUP BERHAD. PLEASE CHECK THE MASTER LIST AND
THIS DOCUMENT IS A PROPRIETARY AND CONFIDENTIAL
VERIFY PROPERTY
THAT THIS IS THE OF VERSION
CORRECT OPUS GROUP BERHAD. PLEASE CHECK THE HIS IS THE
BEFOREUSE.
COVERBEFOREUSE.
PRIVATE & CONFIDENTIAL
MANUAL TITLE NETWORK MAINTENANCE MANAGEMENT PROJECT
THIS DOCUMENT IS A PROPRIETARY AND CONFIDENTIAL PROPERTY OF OPUS GROUP BERHAD. PLEASE CHECK THE MASTER LIST AND
THIS DOCUMENT IS A PROPRIETARY AND CONFIDENTIAL
VERIFY PROPERTY
THAT THIS IS THE OF VERSION
CORRECT OPUS GROUP BERHAD. PLEASE CHECK THE HIS IS THE
BEFOREUSE.
COVERBEFOREUSE.
PRIVATE & CONFIDENTIAL
MANUAL TITLE NETWORK MAINTENANCE MANAGEMENT PROJECT
THIS DOCUMENT IS A PROPRIETARY AND CONFIDENTIAL PROPERTY OF OPUS GROUP BERHAD. PLEASE CHECK THE MASTER LIST AND
THIS DOCUMENT IS A PROPRIETARY AND CONFIDENTIAL
VERIFY PROPERTY
THAT THIS IS THE OF VERSION
CORRECT OPUS GROUP BERHAD. PLEASE CHECK THE HIS IS THE
BEFOREUSE.
COVERBEFOREUSE.
PRIVATE & CONFIDENTIAL
MANUAL TITLE NETWORK MAINTENANCE MANAGEMENT PROJECT
DOCUMENT CONTROL
OMSB NMM’s Quality Assurance Unit will manage the updating of all manuals in the hardcopy
and electronic media.
THIS DOCUMENT IS A PROPRIETARY AND CONFIDENTIAL PROPERTY OF OPUS GROUP BERHAD. PLEASE CHECK THE MASTER LIST AND
THIS DOCUMENT IS A PROPRIETARY AND CONFIDENTIAL
VERIFY PROPERTY
THAT THIS IS THE OF VERSION
CORRECT OPUS GROUP BERHAD. PLEASE CHECK THE HIS IS THE
BEFOREUSE.
COVERBEFOREUSE.
PRIVATE & CONFIDENTIAL
MANUAL TITLE NETWORK MAINTENANCE MANAGEMENT PROJECT
DEFINITIONS
i. i
PLUS - ProjekLebuhraya Utara Selatan Bhd
ii. ELITE
i - Expressway Lingkaran Tengah Sdn Bhd
iii. LINKEDUA
i - Linkedua (M) Bhd
iv. BKE - Butterworth Kulim Expressway
v. Client
i - PLUS Berhad
vi. PEB - PLUS Expressways Bhd, former management company for the Client
vii. PLUS - North South Expressway (NSE), New Klang Valley Expressway
expressways (NKVE), Federal Highway Route II (FHR2), North-South Expressway
Central Link (NSECL), Seremban-Port Dickson Highway (SPDH),
Malaysia-Singapore Second Crossing (MSSC) and Butterworth-Kulim
Expressway (BKE)
viii. PLUS
v Berhad - PROJEK LEBUHRAYA USAHASAMA Berhad, the concession holder
(company) for all PLUS expressways
ix. Opus Bhd - v
Opus Group Berhad
x. OMSB - Opus Management Sdn Bhd, a subsidiary of Opus (M)
xi. Opus (M) - v (M) Berhad, a subsidiary of Opus Bhd
Opus International
xii. OMSB NMM - v
Network Maintenance Management Team of OMSB
xiii. Opus IC - i Consultants Ltd, the New Zealand subsidiary of Opus
Opus International
Bhd
xiv. MD - x of Opus Bhd
Managing Director
xv. Director - x
Director of OMSB
xvi. GMR - x Representative of Opus Bhd
Group Management
xvii. MS - x
Management System
xviii. PD - x OMSB NMM
Project Director of
xix. QMR - x Representative of OMSB NMM
Quality Management
xx. QA & HSE - x and Health, Safety and Environment Department of
Quality Assurance
Opus Bhd
xxi. Opus Bhd MS - Opus Group Berhad Management Systems. An integration of Quality
Management System (ISO 9001:2008), Environmental Management
System (ISO 14001:2004) and Occupational, Health and Safety
Management System (OHSAS 18001:2007) that covers the Asset
Development and Asset Management Services.
xxii. QMS - Quality Management System, the quality assurance system adopted by
OMSB NMM, consisting of the quality documents and OMSB
NMMQuality Assurance Committee
THIS DOCUMENT IS A PROPRIETARY AND CONFIDENTIAL PROPERTY OF OPUS GROUP BERHAD. PLEASE CHECK THE MASTER LIST AND
THIS DOCUMENT IS A PROPRIETARY AND CONFIDENTIAL
VERIFY PROPERTY
THAT THIS IS THE OF VERSION
CORRECT OPUS GROUP BERHAD. PLEASE CHECK THE HIS IS THE
BEFOREUSE.
COVERBEFOREUSE.
PRIVATE & CONFIDENTIAL
MANUAL TITLE NETWORK MAINTENANCE MANAGEMENT PROJECT
xxiii. PQP - Project Quality Plan, the document describing the plan for quality
management used by OMSB NMM
xxiv. PSP - Project Specific x Procedures, documents describing the procedures
utilized specifically by OMSB NMM
THIS DOCUMENT IS A PROPRIETARY AND CONFIDENTIAL PROPERTY OF OPUS GROUP BERHAD. PLEASE CHECK THE MASTER LIST AND
THIS DOCUMENT IS A PROPRIETARY AND CONFIDENTIAL
VERIFY PROPERTY
THAT THIS IS THE OF VERSION
CORRECT OPUS GROUP BERHAD. PLEASE CHECK THE HIS IS THE
BEFOREUSE.
COVERBEFOREUSE.
PRIVATE & CONFIDENTIAL
MANUAL TITLE NETWORK MAINTENANCE MANAGEMENT PROJECT
1.0 INTRODUCTION
PLUS, ELITE, LINKEDUA and BKE are the concessionaires of the North-South
Expressway, North Klang Valley Expressway, Federal Highway Route II, Seremban-
Port Dickson Highway, North-South Expressway Central Link, the Malaysia Singapore
Second Crossing and Butterworth Kulim Expressway.
As the concessionaires of the expressways, PLUS, ELITE, LINKEDUA and BKE need
to maintain and ensure the serviceability of the expressways; collect toll and
subsequently allocate funds from the toll collections and other revenues, amongst others,
to meet:
operational needs;
maintenance requirements;
expressway related projects such as implementation of interchanges, lay-bys, rest &
service areas, etc;
financial obligations; and
other budget disbursement.
Therefore, the prime objectives of PLUS, ELITE, LINKEDUA and BKE are to minimize
the cost of expenditure for operations and maintenance, and to maximize the returns on
the allocated cost, while meeting the concession requirements to an acceptable minimum
level of service. The expressways need to be both operational and economical throughout
their service life such that optimal returns are realized from the capital investments. In
this regard, PLUS, ELITE, LINKEDUA and BKE recognized the need for an efficient
network maintenance management to be in place to meet the prime objectives.
Opus (M) is providing the network maintenance management and technical advisory
services to PLUS, ELITE andLINKEDUA effective from July 2002,whilst for BKE,
effective from January 2008. In view of the delisting of Opus Bhd and streamlining
exercise of Opus (M), the Network Maintenance Management services operation was
transferred from Opus (M) to OMSB effective from 1st January 2009.
Effective from 1 January 2012, the concession holder (company) for all expressways is
PROJEK LEBUHRAYA USAHASAMA Berhad (PLUS Berhad).
United Engineers (Malaysia) Berhad appointed Opus IC in January 2000 to provide the
network maintenance management and technical advisory services for PLUS, ELITE and
LINKEDUA expressways. In July 2002, the PSA between Opus IC and PLUS was
novated to Opus (M). (formerly known as PengurusanLebuhraya Bhd). The project team
of OMSB NMM was set up to undertake the scope of services of PSA. OMSB NMM
provided the required services for PLUS from then on. As for LINKEDUA, Opus (M)
was appointed to provide the network maintenance management and technical advisory
services from January 2004. The fees for the services rendered are negotiated and agreed
annually.
THIS DOCUMENT IS A PROPRIETARY AND CONFIDENTIAL PROPERTY OF OPUS GROUP BERHAD. PLEASE CHECK THE MASTER LIST AND
THIS DOCUMENT IS A PROPRIETARY AND CONFIDENTIAL
VERIFY PROPERTY
THAT THIS IS THE OF VERSION
CORRECT OPUS GROUP BERHAD. PLEASE CHECK THE HIS IS THE
BEFOREUSE.
COVERBEFOREUSE.
PRIVATE & CONFIDENTIAL
MANUAL TITLE NETWORK MAINTENANCE MANAGEMENT PROJECT
In September 2004, PLUS, ELITE and LINKEDUA integrated their management and
maintenance operations under PEB.BKE integrated their management and maintenance
operations under PEB in January 2008. As such all the scope of services under the PSA
between Client and Opus (M) are administrated through PEB.
However, effective from 1 January 2012, all concession agreements have been novated
to PLUS Berhad for all expressways.
Asset management is the process of ensuring the cost effective provision of the desired
level of service for the present and future owners of infrastructure asset in a transparent
and informed manner. Network Maintenance Management is the asset management
services that OMSB NMM provides to the network of expressway under the purview of
the Client.
Network maintenance management services focused on the four major assets of the
expressways namely pavement, slopes, culverts and bridges. The services encompass the
following: -
OMSB NMM is committed to deliver efficient and effective quality service to the Client in
accordance to the PSA. A QMS for the Project consisting of the quality documents is
established to ensure that the commitment to quality is well adhered to by all personnel of
OMSB NMM.
This PQP describes OMSB NMM’s QMS covering the core services currently being
provided and developed based on the guidelines of ISO 9001:2008. The PQP is further
supported by the PSP, which describe details of the work process flow, responsibilities and
records retention required for each procedure.
The QMS will be reviewed from time to time to ensure that services are carried out in
accordance with documented procedures and for continual improvement of services
delivered.
THIS DOCUMENT IS A PROPRIETARY AND CONFIDENTIAL PROPERTY OF OPUS GROUP BERHAD. PLEASE CHECK THE MASTER LIST AND
THIS DOCUMENT IS A PROPRIETARY AND CONFIDENTIAL
VERIFY PROPERTY
THAT THIS IS THE OF VERSION
CORRECT OPUS GROUP BERHAD. PLEASE CHECK THE HIS IS THE
BEFOREUSE.
COVERBEFOREUSE.
PRIVATE & CONFIDENTIAL
MANUAL TITLE NETWORK MAINTENANCE MANAGEMENT PROJECT
2.0 ORGANISATION
The Project Structure, as illustrated in Appendix PQP/001/1, shows the contractual and
functional inter-relationships as well as the line of reporting between the various
organisations involved in provision of the network maintenance management and
technical advisory services.
The functional relationship and scope of activities among the various organisations are as
follows:
c. The Client administers and monitors the network maintenance management and
technical advisory services provided by OMSB NMM. The Client reports to MHA
on issues pertaining to the maintenance of the expressways.
d. OMSB NMM is the Network Maintenance Manager team formed by OMSB to carry
out the services.
THIS DOCUMENT IS A PROPRIETARY AND CONFIDENTIAL PROPERTY OF OPUS GROUP BERHAD. PLEASE CHECK THE MASTER LIST AND
THIS DOCUMENT IS A PROPRIETARY AND CONFIDENTIAL
VERIFY PROPERTY
THAT THIS IS THE OF VERSION
CORRECT OPUS GROUP BERHAD. PLEASE CHECK THE HIS IS THE
BEFOREUSE.
COVERBEFOREUSE.
PRIVATE & CONFIDENTIAL
MANUAL TITLE NETWORK MAINTENANCE MANAGEMENT PROJECT
Document Control
Information Technology (IT) Support
Administration
THIS DOCUMENT IS A PROPRIETARY AND CONFIDENTIAL PROPERTY OF OPUS GROUP BERHAD. PLEASE CHECK THE MASTER LIST AND
THIS DOCUMENT IS A PROPRIETARY AND CONFIDENTIAL
VERIFY PROPERTY
THAT THIS IS THE OF VERSION
CORRECT OPUS GROUP BERHAD. PLEASE CHECK THE HIS IS THE
BEFOREUSE.
COVERBEFOREUSE.
PRIVATE & CONFIDENTIAL
MANUAL TITLE NETWORK MAINTENANCE MANAGEMENT PROJECT
THIS DOCUMENT IS A PROPRIETARY AND CONFIDENTIAL PROPERTY OF OPUS GROUP BERHAD. PLEASE CHECK THE MASTER LIST AND
THIS DOCUMENT IS A PROPRIETARY AND CONFIDENTIAL
VERIFY PROPERTY
THAT THIS IS THE OF VERSION
CORRECT OPUS GROUP BERHAD. PLEASE CHECK THE HIS IS THE
BEFOREUSE.
COVERBEFOREUSE.
PRIVATE & CONFIDENTIAL
MANUAL TITLE NETWORK MAINTENANCE MANAGEMENT PROJECT
This consists of the PQP and PSPs. The PSPs describe the work process flow
practice by OMSB NMM personnel.
a) Committee Chairman
b) Committee Secretary
c) Committee Members
a. Committee Chairman
THIS DOCUMENT IS A PROPRIETARY AND CONFIDENTIAL PROPERTY OF OPUS GROUP BERHAD. PLEASE CHECK THE MASTER LIST AND
THIS DOCUMENT IS A PROPRIETARY AND CONFIDENTIAL
VERIFY PROPERTY
THAT THIS IS THE OF VERSION
CORRECT OPUS GROUP BERHAD. PLEASE CHECK THE HIS IS THE
BEFOREUSE.
COVERBEFOREUSE.
PRIVATE & CONFIDENTIAL
MANUAL TITLE NETWORK MAINTENANCE MANAGEMENT PROJECT
iii. Initiate and conduct periodical reviews at least once a year on the
effectiveness of the QMS;
iv. Liaise with Opus Bhd QA & HSE on matters relating to the
implementation of the Quality, Occupational Health Safety and
Environmental Management System;
b. Committee Secretary
c. Committee Members
THIS DOCUMENT IS A PROPRIETARY AND CONFIDENTIAL PROPERTY OF OPUS GROUP BERHAD. PLEASE CHECK THE MASTER LIST AND
THIS DOCUMENT IS A PROPRIETARY AND CONFIDENTIAL
VERIFY PROPERTY
THAT THIS IS THE OF VERSION
CORRECT OPUS GROUP BERHAD. PLEASE CHECK THE HIS IS THE
BEFOREUSE.
COVERBEFOREUSE.
PRIVATE & CONFIDENTIAL
MANUAL TITLE NETWORK MAINTENANCE MANAGEMENT PROJECT
a. The QA Committee of OMSB NMMshall manage and control all quality related
activities of the Project through a documented quality system structured as below:
i. Tier 1 - PQP.
ii.Tier 2 - PSP.
The above procedures outline the standard methodology for carrying out OMSB
NMM’s duties and responsibilities as specified in the PSA. As the procedures only
cover processes specific to OMSB NMM, generic procedures from Opus Bhd MS
shall be applied in other required elements under ISO 9001: 2008 that has not been
specifically dealt with in the PSP. In cases of ambiguity with Opus Bhd MS, the
documented procedures for OMSB NMMshall take precedence.
b. The OMSB NMM shall refer to the Opus Bhd MS procedures for the HSE
monitoring and implementation and handling of other issues in Quality. The relevant
Opus Bhd MS procedures for the Quality and HSE are as listed below:
The PD and respective Head of Departments/Sections shall be responsible that the staff
understand and comply with the above procedures so that the HSE aspects are fully
observed throughout the project.
THIS DOCUMENT IS A PROPRIETARY AND CONFIDENTIAL PROPERTY OF OPUS GROUP BERHAD. PLEASE CHECK THE MASTER LIST AND
THIS DOCUMENT IS A PROPRIETARY AND CONFIDENTIAL
VERIFY PROPERTY
THAT THIS IS THE OF VERSION
CORRECT OPUS GROUP BERHAD. PLEASE CHECK THE HIS IS THE
BEFOREUSE.
COVERBEFOREUSE.
PRIVATE & CONFIDENTIAL
MANUAL TITLE NETWORK MAINTENANCE MANAGEMENT PROJECT
a. OMSB NMMhas established document control and data management procedure for
the collection, processing, indexing, tracking and retrieval of various project
correspondences to be identified as quality records.
b. The document and data control system complies with the Project Specific Document
Control Procedures, the generic Group Document Control Procedure (Project
Related) as well as the relevant elements of ISO 9001:2008requirement.
The system developed consists of, but is not limited to, the following:
iii. Methods for handling revisable project documents, which include identification
and control of both the active and obsolete revisions.
iv. Methods for identification, filing and tracking of project quality records.
3.4 Procedures
Below is the list of Project Specific Procedures that have been developed during the course
of this project:
THIS DOCUMENT IS A PROPRIETARY AND CONFIDENTIAL PROPERTY OF OPUS GROUP BERHAD. PLEASE CHECK THE MASTER LIST AND
THIS DOCUMENT IS A PROPRIETARY AND CONFIDENTIAL
VERIFY PROPERTY
THAT THIS IS THE OF VERSION
CORRECT OPUS GROUP BERHAD. PLEASE CHECK THE HIS IS THE
BEFOREUSE.
COVERBEFOREUSE.
PRIVATE & CONFIDENTIAL
MANUAL TITLE NETWORK MAINTENANCE MANAGEMENT PROJECT
4.0 REFERENCE
5.0 APPENDICES
a. Appendix PQP/001/1 - Project Structure of OMSB NMM
b. Appendix PQP/001/2 - Organisation Structure of OMSB NMM
c. Appendix PQP/001/3 - Element vs Procedures Compliance Matrix
THIS DOCUMENT IS A PROPRIETARY AND CONFIDENTIAL PROPERTY OF OPUS GROUP BERHAD. PLEASE CHECK THE MASTER LIST AND
THIS DOCUMENT IS A PROPRIETARY AND CONFIDENTIAL
VERIFY PROPERTY
THAT THIS IS THE OF VERSION
CORRECT OPUS GROUP BERHAD. PLEASE CHECK THE HIS IS THE
BEFOREUSE.
COVERBEFOREUSE.
PRIVATE & CONFIDENTIAL
MANUAL TITLE NETWORK MAINTENANCE MANAGEMENT PROJECT
MALAYSIAN Reports to
HIGHWAY
AUTHORITY (MHA)
Concession
Monitoring
PLUS
ProjekLebuhrayaUsa
Appoint hasamaBerhad
ELITE (PLUS Berhad)
Reports to
Monitors
LINKEDUA
Setup
Opus Mgt OMSB NMM
BKE
Reports to
Consultant Contractor
THIS DOCUMENT IS A PROPRIETARY AND CONFIDENTIAL PROPERTY OF OPUS GROUP BERHAD. PLEASE CHECK THE MASTER LIST AND
THIS DOCUMENT IS A PROPRIETARY AND CONFIDENTIAL
VERIFY PROPERTY
THAT THIS IS THE OF VERSION
CORRECT OPUS GROUP BERHAD. PLEASE CHECK THE HIS IS THE
BEFOREUSE.
COVERBEFOREUSE.
PRIVATE & CONFIDENTIAL
MANUAL TITLE NETWORK MAINTENANCE MANAGEMENT PROJECT
PROJECT
DIRECTOR
OFFICE SUPPORT
CONSTRUCTION
OPERATIONS TECHNICAL
MANAGEMENT
NORTHERN CENTRAL SOUTHERN GEOTECH DRAINAGE BRIDGE PAVEMENT DRAFTING THIRD PARTY
THIS DOCUMENT IS A PROPRIETARY AND CONFIDENTIAL PROPERTY OF OPUS GROUP BERHAD. PLEASE CHECK THE MASTER LIST AND
THIS DOCUMENT IS A PROPRIETARY AND CONFIDENTIAL
VERIFY PROPERTY
THAT THIS IS THE OF VERSION
CORRECT OPUS GROUP BERHAD. PLEASE CHECK THE HIS IS THE
BEFOREUSE.
COVERBEFOREUSE.
PRIVATE & CONFIDENTIAL
MANUAL TITLE NETWORK MAINTENANCE MANAGEMENT PROJECT
Assessment
Opus Mgt/NMM/PSP/001 Pavement Condition
Assets
Opus Mgt/NMM/PSP/002 Periodical Inspection of
Management
Opus Mgt/NMM/PSP/003 Asset Condition Data
Technical Documentation Preparation
Opus Mgt/NMM/PSP/004 Annual Works Program &
Monitoring
Opus Mgt/NMM/PSP/006 Contracts Management &
Party Proposal
Opus Mgt/NMM/PSP/009 Technical Review of Third
Records Management
Opus Mgt/NMM/PSP/010 Document Control and
Procedures
Opus Mgt/NMM/PSP/011 Preparation & Revision of
ISO 9001:2000
THIS DOCUMENT IS A PROPRIETARY AND CONFIDENTIAL PROPERTY OF OPUS GROUP BERHAD. PLEASE CHECK THE MASTER LIST AND
THIS DOCUMENT IS A PROPRIETARY AND CONFIDENTIAL
VERIFY PROPERTY
THAT THIS IS THE OF VERSION
CORRECT OPUS GROUP BERHAD. PLEASE CHECK THE HIS IS THE
BEFOREUSE.
COVERBEFOREUSE.