ANNEXURE-AA

TECHNICAL SPECIFICATION OF HORIZONTAL BORING AGAINST item No. 24 of


Schedule-A

1. Execution of tranche of HDD work up to a depth of minimum 1.00 mtr. Form the
ground level at location, as per direction of engineer in-charge.
2. The boring size up to 125mm.
3. This includes supply and laying of DWC/HDPE pipe as per Spec. approved by the
Railway.
4. All accessories and tools required for this works shall be arranged by the contractor.
Execution of Horizontal Boring as per the diagram given below -