Program: Riyadh Township – KADEN Road

INSPECTION AND TEST PLAN


CIVIL WORKS of UTILITIES
Project Kaden Road ITP Sequence No M-002 Rev 0 Discipline Mechanical Date 19-12-2020

S.No Activity Reference Document / Acceptance Criteria Frequency Responsible Record/Forms Inspection Code
Description Standard Personnel SBC MC E

Setting Out Project Specification Setting out shall be Each Construction


1 done as per delivery or Manager/
& Layout Ref- 31 23 00 Part 1.7 C Approved WIR
approved drawing Partial Surveyor H/R H/R H/R
& Approved Material
Submittal. and approved Delivery Site & QC
procedure Engineer
Construction
` Excavation shall be Manager/
done to the required For Each MEP
2 Excavation Project Specification depth as per Installation Manager/ Approved WIR H/R H/R H/R
& Trenching Reference 31 23 00, 31 approved drawing or during Site
23 16.13 and Approved and approved Installation Engineer /
Method Statement procedure shall be QC Engineer
followed

The Geotextile shall


be installed only
3 Installation Project Specification after the as per the For Each Construction
of section 31 34 19.16 approved material Installation Manager/
Approved WIR H/R H/R H/R
Geotextile receiving by or during MEP
Engineer. The Installation Manager/
installation shall be Site
done in accordance Engineer /
approved drawing QC Engineer

1|Page
Program: Riyadh Township – KADEN Road

S.No Activity Reference Document / Acceptance Criteria Frequency Responsible Record/Forms Inspection Code
Description Standard Personnel SBC MC E
Construction
All the required Manager/
4 Installation Project Specification parameters shall be For Each MEP
Approved WIR H/R H/R H/R
of Bedding Ref- 31 23 16.13 Part in accordance with Installation Manager/
around 3.2 specified specs and or during Site
pipes approved Method Installation Engineer /
Statement QC Engineer

Construction
All the required For Each Manager/
Backfilling & Project Specification parameters shall be Installation MEP
5 Compaction Ref- 31 23 16.13 Part in accordance with or during Manager/ Approved WIR H/R H/R H/R
3.3 specified specs Installation Site
Engineer /
QC Engineer

Construction
Manager/
Warning Project Specification 31 Warning Tapes shall For Each MEP
6 Tapes 23 16.13 Part 3.3D be done as required Installation Manager/
and stated in Project or during Site Approved WIR H/R H/R H/R
Specifications. Installation Engineer /
QC Engineer

2|Page
Program: Riyadh Township – KADEN Road

S.No Activity Reference Document / Acceptance Criteria Frequency Responsible Record/Forms Inspection Code
Description Standard Personnel SBC MC E

Construction
All the required For Each Manager/
8 Installation Project Specifications parameters shall be Installation MEP
of Manholes 33 39 13 Part 2.2 Approved WIR H/R H/R H/R
in accordance with or during Manager/
and Covers specified specs Installation Site
Engineer /
QC Engineer

H- Hold Point S-Surveillance R-Record N/A


Written notification required, contractor Relevant party will take continuous Documentation shall be retained by or Not Applicable
shall not proceed beyond this point or periodic survey of activity submitted to relevant party for record
without approval of consultant
SBC MC E WIR
Sub Contactor Main Contractor Consultant Engineer Work Inspection
Request