S.No Activity Reference Document / Acceptance Criteria Frequency Responsible Record/Forms Inspection Code
Description Standard Personnel SBC MC E
1|Page
Program: Riyadh Township – KADEN Road
S.No Activity Reference Document / Acceptance Criteria Frequency Responsible Record/Forms Inspection Code
Description Standard Personnel SBC MC E
Construction
All the required Manager/
4 Installation Project Specification parameters shall be For Each MEP
Approved WIR H/R H/R H/R
of Bedding Ref- 31 23 16.13 Part in accordance with Installation Manager/
around 3.2 specified specs and or during Site
pipes approved Method Installation Engineer /
Statement QC Engineer
Construction
All the required For Each Manager/
Backfilling & Project Specification parameters shall be Installation MEP
5 Compaction Ref- 31 23 16.13 Part in accordance with or during Manager/ Approved WIR H/R H/R H/R
3.3 specified specs Installation Site
Engineer /
QC Engineer
Construction
Manager/
Warning Project Specification 31 Warning Tapes shall For Each MEP
6 Tapes 23 16.13 Part 3.3D be done as required Installation Manager/
and stated in Project or during Site Approved WIR H/R H/R H/R
Specifications. Installation Engineer /
QC Engineer
2|Page
Program: Riyadh Township – KADEN Road
S.No Activity Reference Document / Acceptance Criteria Frequency Responsible Record/Forms Inspection Code
Description Standard Personnel SBC MC E
Construction
All the required For Each Manager/
8 Installation Project Specifications parameters shall be Installation MEP
of Manholes 33 39 13 Part 2.2 Approved WIR H/R H/R H/R
in accordance with or during Manager/
and Covers specified specs Installation Site
Engineer /
QC Engineer
3|Page