This document lists 27 items related to maintenance and certification work completed on the ship at the dockyard. It includes reports on work done, sea chest valves, anchor chains, propeller shafts, rudders, oily water separators, garbage and sludge disposal, various load tests on cranes and equipment, pressure testing of cargo lines, heating coils, boilers, ballast lines, fire mains, foam lines, and bunker lines. It also includes certification for a single arm for the rescue boat.
This document lists 27 items related to maintenance and certification work completed on the ship at the dockyard. It includes reports on work done, sea chest valves, anchor chains, propeller shafts, rudders, oily water separators, garbage and sludge disposal, various load tests on cranes and equipment, pressure testing of cargo lines, heating coils, boilers, ballast lines, fire mains, foam lines, and bunker lines. It also includes certification for a single arm for the rescue boat.
This document lists 27 items related to maintenance and certification work completed on the ship at the dockyard. It includes reports on work done, sea chest valves, anchor chains, propeller shafts, rudders, oily water separators, garbage and sludge disposal, various load tests on cranes and equipment, pressure testing of cargo lines, heating coils, boilers, ballast lines, fire mains, foam lines, and bunker lines. It also includes certification for a single arm for the rescue boat.