PROBABILITY (P)
Very Unlikely Unlikely Possible Probable Near‐certain
1 2 3 4 5
Catastrophic 5 M H H C C
Critical 4 M M H H C
SEVERITY
(S)
Serious or severe 3 U M M H H
Consequential 2 U U M M H
Minor 1 U U U M M
Implementation of PAIT subject to prior approval from the site manager. Plan corrective actions over a short time frame.
High
Implementation of PAIT subject to prior approval from the site manager N+1. Implementation of specific measures
documented/described in a prevention plan.
Critical
Plan corrective actions over a short time frame.
Probability assessment
Exceptional, very rare event / Probability of occurrence 0‐5% / once every 20 years. Has previously occurred in Group.
1 Very unlikely
The event could possibly occur / Probability of occurrence 5‐20% / once every 5 years or less. Has previously occurred in BU.
2 Unlikely
The event could probably occur / Probability of occurrence 20‐40% / once every 2 years or less. Has previously occurred at the site.
3 Possible
The event could very probably occur / Probability of occurrence 40‐60% / once every year or confirmed. Has previously occurred on
4 Probable
multiple occasions.
The event will in all likelihood occur / Probability of occurrence 60‐100% / event occurs almost every time.
5 Near‐certain
Severity assessment
HUMAN INDUSTRIAL / MATERIAL ENVIRONMENTAL
Multiple victims
(employee or third party)
Death Damage to assets + Irreversible impact on sensitive area or >2000 tons hazardous
Catastrophic Irreversible injury estimated loss > products or > 500 tons of very toxic products spilled
Permanent handicap 20 000 000 €
Irreversible occupational
5
disease
Appendix 1: Health and Safety Risk Assessment
Rate Rate
Description Of
No. Hazard
Likelihood
Likelihood
Severity
Severity
Work Activity Mitigation(Precaution Taken)
Risk
Risk
1. E nsure PTW shall be obtained prior to start job
2. All operative persons shall have received site
safety Tool-Box talk.
1. Poor communication between work 3. All task carried out by trained and competent
parties. person.
2. Inexperienced persons/Lack of Safety 4. Supervision at all time by performing party.
awareness and lack of knowledge about
MEDIUM
1. 2 4 5. Ensure that the area has been confirmed and 1 4
the task.
LOW
cleared by concerned authority, prior to entry into
work area. Do not use areas outside of the
cleared for access.
6. Communicate /marking defects
Site Materials / equipment and organize for
preparation/ replacement so that defective materials and
Mobilization of Equipment are never used.
materials for 7. Use appropriate PPE.
the Installation
of EMFM
1. Ensure tool box meeting is conducted
MEDIUM to communicate the correct method of
LOW
2. Manual handling and related injuries 2 3 manual handling to all workers 1 3
2. Mechanical lifting aids to be used
where possible
LOW
3. Injury due to damaged hand tools 2 4 1 4
3. Workers trained and instructed in the
correct use of hand tools
Rate Rate
Description Of
No. Hazard
Likelihood
Likelihood
Severity
Severity
Work Activity Mitigation(Precaution Taken)
Risk
Risk
Injury due to use of hand tools 2 2 1. Ensure only good tools are used 1 2
4.
LOW
LOW
1. Toolbox must be conducted to communicate the
LOW
Injury due to manual work 2 3 1 3
LOW
5.
correct manual handing methods
Material Work
MEDIU
1. Wear all PPE and hand gloves while handling
Injury while handling sharpened
LOW
2 3 sharpened objects and nails 1 3
6.
M
metal objects such as tray, trunk 2. Ensure de‐nailing of all material before storage
or disposal
1. Hard helmet must be warn due to possible
Injury due to drilling overhead 2 3 3 1
MEDIUM
LOW
7. knocks and safety goggles must be worn at all
time when drilling
LOW
8. Injury due to falling material 2 3 displayed warning of possible falling objects 1 3
Rate Rate
Description Of
No. Hazard
Likelihood
Likelihood
Severity
Severity
Work Activity Mitigation(Precaution Taken)
Risk
Risk
1. Only competent person shall be allowed to
MEDIUM
Injury due to while lifting the
carry out the activity
LOW
2 4 1 4
9. material 2. Ensure area is barricaded and signage displayed
warning of possible failing objects.
LOW
LOW
2 2 1 2
10. material proper manual handling techniques
MEDIUM
working at height 1 4
LOW
11. Injury due to using tools and 2 4 3. All damage equipments must be tagged DO NOT
equipments during installation USED and remove from site
4. All equipments to be inspected and color coded
to project requirements
5. Pre‐use inspections and weekly checklists to be
carried out
MEDIUM
1. Ensure fresh drinking water is provided and
HIGH
Heat Stress 3 3 2 4
12. provide workers with individual drinking bottle
2. Provide proper cooling system
Rate Rate
Description Of
No. Hazard
Likelihood
Likelihood
Severity
Severity
Work Activity Mitigation(Precaution Taken)
Risk
Risk
1. Train operator in safe use and inspection
2. PPE to be used such as face shield, fire apron,
gloves and overall
3. Ensure disk speed is compatible with machine
Installation of
MEDIUM
13. Grinding Machine spark, fire and speed
HIGH
Material 5 5 1 5
burns 4. Work carried out in segregated area such as
temporary workshop
5. Prevent unauthorized persons entering workshop
area
6. Avoid such work near flammable materials
7. Hazard warning signs displayed