M/s. Douse Fire Systems Pvt. Ltd. Area:- TER Room, SER Room, S&T UPS
Room, Electrical UPS Room
Date: 22/06/21 Activity: Flooding Fire Suppression System Installation Assessment Team:
Revision No:01
Sr. Task/ Hazards Possible Existing Severity Likelihood Risk Risk Additional Severity Likelihood of Risk Resi- Actio
Consequences
No. Activity Control Level of of Rating Level Control Level of Occurrence of Rating dual n By
Measures Hazard Occurrence (RL) = (L/M/ measures Hazard Hazard (L) (RL) = Risk
(S) of Hazard SxL H) (S) SxL Level
(L)
1 Mobilization Unaware &
(manpower) unfamiliar
workers
Materials
Loading &
2 Unloading
4 Painting work
5 Welding Work
6 Drilling Work
10
11