Professional Documents
Culture Documents
Architectural 2 PDF
Architectural 2 PDF
ROOM ROOM
WALL SYMBOLS
ENGINEERING ROOM CH 4 : 2700m HT.
DISWASHING AREA T-RUNNER ON LAMINATED
GYPSUM BOARD CH 3 : 2400m HT.
T-RUNNER ON LAMINATED
GYPSUM BOARD
CH 1 : 7000m HT.
MIXING AND PIPING ROOM OPEN CEILING
COOKING AREA
CH 3 : 2400m HT.
T-RUNNER ON LAMINATED
CH 4 : 2700m HT. GYPSUM BOARD
T-RUNNER ON LAMINATED CH 3 : 2400m HT.
SCALING ROOM GYPSUM BOARD T-RUNNER ON LAMINATED
GYPSUM BOARD
CH 3 : 2400m HT.
T-RUNNER ON LAMINATED
GYPSUM BOARD
CH 1 : 7000m HT.
OPEN CEILING
ACCOUNTANT
OFFICE
CH 1 : 7000m HT.
OFFICE
OPEN CEILING
CH 2 : 2400m HT.
3/8" GYPSUM CEILING
QA ROOM
PROJECT TITLE OWNER DATE AUG 2018 SHEET CONTENTS SHEET NO.
THIS DRAWING AS AN INSTRUMENT OF SERVICE IS A
PROPERTY OF THE ARCHITECT AND AS SUCH MUST WALL FINISHES
NOT BE REPRODUCED OR COPIED IN PART OR IN
WHOLE WITHOUT THEIR CONSENT ALL DRAWINGS
ARE TO BE RETURNED WHEN NO LONGER IN USE.
MANUFACTURE OF PASTRY PRISM PUFF PASTRY DESIGN BY : REFLECTED CEILING FLAN
WALL SYMBOLS
A-03
PTR #: PRC #:
REPUBLIC ACT 545 BASE PRODUCTS CORPORATION DRAWN GCA
CEILING FINISHES
FILENAME
C2-3 UNIT 4, SAN JUAN RIVER DRIVE, CARMELRAY
DATE: PLACE: LOCATION: INDUSTRIAL PARK 2, BRGY. PUNTA, CALAMBA, LAGUNA SCALE: AS INDICATED 042718.dwg