SUPPLIER DOCUMENT REVIEW REFERENCE DRAWINGS

PERMISSION TO PROCEED DOES NOT CONSTITUTE ACCEPTANCE OR


APPROVAL OF DECISION DETAILS, CALCULATION. ANALYSIS TEST
METHODS OR MATERIALS DEVELOPED OR SELECTED BY SUPPLIER
AND DOES NOT RELIEVE SUPPLIER FROM FULL COMPLIANCE WITH
CONTRACTUAL OBLIGATIONS.

Code 1 ■ 1. WORK MAY PROCEED


2. REVISE & RESUBMIT, WORK MAY PROCEED SUBJECT TO
INCORPORATION OF CHANGES INDICATED.
3. REVISE & RESUBMIT, WORK MAY NOT PROCEED.
4. REVIEW NOT REQUIRED, WORK MAY PROCEED.

P.O. NO. ZOHR-400 ORIG.


EQUIP. TAG. 012100TA001 DATE February 21, 2017
ENPPI SUPP. DOC. NO. 193201DVDAS5874 REV. 04

36.O THK. SHELL PLATE 36.O THK. SHELL PLATE


(7-Nos. REQD.) (2-Nos. REQD.)

32.O THK. SHELL PLATE 32.O THK. SHELL PLATE


(9-Nos. REQD.) (1-Nos. REQD.)

36.O THK. SHELL PLATE


(1-Nos. REQD.)
(SCA.1-300)

28.O THK. SHELL PLATE 28.O THK. SHELL PLATE


(9-Nos. REQD.) (1-Nos. REQD.)

24.O THK. SHELL PLATE 24.O THK. SHELL PLATE


(9-Nos. REQD.) (1-Nos. REQD.)
(SCA.1-300) (SCA.1-300)

20.O THK. SHELL PLATE 20.O THK. SHELL PLATE


(9-Nos. REQD.) (1-Nos. REQD.)

EX-DE 04 02/02/2017 ISSUED FOR CONSTRUCTION M.KHISHIN M.HABIAN H.SAKR


EX-DE 03 23/01/2017 ISSUED FOR CONSTRUCTION M.KHISHIN M.HABIAN H.SAKR
EX-DE 02 10/01/2017 ISSUED FOR CONSTRUCTION M.KHISHIN M.HABIAN H.SAKR
EX-DE 01 20/11/2016 ISSUED FOR CONSTRUCTION H.K. M.HABIAN H.SAKR
EX-DE 00 20/10/2016 ISSUED FOR COMMENTS M.KHISHIN M.HABIAN H.SAKR
Validity Revision
Status Number Vendor Vendor Vendor Contractor Company
Date Description
Index Revision Prepared Verified Approved Checked Approved

Company Logo and Business Name Project Name Company Document ID:
16.O THK. SHELL PLATE 16.O THK. SHELL PLATE ZOHR
(9-Nos. REQD.) (1-Nos. REQD.) DEVELOPMENT PROJECT
193201DVDAS5874
Petrobel eni S.p.a. Job N.
Contractor Logo and Business Name Contractor Document ID:

------
Engineering for the Petroleum and Process Industries
Job N.
Vendor Logo and Business Name Vendor Document ID:

38.O THK. SHELL PLATE 38.O THK. SHELL PLATE ZOHR -1932-30-2-TK-0294
(9-Nos. REQD.) (1-Nos. REQD.) Job N.
Facility and Sub Facility Name Scale Sheet of Sheets

ZOHR ONSHORE - PHASE 1 AS SHOWN 1/1


SHELL PLATE DIMENSIONS Document Title Superseeded N.

Superseeded by N.
Plant Area Unit
F03 210