You are on page 1of 8

8

8
8
Sheet of Sheets
Company Document ID Contractor Document ID
3/8
Validity Revision
Status Number
193201DVGA28006 N/A
EX-DE 04

REVISION LIST
00 Issue for Comments
01 Issue for Comments
02 Issue for Design
03 Re-Issued for Design
04 Issue for Construction

HOLD RECORD
01 Refer to sheet 7 / 7
02 Refer to sheet 7 / 7
03 Refer to sheet 7 / 9
04 Refer to sheet 7 , 9 / 9

This document is property of Eni S.p.A.


It shall neither be shown to Third Parties not used for purposes other than those for which it has been sent.
Sheet of Sheets
Company Document ID Contractor Document ID
4/8
Validity Revision
Status Number
193201DVGA28006 N/A
EX-DE 04

TANK PROCESS DATA SHEET Rev.

1 SERVICE Off-spec Condensate / Slop Oil Storage ITEM 01-210-0-TA-001


2 UNIT SECTION ( NUMBER / NAME ) Unit 210 - Crude Oil Treatment - Off spec
3 PID REFERENCE 193201DPFM86567
4 TYPE DOME ROOF BLANKETING FUEL GAS
5 DESIGN DATA TANK PRESSURE PROTECTION
6 DESIGN PRESSURE (A) 0.5 (Note 1) barg MAX. INLET FLOW 77 m3/h 04
7 DESIGN VACUUM PRESS. -0.006 barg MAX. OUTLET FLOW 50 m3/h 04
8 DESIGN TEMPERATURE MIN. / MAX. -5 / 80 °C EXTERNAL OVERPRESSURE CASE BLANKETING FAILURE
9 INTERNAL DIAMETER 30,480 mm FLOW 400 Nm3/h 04
10 GEOMETRICAL HEIGHT (Note 31) 14,640 mm TANK EXPOSED TO FIRE (EMERG. HATCH) YES (Note 3) 04
11 CAPACITY GEOMETRIC 10,677 m3 LIQUID LEVELS 04
12 WORKING BETWEEN LLL AND HLL 9335 m3 HHLL 14,200 mm 04
13 CODE API STD 620 HLL 14,000 mm 04
14 STORAGE HOLD-UP 5 DAYS LLL 1,200 mm 04
15 BOTTOM SLOPE CONE UP LLLL 1,000 mm 04
16
17 FLUID AND OPERATING CONDITIONS
18 LIQUID STORED Off-spec Condensate / Slop Oil FLAMMABLE - EXPLOSIVE FLAMMABLE
19 VAPOR PRESSURE 0.1 barg HAZARDOUS SERVICE TOXIC
20 OPERATING PRESSURE (A) 0.1 (Note 1) barg SOUR SERVICE YES
21 OPERATING TEMPERATURE 48 °C EROSION, CORROSION DUE TO: (Note 4) 04
22 MAX SPECIFIC GRAVITY 0.95 CO2 0.02 weight%
23 FLASH POINT 37 HOLD °C H2S 0.02 (Note 12) weight% 04
24 POUR POINT N.A. °C CHLORIDE 16400 mg/l
25 SOLID CONTENT (Note 4) O2 ppb
26 LATENT HEAT OF VAPORIZATION 630 (HOLD) (Note 13) kJ/kg WATER 67 weight% 04
27 CHEMICAL / ADDITIVE QUANTITY mol% AROMATICS 5.3 weight% 04
28 MATERIAL NOTES
29 MATERIAL Low Temperature Carbon Steel (A) Pressure of gas phase (without liquid static head).
30 NACE MR0175/ISO 15156 HIC None (B) Sparing philosophy includes one spare PSV 04
31 CORROSION ALLOWANCE BOTTOM - 1st COURSE 3 mm
32 CORROSION ALLOWANCE OTHER COURSES - ROOF 3 mm
33 INTERNAL LINING YES (Note 15)
34 LINING HEIGHT mm
35 LINING THICKNESS mm
36 INSULATION NONE
37 INTERNALS SS 316L
38 CATHODIC PROTECTION INTERNAL YES
39 ACCESSORIES
40 DESCRIPTION No. Remarks / Data sheet
41 PSV N+1 (Notes 3, 5, 14)
42 BREATHING VALVE
43 SUCTION HEATER
44 GAUGING AND SAMPLING HATCH 1
45 EXTERNAL BOARD LEVEL INDICATOR 1
46 COOLING RING (Note 6)
47 FOAM CHAMBERS (Note 6)
48 PROPELLER MIXER
49 JET MIXER
50 HEATING COIL
NOTES

This document is property of Eni S.p.A.


It shall neither be shown to Third Parties not used for purposes other than those for which it has been sent.
Sheet of Sheets
Company Document ID Contractor Document ID
5/8
Validity Revision
Status Number
193201DVGA28006 N/A
EX-DE 04

MECHANICAL DATA SHEET Rev.

1 ITEM 01-210-0-TA-001 No. REQUIRED 1 CONSTRUCTION DATA


2 DESIGN DATA BOTTOM TYPE APEX-UP SLOPE 1 % MASS kg
3 DESIGN DIAMETER 30,480 mm HEIGHT 14,640 mm HIGH PERIPH. RING Thk. mm W mm 04
th
4 CODE: STD. API 620 12 ED. ADD. HIGH CENTR. PLATE Thk. mm BUTT LAP
5 APPENDIX: L&N LOW PERIPH. RING Thk. mm W mm
6 SHELL LOW CENTR. PLATE Thk. mm BUTT LAP
API 620
7 DESIGN BOTTOM TOTAL MASS
8 AMBIENT TEMPERATURE: MIN 0 MAX 40 °C SHELL THICKNESS mm HEIGHT mm
9 WIND VELOCITY 174 km/h MDMT Note b °C 1st COURSE Note a Note a Note a
10 Ss 0.68g S1 0.32g 2nd COURSE
11 EARTHQUAKE SOIL TYPE E IMPORT. FACTOR 1.25 / 1.5 3rd COURSE
12 ASCE 7-10 4th COURSE
13 RAINFALL 56 mm/h SNOW - N/m² 5th COURSE
14 VALVES SETTING 6th COURSE
15 BREATHER + 300 - mbar 7th COURSE
16 EMERGENCY + 400 - - mbar 8th COURSE
17 PRESS./VACUUM + - - - mbar 9th COURSE
18 MATERIALS 10th COURSE
19 BOTTOM PERIPHERAL RING A 516 Gr.60N COMP. RING Note a WIDTH Note a Note a 04
20 PLATES CENTRAL PLATES A 516 Gr.60N STIFFENING RINGS 04
21 FROM COURSE No. 1 TO 7 A 516 Gr.60N CALCULATED WITH SHELL: X CORRODED UNCORRODED 04
22 SHELL Y.S. T.S. N/mm² TOP INTERMEDIATE INTERMEDIATE INTERMEDIATE
23 FROM COURSE No. TO A mm A mm A mm A mm
24 PLATES Y.S. T.S. N/mm² B mm B mm B mm B mm
25 C mm C mm C mm C mm
26 COMP. RING A 516 Gr.60N Thk. mm Thk. mm Thk. mm Thk. mm 04
27 ROOF PLATES A 516 Gr.60N SHELL TOTAL MASS 04
28 WINDGIRDERS A 516 Gr.60N ROOF TYPE DOME SLOPE 10 Degree R= D 04
29 STRUCTURES EXT. A 36 PLATES Thk. mm BUTT X LAP
30 STRUCTURES A 36 SUPPORTED BY
31 PIPES A 106 Gr. B
32 FLANGES A 105 N ROOF TOTAL MASS
33 GASKETS GYLON Styles 3500 or equivalent INTERNAL FLOATING ROOF
34 BOLTS / NUTS A320 L7 / A194 Gr 4 ACCESSORIES TOTAL MASS
35 Y.S.=YIELD STRENGTH T.S. =TENSILE STRENGTH TANK TOTAL MASS
36 LIST OF ACCESSORIES and FITTINGS SUPPLIED by VENDOR
37 POSITION SERVICE ITEM NUMBER SIZE REMARKS REFERENCES / DRAWING
38 BOTTOM ANCHOR BOLTS AB Note 8 Note 8 Note 8 TS SPA ENG SETK 314
39 SHELL HELICOIDAL STAIRWAY HS 1 per STD. TS SPA ENG SETK 309
40 SHELL NAME PLATE NP 1 per STD. TS SPA ENG SETK 347
41 SHELL NAME PLATE HOLDER NPH 1 per STD. TS SPA ENG SETK 350
42 SHELL GROUNDING GR 3 per STD. TS SPA ENG SETK 340
43 ROOF CIRCUMF. HANDRAIL CH 1 per STD. TS SPA ENG SETK 325
44 ROOF RADIAL HANDRAIL RH 1 per STD. TS SPA ENG SETK 327
45 ROOF BREATHER VALVE on V2, V4 Note 8 Note 8 Note 8
46 ROOF EMERGENCY VALVE 1 Note 8 Note 8
47 SHELL/ROOF PIPING SUPPORTS PS Note b Note b See SPC: Note b
48 ROOF EXT. BOARD LEVEL INDIC. on L4 1 Note 8
49 SURFACE TREATMENTS NOTES
50 X EXTERNAL X SHOP SITE BY OTHERS a) To Confirm / Defined by PETROJET. 04
BLASTING
51 X INTERNAL X SHOP X SITE BY OTHERS b) Piping supports size , numbers and spec. Shall be confirmed during
52 X EXTERNAL X SHOP SITE BY OTHERS detail engineering phase.
PRIMER
53 INTERNAL SHOP SITE BY OTHERS
54 EXT. TOUCH UP & PAINTING SHOP X SITE BY OTHERS
55 P.W.H.T PROCESS CODE
Form Code: FORM-COR-ENG-SETK-013-E Sh. 1/9 Rev.01/15

This document is the property of Saipem SpA. All rights reserved.


Sheet of Sheets
Company Document ID Contractor Document ID
6/8
Validity Revision
Status number
193201DVGA28006 N/A
EX-DE 04

TANK NOZZLES Rev.

1 NOZZLES
2 ITEM No. SIZE TYPE RATING FACING SERVICE REFERENCES / NOTES
3 N1 1 10" WN 150 RF Liquid Inlet with Deep Pipe
4 N2 1 8" WN 150 RF Liquid Outlet with vortex Breaker 04
5 N3 1 6" WN 150 RF Inbreathing (2) 04
6 N4 1 6" WN 150 RF Outbreathing (2) 04
7 N5 1 3" (Note 7) WN 150 RF Pump minimum flow (1)
8 N6 (Note 8) (Note 8) WN 150 RF Pressure / vacuum relief valve (3)
9 N7 1 2" WN 150 RF Utility connection
10 N8 A/B 2 (Note 6) 2" WN 150 RF Foam inlet (Note 6 & 17) 04
11 N9 1 6" WN 150 RF Vent 04
12 N10 A/B 2 6" WN 150 RF Drain 04
13 N11 1 6" WN 150 RF Gauge Hatch Note 9
14 N12 A/B/C/D 4 2" WN 150 RF Sample connection (Note 11)
15 N13 1 (Note 8) WN 150 RF Emergency Hatch
16 M1 A/B 2 24" WN 150 RF Shell Manhole (5) (Note 9)
17 M2 A/B/C 3 24" WN 150 RF Roof Manhole (5) (Note 9) 04
18 M3 1 30" WN 150 RF Shell Manhole 04
19 .
20
21
22
23
24
25
26 INSTRUMENTATION NOZZLES
27 ITEM No. SIZE TYPE RATING FACING SERVICE REFERENCES / NOTES
28 CN1 1 4" WN 300 RF Level Transmitter (4) Note 17
29 CN2 1 4" WN 300 RF Level Transmitter (4) Note 17
30 CN3 1 (Note 8) WN 300 RF External board level indicator (4)
31 CN4 1 2" WN 300 RF Shell Temperature Transmitter (4)
32 CN5 1 3" WN 300 RF Roof Pressure Transmitter (4)
33 CN6 A/B 2 2" WN 300 RF Level Gauge (Interface)
34 CN7 1 2" WN 300 RF Pressure Gauge
35
36
37
38
39
40
41
42
43
44
45 NOTES
46
47
48
49
50
This document is property of Eni S.p.A.
It shall neither be shown to Third Parties not used for purposes other than those for which it has been sent.
Sheet of Sheets
Company Document ID Contractor Document ID
7/8
Validity Revision
Status number
193201DVGA28006 N/A
EX-DE 04

TANK SKETCH Rev.

1 04
2
3
4
5
6
7
8
N11
M2 C
9 CN1
10 N13

11 M2 B CN3
CN2 M2 A
N3
12
N4 N6
13
N9 CN5
14
15
16
N8A
17
18
N8B
19 HHL= 14,200mm
M1 B
20
21
Hold mm (Note 2) HLL= 14,000 mm
N1
22
N5
23
H = 14,640 mm

24 N7
N12 D
25 (Note 11)
26 M1 A N12 C

27 (Note 11)
28 CN6A N12 B

29 CN4 (Note 11)


30 CN6B LLL= 1,200 mm N12 A

31 CN7 V.B. N2
32 LLLL= 1,000 mm
33 M3
N10 A/B
34
35
36
37 ID= 30,480 mm
38
39
40
41
42
43
44
45 NOTES
46
47
48
49
50
This document is property of Eni S.p.A.
It shall neither be shown to Third Parties not used for purposes other than those for which it has been sent.
Sheet of Sheets
Company Document ID Contractor Document ID
8/8
Validity Revision
Status number
193201DVGA28006 N/A
EX-DE 04

NOTES Rev.

1 1 Pressure of gas phase (without liquid static head).


2 2 Inlet nozzle elevation to be finalised on the basis that the inlet nozzle shall be 500 mm above Degassing Booot bottom line.
3 3 In addition to Pressure / Vacuum Relief Valve (PSVs), Vendor shall provide an emergency hatch to protect the tank in case of 04
4 external fire exposure.
5 4 Tank in not erosive service. Anyway the stored fluid may contain sand (Medium granulometry: 40 m)
6 5 Sparing philosophy includes one spare PSV
7 6 Foam distribution system shall be provided by Vendor; it shall be defined in accordance with NFPA11 04
8 7 Preliminary size, to be confirmed later.
9 8 To Confirm / Defined and supply by tank PETROJET. 04
10 9 To be defined / confirmed by PETROJET. 04
11 10 By Instrument Department.
12 11 Nozzle N12 A/B/C/D to be located every 3.0 m, starting from tank bottom.
13 12 Max H2S content 0.05% weight.
14 13 Latent heat estimated at relieving conditions
15 14 PSV settings: +0.4 barg, -0.002 barg.
16 15 Epoxy lining.
17 16 Manways to be complete with cover, bolting, gasket, davit and handles
18 17 Nozzle with stilling wells.
19 18 PETROJET shall, under his own responsibility, perform all mechanical calculations of all tank parts in order to 04
20 meet the design codes and datasheet requirements and guarantee the equipment stability, all the thicknesses
21 and weights indicated on mechanical data sheet or supplier offer are given only as a guide, PETROJET shall be
22 responsible to determine the final thickness and weights of all tank parts in detailed engineering phase.
23 19 PETROJET, based on the code and design data and in accordance with the flow capacity of standard valves 04
24 selected, shall verify the quantities and dimensions of the vents, breather and emergency valves shown on the
25 data sheets.
26 20 Size, number and location of anchor bolts shall be calculated and determinate by PETROJET. dimensions and 04
27 number shown on data sheets shall be considered as minimum requirement.
28 21 safe access shall be provided to all nozzles on tank shell above 2 meter from grade by means of permanent or Portable 04
29 access according to orientation drawings (during detailed engineering phase).
30 22 All gaskets shall be asbestos-free and certificated for vapor/gas low emission (for example TA-LUFT certified).
31 23 All RF flanges shall have smooth finish facing with 125 AARH RA and waviness height of 0.05mm max.
32 24 Bolt centers of flanges shall evenly straddle vertical axis.
33 25 All the internals shown on the data sheets will be detailed by PETROJET and shown on the constructive
34 drawing.
35 26 Loads superimposed by platforms and brackets and loads resulting from connected piping shall be
36 considered in the tank design.
37 27 Loads resulting from the piping on the tank's nozzles shall be as per project specification no.
38 SPC-SPA-ENG-SE-510-E, CLAUSE 4.10.
39 28 Level instrument to be provided to monitor interface r-- level in proximity of liquid outlet nozzle 04
40 29 Water cooling distribution system for shell and roof shall be provided by Vendor. Tha system shall be designed in 04
41 accordance with API2030
42 30 Nozzles for foam inlet shall be in diametrica lly opposed positions 04
43 31 PETROJET Shall Consider Adequate Free Board In Tank Geometrical Height To Accommodate Liquid Sloshing Wave 04
44 During Earthquake As Per API STD.
45
46 GENERAL HOLDS
47 A All data shown on this ds are based on short cut (low water cut) preliminary estimation of the major modifications 04
48 to be confirmed after the simulation Rev,02 freezing
49
50
This document is property of Eni S.p.A.
It shall neither be shown to Third Parties not used for purposes other than those for which it has been sent.