You are on page 1of 5

PREFACE

Thank you I pray to Allah Swt for His blessings, mercy, and guidance, I can
complete this job training activity, that has been implemented a at PT EXPRO
INDONESIA on 1 February until 30 March 2019.
This practice is one of the requirements that must be taken to complete the
study in S1 Department of Petroleum Engineering, College of Oil and Gas
Technology (STT MIGAS) Balikpapan.
In developing and implementing this practice many people who have helped
me so that I would like to thank:
1. Mr. Lukman ST, MT, as Chairman of Oil and Gas STT Balikpapan.
2. Mr. Abdi Suprayitno ST, M. Eng., As Chairman of the Department of
Petroleum Engineering Oil and Gas STT Balikpapan.
3. Mr. Sri Konsep Harum Wicaksono, ST, MT, as supervisor Job.
4. Mrs. Irma Andrianti, S.Pd., MT, as the supervisor of Academic.
5. Both of my parents were always pray, give support, and compassion is endless
- stopping for me.
6. As Mr. Yulias Fauzie Base Supervisor PT. Expro Indonesia Balikpapan Base,
thank you for the opportunity given practical work ..
7. Mr. Erfian Nor as Leader Subsea Safety System PT. Expro Indonesia
Balikapan Base
8. Mr Ervian Nor and Mr. Asremanto Matulatuwa, Mr. Richard, Mr. Yuliadi,
Mr. Hardiansyah as a mentor in the field.
9. As well as other engineers, who continue to give time amid the bustle of work
for taking our teaching and provide additional knowledge that is very useful
for us ..
Authors realize that there are many shortcomings in the preparation of Work
Report and the authors expect their innovative suggestions and criticism from
readers in order to excellence in many aspects of this report.
Hopefully Work Report will be useful for me in particular and for the
student / STT Migas Balikpapan for both current and future.

iii
Hopefully Work Report will be useful for me in particular and for the
student STT Migas Balikpapan for both current and future.

Balikpapan, 13 April, 2019

Composer
Fajrul Muin

iv
TABLE OF CONTENTS

TITLE PAGE ...............................................................................................i


VALIDITY SHEET .......................................................................................ii
PREFACE ............................................................................................................. iii
TABLE OF CONTENTS .......................................................................................v
LIST OF FIGURES ............................................................................................ vii

CHAPTER I INTRODUCTION..........................................................................1
1.1. Background ...........................................................................................1
1.2. Purpose .................................................................................................2
1.2.1 The purpose of practical work ...................................................2
1.3. Scop Of Job Training.......................................................... ..................2
1.4. Time And Place Of Implementation .....................................................2
CHAPTER II THEORITICAL STUDY .............................................................4
2.1Well Control During Subsea Completion and Workover Operations ..4
2.1.1 Subesea Well Control.......................................................................6
2.1.2 Riser Margin ....................................................................................6
2.1.3 Kick Tolerance .................................................................................7
2.1.4 Choke Line Friction .........................................................................7
2.1.5 Handling Trapped Gas In The Blow Out Preventer Stack ...............7
2.1.6 Riser Kill ..........................................................................................8
2.1.7 Shut-In Procedure.............................................................................8
2.1.9 General Shut-In Procedure Drill Pipe ..............................................9
2.1.10 Shut In Procedure Whilst Circulating ..........................................10
2.2.1 Shut-In ProceduresWhilst Running Or Pulling A Completion ......11
2.2.2 Running Sand Control Screens Or Slotted Liner ...........................11
2.2.3 Running Control Lines And Instrument Cables .............................11
2.2.4 Pulling Spent Tubing Conveyed Perforating Guns ........................11
2.2.5 Pulling Damaged Completion Tubing ..........................................12
2.3.1 Pre-Workover Planned Well Kill ...................................................12

v
2.3.2 Establishing A Circulation Path .....................................................12
2.3.3 Handling Hdrocarbons ...................................................................13
2.3.4 Riser Disconnect ............................................................................13
2.3.5 Planned (Nonemergency) Disconnect............................................14
2.3.6 Emergancy (Unplanned) Disconnect .............................................15
2.3.7 Reentering A Well Following A Disconnect .................................16
2.3.8 WellBore Acces: Horizontal Trees ................................................16
CHAPTER III COMPANY PROFILE .............................................................20
3.1 Company Profile ..................................................................................20
3.2 Expro House Rules ...............................................................................22
CHAPTER IV FIELD ANALYSIS

4.1 Understanding Subsea Safety System ..................................................26

4.2 Development Of The System ..............................................................27

4.3 Well Control During Subsea Intervention Operations ........................32

4.4 Planned Disconnection With Intervention Tools In The Well .............32

4.5 Leak Between The Subsea Test Tree And The Surface Test Tree .......33

4.6 Subsea Safety System-Main Component .............................................34

4.7 Subsea Test Tree (SSTT) .....................................................................35

4.8 Surface Flow Tree (SFT) or Flowhead ................................................37

4.9 Lubricator Valve ..................................................................................39

4.9.1 Retainer Valve ..................................................................................42

4.9.2 Annular Slick Joint (Optional) ..........................................................44

4.9.3 Shear Sub ..........................................................................................45

4.9.4 THRT/TCRT Adapter Joint Assembly .............................................46

4.9.5 Umbilical Reeler Unit .......................................................................47

4.9.6 Hydraulic Contol Panel .....................................................................49

vi
CHAPTER IV CONCLUSION & WAY FORWARD

5.1 Conclusion ............................................................................................50

5.2 Forward ...............................................................................................50

REFERENCES

References ..................................................................................................52

vii

You might also like