Organization : Snipe Engineers Private Limited, Chennai.
Designation : Senior Electrical Testing and Commissioning Engineer.
Experience : 3 Year 3 Months And Still Date
Nature of Work
Testing and Commissioning Of Power Transformer, CT, PT/CVT, Circuit Breaker, Disconnector, Earth
switch Switchgear , Electro Magnetic Relays, Motor Testing, Surge Arrester, HT Cable as different
manufactures.
Transformer special test for Tan delta test and SFRA test.
Schematic modification, circuit interlocks (mechanical, electrical and busbar) checking for
LV/MV/HV/EHV Substation.
Knowledge Of Line Protection, Trasformer Protection & REF Protection, Disturbance Recorder And
Isolator Logics.
Co-Ordination With Client In As Built Scheme Drawing Submission, Test Report Submission, As Build
Cable Schedule Submission And All Site Activity To Satisfy The Customer.Trouble Shooting Of All
Electricals Equipments,Control & Protection Circuit.
Domestic Assignment :
Client : ABB
Duration : July’16 to October’16
Duties and Responsibilities
Ct,Pt Cvt,Transformer.
Organization : KPTCL
Project : 220KV BAY EXTENSION SUBSTATION.
Client : ABB.
Duration : November’16
Duties and Responsibilities
Testing of 220 KV Switchyard CT,VT,SF6 BREAKER,CVT,ISOLATOR.
Organization : TSRANSCO.
Project : 400/220 KV ASUPAKKA SUBSTATION.
Client : GE.
Duration :April’17 to June’17
Duties and Responsibilities
Testing of 400/220 KV CONTROL RELAY PANEL AND GE NUMERICAL RELAY
TRANSFORMER,REF,OC/EF PROTECTION AND LINE PROTECTING.
Client : AAB
Duration : July’17 to October’17
Duties and Responsibilities
Testing & Commissioning of 50 MVA CGCL-Transformer And
(CT,VTCVT,ISOLATOR,EARTH SWITCH,SF6 BREAKER and Relays.
HIPOT Test For HT cables.Tandelta Test Performed For 6.6kv Ct,Pt
Cvt,Transformer
Client : ABB
Duration : January’18 to March’18
Duties and Responsibilities
Testing & Commissioning of 12 MVA,100MVA Transformer And CT,PT,VACCUM
AND AIR BREAKER FOR SWITCHGEAR (LT AND HT)PANELS
Transformer Testing And Commissioning HIPOT Test For HT cables AND BUSBAR.
Client : ABB
Duration : March’18 to April’18
Duties and Responsibilities
Testing & Commissioning of 50 MVA,4.4MVA(5NOS)Transformer And
(CT,VTCVT,Isolator,Earth Switch,SF6 Breaker And Relays For Rmu Panels And
Switchgear Panels.
All ICR Transformer Testing And Commissioning HIPOT Test For HT cables.
1. OMICRON(356)
2. MEGGER
3. SCOPE
4. ELTEL
SCHEMES HANDLED
1. ABB
2. GE
3. SCHNIDER
4. L&T
5. Alstrom
6. Scope