Professional Documents
Culture Documents
12.12.2017
INITIAL SURVEY FINAL SURVEY
21:00
INITIAL
520.9 mt
45.3 mt
52.6 mt
0 mt
105 mt
16424 mt
17147.8 mt
1.945 m
97.8046 m
53.026 m
64304.200 m
61151.981 m
3152.219 m
1.0240
Swell 0,5 mtr
185.00 m
10822.28 mt
FINAL
mt
mt
mt
mt
mt
mt
mt
0 mt
0.000 m
#N/A m
#N/A m
#N/A m
#N/A m
#N/A m
1.0240
swell 0,5 mtr
Vysochyn O.
CARGO DISTRIBUTION FOR REQUESTED TRIM
Actual Draft
MTC1 (MM+50)
MTC2 (MM-50)
Diff. (MTC) 83722
12.35
83770
INTERPOLATION
Initial survey
corresponding draft displacement
1st tabulated draft 12.55 841.200 1st tabulated displ.
QM draft 12.5700 841.520 Interpolated QM displ. (mt)
Final survey
corresponding draft displacement
1st tabulated draft 9.50 1000.00 1st tabulated displ.
QM draft 9.5250 1500.00 Interpolated QM displ. (mt)
2.00000
0.32
200.00
2.50000
500