I Project

I Submittal Number Package NS06

Specialist Roof
D u b a i Mall DM02 - N S 0 6 - 1047
Structures

-- - -

Document Reference DM-NS06-OT-42

Document Description Design of Steel Work Connections

1 Location Fountain oasis

1 Revision

I AIico Sub-contractor Eversendai Engineering


I
EVERSENDAI ENGINEERING L.L.C Doc. No: DM-NS06-OT-42, Rev-2

BURJ DUBAl DEVELOPMENT- DUBAl MALL

BURJ DUBAl DEVELOPMENT - DUBAl MALL


FOUNTAIN OASIS- STRUCTURAL STEEL WORK
(STEEL TO STEEL CONNECTIONS)

Prepared By: , Approved By:

fl
G.N. ijayaprakash B.N.Rao

EVERSENDAI ENGINEERING LLC


Al Quasis Industrial Area # 1,
P.0 Box : 29537
E-Mail : design@eversendai.net
20' Dec 2006

CONNECTION DESIGN

Tne nformaaon conraned herein s the so e propnelav ngnl of Eversenaa Engneenng and the possessor agrees to rna'nlam Vl's inlormalon in su'ctest con1dence.
The conlenls sna not w reprodJced. copea or ovJlged to any tnlro parry, n wnole or n part, ~~Ino.1
Ine wrinen consenlano con1rrnauon of Eversendal Eng~neer~ng
EVERSENDAI ENGINEERING L.L.C Doc. No: DM-NS06-OT-42, Rev-2

BURJ DUBAl DEVELOPMENT- DUBAl MALL

EXECUTIVE SUMMARY

CONNECTION DESIGN

The inionnationcontained herein is h e sole proprietary right of Everrendai Engineering and h e possessor agrees to maintain his informalion in strictest confidence.
' The contents shall not be reproduced,copied ordivulged to any third paw, in whole or in part, wihoutthe wntlen consent and confirmation of Eversendai Engineering
EVERSENDAI ENGINEERING L.L.C Doc. No: DM-NS06-OT-42, Rev-2

BURJ DUBAl DEVELOPMENT - DUBAl MALL

1.0 GENERAL INFORMATION


The purpose of this document is to confirm the Design of Structural steel connection details of steel
structures of Fountain oasis for Dubai Mall, Dubai .The purpose of this Design method statement is to define the
structural specification, Design codes & standards, Type of connections, etc., to satisfy the design forces
offered by the Consultant. As such it will be a brief note to whom ever going to perform the check, use and
interface of the same. It will also be used to inform the relevant Approval Authorities.

2.0 SCOPE OF WORK


I
The scope of the design method statement is to describe the Design of connection details for Structural steel
works for Fountain oasis for Dubai Mall, Dubai

3.0 PROJECT INFORMATION


The Dubai Mall consists of about 22 buildings. The scope of the work for Dubai Mall is limited to Design of
Connection Designs for Beams, columns & Roofs (including Trusses and Bracings), etc., All the structural steel
connections for the Truss in the Fountain oasis have been checked and designed as per the connection design
forces from the member forces Submittal no.DM02-JV-SC-5275, The relevant sketches, which show the
connections, are attached wherever required.

4.0 CODES & REFERENCES


BS 5950-1: 2000
, 1
Structural use of Steel work in Building, Part - 1. Code of Practice for Design in - Rolled and welded sections.

5.0 STRUCTURAL LOADING


The member sizes and its loads for the design calculations are taken out from the Member end design forces
issued by the consultant.

CONNECTION DESIGN

The informahon contained herein is the sole proprietary right of Eversendai Engineering and h e possessor agrees to maintain this information in strictest confidence.
The contenlsshall not be reproduced. copied or divulged to any third pa*. in whole or in part, withoutthe wntten consent and confirmation of Eversendai Engineering
EVERSENDAl ENGINEERING L.L.C Doc. No: DM-NS06.OJ-42, Rev-2

BURJ DUBAl DEVELOPMENT- DUBAl MALL

6.0 SPECIFICATION OF PLATES AND MEMBERS

All structural steelwork shall be by accordance with BS 5950-2000 of Grade


Grade of material and Plates - 50B

7.0 SPECIFICATION OF BOLTS

Grade of Bolts - HSFG TYPE - 2 18.8

8.0 SPECIFICATION OF WELDING


, 'i Strength of the Weld = 70ksi
Welding Electrodes = E 7 0 M As per AWSD1.1 (or equivalent)

CONNECTION DESIGN

The information contained herein is the sole proprietary right of Eversendai Engineering and h e possessor agrees to maintain this informason in strictest confidence.
The cantenls shall not be reproduced, copied or divulged toany lhird party in whole or in part,vrilhout !he wrillen consent and confirmason of Eversendai Engineering
EVERSENDAI ENGINEERING L.L.C Doc. No: DM-NS06-OT-42, Rev-2

BURJ DUBAl DEVELOPMENT- DUBAl MALL

CONTENTS

CONNECTION DESIGN

The inlormalion contained herein is the sole proprietary right of Eversendai Engineering and !he possessor agrees to maintain this information in strictesl confidence.
The contents shall not be reproduced, copied or divulged lo any third pa*, in whole or In pafi, without he wrinen consenland confirmalion of Eversendai Engineering
EVERSENDAI ENGINEERING 1.L.C Doc. No: DM-NS06-OT-42. Rev-2

BURJ DUBAl DEVELOPMENT DUBAI MALL -


CONTENTS PAGE NO

Executive Summary 2

Contents 5

Reply t o consultant comments 9

Member Schedule & Member Force Table 13

Key Plans and Connection Details 16

Connection Design 28

Detail WC-01 29

Detail WC-02 39

Detail WC-03 43

Detail WC-04 46

Detail WC-05 49

Detail WC-06 55

Detail WC-07 57

Detail WC-08 60

Detail WC-09 70

Detail WC-10 73

CONNECTION DESIGN

The inlormalion contained herein is ihe sole proprietary right of Evenendai Engineering and lhe possessor agrees lo maintain this inlomation in strictesl confidence.
The contents shall not be reproduced. copied or divulged io any lhird party in whole or in part. withoutlhe wrinen consent and confirmation of Eversendai Engineering
EVERSENDAI ENGINEERING L.L.C Doc. No: DM-NS06-OT-42, Rev-2

BURJ DUBAl DEVELOPMENT- DUBAl MALL

CONTENTS PAGE NO
Detail WC-11 79

Detail WC-12

Detail WC-13

Detail WC-14

Detail WC-15

Detail WC-16

Detail WC-17

Detail SC-01

Detail SC-02

Detail SC-03

Detail SC-04

Detail SC-05

Detail SC-06

Detail SC-07

Detail SC-08

Detail SC-09

Detail MC-01

Detail MC-02

Detail MC-02A

CONNECTION DESIGN

The information contained herein is the sole proprielay righl oi Evenendai Engineering and h e possessor agrees lo maintain lhis information in strictest confidence.
The conlenls shall no1be reproduced, copied or divulged to any lhird party in whole or in part, wilhoulthe wrillen consent and confirmalion oi Eversendai Engineedng
EVERSENDAI ENGINEERING L.L.C Doc. No: DM-NS06.OT-42, Rev-2

BURJ DUBAl DEVELOPMENT- DUBAl MALL


CONTENTS PAGE NO

Detail MC-03 202

Detail MC-04 206

Detail MC-05 211

Detail MC-06 216

Detail MC-07 221

Detail MC-08 227


' I

Detail MC-09 232

Detail MC-10

Detail MC-11

Detail MC-12

PURLIN CLEAT DESIGN

ANNEXURE

SAMPLE CALCULATION FOR MC-11

SAMPLE CALCULATION FOR WC-04

SAMPLE CALCULATION FOR WC-17

The information contained herein is the sole proprietaiy right of Evenendai Engineering and me possessor agrees to maintain this information in strictest confidence.
The contents shall not be reproduced. copied or divulged to any third party. in whole or in part, without the written consent and confirmation of Eversendai Enginee"ng
EMRSENDAI ENGINEERING LL.C Doc. No: DM-NSWOT-42, Rev*

BURJ DUBAI DEVELOPMENT- DUBAI MALL

REPLY FOR CONSULTANT COMMENTS

CONNECTiON DESIGN

The infwmalon m n l a h d her& is me sole prop^ h h t of Eve~endalEngineEd and mepnesror agrees bmamlan thisinlmaUon nsbicklmnftdence.
The mntenrsrclal not be repmduced, w p i d w diilged to any !hid parP/,in wh& or h part W t ! h e wriltm msentacdmlirmabon of Evenemhi Enginm'ng
slnyan
10 sa6ueu aqtjo uo!!enu!luoa aqt lo, lauau!ls y ~Z L l
'sJauau!cs in!uan aqtfiu1q3undhle!ved
Zi9OE1'd8'OSA3'3W'lO:ON ale sale1dle1n6uulse pafiuwea aq lleqs Yauau!ls qaM
S M ul~a ~ e 3u a y e l 'luawlumdad se patepdn uaaq seq i!elaa leln6ueul g uauau!ls uo!!enu!luoa a6ueu lm!van a q l
1 -l l V l 3 L190E1.'d~OS'A3'3W'lO:ON:3M~
slbelap uo!13auuo3 s

Z/~OEl~dXOP/~3'3~lO:ON 'dn 1g ampq aleid s!ql


3 ~ u!aam lualulum lad se uanB s! a l o ~ 10 qtealuapun ot pap la^ aq lleqs s~auau!lsl=!ven IW
q- i 1 v ~ 3 a

8C-3s 10
lassnfi aqt a1 lenba 1q6!aq a41 ol>auafi!ls [ m y a n y q l ZL
sl!qap d n ~ o l qa46 g waq3
esea(dsuo!te301 asaqt oc s s a x p l a ou
~ ley1 sluaas II
ZIPOEl~dtlOSA33W'LO:ON 'SU!P~Maql oi sane 6u!~eqcln3u!p &an
u! ale3 u a y e l .lualulum lad se palepdn uaaq seq i!e!ag s! I! se IesodoJd an!lelualle s!qt ap!no~dg hpn~saseald
E-1 V lIPOEl'~~OS'A3'3W'LO:ON:SMO

sl!elap uojl3auuo3 p

.tualuwo3~adse pappv ' P ~ P Paq~ 01 s! e 81.2


'6u!ze16 g 6u!ppep oc
sple6al q l ! 03!1v
~ ~I!M pa(eu!p~amaq at aneq s6u!uado
ZiEOEi'd8'Os/~3'3W'lO:ON ~ e 1 n 3 ~aldluexe
!3 ~oj'1013e11uo3Lq paleu!p~oa3aq 01
3 ~ u!aa ~ u an y e l no ale suo!sualu!p )no ~ a s p a g ! ~ aq
a n at s! tualuuoa s ! q r ~ LIEOEL'~~OS'A~'~W'L.O:ON:~MO

uo!pas g uo!lenala s s n ~ l E

lualuuo3 a q dad
~ se pas!naj sl u o ! l n o ~auc @
L aIs s ! le3!vaA a281
'6u!ze169 fiu!ppela 01
sple6al UM!I oa!lv U!!M paleu!plom aq 01 aneq s6u!uado
ZIZOEL'~~'OS'A~'~W'LO:ON lelnll!-J aldluexa loj-Jol3elluo3hq paleu!ploo3 aq oc
3 ~ u!aa ~ u an y e l no ale suo!suaw!p tno las'pagyan aq ol s! luawluo3 s ! r l l l
LIZOEI'dwOS'A31W'lo:oN:3Ma
uo!lsas g uo!tenala s s l u l
Z

.6u!ze16 g 6u!ppel:, 01 LlLOE~d~OS'A3'3W'lO:ON:3MO


sple6al q l ! 03!1v
~ q l ! paleu!pmm
~ aq 01 aneq s6u!uado
L/LOEl'd8'OSA3'3YYYYlOO'ON le!n3~!3a(dluexa,oj-rot~e,luo~KqpaIeu!p,m;, aq 04
U! am uayel YO ale suo!sualu!p *no laspagyan aq 08 s! y a w u r n sq1.l 1ualua6~euv(elaua3 1008 1

N0113V Ald3a lN3WW03 N011V301 ON'S


S.NO LOCATION COMMENT REPLY ACTION
DETAIL - 18
Provide 10 thk stiffener. Stiffener is provided as per the comment. Taken care in DWG
NO:Ol.ME.EV.5O.RF.l30612
DETAIL- 19
Please review the depth ofthe sketch on the sketch. Detail has been updated as per the comment. Taken care in DWG
Provide 10 thk face plate on bottom side of the gusset. NO:Ol.ME.EV.5O.RF.1306/2

DETAIL 22-
Is this space enough for root welding ofgusset for SC- Detail has been updated as per the comment. Taken care in DWG
OSPlease check 8 revise the connection NO:Ol.ME.EV.50.RF.I30612
accordingly.Please show weld blown up details.

Please check 8 make sure as bottom faces shall have


l o be alinged at the same level.

6 Connection details

DWG:NO:0l.ME.EV.50.RF.l307M DETAIL 23-


Please curtile the bottom spred as commented 8 Detail hasbeen updated as per the comment.& also Taken care in OWG
increase the plate thickness as required design design is performed. NO:Ol.ME.EV.50.RF.130712
calculation. 8 also In document
pageno:l81
DETAIL - 25
Please curtile the bottam spread as commented 8 Detail has been updated as per the comment. Taken care in OWG
increase the plate thickness as required design NO:Ol.ME.EV.50.RF.130712
calculation.
DETAIL - 26
16 Thk stiffener for flange continuation of verticals. Detail has been updated as per the comment.
DETAIL - 26
Provide sectional detail. Taken care in DWG
NO:Ol.ME.EV.5O.RF.l30712
DETAIL - 27
Please show weld blow up detail 8 sequence offit up for Detail has been updated as per the comment. Taken care in DWG
stifeners 8 cleats welding woks. NO:Ol.ME.EV.SO.RF.l30712
Provide 10 Thk stiffener.

DETAIL - 28
Add 12Thk stiffener plate. Stiffener plate is added. Taken care in DWG
NO:Ol.ME.EV.SO.RF.l30712
DETAIL - 29
Please curtile the bottom spred as commented 8 Detail has been updated as per the comment. Taken care in DWG
increase the plate thickness as required design NO:Ol.ME.EV.50.RF.130712
calculation.
-S.NO LOCATION COMMENT REPLY ACTION

7 Connection details
DWG:NO:Ol.ME.EV.50.RF.l308H DETAIL-30
Please reduce this cantilever distance to the minimum Detail has been updated as perthe comment. Taken care in DWG
possible extent. NO:Ol.ME.EV.5O.RF.l30812
NOaccess forweldingPlease check 8 revise
accordingly.
Pmvide 16 Thk stifener.

DETAIL - 32
?mvide a blown up of weldAlsa outline the fitup 8 weld Detail has been updated as per the comment. Taken care in DWG
sequence steps on the drawing. NO:Ol.ME.EV.50.RF.l30812

8 Connection details
DWG:NO:Ol.ME.EV.50.RF.l309H -
DETAIL 33
Connection to be pushed in to reduce beam cantilever Detaii has been updated as per the comment. Taken care in DWG
3.M on the column.push in as much as possible. NO:Ol.ME.EV550.RF.130911

-
DETAIL 34
?lease give a note that the vettical flanges continuation Detail has been updated as per the comment. Taken care in DWG
stiffeners in the beam shall be welded after completion NO:Ol.ME.EV.50.RF.130912
of all vertical cleats (for bracings)weldingworks.

-
DETAIL 35
?rovide weld detail. Weld detail is provided. Taken care in DWG
NO:Ol.ME.EV.5O.RF.1309/2
DETAIL - 36
?rovide FPBW FPBW is provided.

9 Connection details
DWG:NO:Ol.ME.EV.SO.RF.131011 ?lease revise the cleat sections as commented an page Detaii is revised as per the design requirement.& Taken care in DWG
"0.253 of calculations document no.NS06-256 R1. also design is performed. NO:Ol.ME.EV.5O.RF.l31012
8 also in document page
TOOheight to be supported bythe given cleat
no:251
arrangement.

Connection details
DWG:NO:OI.ME.EV.50.RF.131210 DETAIL-37
Provide flange continuation stiffeners for verticals. Detail has been updated as per the comment. Taken care in DWG
Please check far the access forwelding and accordingly NO:Ol.ME.EV.5O.RF.l31Z1
revise the detail if required.

DETAIL - 39
Provide stiffener. stiffener is provided. Taken care in DWG
NO:Ol.ME.EV.5O.RF.l31211
EVERSENDAI ENGINEERING LLC Doc. No: DM-NS06-01-42, Rev-2

BURJ DUBAI DEVELOPMENT-DUBAI MALL

MEMBER SCHEDULE&
MEMBER FORCES TABLE

CONNECTION DESIGN
- \.
.d

TRUSS CHORDS CONTINUOUS SPLICE


CONNECTION

CONNECTION

INNER CENTRAL CONTINUOUS SPLICE


RING BEAMS CONNECTION

CONTINUOUS END
CONNECTION

UC203X203X52

NOTE: THE VERTICAL SHEAR FORCE OF 3 5 K N PER CLEAT SHALL BE ADDED TO THE EXISTING FORCES OF BRACING MEMBERS, CHS 273~6.3.
CHS 219.1x6.3 & SHS 1 5 0 ~ 1 5 0 ~ 6 . 3 ,IF IN ANY CASE THE PURLIN SUPPORTING CLEATS ARE CONNECTED TO THESE BRACING MEMBERS.
ALSO THE MAXIMUM SPAN OF THE PURLIN SHALL BE LIMITED TO 9.OM
Q
MEMBER SIZE

UC 152x152x30 Kglm

I0 SB10 UC 305X305X97 Kglm


11 SC1 CHS 508x16 Kglm
NERSENDAI ENGINEERING &LC Doc. No: DM-NS06-OT-4Z Rev;!

BURJ DUBAI DEVELOPMENT - DUBAl MALL

KEY PLAN AND CONNECTION DETAILS

CONNECTION DESIGN

hsreh lo hedole p m p M a y ilght of Eversendai Engin-


Tha hlorma~'~nmnbined and b e m a g r a a to maMeimthbinlorma(lmh ~ m n A d s n o s .
Tne mnfenkshallnot oe repmduced,mpiedardiilged b any third paw, hinuhob or in part uinhwtthewlitlenmnsentsnd mn6nnabnof Ewsencai Ergin-

You might also like