Item Description Unit Calculated Qty Rate

3 Structural Works
3.1 Earthworks
3.1.1 Soil Excavation m3 368.81 3.15
3.1.2 Soil Backfilling with excavated material m3 336.66 3.15
3.1.3 Anti termite spray m2 358.11 4.25
3.1.4 Crush stone underneath pile cap m3 0.00 36.75
3.1.5 Plastic sheet m2 358.11 1.00
3.1.6 Lean concrete 15MPa underneath pile cap m3 3.64 70.25
3.1.7 Lean concrete 15MPa underneath ground beam m3 6.96 70.25
3.1.8 Lean concrete 15Mpa underneath ground slab m3 18.11 70.25
3.2 Pilings Works
3.2.1 Precast pile 0.3x0.3x12 m m 912.00 17.50
3.2.2 Pile cutting head set 76.00 5.25
3.3 Substructure Works
3.3.1 Pile cap
3.3.1.1 Concrete C35 MPa m3 25.60 84.00
3.3.1.2 Formwork m2 83.26 12.60
3.3.1.3 Rebar t 2.30 810.00
3.3.2 Base column
3.3.2.1 Concrete C35 MPa m3 8.21 94.50
3.3.2.2 Formwork m2 72.23 12.60
3.3.2.3 Rebar t 3.78 810.00
3.3.3 Ground beam
3.3.3.1 Concrete C35 MPa m3 16.22 84.00
3.3.3.2 Formwork m2 146.40 12.60
3.3.3.3 Rebar t 2.43 810.00
3.3.4 Ground slab
3.3.4.1 Concrete C35 MPa m3 46.11 84.00
3.3.4.2 Formwork m2 0.00 12.60
3.3.4.3 Rebar t 3.00 810.00
Amount Remarks
43766.66
6119.55
1161.76
1060.49
1521.96
0.00
358.11
255.68
489.24
1272.31
16359.00
15960.00
399.00
21288.11
5065.84
2150.50
1049.03
1866.31 90kg/m3
4745.05
775.85
910.15
3059.05 460kg/m3
5176.83
1362.03
1844.68
1970.12 150kg/m3
6300.39
3872.91
0.00
2427.48 65kg/m3