Professional Documents
Culture Documents
Length of weightage
Cost as per Rate Cost as per
Sl No Description Unit Gravity Rate on other
analysis Schedule "H"
wall works
Gravity wall
1 2.0 m Height Gabian wall RM 2140 18883.90 40,411,543.86 6.49% 53,536,178.09
2 3.0 m Height Gabian wall RM 1230 33227.64 40,869,997.20
13.50% 111,361,849.65
3 4.0 m Height Gabian wall RM 1230 42874.04 52,735,074.12
4 5.0 m Height Gabian wall RM 300 75652.43 22,695,728.40
5.45% 44,957,191.16
5 6.0 m Height Gabian wall RM 300 108120.24 32,436,072.00
Retaining wall
2 3.0 m Height Gabian wall RM 6125 33227.64 203,519,295.00 9.52% 78,530,726.57
3 4.0 m Height Gabian wall RM 300 42874.04 12,862,213.20
4 5.0 m Height Gabian wall RM 200 75652.43 15,130,485.60 4.22% 34,810,889.30
5 6.0 m Height Gabian wall RM 200 108120.24 21,624,048.00
RM 12025 442,284,457.38 323,196,834.76
Name of Work : Widening to 2-Lane with Geometric Improvement od Tura Dalu Road under JICA funding from Km 85.00 to 95.00 &
101.00 to 145.00 to 2-Lanes with paved shoulder of Tura Dalu Section of NH-51 in the state of Meghalaya
Annexure : 1 A
Analyisis of rate for Gabion Structure
Size = 2.0 m height
Length of Drain = 100 m
b Ordinary Rock cum 200.00 1 10.00 2.50 0.200 5.000 Rs. 1,000.00 50.00 Rs. 10,000.00
2 Gabion Structure for Retaining
Earth
1st Layer cum 1 10.00 2.50 1.00 25.00
2nd Layer cum 1 10.00 1.00 1.00 10.00
cum 4158.00 35.00 Rs. 145,530.00 350.00 Rs. 1,455,300.00
3 Filter Media Cum 1816.00 1 10.00 0.25 1.20 3.00 Rs. 5,448.00 30.00 Rs. 54,480.00
Carriage cost of Stone Chips from Quarry to Plant
4 Consumption of Boulder stone
Weight
Rate loose loose Total
Item Description Qntty (T /
factor quantity Weigth
Cum)
Gabion Structure cum 35.0 1.00 35.00 2.65 92.75
Filter media cum 3.0 1.20 3.60 2.65 9.54
Total quantity of loose stone chips = tonne 346.50 102.29 Rs. 35,443.49 1022.90 Rs. 354,434.85
Rate :
Distance From Quarry to Site = 50 km
Surface Road = 45 km @ Rs.6.80 /tonne.km = Rs.
244.80
Unsurfaced Gravelled Road = 5 km @ Rs. 8.10
/tonne.km = Rs. 153.90
Anx 5A-E
ANNEXURE 2
Anx 5A-E
ANNEXURE 2
Name of Work : Widening to 2-Lane with Geometric Improvement od Tura Dalu Road under JICA funding from Km 85.00 to 95.00 &
101.00 to 145.00 to 2-Lanes with paved shoulder of Tura Dalu Section of NH-51 in the state of Meghalaya
Annexure : 1 B
a Ordinary soil cum 189.00 1 10.00 3.00 0.30 9.000 Rs. 1,701.00 90.00 17010.00
b Ordinary Rock cum 200.00 1 10.00 3.00 0.200 6.000 Rs. 1,200.00 60.00 12000.00
3 Filter Media
cum 1 10.00 0.25 1.00 2.50
cum 1 10.00 0.5 1.20 6.00
Cum 1816.00 8.50 Rs. 15,436.00 85.00 154360.00
Anx 5A-E
ANNEXURE 2
Anx 5A-E
ANNEXURE 2
Name of Work : Widening to 2-Lane with Geometric Improvement od Tura Dalu Road under JICA funding from Km 85.00 to 95.00 &
101.00 to 145.00 to 2-Lanes with paved shoulder of Tura Dalu Section of NH-51 in the state of Meghalaya
Annexure : 1 C
a Ordinary soil cum 189.00 1 10.00 3.50 0.30 10.500 Rs. 1,984.50 105.00 19845.00
b Ordinary Rock cum 200.00 1 10.00 3.50 0.200 7.000 Rs. 1,400.00 70.00 14000.00
Anx 5A-E
ANNEXURE 2
Anx 5A-E
ANNEXURE 2
Construction of Two-Lane with hard shoulders of Changtongya Longleng Road on EPC basis from existing Km 0.0 to Km 16.592
[Design Km. 0+000 to Km. 18+780] (Design Length – 18.780 Km) in the state of Nagaland under SARDP-NE Phase A on EPC Mode
Annexure : 1 D
a Ordinary soil cum 189.00 1 10.00 2.50 0.30 7.500 Rs. 1,417.50 75.00 14175.00
b Ordinary Rock cum 200.00 1 10.00 2.50 0.200 5.000 Rs. 1,000.00 50.00 10000.00
3 Filter Media
cum 1 10.00 0.46 1.00 4.60
cum 1 10.00 0.92 1.00 9.20
cum 1 10.00 1.38 1.00 13.80
cum 1 10.00 1.84 1.20 22.08
Cum 1816.00 49.68 Rs. 90,218.88 496.80 902188.80
Anx 5A-E
ANNEXURE 2
Anx 5A-E
ANNEXURE 2
Construction of Two-Lane with hard shoulders of Changtongya Longleng Road on EPC basis from existing Km 0.0 to Km 16.592
[Design Km. 0+000 to Km. 18+780] (Design Length – 18.780 Km) in the state of Nagaland under SARDP-NE Phase A on EPC Mode
Annexure : 1 E
a Ordinary soil cum 189.00 1 10.00 3.00 0.30 9.000 Rs. 1,701.00 90.00 17010.00
b Ordinary Rock cum 200.00 1 10.00 3.00 0.200 6.000 Rs. 1,200.00 60.00 12000.00
3 Filter Media
cum 1 10.00 0.5 1.00 5.00
cum 1 10.00 1 1.00 10.00
cum 1 10.00 1.5 1.00 15.00
cum 1 10.00 2 1.00 20.00
cum 1 10.00 2.5 1.30 32.50
Cum 1816.00 82.50 Rs. 149,820.00 825.00 1498200.00
Anx 5A-E
ANNEXURE 2
Anx 5A-E
Annexure-6
Construction of Two-Lane with hard shoulders of Changtongya Longleng Road on EPC basis from existing Km 0.0 to Km 16.592 [Design Km. 0+000 to Km. 18+
Annexure 6 : Quantity Calculation of BOX CULVERT (1.5M X 1.5M)
FOR MAIN CARRIAGEWAY ONLY WIDTH 12 M ###
Sl.No. Descriptions Unit No. Length Width Ht./Th. Area Quantity Rate Amount
1 Excavation
Box Portion cum 3.3 12 1.2 47.52
L=2.0+2x0.30+2x0.50+2x0.10 = 3.80 m
Width =12 m
Depth = 1.2 m from natural ground level
For Key portion cum 2 3.3 0.425 2.805
L=2.0+2x0.30+2x0.50+2x0.10 = 3.80 m
Area = (0.30x0.67)+(0.50x0.67x0.67) = 0.425 sqm
No. = 2
For Return wall cum 0 1 3.03 1.5 0
Length of Return wall = 3.5m
Width = 3.03 m
Depth = 1.5 m
No. = 4
For U/S Protection work Type A cum #REF!
For D/S Protection work Type C cum #REF!
Total #REF! 87 #REF!
Widening to 2-Lane with Geometric Improvement od Tura Dalu Road under JICA funding from Km 85.00 to 95.00 & 101.00 to 145.00 to 2-Lanes with paved
shoulder of Tura Dalu Section of NH-51 in the state of Meghalaya”
Annexure 2 : Quantity Calculation of BOX CULVERT (2M X 2M) Protection Type B & C
FOR MAIN CARRIAGEWAY ONLY WIDTH 12 M ###
Sl.No. Descriptions Unit No. Length Width Ht./Th. Area Quantity Rate Amount
1/12.1 Excavation
Box Portion cum 1 3.8 12 1.062 48.404
L=2.0+2x0.30+2x0.50+2x0.10 = 3.80 m
Width =12 m
Depth = 1.2 m from natural ground level
For Key portion cum 2 3.8 0.425 3.23
L=2.0+2x0.30+2x0.50+2x0.10 = 3.80 m
Area = (0.30x0.67)+(0.50x0.67x0.67) = 0.425 sqm
For RCC Retaining wall - Total Ht. - 2m cum #REF!
For U/S Protection work Type B cum 8.82
For D/S Protection work Type C cum #REF!
Total #REF! 189.00 #REF!
2/12.4 PCC 1:3:6
Box Portion cum 3.8 12 0.15 6.84
L=2.0+2x0.30+2x0.50+2x0.10 = 3.80 m
Width =12 m
Thick = 0.15 m
For RCC Retaining wall - Total Ht. - 2m cum #REF!
For U/S Protection work Type B cum 0.87
For D/S Protection work Type C cum #REF!
Total #REF! 7350.00 #REF!
3/13.5 G RCC grade M-30
Box Portion ###
(Refer MOST Dwg. No. SD/108 sheet 2 of 6) cum 54.0
For U/S & D/S RCC Retaining wall - Total Ht. - 2m cum #REF!
Total cum #REF! 10888.00 #REF!
Approach slab ###
5/14.10 I. Levelling course M-15 concrete ###
Box 2x2-BC
Annexure 2 : Quantity Calculation of BOX CULVERT (2M X 2M) Protection Type B & C
FOR MAIN CARRIAGEWAY ONLY WIDTH 12 M ###
Sl.No. Descriptions Unit No. Length Width Ht./Th. Area Quantity Rate Amount
L= 3.50 m ###
Width =12 m ###
Thick = 0.15m ###
No. = 2 cum 2 3.5 11.4 0.15 11.97 8044.00 96286.68
6/14.11 II. RCC M-30 grade concrete ###
L= 3.50 m ###
Width =12 m ###
Thick = 0.3m ###
No. = 2 cum 2 3.5 11.4 0.3 23.94 14335.00 343179.90
6/14.6 RCC Railing ###
No. = 2 ###
L = 2+2x0.3+2x3.5 = 9.60 m Lm 2 9.6 19.2 2601.00 49939.20
7/13.10 Filling with Filter media (Both side) ###
a) For Box Portion ###
No. =2 ###
L= 0.5 m ###
Width =12 m ###
Ht. = 1.4m cum 2 0.5 12 1.4 16.8 ###
For RCC Retaining wall - Total Ht. - 2m cum #REF!
Total #REF! 1816.00 #REF!
8/13.5 B PCC M-20 ###
For U/S Protection work Type B cum 4.403 ###
For D/S Protection work Type C cum #REF! ###
Total #REF! 9745.00 #REF!
9/15.1 Stone pitching for Protection work ###
For D/S Protection work Type C cum #REF! 2984.00 #REF!
11 Backfilling behind Abutment, wing wall etc. ###
a) Behind Abutment cum 0 12 0.6 1.2 0 ###
Total 0 3466.00 0.00
12/14.18 E( xpansion joint Mtr. 2 12 24 1585.00 38040.00
13/14.9 Drainage Spout No. 2 3650.00 7300.00
Box 2x2-BC
Annexure 2 : Quantity Calculation of BOX CULVERT (2M X 2M) Protection Type B & C
FOR MAIN CARRIAGEWAY ONLY WIDTH 12 M ###
Sl.No. Descriptions Unit No. Length Width Ht./Th. Area Quantity Rate Amount
14/13.8 Weap holes ###
For Box Portion No. 18 ###
For D/S Protection work Type C No. #REF! ###
Total #REF! 596.00 #REF!
15/13.6 Reinforcement (As per MOST) MT 3.458 84251.00 291339.96
16 Wearing Coarse (Mastic Asphalt) sqm 1 9.6 12 115.2 0.00
Carriage from Quarry to Plant
17 Consumption of Stone Chips
Weight
loose loose Total
Item Description Qntty (T /
factor quantity Weigth
Cum)
PCC 1:3:6 cum #REF! 0.90 #REF! 2.65 #REF!
PCC grade M-15 cum 12.0 0.90 10.77 2.65 28.55
RCC grade M-30 cum #REF! 0.90 #REF! 2.65 #REF!
RCC Railing cum 1.632 0.90 1.47 2.65 3.89
PCC grade M-20 cum #REF! 0.90 #REF! 2.65 #REF!
Total Quantity of Mixing Material = cum #REF!
Filter Media cum #REF! 1.20 #REF! 2.65 #REF!
Stone Pitching cum #REF! 1.20 #REF! 2.65 #REF!
Annexure 2 : Quantity Calculation of BOX CULVERT (2M X 2M) Protection Type B & C
FOR MAIN CARRIAGEWAY ONLY WIDTH 12 M ###
Sl.No. Descriptions Unit No. Length Width Ht./Th. Area Quantity Rate Amount
Carriage from Plant to work site
Average distance from Plant to work site = (44-10)/2 =
17 km@ Rs. 8.10 / tonne.km = Rs.137.70 #REF! 137.70 #REF!
#REF!
Carriage from Quarry to Plant
18 Consumption of Sand
Weight
loose loose Total
Item Description Qntty (T /
factor quantity Weigth
Cum)
PCC 1:3:6 cum #REF! 0.45 #REF! 2.40 #REF!
PCC grade M-15 cum 12.0 0.45 5.39 2.40 12.93
RCC grade M-30 cum #REF! 0.45 #REF! 2.40 #REF!
RCC Railing cum 1.632 0.46 0.74 2.40 1.78
PCC grade M-20 cum #REF! 0.45 #REF! 2.40 #REF!
Widening to 2-Lane with Geometric Improvement od Tura Dalu Road under JICA funding from Km 85.00 to 95.00 & 101.00 to 145.00 to 2-Lanes with paved
shoulder of Tura Dalu Section of NH-51 in the state of Meghalaya”
Annexure 3 : Quantity Calculation of BOX CULVERT (2M X 2M) Protection Type B & D
FOR MAIN CARRIAGEWAY ONLY WIDTH 12 M ###
Sl.No. Descriptions Unit No. Length Width Ht./Th. Area Quantity Rate Amount
1/12.1 Excavation
Box Portion cum 1 3.8 12 1.062 48.404
L=2.0+2x0.30+2x0.50+2x0.10 = 3.80 m
Width =12 m
Depth = 1.2 m from natural ground level
For Key portion cum 2 3.8 0.425 3.23
L=2.0+2x0.30+2x0.50+2x0.10 = 3.80 m
Area = (0.30x0.67)+(0.50x0.67x0.67) = 0.425 sqm
For RCC Retaining wall - Total Ht. - 2m cum #REF!
For U/S Protection work Type B cum 8.82
For D/S Protection work Type D cum 13.65
Total #REF! 189.00 #REF!
2/12.4 PCC 1:3:6
Box Portion cum 3.8 12 0.15 6.84
L=2.0+2x0.30+2x0.50+2x0.10 = 3.80 m
Width =12 m
Thick = 0.15 m
For RCC Retaining wall - Total Ht. - 2m cum #REF!
For U/S Protection work Type B cum 0.87
For D/S Protection work Type D cum 1.425
Total #REF! 7350.00 #REF!
3/13.5 G RCC grade M-30
Box Portion ###
(Refer MOST Dwg. No. SD/108 sheet 2 of 6) cum 54.0
For U/S & D/S RCC Retaining wall - Total Ht. - 2m cum #REF!
Total cum #REF! 10888.00 #REF!
Approach slab ###
5/14.10 I. Levelling course M-15 concrete ###
Box 2x2-BD
Annexure 3 : Quantity Calculation of BOX CULVERT (2M X 2M) Protection Type B & D
FOR MAIN CARRIAGEWAY ONLY WIDTH 12 M ###
Sl.No. Descriptions Unit No. Length Width Ht./Th. Area Quantity Rate Amount
L= 3.50 m ###
Width =12 m ###
Thick = 0.15m ###
No. = 2 cum 2 3.5 11.4 0.15 11.97 8044.00 96286.68
6/14.11 II. RCC M-30 grade concrete ###
L= 3.50 m ###
Width =12 m ###
Thick = 0.3m ###
No. = 2 cum 2 3.5 11.4 0.3 23.94 14335.00 343179.9
6/14.6 RCC Railing ###
No. = 2 ###
L = 2+2x0.3+2x3.5 = 9.60 m Lm 2 9.6 19.2 2601.00 49939.2
7/13.10 Filling with Filter media (Both side) ###
a) For Box Portion ###
No. =2 ###
L= 0.5 m ###
Width =12 m ###
Ht. = 1.4m cum 2 0.5 12 1.4 16.8 ###
For RCC Retaining wall - Total Ht. - 2m cum #REF!
Total #REF! 1816.00 #REF!
8/13.5 B PCC M-20 ###
For U/S Protection work Type B cum 4.403 ###
For D/S Protection work Type D cum 5.694 ###
Total 10.097 9745.00 98395.27
9/15.1 Stone pitching for Protection work ###
For D/S Protection work Type D cum 2.7 2984.00 8056.8
11 Backfilling behind Abutment, wing wall etc. ###
a) Behind Abutment cum 0 12 0.6 1.2 0 ###
Total 0 3466.00 0
12/14.18 E( xpansion joint Mtr. 2 12 24 1585.00 38040.00
13/14.9 Drainage Spout No. 2 3650.00 7300.00
Box 2x2-BD
Annexure 3 : Quantity Calculation of BOX CULVERT (2M X 2M) Protection Type B & D
FOR MAIN CARRIAGEWAY ONLY WIDTH 12 M ###
Sl.No. Descriptions Unit No. Length Width Ht./Th. Area Quantity Rate Amount
14/13.8 Weap holes ###
For Box Portion No. 18 ###
Total 18 596.00 10728.00
15/13.6 Reinforcement (As per MOST) MT 3.458 84251.00 291339.96
16 Wearing Coarse (Mastic Asphalt) sqm 1 9.6 12 115.2 0
Carriage from Quarry to Plant
17 Consumption of Stone Chips
Weight
loose loose Total
Item Description Qntty (T /
factor quantity Weigth
Cum)
PCC 1:3:6 cum #REF! 0.90 #REF! 2.65 #REF!
PCC grade M-15 cum 12.0 0.90 10.77 2.65 28.55
RCC grade M-30 cum #REF! 0.90 #REF! 2.65 #REF!
RCC Railing cum 1.632 0.90 1.47 2.65 3.89
PCC grade M-20 cum 10.1 0.90 9.09 2.65 24.08
Total Quantity of Mixing Material = cum #REF!
Filter Media cum #REF! 1.20 #REF! 2.65 #REF!
Stone Pitching cum 2.7 1.20 3.24 2.65 8.59
Annexure 3 : Quantity Calculation of BOX CULVERT (2M X 2M) Protection Type B & D
FOR MAIN CARRIAGEWAY ONLY WIDTH 12 M ###
Sl.No. Descriptions Unit No. Length Width Ht./Th. Area Quantity Rate Amount
Carriage from Plant to work site
Average distance from Plant to work site = (44-10)/2 =
17 km@ Rs. 8.10 / tonne.km = Rs.137.70 #REF! 137.70 #REF!
#REF!
Carriage from Quarry to Plant
18 Consumption of Sand
Weight
loose loose Total
Item Description Qntty (T /
factor quantity Weigth
Cum)
PCC 1:3:6 cum #REF! 0.45 #REF! 2.40 #REF!
PCC grade M-15 cum 12.0 0.45 5.39 2.40 12.93
RCC grade M-30 cum #REF! 0.45 #REF! 2.40 #REF!
RCC Railing cum 1.632 0.46 0.74 2.40 1.78
PCC grade M-20 cum 10.1 0.45 4.54 2.40 10.90
Construction of Two-Lane with hard shoulders of Changtongya Longleng Road on EPC basis from existing Km 0.0 to Km 16.592 [Design Km. 0+
Annexure 9 : Quantity Calculation of BOX CULVERT (4M X 4M)
FOR MAIN CARRIAGEWAY ONLY WIDTH 12 M
Sl.No. Descriptions Unit No. Length Width Ht./Th. Area Quantity Rate Amount
1/12.1 Excavation
Box Portion cum 7.7 12 1.2 110.88
L=4.0+2x1.20+2x0.55+2x0.10 = 7.70 m
Width =12 m
Depth = 1.2 m from natural ground level
For Key portion cum 2 7.7 0.275 4.235
L=4.0+2x1.20+2x0.55+2x0.10 = 7.70 m
Area = (0.30x0.50)+(0.50x0.50x0.50) = 0.275 sqm
For RCC Retaining wall - Total Ht. - 4.0 m cum #REF!
For D/S Protection work Type C cum 6.42
For U/S Protection work Type A cum 17.0625
Total #REF! 189 #REF!
Construction of Two-Lane with hard shoulders of Changtongya Longleng Road on EPC basis from existing Km 0.0 to Km
Annexure 10 : Quantity Calculation of BOX CULVERT (5M X 5M)
FOR MAIN CARRIAGEWAY ONLY WIDTH 12 M
Sl.No. Descriptions Unit No. Length Width Ht./Th.
1 Excavation
Box Portion cum 9.6 12 1.2
L=5.0+2x1.50+2x0.70+2x0.10 = 9.60 m
Width =12 m
Depth = 1.2 m from natural ground level
For Key portion cum 2 9.6
L=5.0+2x1.50+2x0.70+2x0.10 = 9.60 m
Area = (0.30x0.50)+(0.50x0.50x0.50) = 0.275 sqm
No. = 2
For Return wall
For D/S RCC Retaining wall - Total Ht. - 6m cum
For D/S Protection work Type C cum
For U/S Protection work Type A cum
Total
Area Quantity
138.24
0.213 4.0896
#REF!
6.42
17.0625
#REF!
17.28
#REF!
2.145
#REF!
224
#REF!
#REF!
1.365
1.365
12.6
25.2
Annexure-10
Area Quantity
12.8
52.8
#REF!
#REF!
6.0075
9.69
15.6975
0
8.424
8.424
9.3
19.8
29.1
0
0
24
2
24
14.339
70.4
Annexure-C : PROTECTION WORK AT CULVERTS ON UP STREAM , TYPE-B
Annexure C-1
Width 2m
Length 1.5 m Pitching Thickness 0.3 m
Curtain wall Thickness(1st step) 0.2 m PCC overlay Thick 0.1 m
Curtain wall Thickness(2nd step) 0.45 m PCC Levelling Course 0.1 m
Curtain wall Thickness(Bottom) 1.3 m
Annexure C-2
Width 3M
Length 1.5 M
Sl.No. Items Unit No. Length Width Ht/Th Quantity
1 Excavation
Curtain wall Cum 1 4.0 1.4 2.1 11.76
Total = 11.76
2 Stone Pitching on slope Cum 1 1.5 4.0 0.3 1.8
3 PCC M-15
Curtain wall Cum 1 4.0 1.4 0.1 0.56
Over stone pitching Cum 1 1.5 4.0 0.1 0.60
Total = 1.16
4 PCC M-20
Curtain wall Cum 1 4.0 1.3 0.8 4.16
Cum 1 4.0 0.45 0.75 1.35
Cum 1 4.0 0.2 0.45 0.36
Total = 5.87
Annexure-E : PROTECTION WORK AT CULVERTS ON DOWN-STREAM, TYPE D
Annexure E-1
Width 2m
Length 3 m Pitching Thickness 0.3 m
Curtain wall Thickness(1st step) 0.2 m PCC overlay Thick 0.1 m
Curtain wall Thickness(2nd step) 0.45 m PCC Levelling Course 0.1 m
Curtain wall Thickness(3rd step) 0.75 m
Curtain wall Thickness(Bottom) 1.65 m
Annexure E-2
WIDTH 3M
LENGTH 3M
Sl.No. Items Unit No. Length Width Ht/Th Quantity
1 Excavation
Curtain wall Cum 1 4.0 1.75 2.6 18.2
Total = 18.2
2 Stone Pitching on slope Cum 1 3 4.0 0.3 3.6
3 PCC M-15
Curtain wall Cum 1 4.0 1.75 0.1 0.70
Over stone pitching Cum 1 3 4.0 0.1 1.20
Total = 1.90
4 PCC M-20
Curtain wall Cum 1 4.0 1.65 0.55 3.63
Cum 1 4.0 0.75 0.75 2.25
Cum 1 4.0 0.45 0.75 1.35
Cum 1 4.0 0.2 0.45 0.36
Total = 7.59