PID No. SIF Number Initiators Main Final Elements Other Final Elements Assigned SIL Comments
ESD1 bar Design Intent Criteria Transmission Solver Transmission Criteria
On high-high pressure in FG
PSDV-13902
ID-PCK-SWPG-0103-500016 SD-3.15 PCK8A-SIF-12 scruberr, close FG suppy to Liquid PSHH-13121A 1oo1 Hardwire SSS Hardwire
FG System Shutdown
Transfer Pump
Note: Success criteria of the final elements is determined based on the number of main final elements which directly meet its design intent.