You are on page 1of 7

#

REFRACTORY RFI LOG

ACTIVITY #
S.N. RFI No.date raise SATIP
LOCATION ACTIVITIES SAIC TIME QMIS NO. SAPID
REF.

FLARE AREA (HDEC/GIWI,Willie) Pre-Application Inspection of Castable Refractory SATIP-N-110-01 SAIC-N-2024 9:00:00 AM
1 CO-200131-01 3.3 RAJAN
Installation for BURN PIT (1) (R37-F-1005) SIDEWALL CASTING-4
PANELS

(HDEC/GIWI,Willie) In-process Inspection/Testing:Casting Application


2 CO-200131-02 3.5 FLARE AREA for SATIP-N-110-01 SAIC-N-2026 9:30:00 AM RAJAN
BURN PIT (1) (R37-F-1005) SIDEWALL CASTING-4 PANELS

# Saudi Aramco: Company General Use


#

# Saudi Aramco: Company General Use


#

# Saudi Aramco: Company General Use


#

# Saudi Aramco: Company General Use


#

# Saudi Aramco: Company General Use


#

# Saudi Aramco: Company General Use


#

(HDEC / IWI / WILLY) Surface preparation Inspection prior to


installation of RCF, ceramic blanket of Burner area for BURN PIT (2)
52 CO-190815-01 3.4 FLARE AREA SATIP-N-140-01 9:00:00 AM 118179 RAJAN
(R37-F-1006)

(HDEC / IWI / WILLY) Installation inspection of the RCF materials (All


FLARE AREA method of installation)ceramic blanket of Burner area for BURN PIT SATIP-N-140-01
53 CO-190815-02 3.5 9:30:00 AM 118180 RAJAN
(2) (R37-F-1006)

# Saudi Aramco: Company General Use