PROJECT:

LUWUK GAS ENGINE POWER PLANT 40 MW

OWNER :

PT. PERUSAHAAN LISTRIK NEGARA (PERSERO)

ENGINEER:

PT. PLN ENJINIRING

CONTRACT NO. :
0758.PJ/DAN.02.01/DIR/2017

PLN DOC. NO. :

TITLE:

PIPE CROSS OVER FOUNDATION CALCULATION


PURPOSE:
FOR APPROVAL

REV DESCRIPTION PREPARED CHECKED APPROVED DATE


0 Issued For Approval Ari Toto Ananto

DOC. NO.:
CONTRACTOR :

KONSORSIUM
LGE001-CSA-CAL-045
Page 1 - 11
18/09/2018 - 08:57

3. FOUNDATION ANALYSIS
Project Name : GEPP 40MW LUWUK Site Name : PIPE CROSSOVER
Client : PLN (PERSERO) Site ID : -
Tower Type : STEEL STRUCTURE Foundation Type : Spread Footing

A. LOAD CASE
Maximum Force on Pedestal :
Uplift Force - T (ton) = 0.01
Compressive Force - C (ton) = 0.46
Lateral Force - H (ton) = 0.46 eB
Moment - M (ton-m) = 0.46
B1
Load Eccentricities :

eL
Eccentricity along Width of Footing - eB (m) = 0.00 Pedestal
Eccentricity along Length of Footing - eL (m) = 0.00
Footing
B. FOUNDATION GEOMETRY
Y Tie Beam
Depth of Foundation - H (mm) = 800

L
Pedestal B2
Center to Center Pedestal - Sp (mm) = 1200 X
Width of Pedestal - B1 (mm) = 250 B
Height of Pedestal above Ground - T1 (mm) = 175
B1
Height of Pedestal - H1 (mm) = 775
Edge Pedestal to Edge Footing - B' (mm) = 175
Grade of Concrete - K (kg/cm2) Ground Level

T1
= 300
f'c (kg/cm2) = 300

T2
Pedestal
Tie Beam φ

H1
Tie Beam

H2
Width of Tie Beam - B2 (mm) = 0
T4

Backfill
Height of Tie Beam - H2 (mm) = 0
H

T3
Top Tie Beam to Ground Surface - T2 (mm) = N/A
Grade of Concrete - K (kg/cm2) = 300

H3
Footing
f'c (kg/cm2) = 300
Footing B
Width of Footing - B (mm) = 600
Length of Footing - L (mm) = 1500
Footing Thickness - H3 (mm) = 200 Figure 1. Foundation Geometry
Top Footing to Bottom Tie Beam - T3 (mm) = N/A
Top Footing to Ground Surface - T4 (mm) = 600
Grade of Concrete - K (kg/cm2) = 300
f'c (kg/cm2) = 300

C. SOIL BEARING CAPACITY FROM SONDIR TEST


Soil Bearing Capacity - qc (ton/m2) = 380
Allowable Soil Bearing Capacity - Qall (ton/m2 = qc/30
= 12.67

D. BEARING CAPACITY
Eccentricity Load Condition = No Eccentricity
eL/L = 0.000 L (m) = 1.50
eB/B = 0.000 B (m) = 0.60
Case of Two-Way Eccentricities : N/A Case of One-Way Eccentricity : N/A
Case 1 : eL/L ≥ 1/6 and eB/B ≥ 1/6 NO Case 1 : Eccentricity along Width of Footing (eL = 0) NO
Case 2 : eL/L < 0.5 and 0 < eB/B < 1/6 NO Case 2 : Eccentricity along Length of Footing (eB = 0) NO
Case 3 : eL/L < 1/6 and 0 < eB/B < 0.5 NO Effective Area of Foundation caused by Eccentricity :
Case 4 : eL/L < 1/6 and eB/B < 1/6 NO A' (m2) = B' L' = N/A
B' (m) = Effective Width = N/A (Two-Way Eccentricities)
Case 3 Case 4
B1/B B2/B B2/B
0.00 0.00 0.00
= N/A (One-Way Eccentricity)
L' (m) = Effective Length = N/A (Two-Way Eccentricities)
Case 2 Case 4
L1/L L2/L L2/L
0.00 0.00 0.00
= N/A (One-Way Eccentricity)
Page 2 - 11
18/09/2018 - 08:57

3. FOUNDATION ANALYSIS
Project Name : GEPP 40MW LUWUK Site Name : PIPE CROSSOVER
Client : PLN (PERSERO) Site ID : -
Tower Type : STEEL STRUCTURE Foundation Type : Spread Footing

Bearing Capacity According to Terzaghi's Formula :


qu (ton) = (Eq. D.1)

where :

Case 1

h1
q1 c
Square φ
GWT

H
ϒsat
then :
h1 (m) = NO (level of GWT below ground surface)
GWT Cond. = N/A (see Figure 2) q2
H' (m) = 0.00
He (m) = 0.5B tan (45 + φ/2) (approximately depth of B
= 0.47 wedge zone)
φ = 25° (internal friction angle)
Nq = 12.7 Case 2
(Terzaghi's bearing
Nc = 25.1
capacity factor)
Nγ = 9.7
sc = 1.30 ϒ
(shape factor) c
sγ = 0.80

H = h1
φ
γe (ton/m3) = ( γe is an everage effective
unit weight of the soil in
= 0.00 the wedge zone) q
q (ton/m2) = Overburden Pressure (OP) γ' (ton/m3) = γsat - γw GWT
= γH = 0.79 B ϒsat
= 1.38
c (ton/m2) = Cohession
= 3.50 Case 3
thus, Terzaghi's Ultimate Bearing Capacity :
qu (ton/m2) = 135.81
Bearing Capacity of an Eccentically Loaded Foundation : ϒ
Qu (ton) = qu A' c
= 0.00 φ
H

then, Terzaghi's Allowable Bearing Capacity :


qall (ton/m2) = qu/SF (if centrically loaded) or (Qu/A)/SF (if eccentrically loaded)
h1

SF = 3 q
qall (ton/m2) = 45.27 (centrically loaded)
qall (ton/m2) = N/A
wedge zone

(eccentrically loaded) B
H'

q'
Bearing Capacity According to Meyerhof's Formula :
GWT
qu (ton) = (Eq. D.2)
where : ϒsat

Figure 2. Ground Water Table (GWT) Conditions


Page 3 - 11
18/09/2018 - 08:57

3. FOUNDATION ANALYSIS
Project Name : GEPP 40MW LUWUK Site Name : PIPE CROSSOVER
Client : PLN (PERSERO) Site ID : -
Tower Type : STEEL STRUCTURE Foundation Type : Spread Footing

then :
φ = 25° (internal friction angle)
Nq = 10.7
(Meyerhof's bearing
Nc = 20.71
capacity factor)
Nγ = 6.8
Kp = tan2 (45 + φ/2)
= 2.46
B' (m) = Effective Width
= 0.60
D (m) = 0.80
shape factor :
sc = 1.49
sq = sγ = 1.25
depth factor :
dc = 1.42
dq = dγ = 1.21
γe (ton/m3) = ( γe is an everage effective (Eq. D.3)
unit weight of the soil in
= 0.00 the wedge zone)
q (ton/m2) = Overburden Pressure γ' (ton/m3) = γsat - γw
= γH
= 1.38
c (ton/m2) = Cohession
= 3.50
thus, Meyerhof's Ultimate Bearing Capacity :
qu (ton/m2) = 181.14
Ultimate Load of an Eccentically Loaded Foundation :
C
Qu (ton) = qu A'
= 0.00
then, Meyerhof's Allowable Bearing Capacity : M
qall (ton/m2) = qu/SF (if centrically loaded) or (Qu/A)/SF (if eccentrically loaded)
SF = 3
qall (ton/m2) = 60.38 (centrically loaded)
qall (ton/m2) = N/A (eccentrically loaded)
The summary of Allowable Bearing Capacity - qall :
qall (ton/m2) = 12.67 (Sondir)
qall (ton/m2) = 45.27 (Terzaghi)
qall (ton/m2) = 60.38 (Meyerhof)
qall (ton/m2) = 12.67 (Used allowable bearing capacity)
Check bearing capacity against compressive force :
Q min

P M P M
Q max

Qmax (ton/m2) =  Qmin (ton/m2) =  (Eq. D.4)


A S A S

where : B
P (ton) = Wc + Ws + C
= 1.87
A (m2) = BxL Figure 3. Illustration of Bearing Pressure under Footing
= 0.9
M (ton-m) = H x Ht if centrically loaded or (H x Ht) + (C x e) if eccentrically loaded
= 0.44
S (m3) = Static Moment of Section
= 0.23
thus :
Qmax (ton/m2) = 4.06
Qmax < Qall ……….. OK ! (Foundation is Sufficient to Support Compressive Force)
Qmin (ton/m2) = 0.11
Qmin > 0 ……….. OK ! (Foundation is Stable)
Page 4 - 11
18/09/2018 - 08:57

3. FOUNDATION ANALYSIS
Project Name : GEPP 40MW LUWUK Site Name : PIPE CROSSOVER
Client : PLN (PERSERO) Site ID : -
Tower Type : STEEL STRUCTURE Foundation Type : Spread Footing

E. CAPACITY AGAINST UPLIFT FORCE


Depth Ratio :
D/B = 1.33
Limiting H/B (as a function of φ) :
φ = 25° (frustum angle)
H/B = 3
check :
D/B < H/B …………. Shallow Foundation !

Formula of Uplift Capacity of Foundation :


Tu = Perimeter Resistance + W (Eq. E.1)
where :
Tu = maximum bearing capacity of foundation against uplift force (ton)
Wc = weight of concrete + weight of soil uplifted (ton)

Formula 1. Shallow Foundation :


Tu = 2 su D (B + L) + γ D2 (2 sf B + L - B) Ku tanφ + W (Eq. E.2)
where the side friction adjustment factor - sf = 1 + mD/B
Shallow Foundation - Use Formula 1 !
Formula 2. Deep Foundation :
Tu = 2 su H (B + L) + γ (2D - H) (2 sf B + L - B) H Ku tanφ + W (Eq. E.3)
where the side friction adjustment factor - sf = 1 + mH/B
then :
L1 (m) = 0.00
H (m) = 0.80
D (m) = 0.80
L (m) = B (m) ===> for square footing
= 0.60
m = 0.1
sf = 1.13
su = Undrained Shear Strength (ton/m2)
Formula 1. Granular Soil (c = 0)
= σ' tan φ ========> σ' = σ - u (Eq. E.4)
σ = γH Granular Soil - Use Formula 1 !
u = γw Zw
Formula 2. Cohessive Soil ( φ = 0)
= c = qu/2 (Unconfined Compression) =====> qu (ton/m2) = 6.5 3.250 (Eq. E.5)
= c + tan φ (Consolidated Undrained) 3.966 (Eq. E.6)
thus su :
= 0.65
Ku = Lateral Earth Pressure Coefficient

 20 
Ku = tan 2  45    Kp (Eq. E.7)
 2 
= 2.04
Ku = Kp
= 1.43
Ku = 0.65 + 0.5φ ===> ( φ in radians)
= 0.87
Ku = Ko
= 1 - sin 20° Figure 4. Footings for Tension Load
= 0.66
Average Ku = 1.25
γ (ton/m3) = Unit Weight of Soil = γwet Unit Weight of Water - γw (ton/m3) = 1
= 1.73 Moisture Content - w (%) = 34.07
Page 5 - 11
18/09/2018 - 08:57

3. FOUNDATION ANALYSIS
Project Name : GEPP 40MW LUWUK Site Name : PIPE CROSSOVER
Client : PLN (PERSERO) Site ID : -
Tower Type : STEEL STRUCTURE Foundation Type : Spread Footing

γsat (ton/m3) = Saturated Unit Weight of Soil Specific Gravity of Soil - Gs = 2.59
= 1.79 γdry (ton/m3) = γwet / (1 + w) (Eq. E.8)
3
γc (ton/m ) = Unit Weight of Concrete = 1.29
= 2.40 Vs (m3) = γdry / (Gs γw) (Eq. E.9)
3
Vc (m ) = 0.23 (volume of concrete) = 0.50
Wc (ton) = 0.55 (weight of concrete) Vv (m3) = 1 - Vs (Eq. E.10)
3 st
Vs1 (m ) = 0.50 (volume of backfill soil - 1 layer) = 0.50
Vs2 (m3) = 0.00 (volume of backfill soil - 2 nd layer)
Ws (ton) = 0.87 (weight of backfill soil)
W (ton) = Wc + Ws
= 1.42 (total weight of concrete + backfill soil)
thus, Ultimate Uplift Force :
Tu (ton) = 3.53
Allowable Uplift Force :
Tall (ton) = Tu/SF
SF = 3
Tall (ton) = 1.18
check :
Tall > T ……….. OK ! (Foundation is Sufficient to Support Uplift Force)

F. CAPACITY AGAINST SHEAR FORCE


Formula :
SF = (ΣV / ΣH) δ > 1.5 (Eq. F.1)
where :
ΣV = total vertical force (ton) = Wc + Ws + C
= 1.87
ΣH = total horizontal force (ton)
= 0.46
δ = coefficient of friction = 0.45
thus :
1.8 > 1.5 ……….. OK ! (Foundation is Sufficient against Lateral Force)

G. PUNCHING SHEAR ON FOOTING


Two-Way Punching Shear
Formula :
φVc > Vu
where :
φ = shear strength reduction factor
= 0.75
Vc1 = 1st formula of concrete shear strength (ton)

 4 '
=  2   fc b 0 d (Eq. G.1)
 β c 

βc = ratio of long side to short side of the column,


concentrated load or reaction area
=1 Critical Area
b0 (cm) = 4 (H3 + B1) Pedestal
L

= 180 Footing
d (cm) = H3
= 20 H3/2 B1 H3/2
thus :
b0
Vc1 (ton) = 340.84
Vc2 = 2nd formula of concrete shear strength (ton)
B
α d  '
=  s  2  fc b 0 d (Eq. G.2)
 b0  Figure 5. Two-Way Punching Shear Area
αs = 40 (for interior column) interior column

30 (for edge column) then αs =


20 (for corner column) 40
Page 6 - 11
18/09/2018 - 08:57

3. FOUNDATION ANALYSIS
Project Name : GEPP 40MW LUWUK Site Name : PIPE CROSSOVER
Client : PLN (PERSERO) Site ID : -
Tower Type : STEEL STRUCTURE Foundation Type : Spread Footing

thus :
Vc2 (ton) = 366.09 B1
Vc3 = 3rd formula of concrete shear strength (ton)
= 4 fc ' b 0 d (Eq. G.3)
thus :
Vc3 (ton) = 227
Pedestal
the smallest Vc :
Vc (ton) = 227.23
thus, Design Shear Strength :
Footing
φVc (ton) = 170.42
then :
Vu = factored shear force on critical area (ton)

H3
= C . Shade Ratio (Eq. G.4)
where :
FootingArea PunchingArea B
Shade Ratio = (Eq. G.5)
FootingArea
= 0.44 Figure 6. Two-Way Punching Shear Line
thus, Ultimate Shear Strength :
Vu (ton) = 0.20
check :
φVc > Vu ……….. OK ! (Footing is Sufficient to Support Two-Way Punching Shear)

One-Way Punching Shear


Formula :
φVc > Vu
where : Critical Area
φ = shear strength reduction factor
= 0.75

L = b0
Vc1 = 1st formula of concrete shear strength (ton) Pedestal
 4 ' Footing
=  2   fc b0d H3/2
 βc 
βc = ratio of long side to short side of the column,
concentrated load or reaction area
=1
B
b0 (cm) = L
= 60
d (cm) = H3 Figure 7. One-Way Punching Shear Area
= 20
thus : B1
Vc1 (ton) = 113.61
Vc2 = 2nd formula of concrete shear strength (ton)
 αs d  '
=   2 fc b0d Pedestal
 b0 
αs = 40 (for interior column) interior column

30 (for edge column) then αs = Footing

20 (for corner column) 40


thus :
H3

Vc2 (ton) = 290.35


Vc3 = 3rd formula of concrete shear strength (ton)
B
= 4 fc ' b 0 d
thus :
Vc3 (ton) = 76 Figure 8. One-Way Punching Shear Line
the smallest Vc :
Vc (ton) = 75.74
thus, Design Shear Strength :
φVc (ton) = 56.81
Page 7 - 11
18/09/2018 - 08:57

3. FOUNDATION ANALYSIS
Project Name : GEPP 40MW LUWUK Site Name : PIPE CROSSOVER
Client : PLN (PERSERO) Site ID : -
Tower Type : STEEL STRUCTURE Foundation Type : Spread Footing

then :
Vu = factored shear force on critical area (ton)
= C . Shade Ratio
where :
Footing Area  PunchingArea
Shade Ratio =
FootingArea
= 0.88
thus, Ultimate Shear Strength :
Vu (ton) = 0.40
check :
φVc > Vu ……….. OK ! (Footing is Sufficient to Support One-Way Punching Shear)

H. REQUIRED REINFORCEMENT
Pedestal Reinforcement
Design of Longitudinal Reinforcement
Minimum Percentage of Reinforcement = 1.00% Actual Percentage of Reinforcement = 1.70%
Gross Area of Section - Ag (cm2) = 625
Total Area of Longitudinal Reinforcement - Ast1 (cm2) = 6.25
Try to Use Reinforcement :
Number of Rebar = 8 Ast2 > Ast1 ………………OK ! (Assumption Rebar Area is Sufficient)
Dia. (mm) = 13
Total Area of Longitudinal Reinforcement - Ast2 (cm2) = 10.62
Type and Grade of Reinforcement = Deformed
Tensile Strength - fu (MPa) = 560
Minimum Yield Stress - fy (MPa) = 390
Concrete Cover (mm) = 50
Formula :
φPn > Pu
where :
Pu (ton) = C
= 0.46
Pn (ton) = 0.80 φ [0.85 fc' (Ag - Ast) + fy Ast] tied column, φ = 0.65 (Eq. H.1)
tied column = 0.65
= 89.15 spiral column, φ = 0.75
thus :
φPn (ton) = 57.95
Check Axial Load Capacity of Column :
φPn > Pu ……….. OK ! (Pedestal is Sufficient to Support Axial Load)
U-Stirrup
Y-Direction
Used Longitudinal Reinforcement : 8 D 13
Tied
Stirrup
Design of Ties
Longitudinal
Type and Grade of Reinforcement = Plain fu (MPa) = 380 B1
Reinforcement
Try to use Dia. (mm) = 10 fy (MPa) = 235
U-Stirrup
Spacing (S) of stirrup is the smallest from :
X-Direction
16 x dia. of longitudinal reinforcement (mm) = 208
48 x dia. of strirrup (mm) = 480
The smallest of pedestal width (mm) = 250 B1 or bw
The smallest spacing - S (mm) = 208
Used spacing - S (mm) = 200
Figure 9. Illustration of Pedestal Reinforcement
Check for Requirement Shear Reinforcement Area :

Asmin-1 (mm2) = not less than Asmin-2 (mm2) = used Asmin (mm2) = 70.92 (Eq. H.2)

= 65.69 = 70.92
Actual Shear Reinforcement Area : check :
Av (mm2) = 2 (πr2) Asmin < Av No Need Additional U-Stirrup !
= 157.08

Try to Use U-Stirrup Dia. (mm) = N/A


Direction of U-Stirrup = N/A
Spacing of U-Stirrup (mm) = N/A
Page 8 - 11
18/09/2018 - 08:57

3. FOUNDATION ANALYSIS
Project Name : GEPP 40MW LUWUK Site Name : PIPE CROSSOVER
Client : PLN (PERSERO) Site ID : -
Tower Type : STEEL STRUCTURE Foundation Type : Spread Footing

Av1 (mm2) = N/A


then, Actual Shear Reinforcement Area become :
Av' (mm2) = Av + Av1
= #VALUE!
check :
Av' > Asmin ……….. (Minimum Shear Reinforcement Area is Sufficient)

Design of Cross Sections Subject to Shear :


φVn ≥ Vu
where :
φ = shear strength red. factor = 0.65

Vn = Vc + Vs Vc (lb) = Vc (lb) = 8507.15 (Eq. H.3)


Vc (ton) = 3.86
where :
Nu (lb) = C bw (in) = B1
= 1005.31 = 9.84
Ag (in2) = B1 x B1 d (in) = B1 - c - Ds - (D/2)
= 96.88 = 7.22
f'c (psi) = 3541.61 hence :
Vn (ton) = 7.31
Vs (ton) = = 3.45 φVn (ton) = 4.75 (Eq. H.4)

Vu (ton) = H
= 0.46
check :
φVn > Vu No Need Additional U-Stirrup !

Try to Use U-Stirrup Dia. (mm) = N/A


Av' (mm2) = N/A
Direction of U-Stirrup = N/A
Spacing of U-Stirrup (mm) = N/A
Vs' (ton) = N/A
After add U-Stirrup, we get :
Vn (ton) = Vc + (Vs + Vs') = N/A
φVn (ton) = N/A
check :
φVn > Vu ……….. OK ! (Pedestal is Sufficient to Support Shear Force)

Used Tied Reinforcement : Ø 10 - 200


N/A N/A
B1
Footing Reinforcement
Try to Use Reinforcement :
Dia. (mm) = 13
Spacing (mm) = 200
Pedestal
Type and Grade of Reinforcement = Deformed
Tensile Strength - fu (MPa) = 560
Minimum Yield Stress - fy (MPa) = 390
Concrete Cover Footing
c (mm) = 50
Bearing Force of Soil to Footing - q (ton) = Qmax
= .e.L
H3

= 1.07
where :
q
e (m) = (B - B1) / 2 if centrically loaded or (B/2) + e - (B1/2) if eccentically loaded
= 0.18 e
then : B
Moment at Face of Pedestal - M (ton-m) = q . e/2 (see Figure 9)
= 0.09
The area of reinforcement : Figure 10. Critical Flexure Location
kd
b fc jd  M  A s fs j d (Eq. H.5)
2
Page 9 - 11
18/09/2018 - 08:57

3. FOUNDATION ANALYSIS
Project Name : GEPP 40MW LUWUK Site Name : PIPE CROSSOVER
Client : PLN (PERSERO) Site ID : -
Tower Type : STEEL STRUCTURE Foundation Type : Spread Footing
2

then :
Asreq. (mm2) = M / (fs j d) Es (MPa) = 199948 Ec (MPa) = 23225
where :
fs (MPa) = fy
j = 1 - k/3 k = n / (n + r) n = Es/Ec r = fy / f'c
= 0.88 = 0.35 = 8.61 = 15.66
d (mm) = H3 - concrete cover - rebar diameter/2
= 143.5
thus :
Asreq. (mm2) = 18.52
then :
Total Area of Reinforcement - Astotal (mm2) = 464.56
Check :
Astotal > Asreq ……….. OK ! (Assumption Rebar Area is Sufficient)

Used X - Reinforcement (Top & Bott.) : D 13 - 200


Used Y - Reinforcement (Top & Bott.) : D 13 - 200

Tie Beam Reinforcement


Design of Longitudinal Reinforcement
Try to Use Reinforcement :
Number of Rebar = 4
Top Rebar Arrangement = 2
Bottom Rebar Arrangement = 2 MA MB
Dia. (mm) = 13 w
Total Area of Longitudinal Reinforcement - Ast (cm2) 5=.31 N N
Tension Area of Longitudinal Reinforcement - As (cm2) =2.65 A B
fmax
Type and Grade of Reinforcement = Deformed
Tensile Strength - fu (MPa) = 560
L
Minimum Yield Stress - fy (MPa) = 390
Concrete Cover (mm) = 40
̶ ̶

Check Flexural Reinforcement Capacity : +


φMn > Mu
Mmax
where :
φ = 0.90 Figure 11. Force Diagram of Tie Beam

 a A s fy
Mn (ton-m) = As fy d -  a (cm) = (Eq. H.6)
 2 0.85fc ' b
= #DIV/0! = #DIV/0!
φMn (ton-m) = #DIV/0!
then :
Loading on Tie Beam :
wtie beam (ton/m) = 0.00
wsoil above tie beam (ton/m) = 0.00 w (ton/m) = 0.25
wlive load (ton/m) = 0.25
thus, Forces which working on Tie Beam :
Bending Moment on Tie Beam :
MA = MB (ton-m) = (wL2)/12 (Eq. H.7)
= 0.02
M (ton-m) = 0.02
Mmax (ton-m) = (wL2)/24 (Eq. H.8)
= 0.01
Normal Force on Tie Beam :
N (ton) = 0.10 C + H C = 0.46
= 0.50 H = 0.46
fmax (m) = (wL4) / 384 EI E (MPa) = 23217.24 (Eq. H.9)
2
= N/A E (ton/m ) = 2368158.36
MN (ton-m) = N . fmax I (m4) = 0.0000
= N/A
Page 10 - 11
18/09/2018 - 08:57

3. FOUNDATION ANALYSIS
Project Name : GEPP 40MW LUWUK Site Name : PIPE CROSSOVER
Client : PLN (PERSERO) Site ID : -
Tower Type : STEEL STRUCTURE Foundation Type : Spread Footing

hence :
Mu (ton-m) = M + MN
= #DIV/0!
thus :
φMn N/A

Used Longitudinal Reinforcement : 4 D 13

Design of Ties
Formula :

Asmin-1 (mm2) = not less than Asmin-2 (mm2) = used Asmin (mm2) = 0.00 (Eq. H.10)

= 0.00 = 0.00

Type and Grade of Reinforcement = Plain fu (MPa) = 380


Try to use Dia. (mm) = 8 fy (MPa) = 235
As (mm2) = 100.53 As > used Asmin …………… (Shear Reinforcement Area is Sufficient)
Spacing (S) of stirrup is shall be less than from : d/2
S (mm) = -27.25
Used S (mm) = -20

Check for Reinforcement Shear Capacity :


Formula :
Vs (ton) = (Eq. H.11)

= 6.44
Check for Concrete Shear Capacity : Tied Ties

Formula : H2
Vc (ton) = 0.17λ f'c b w d λ = 1 Longitudinal (Eq. H.12)
= 0.00 Reinforcement

Nominal Shear Force :


Vn (ton) = Vc + Vs (Eq. H.13)
B2 or bw
= 6.44
Ultimate Shear Force :
Vu (ton) = w/2 w (ton) = 0.24 Figure 12. Illustration of Tie Beam Reinforcement
= 0.12
Check for Design Concrete Shear Capacity :
Formula :
φVn ≥ Vu (Eq. H.14)
where :
φ = shear reduction factor
= 0.75
then :
φVn (ton) = 4.83
check :
φVn > Vu ……….. OK ! (Design Shear Capacity of Tie Beam is Sufficient)

Used Tied Reinforcement : Ø8 -- 20


Page 11 - 11
18/09/2018 - 08:57

3. FOUNDATION ANALYSIS
Project Name : GEPP 40MW LUWUK Site Name : PIPE CROSSOVER
Client : PLN (PERSERO) Site ID : -
Tower Type : STEEL STRUCTURE Foundation Type : Spread Footing

I. SUMMARY OF ANALYSIS
Table of Summary of Analysis
Foundation Stability
Max. Base Pressure Allowable Bearing of Soil
Design Requirement Ratio Remark for Analysis Result
(ton/m2) (ton/m2)
Qmax. 4.06 q all 12.66666667 3.12 OK - design is sufficient
Bearing Capacity
Qmin. 0.11 qall 0 - OK - found. is stable
Ultimate Uplift Force - Tu Allowable Uplift Force - Tall
Design Requirement Ratio Remark for Analysis Result
(ton) (ton)
Uplift Capacity 0.01 1.18 117.78 OK - design is sufficient

Design Requirement Actual Safety Factor Minimum Safety Factor Ratio Remark for Analysis Result

Sliding Capacity 1.8 1.5 1.23 OK - design is sufficient


Concrete Assessment
Ultimate Axial Force - Pu Design Axial Force - φPn
Design Requirement Ratio Remark for Analysis Result
(ton) (ton)
Pedestal - Axial Capacity 0.46 57.95 127.08 OK - design is sufficient
Ultimate Shear Force - Vu Design Shear Force - φVn
Design Requirement Ratio Remark for Analysis Result
(ton) (ton)
Pedestal - Shear Capacity 0.46 4.75 10.42 OK - design is sufficient
Ultimate Shear Force - Vu Design Shear Force - φVc
Design Requirement Ratio Remark for Analysis Result
(ton) (ton)
Slab - Punching Shear by Pedestal - One Way 0.40 56.81 142.37 OK - design is sufficient
Slab - Punching Shear by Pedestal - Two Ways 0.20 170.42 854.24 OK - design is sufficient
Ultimate Shear Force - Vu Design Shear Force - φVc
Design Requirement Ratio Remark for Analysis Result
(ton) (ton)
Tie Beam - Shear Capacity 0.12 4.83 40.66 OK - design is sufficient