OWNER :
ENGINEER:
CONTRACT NO. :
0758.PJ/DAN.02.01/DIR/2017
TITLE:
DOC. NO.:
CONTRACTOR :
KONSORSIUM
LGE001-CSA-CAL-045
Page 1 - 11
18/09/2018 - 08:57
3. FOUNDATION ANALYSIS
Project Name : GEPP 40MW LUWUK Site Name : PIPE CROSSOVER
Client : PLN (PERSERO) Site ID : -
Tower Type : STEEL STRUCTURE Foundation Type : Spread Footing
A. LOAD CASE
Maximum Force on Pedestal :
Uplift Force - T (ton) = 0.01
Compressive Force - C (ton) = 0.46
Lateral Force - H (ton) = 0.46 eB
Moment - M (ton-m) = 0.46
B1
Load Eccentricities :
eL
Eccentricity along Width of Footing - eB (m) = 0.00 Pedestal
Eccentricity along Length of Footing - eL (m) = 0.00
Footing
B. FOUNDATION GEOMETRY
Y Tie Beam
Depth of Foundation - H (mm) = 800
L
Pedestal B2
Center to Center Pedestal - Sp (mm) = 1200 X
Width of Pedestal - B1 (mm) = 250 B
Height of Pedestal above Ground - T1 (mm) = 175
B1
Height of Pedestal - H1 (mm) = 775
Edge Pedestal to Edge Footing - B' (mm) = 175
Grade of Concrete - K (kg/cm2) Ground Level
T1
= 300
f'c (kg/cm2) = 300
T2
Pedestal
Tie Beam φ
H1
Tie Beam
H2
Width of Tie Beam - B2 (mm) = 0
T4
Backfill
Height of Tie Beam - H2 (mm) = 0
H
T3
Top Tie Beam to Ground Surface - T2 (mm) = N/A
Grade of Concrete - K (kg/cm2) = 300
H3
Footing
f'c (kg/cm2) = 300
Footing B
Width of Footing - B (mm) = 600
Length of Footing - L (mm) = 1500
Footing Thickness - H3 (mm) = 200 Figure 1. Foundation Geometry
Top Footing to Bottom Tie Beam - T3 (mm) = N/A
Top Footing to Ground Surface - T4 (mm) = 600
Grade of Concrete - K (kg/cm2) = 300
f'c (kg/cm2) = 300
D. BEARING CAPACITY
Eccentricity Load Condition = No Eccentricity
eL/L = 0.000 L (m) = 1.50
eB/B = 0.000 B (m) = 0.60
Case of Two-Way Eccentricities : N/A Case of One-Way Eccentricity : N/A
Case 1 : eL/L ≥ 1/6 and eB/B ≥ 1/6 NO Case 1 : Eccentricity along Width of Footing (eL = 0) NO
Case 2 : eL/L < 0.5 and 0 < eB/B < 1/6 NO Case 2 : Eccentricity along Length of Footing (eB = 0) NO
Case 3 : eL/L < 1/6 and 0 < eB/B < 0.5 NO Effective Area of Foundation caused by Eccentricity :
Case 4 : eL/L < 1/6 and eB/B < 1/6 NO A' (m2) = B' L' = N/A
B' (m) = Effective Width = N/A (Two-Way Eccentricities)
Case 3 Case 4
B1/B B2/B B2/B
0.00 0.00 0.00
= N/A (One-Way Eccentricity)
L' (m) = Effective Length = N/A (Two-Way Eccentricities)
Case 2 Case 4
L1/L L2/L L2/L
0.00 0.00 0.00
= N/A (One-Way Eccentricity)
Page 2 - 11
18/09/2018 - 08:57
3. FOUNDATION ANALYSIS
Project Name : GEPP 40MW LUWUK Site Name : PIPE CROSSOVER
Client : PLN (PERSERO) Site ID : -
Tower Type : STEEL STRUCTURE Foundation Type : Spread Footing
where :
Case 1
h1
q1 c
Square φ
GWT
H
ϒsat
then :
h1 (m) = NO (level of GWT below ground surface)
GWT Cond. = N/A (see Figure 2) q2
H' (m) = 0.00
He (m) = 0.5B tan (45 + φ/2) (approximately depth of B
= 0.47 wedge zone)
φ = 25° (internal friction angle)
Nq = 12.7 Case 2
(Terzaghi's bearing
Nc = 25.1
capacity factor)
Nγ = 9.7
sc = 1.30 ϒ
(shape factor) c
sγ = 0.80
H = h1
φ
γe (ton/m3) = ( γe is an everage effective
unit weight of the soil in
= 0.00 the wedge zone) q
q (ton/m2) = Overburden Pressure (OP) γ' (ton/m3) = γsat - γw GWT
= γH = 0.79 B ϒsat
= 1.38
c (ton/m2) = Cohession
= 3.50 Case 3
thus, Terzaghi's Ultimate Bearing Capacity :
qu (ton/m2) = 135.81
Bearing Capacity of an Eccentically Loaded Foundation : ϒ
Qu (ton) = qu A' c
= 0.00 φ
H
SF = 3 q
qall (ton/m2) = 45.27 (centrically loaded)
qall (ton/m2) = N/A
wedge zone
(eccentrically loaded) B
H'
q'
Bearing Capacity According to Meyerhof's Formula :
GWT
qu (ton) = (Eq. D.2)
where : ϒsat
3. FOUNDATION ANALYSIS
Project Name : GEPP 40MW LUWUK Site Name : PIPE CROSSOVER
Client : PLN (PERSERO) Site ID : -
Tower Type : STEEL STRUCTURE Foundation Type : Spread Footing
then :
φ = 25° (internal friction angle)
Nq = 10.7
(Meyerhof's bearing
Nc = 20.71
capacity factor)
Nγ = 6.8
Kp = tan2 (45 + φ/2)
= 2.46
B' (m) = Effective Width
= 0.60
D (m) = 0.80
shape factor :
sc = 1.49
sq = sγ = 1.25
depth factor :
dc = 1.42
dq = dγ = 1.21
γe (ton/m3) = ( γe is an everage effective (Eq. D.3)
unit weight of the soil in
= 0.00 the wedge zone)
q (ton/m2) = Overburden Pressure γ' (ton/m3) = γsat - γw
= γH
= 1.38
c (ton/m2) = Cohession
= 3.50
thus, Meyerhof's Ultimate Bearing Capacity :
qu (ton/m2) = 181.14
Ultimate Load of an Eccentically Loaded Foundation :
C
Qu (ton) = qu A'
= 0.00
then, Meyerhof's Allowable Bearing Capacity : M
qall (ton/m2) = qu/SF (if centrically loaded) or (Qu/A)/SF (if eccentrically loaded)
SF = 3
qall (ton/m2) = 60.38 (centrically loaded)
qall (ton/m2) = N/A (eccentrically loaded)
The summary of Allowable Bearing Capacity - qall :
qall (ton/m2) = 12.67 (Sondir)
qall (ton/m2) = 45.27 (Terzaghi)
qall (ton/m2) = 60.38 (Meyerhof)
qall (ton/m2) = 12.67 (Used allowable bearing capacity)
Check bearing capacity against compressive force :
Q min
P M P M
Q max
where : B
P (ton) = Wc + Ws + C
= 1.87
A (m2) = BxL Figure 3. Illustration of Bearing Pressure under Footing
= 0.9
M (ton-m) = H x Ht if centrically loaded or (H x Ht) + (C x e) if eccentrically loaded
= 0.44
S (m3) = Static Moment of Section
= 0.23
thus :
Qmax (ton/m2) = 4.06
Qmax < Qall ……….. OK ! (Foundation is Sufficient to Support Compressive Force)
Qmin (ton/m2) = 0.11
Qmin > 0 ……….. OK ! (Foundation is Stable)
Page 4 - 11
18/09/2018 - 08:57
3. FOUNDATION ANALYSIS
Project Name : GEPP 40MW LUWUK Site Name : PIPE CROSSOVER
Client : PLN (PERSERO) Site ID : -
Tower Type : STEEL STRUCTURE Foundation Type : Spread Footing
20
Ku = tan 2 45 Kp (Eq. E.7)
2
= 2.04
Ku = Kp
= 1.43
Ku = 0.65 + 0.5φ ===> ( φ in radians)
= 0.87
Ku = Ko
= 1 - sin 20° Figure 4. Footings for Tension Load
= 0.66
Average Ku = 1.25
γ (ton/m3) = Unit Weight of Soil = γwet Unit Weight of Water - γw (ton/m3) = 1
= 1.73 Moisture Content - w (%) = 34.07
Page 5 - 11
18/09/2018 - 08:57
3. FOUNDATION ANALYSIS
Project Name : GEPP 40MW LUWUK Site Name : PIPE CROSSOVER
Client : PLN (PERSERO) Site ID : -
Tower Type : STEEL STRUCTURE Foundation Type : Spread Footing
γsat (ton/m3) = Saturated Unit Weight of Soil Specific Gravity of Soil - Gs = 2.59
= 1.79 γdry (ton/m3) = γwet / (1 + w) (Eq. E.8)
3
γc (ton/m ) = Unit Weight of Concrete = 1.29
= 2.40 Vs (m3) = γdry / (Gs γw) (Eq. E.9)
3
Vc (m ) = 0.23 (volume of concrete) = 0.50
Wc (ton) = 0.55 (weight of concrete) Vv (m3) = 1 - Vs (Eq. E.10)
3 st
Vs1 (m ) = 0.50 (volume of backfill soil - 1 layer) = 0.50
Vs2 (m3) = 0.00 (volume of backfill soil - 2 nd layer)
Ws (ton) = 0.87 (weight of backfill soil)
W (ton) = Wc + Ws
= 1.42 (total weight of concrete + backfill soil)
thus, Ultimate Uplift Force :
Tu (ton) = 3.53
Allowable Uplift Force :
Tall (ton) = Tu/SF
SF = 3
Tall (ton) = 1.18
check :
Tall > T ……….. OK ! (Foundation is Sufficient to Support Uplift Force)
4 '
= 2 fc b 0 d (Eq. G.1)
β c
= 180 Footing
d (cm) = H3
= 20 H3/2 B1 H3/2
thus :
b0
Vc1 (ton) = 340.84
Vc2 = 2nd formula of concrete shear strength (ton)
B
α d '
= s 2 fc b 0 d (Eq. G.2)
b0 Figure 5. Two-Way Punching Shear Area
αs = 40 (for interior column) interior column
3. FOUNDATION ANALYSIS
Project Name : GEPP 40MW LUWUK Site Name : PIPE CROSSOVER
Client : PLN (PERSERO) Site ID : -
Tower Type : STEEL STRUCTURE Foundation Type : Spread Footing
thus :
Vc2 (ton) = 366.09 B1
Vc3 = 3rd formula of concrete shear strength (ton)
= 4 fc ' b 0 d (Eq. G.3)
thus :
Vc3 (ton) = 227
Pedestal
the smallest Vc :
Vc (ton) = 227.23
thus, Design Shear Strength :
Footing
φVc (ton) = 170.42
then :
Vu = factored shear force on critical area (ton)
H3
= C . Shade Ratio (Eq. G.4)
where :
FootingArea PunchingArea B
Shade Ratio = (Eq. G.5)
FootingArea
= 0.44 Figure 6. Two-Way Punching Shear Line
thus, Ultimate Shear Strength :
Vu (ton) = 0.20
check :
φVc > Vu ……….. OK ! (Footing is Sufficient to Support Two-Way Punching Shear)
L = b0
Vc1 = 1st formula of concrete shear strength (ton) Pedestal
4 ' Footing
= 2 fc b0d H3/2
βc
βc = ratio of long side to short side of the column,
concentrated load or reaction area
=1
B
b0 (cm) = L
= 60
d (cm) = H3 Figure 7. One-Way Punching Shear Area
= 20
thus : B1
Vc1 (ton) = 113.61
Vc2 = 2nd formula of concrete shear strength (ton)
αs d '
= 2 fc b0d Pedestal
b0
αs = 40 (for interior column) interior column
3. FOUNDATION ANALYSIS
Project Name : GEPP 40MW LUWUK Site Name : PIPE CROSSOVER
Client : PLN (PERSERO) Site ID : -
Tower Type : STEEL STRUCTURE Foundation Type : Spread Footing
then :
Vu = factored shear force on critical area (ton)
= C . Shade Ratio
where :
Footing Area PunchingArea
Shade Ratio =
FootingArea
= 0.88
thus, Ultimate Shear Strength :
Vu (ton) = 0.40
check :
φVc > Vu ……….. OK ! (Footing is Sufficient to Support One-Way Punching Shear)
H. REQUIRED REINFORCEMENT
Pedestal Reinforcement
Design of Longitudinal Reinforcement
Minimum Percentage of Reinforcement = 1.00% Actual Percentage of Reinforcement = 1.70%
Gross Area of Section - Ag (cm2) = 625
Total Area of Longitudinal Reinforcement - Ast1 (cm2) = 6.25
Try to Use Reinforcement :
Number of Rebar = 8 Ast2 > Ast1 ………………OK ! (Assumption Rebar Area is Sufficient)
Dia. (mm) = 13
Total Area of Longitudinal Reinforcement - Ast2 (cm2) = 10.62
Type and Grade of Reinforcement = Deformed
Tensile Strength - fu (MPa) = 560
Minimum Yield Stress - fy (MPa) = 390
Concrete Cover (mm) = 50
Formula :
φPn > Pu
where :
Pu (ton) = C
= 0.46
Pn (ton) = 0.80 φ [0.85 fc' (Ag - Ast) + fy Ast] tied column, φ = 0.65 (Eq. H.1)
tied column = 0.65
= 89.15 spiral column, φ = 0.75
thus :
φPn (ton) = 57.95
Check Axial Load Capacity of Column :
φPn > Pu ……….. OK ! (Pedestal is Sufficient to Support Axial Load)
U-Stirrup
Y-Direction
Used Longitudinal Reinforcement : 8 D 13
Tied
Stirrup
Design of Ties
Longitudinal
Type and Grade of Reinforcement = Plain fu (MPa) = 380 B1
Reinforcement
Try to use Dia. (mm) = 10 fy (MPa) = 235
U-Stirrup
Spacing (S) of stirrup is the smallest from :
X-Direction
16 x dia. of longitudinal reinforcement (mm) = 208
48 x dia. of strirrup (mm) = 480
The smallest of pedestal width (mm) = 250 B1 or bw
The smallest spacing - S (mm) = 208
Used spacing - S (mm) = 200
Figure 9. Illustration of Pedestal Reinforcement
Check for Requirement Shear Reinforcement Area :
Asmin-1 (mm2) = not less than Asmin-2 (mm2) = used Asmin (mm2) = 70.92 (Eq. H.2)
= 65.69 = 70.92
Actual Shear Reinforcement Area : check :
Av (mm2) = 2 (πr2) Asmin < Av No Need Additional U-Stirrup !
= 157.08
3. FOUNDATION ANALYSIS
Project Name : GEPP 40MW LUWUK Site Name : PIPE CROSSOVER
Client : PLN (PERSERO) Site ID : -
Tower Type : STEEL STRUCTURE Foundation Type : Spread Footing
Vu (ton) = H
= 0.46
check :
φVn > Vu No Need Additional U-Stirrup !
= 1.07
where :
q
e (m) = (B - B1) / 2 if centrically loaded or (B/2) + e - (B1/2) if eccentically loaded
= 0.18 e
then : B
Moment at Face of Pedestal - M (ton-m) = q . e/2 (see Figure 9)
= 0.09
The area of reinforcement : Figure 10. Critical Flexure Location
kd
b fc jd M A s fs j d (Eq. H.5)
2
Page 9 - 11
18/09/2018 - 08:57
3. FOUNDATION ANALYSIS
Project Name : GEPP 40MW LUWUK Site Name : PIPE CROSSOVER
Client : PLN (PERSERO) Site ID : -
Tower Type : STEEL STRUCTURE Foundation Type : Spread Footing
2
then :
Asreq. (mm2) = M / (fs j d) Es (MPa) = 199948 Ec (MPa) = 23225
where :
fs (MPa) = fy
j = 1 - k/3 k = n / (n + r) n = Es/Ec r = fy / f'c
= 0.88 = 0.35 = 8.61 = 15.66
d (mm) = H3 - concrete cover - rebar diameter/2
= 143.5
thus :
Asreq. (mm2) = 18.52
then :
Total Area of Reinforcement - Astotal (mm2) = 464.56
Check :
Astotal > Asreq ……….. OK ! (Assumption Rebar Area is Sufficient)
a A s fy
Mn (ton-m) = As fy d - a (cm) = (Eq. H.6)
2 0.85fc ' b
= #DIV/0! = #DIV/0!
φMn (ton-m) = #DIV/0!
then :
Loading on Tie Beam :
wtie beam (ton/m) = 0.00
wsoil above tie beam (ton/m) = 0.00 w (ton/m) = 0.25
wlive load (ton/m) = 0.25
thus, Forces which working on Tie Beam :
Bending Moment on Tie Beam :
MA = MB (ton-m) = (wL2)/12 (Eq. H.7)
= 0.02
M (ton-m) = 0.02
Mmax (ton-m) = (wL2)/24 (Eq. H.8)
= 0.01
Normal Force on Tie Beam :
N (ton) = 0.10 C + H C = 0.46
= 0.50 H = 0.46
fmax (m) = (wL4) / 384 EI E (MPa) = 23217.24 (Eq. H.9)
2
= N/A E (ton/m ) = 2368158.36
MN (ton-m) = N . fmax I (m4) = 0.0000
= N/A
Page 10 - 11
18/09/2018 - 08:57
3. FOUNDATION ANALYSIS
Project Name : GEPP 40MW LUWUK Site Name : PIPE CROSSOVER
Client : PLN (PERSERO) Site ID : -
Tower Type : STEEL STRUCTURE Foundation Type : Spread Footing
hence :
Mu (ton-m) = M + MN
= #DIV/0!
thus :
φMn N/A
Design of Ties
Formula :
Asmin-1 (mm2) = not less than Asmin-2 (mm2) = used Asmin (mm2) = 0.00 (Eq. H.10)
= 0.00 = 0.00
= 6.44
Check for Concrete Shear Capacity : Tied Ties
Formula : H2
Vc (ton) = 0.17λ f'c b w d λ = 1 Longitudinal (Eq. H.12)
= 0.00 Reinforcement
3. FOUNDATION ANALYSIS
Project Name : GEPP 40MW LUWUK Site Name : PIPE CROSSOVER
Client : PLN (PERSERO) Site ID : -
Tower Type : STEEL STRUCTURE Foundation Type : Spread Footing
I. SUMMARY OF ANALYSIS
Table of Summary of Analysis
Foundation Stability
Max. Base Pressure Allowable Bearing of Soil
Design Requirement Ratio Remark for Analysis Result
(ton/m2) (ton/m2)
Qmax. 4.06 q all 12.66666667 3.12 OK - design is sufficient
Bearing Capacity
Qmin. 0.11 qall 0 - OK - found. is stable
Ultimate Uplift Force - Tu Allowable Uplift Force - Tall
Design Requirement Ratio Remark for Analysis Result
(ton) (ton)
Uplift Capacity 0.01 1.18 117.78 OK - design is sufficient
Design Requirement Actual Safety Factor Minimum Safety Factor Ratio Remark for Analysis Result