Professional Documents
Culture Documents
KEY PLAN :
TABEL PENULANGAN SLOOF (SLF1) DAN PEDESTAL
A A
TIPE SLF 1 PEDESTAL
DIMENSI 300 x 400 1000 x 1000
U
P3 P1 P1 P2 P3
DAERAH TUMPUAN LAPANGAN
SLF 1 SLF 1 SLF 1 SLF 1
7 BP1 BP2 BP2 BP1 BP1
B POTONGAN B
³
P3 P1 P1 P2 P3
D D
SLF 1 SLF 1
P4
P5 SLF 1
5 BP3 BP3
E E
F
F
P3 SLF 1 P3
4 PD2 PD2
SLF 1 SLF 1
P3 P1 P1 P2 P3
REFERENCE DRAWING
REVISIONS
P3 P1 P1 P2 P3
PT. PROSYS BANGUN PERSADA I
SLF 1 SLF 1 SLF 1 SLF 1
I
2 BP1 BP2 BP2 BP1 BP1
JAKARTA - INDONESIA
PROJECT :
P4
EPCC PENINGKATAN KAPASITAS PG. GEMPOL KREP
P5 SLF 1 DARI 6500 MENJADI 8000 TCD TERINTEGRITASI
J 1 BP3 BP3
DENGAN BIOETHANOL DAN COGENERATION
J
TITLE :
Drawing of Water Tube Boiler Bagasse & Gas Fuel Foundation
LAYOUT BOILER FOUNDATION & SLOOF
DRAWN SIZE :
K A B C D E CHECKE'D A3 K
APPROVED
P1-6A-C3-DW-001-R03-C
. 1 OF 7 3
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16