GIRDER SAMPING JEMBATAN


SKALA 1: 35
10318
159 1000 1000 1000 1000 1000 1000 1000 1000 1000 1000 159

NOTES :
1. ALL DIMENSION ARE IN MILLIMETERS
UNLESS OTHERWISE NOTED
2. ALL COORDINATES AND ELEVATION
ARE IN METERS UNLESS OTHERWISE
RAILING SAMPING JEMBATAN NOTED
3. MATERIAL
SKALA 1: 35 - CONCRETE PILE CAP : K-300
- LEAN CONCRETE : K-150
- DEFORMED BAR FOR : 400 MPa(BJTD40)
D 13mm
6600 - PLAIN BAR FOR : 240 MPa(BJTP24)
1100 1100 1100 1100 1100 1100 D 13mm
- GROUTING : SIKAGROUT 215

DRAWING NO. TITLE

REFERENCE DRAWING

GIRDER POTONGAN B-B 1


0
04/01/2019
21/12/2018
ISSUED FOR APPROVE
ISSUED FOR REVIEW
PREP'D APP'D CHK'D APP'D
SKALA 1: 35 REV. DATE DESCRIPTION
PMC PTPN X

125
25 75 25 PT. PERKEBUNAN NUSANTARA X
SURABAYA-INDONESIA
75 100 75
250

PT. PROSYS BANGUN PERSADA


JAKARTA-INDONESIA
100

PT. BARATA INDONESIA


GRESIK-INDONESIA

PROJECT :

EPCC PENINGKATAN KAPASITAS PG. GEMPOL KREP


DARI 6500 TCD MENJADI 8000 TCD TERINTEGRITAS
J
DENGAN PABRIK BIOETHANOL DAN COGENERATION
TITLE :
Detail Girder & Railing Samping Jembatan

BARATA PMC PTPN X SCALE :


DESCRIPTION
SIGN DATE SIGN DATE SIGN DATE

DRAWN

CHECKE'D A3
APPROVED

DWG No. SHEET

P1 - 92 - C3 - DW - 002 - 00 - C 6 OF 6