This safety plan should be prepared by contractor before a project start. This document will outlines the safety precautions that will be taken
during a specific project.
PROJECT TITLE : Exhaust Blower Replacement
NAME OF CONTRACTOR : UNI-TEC GLOBAL ENTERPRISES
We the UNI-TEC Global, has the project goal of ZERO accidents and ZERO injuries, with work task
designed to minimize or eliminate hazards to personels,processes and equipment and the general
public. No worker should ever perform a task that may endanger their own safety and health or
that of others.
This SSSP outlines the Environment, Safety, and Health (ES&H) requirements and guidelines
developed
for the Exhaust Blower Replacement Project. These requirements are written to help protect site
personnel, visitors, and the general public from exposure to potential E S &H hazards on this job
site. There are several plans and actions that are included to ensure that we act to protect the
environment, the general public, as well as our workforce during the construction phase of this
project. This plan shall be updated if there are major changes to project conditions, situations, or
exposures, and those revisions shall be noted on the document. An employee acknowledgement
form documents that each employee understands the SSSP and will implement these safety and
health requirements on this job site.
PROJECT DESCRIPTION:
Construction and installation of Exhaust Blower ducts, Fabrication of flatform and ducts.
HAZARD ANALYSIS
NO TASK HAZARDS CONTROLS
Fall from heigths Wear full body harness
Fall of objects/materials Provision of toolbags
Ergonomics Buddy system, frequent breaks
1 Installation of scaffolds for access Provision of temporary cover,frequent
Exposure to extreme environment
breaks
Inspection/Secure scaffolds, provision
Collapse of scaffold
of supports.
Slip/trip Wear rubber soled safety shoes
Buddy system, frequent breaks,
Proper lifting techniques, proper
Ergonomics
working instruction, streching before
work.
Slip/Trip Wear rubber soled safety shoes
Use of safety line, provision of safety
nets and board ups, Use of chain
Fall of objects/materials blocks on carrying loads, secure loads
2 Hauling of materials. with tight rope.
Secure Lifelione, always wear full body
harness while on top of scaffolds, do
Fall from heigths not over lean, do not over reach.
Provision of board ups on stationary
positions.
Inspection/Secure scaffolds, provision
Collapse of scaffold of supports.
Frequent breaks.
Provision of rest area if the area is
fully exposed of direct heat.
Extreme heat/ prolonged exposure
Always keep hydrated, Provision of
clean potable water at site.
Frequent job rotation.
Always store cylinder tanks in upright
position.
Provision of flashback arresters.
Compressed gas cylinder Proper material handling while
Fabrication of flatform transporting, provision of pushcarts.
(welding works) Chain tie up cylinder tanks in case of
stationary works.
Cylinders are tied and secured properly with proper chains attached and built I flashback arrester for in
use purposes.
HOT WORKS: Please tick (ü) what is applicable
Welding Soldering Others: Pls Specifiy
Cutting Thawing
Grinding _________________
FIRST AID:
NAME OF FIRST AID PERSONNEL
1. JULIUS ERLANO
We refer and comply on the exisisting emergency and evacuation plan of Yutaka management, thus
having a separate TBM fo the said program.
HAZARDOUS CHEMICALS: (List up all chemicals to be used )
1.) Oxyacethene 4.) ___________________ 7.) ___________________
2.) Red Oxide Primer paint 5.) ___________________ 8.) ___________________
3.) QDE Paint 6.) ___________________ 9.) ___________________