SAFETY PLAN

This safety plan should be prepared by contractor before a project start. This document will outlines the safety precautions that will be taken
during a specific project.
PROJECT TITLE : Exhaust Blower Replacement
NAME OF CONTRACTOR : UNI-TEC GLOBAL ENTERPRISES

DATE START 2-Jan-20


DATE END 23-Feb-20

PROJECT MANAGER : ANDREI BUENAVISTA


CONTACT NUMBER : 09178817790

SAFETY OFFICER : JULIUS ERLANO


CONTACT NUMBER : 09171999112

PURPOSE OF SAFETY PLAN:

We the UNI-TEC Global, has the project goal of ZERO accidents and ZERO injuries, with work task
designed to minimize or eliminate hazards to personels,processes and equipment and the general
public. No worker should ever perform a task that may endanger their own safety and health or
that of others.

This SSSP outlines the Environment, Safety, and Health (ES&H) requirements and guidelines
developed
for the Exhaust Blower Replacement Project. These requirements are written to help protect site
personnel, visitors, and the general public from exposure to potential E S &H hazards on this job
site. There are several plans and actions that are included to ensure that we act to protect the
environment, the general public, as well as our workforce during the construction phase of this
project. This plan shall be updated if there are major changes to project conditions, situations, or
exposures, and those revisions shall be noted on the document. An employee acknowledgement
form documents that each employee understands the SSSP and will implement these safety and
health requirements on this job site.

PROJECT DESCRIPTION:

Construction and installation of Exhaust Blower ducts, Fabrication of flatform and ducts.

HAZARD ANALYSIS
NO TASK HAZARDS CONTROLS
Fall from heigths Wear full body harness
Fall of objects/materials Provision of toolbags
Ergonomics Buddy system, frequent breaks
1 Installation of scaffolds for access Provision of temporary cover,frequent
Exposure to extreme environment
breaks
Inspection/Secure scaffolds, provision
Collapse of scaffold
of supports.
Slip/trip Wear rubber soled safety shoes
Buddy system, frequent breaks,
Proper lifting techniques, proper
Ergonomics
working instruction, streching before
work.
Slip/Trip Wear rubber soled safety shoes
Use of safety line, provision of safety
nets and board ups, Use of chain
Fall of objects/materials blocks on carrying loads, secure loads
2 Hauling of materials. with tight rope.
Secure Lifelione, always wear full body
harness while on top of scaffolds, do
Fall from heigths not over lean, do not over reach.
Provision of board ups on stationary
positions.
Inspection/Secure scaffolds, provision
Collapse of scaffold of supports.

Provision of fire extiguisher


Provision of fire blankets
Inspection of tools & equipment
before use.
Remove all combustible materials in
activity area.
Fire hazard combustion,flammable, ignition
Coordinate Hot works before start of
source.
work, accomplish hotwork permit.
Provision of fire watchmen on and
after work.
Isolate the affected area during
activity.

Provision use of Fullface


shield/goggles.
Proper material guarding.
Foreign fying objects Isolate/ barricade the area affected.
Use of long sleeved uniforms.

Provision/use of face mask.


Ensure the work area is properly
ventilated.
Exposure to dust Provision of long sleeved uniforms.
Kepp 5's on and after work.

Frequent breaks.
Provision of rest area if the area is
fully exposed of direct heat.
Extreme heat/ prolonged exposure
Always keep hydrated, Provision of
clean potable water at site.
Frequent job rotation.
Always store cylinder tanks in upright
position.
Provision of flashback arresters.
Compressed gas cylinder Proper material handling while
Fabrication of flatform transporting, provision of pushcarts.
(welding works) Chain tie up cylinder tanks in case of
stationary works.

Provision/use of face mask.


Ensure the work area is properly
Inhalation of fumes ventilated.
Keep 5's on and after work.
Provision of exhaust ventilation.
Avoid prolonged exposure, job
rotation, frequent breaks.
Radiation Ensure safe distance of workers to the
area affected.
Isolate/barricade the area affected.
Provision/use of welding/leather
gloves.
Bruises and burns
Provision of bump guards.
Isolate the inflicted item/s.
Provision/use of dark glass.
Provision of heat/fire resistant cloth.
Do not focus directly on the flashes
w/o safety gear.
Arc and flashes
Provision of long sleeved jacket jeans.

Use of ear plugs.


Excessive noise Ensure work area is well ventillated
and open area.
Inspection of welding machine and
extension cords before use.
Provision of circuit breakers.
Do not use deffective items.
Electrocution Acknowledge location of safety switch
and panel for easy access in case of
emergency.
Use of gloves, rubber sole safety
shoes, and leather apparel.

Secure materials with thight rope.


Ensure sling are properly attached.
Ensure the item is properly hoist into
position.
Fall of materials Check/inspect mobile crane before
use.
Do not stay under the working area
affected.
Isolate/barricade the area.

Checking and inspection of mobile


crane before use.
Ensure outriggers and properly
deployed.
Collapse of crane Ensure proper load ratings.
Lifting of Exhaust blowers Ensure proper training of operators.
Crane/boom operations Ensure proper instructions are being
held.
Do not over load.

Do not drag items.


Do not over load.
Do not use exccessive speeds when
Damage to property items are loaded.
Remove/clear att un necessary
materials on affected area.

Improper load rating Compute accurately SWL.


Manuever mobile crane on level and
even surface.
Improper angle of un-even landscape Check and verify allowance of spaces
of work spaces.
Note: Use additional sheet(s) if necessary.
SAFETY SIGNAGES: Please tick (ü) what is applicable
Authorized Personnel Only Fall Protection required Others: Pls Specifiy
Hard Hats required Ear Protection Required
Safety Glass Required
NOISE MITIGATION: (Discuss the activity to be employed)
_____________________________________________________________________________________
PERSONAL PROTECTIVE EQUIPMENT: Please tick (ü) what is applicable
Hard Hats Safety Shoes Others: Pls Specifiy
Safety Glasses Safety Gloves
Ear Plugs/Muff Safety Harness
FALL PROTECTION: (Discuss the activity to be employed)
Attached on stable and suceptible anchorage, tied and secured.

SCAFFOLD PLAN: (Discuss the activity to be employed)


Erected and inspected by a certified competent person on site.

FIRE PROTECTION: (Discuss the activity to be employed)


Deployed sufficient number of fire extinguisher on site, one on the ground and one on the rooftop. Rated
ABC, we also deployed fire proof blankets on the production side to minimize or eliominate the splatters
of frags.
HAZARDOUS ENERGY: (Discuss the activity to be employed)

Cylinders are tied and secured properly with proper chains attached and built I flashback arrester for in
use purposes.
HOT WORKS: Please tick (ü) what is applicable
Welding Soldering Others: Pls Specifiy
Cutting Thawing
Grinding _________________
FIRST AID:
NAME OF FIRST AID PERSONNEL
1. JULIUS ERLANO

EMERGENCY ACTION PLAN: (Discuss the activity to be employed)

We refer and comply on the exisisting emergency and evacuation plan of Yutaka management, thus
having a separate TBM fo the said program.
HAZARDOUS CHEMICALS: (List up all chemicals to be used )
1.) Oxyacethene 4.) ___________________ 7.) ___________________
2.) Red Oxide Primer paint 5.) ___________________ 8.) ___________________
3.) QDE Paint 6.) ___________________ 9.) ___________________

Prepared Checked Approved


Jan 27, 2020
Date JULIUS ERLANO

REMARKS: (To be filled -up by YMPI Safety Practitioner.)


_____________________________________________________________________________________
APPROVED DIS APPROVED Reason:
_____________________________________________________________________________________