You are on page 1of 1

Page

1 of 1

Document No.: 19FTA86024G Revision: O


CONTRACTORS TOOLS, EQUIPMENT & PPE
Title:
INSPECTION CHECKLIST Process
Effective Date : 22 Mar 2018 EHS
Owner:
SLMT FOR INSTALLATION OF 1.5 TON WINDOW TYPE
Project Name: AC, INVERTER 220V Date: 10-4-18

Name of Contractor: UNITEC GLOBAL ENTERPRISES Location: Dorm 3


OLIVER NASTOR /
Contractor Project In-Charge: LEMUEL LINGAD Safety Officer: MARK JAYSON YABES
(Signature over printed name) (Signature over printed name)

Condition Condition
Tools / Equipment .PPE Remarks
Good Poor Good Poor
 
Screw Driver Safety Glass
 
Adjustable Wrench Safety Shoes
 
Open Wrench Hard hat w/ chin strap
 
Combination Wrench Safety Gloves
 
Pliers Sleeves
 
Measuring Tape Full Body Harness
 
Level Dust / face mask

Ladder

Pipe Bender

Flashlight

List all PPE User:

Name Signature Name Signature

Inspected By: OLIVER NASTOR / MARK JAYSON YABES


(Signature over Printed Name)

Prepare 3 copies: EHS (original copy), Security and Contractor

REVISION HISTORY

Change Change Effective


Revision Description and Reason of Change
Originator Analyst Date
Initial issue.
O A. Refugia Improvement for contractor safety management. E. Gozum 22 Mar 2018
As per ECO-NBOI-165729

VERIFY THAT THIS IS THE CORRECT REVISION BEFORE USE


TEM001458 Revision B

You might also like