You are on page 1of 53

AS BUILT PLANS

MONDE NISSIN CORPORATION

PROJECT MACTAN 2
(GL 12-13 / A-P)

ARCHITECTURAL, STRUCTURAL,
ELECTRICAL, MECHANICAL,FIRE PRO
AND PLUMBING

SACRIS ROAD, BRGY. CASUNTINGAN


MANDAUE CITY, CEBU

STA. CLARA INTERNATIONAL CORPORATION

AUGUST 2019
TABLE OF CONTENTS

CONTRACTOR: SUBMITTED BY: NAME: PROJECT TITLE: OWNER: SHEET CONTENTS: SHEET NO.:

STA. CLARA INTERNATIONAL NORMAN B. ENRIQUEZ REYNALDO L. ANOR NITA N. ALIPOSA ARCHITECTURAL
CORPORATION PROJECT MANAGER ARCHITECT / ENGINEER : PLANT MANAGER PROJECT MACTAN 2 MONDE NISSIN CORPORATION STRUCTURAL
CEBU PLANT ELECTRICAL
TOC
BUBUNAWAN BUBUNAWAN

2nd FLOOR HIGHWAY 54 PLAZA EDSA, WACK-WACK, TM

MANDALUYONG CITY 1550, PHILIPPINES MECHANICAL


TEL. NO. : (632) 706 - 5155 - 57
(GL 12-13 / A-P) Monde Nissin FIRE PROTECTION
STA. CLARA FAX. NO.: (632) 706-5158 SIGNATURE SIGNATURE LOCATION : SACRIS ROAD, CASUNTINGAN, MANDAUE CITY, CEBU, PHILIPPINES
LOCATION : F.REYES ST.,BRGY. BALIBAGO, STA.ROSA LAGUNA,PHILIPPINES PLUMBING
CONSTRUCTION NOTES

1.0 GENERAL :
4.0 NOTES ON STRUCTURAL STEEL :

2.0 FOUNDATIONS :

6.0 INTERIOR FLOOR SLAB :

ER

3.0 MATERIALS :

AIRCONDITIONING GENERAL NOTES:


FOR LIVE LOAD:

7.0 MASONRY :

CONVERSION TO METRIC SYSTEM

CONTRACTOR: SUBMITTED BY: NAME: PROJECT TITLE: OWNER: SHEET CONTENTS: SHEET NO.:
REYNALDO L. ANOR
STA. CLARA INTERNATIONAL NORMAN B. ENRIQUEZ NITA N. ALIPOSA ARCHITECTURAL

CORPORATION PROJECT MANAGER ARCHITECT / ENGINEER : PLANT MANAGER PROJECT MACTAN 2 MONDE NISSIN CORPORATION
STRUCTURAL
2nd FLOOR HIGHWAY 54 PLAZA EDSA, WACK-WACK,
MANDALUYONG CITY 1550, PHILIPPINES
TEL. NO. : (632) 706 - 5155 - 57
BUBUNAWAN

CEBU PLANT
(GL 12-13 / A-P)
TM

Monde Nissin
ELECTRICAL
MECHANICAL
PLUMBING
GN
STA. CLARA FAX. NO.: (632) 706-5158 SIGNATURE SIGNATURE LOCATION : SACRIS ROAD, CASUNTINGAN, MANDAUE CITY, CEBU, PHILIPPINES
LOCATION : F.REYES ST.,BRGY. BALIBAGO, STA.ROSA LAGUNA,PHILIPPINES
MECHANICAL and PLUMBING: ELECTRICAL and AUXILIARIES GENERAL ABBREVIATIONS

1
LP

S1
S2

SD

HD

H
FACP

EOL

FDAS

CONTRACTOR: SUBMITTED BY: NAME: PROJECT TITLE: OWNER: SHEET CONTENTS: STRUCTURAL SHEET NO:

STA. CLARA INTERNATIONAL NORMAN B. ENRIQUEZ REYNALDO L. ANOR NITA N. ALIPOSA


CORPORATION PROJECT MANAGER CIVIL ENGINEER PLANT MANAGER PROJECT MACTAN 2 MONDE NISSIN CORPORATION
2nd FLOOR HIGHWAY 54 PLAZA EDSA, WACK-WACK,
BUBUNAWAN BUBUNAWAN

CEBU PLANT TM
LEGENDS and SYMBOLS LEGEND
MANDALUYONG CITY 1550, PHILIPPINES
TEL. NO. : (632) 706 - 5155 - 57
(GL 12-13 / A-P) Monde Nissin
STA. CLARA FAX. NO.: (632) 706-5158 SIGNATURE SIGNATURE LOCATION : SACRIS ROAD, CASUNTINGAN, MANDAUE CITY, CEBU, PHILIPPINES
LOCATION : F.REYES ST.,BRGY. BALIBAGO, STA.ROSA LAGUNA,PHILIPPINES
ARCHITECTURAL
REPUBLIC OF THE PHILIPPINES

DEPARTMENT OF PUBLIC WORKS


AND HIGHWAY

OFFICE OF THE BUILDING OFFICIALS


.
CASUNTINGAN
ST MANDAUE CITY
ES
RT
CO ISSUANCE RECOMMENDED
AN
RN
HE CITY / DISTRICT / MUNICIPALITY
ST.
LC CABRERA

HEAD ARCHITECTURAL DATE


ST

M.L. QUEZON ST.


VIL . MA SECTION
LA RT .
GE IN T
AS ISSUED BY
VIL OSM CE
NIZ
LA EA M.
GE

SACRIS ROAD
BAKILID

E.V. ESPINA ST.


BUILDING OFFICIAL DATE

P.D. BASUBAS ST.

L. JAYME ST.

BUTUANON RIVER
MAGUIKAY
RECOMMENDING APPROVAL

A.S. FORTUNA ST.

M.O. EC
HAVEZ
TIPOLO
ST.
AÑO
V. ALB

. ST
TIPOLO CREEK

M.L. QUEZ
L. JAYME ST.

ON ST.
HEAD DATE

N. CABA
RECOMMENDING APPROVAL

HUG ST
.
M.C. BRION
ES ST.
DEL R L ST.
OSAR E. ROSA
IO AV
E.
M.C. BRIONES
LINE & GRADE
B.B. CABAHUG ST. ST.

GU

M. SANCHEZ
IZO
HEAD DATE
BO REEK

ST.
UN NG C
PR DA TUYO
OP RY MAN
ER LIN

F. C
TY E
BO TO

ABA
UN FO
DA LLO
ARCHITECTURAL

H
UG
RIE W
S

ST.
- PERSPECTIVE HEAD DATE
- VICINITY MAP

STRUCTURAL

W N

CASUNTINGAN
HEAD DATE

E
S
AREA OF PROJECT DEVELOPMENT
ST.
LC CABRERA

UPPER ROOFING

2.5mm THK. THERMOPLASTIC TRANSLUSCENT ROOFING


UPPER ROOFING

SITE SANITARY
O

M.L. QUEZON ST.


Hazardous materials, chemicals
chemicals,oil,
oil waste storage

VIL SM
LA EA
GE

GF + 20000
MACH. ST
VIL . MA
ROOM
13 SQ.M
AN

LA RTIN
UTILITY
DN

GE
DECK
EC

.
A ST
NIZ
ITO

CE
BAKILID M.
HEAD DATE

SACRIS ROAD
SE

±9000
NO

E.V. ESPINA ST. MAGUIKAY


S T.

A.S. FOR
ELECTRICAL

TUNA ST.
(S A

L. JAYME ST.
CR
IS
RD)

UP
HEAD DATE

- LOCATION MAP

- SITE DEVELOPMENT PLAN


MECHANICAL

HEAD DATE

CONTRACTOR: SUBMITTED BY: NAME: PROJECT TITLE: OWNER: SHEET CONTENTS: ARCHITECTURAL SHEET NO:

STA. CLARA INTERNATIONAL NORMAN B. ENRIQUEZ REYNALDO L. ANOR NITA N. ALIPOSA VICINITY MAP
CORPORATION PROJECT MANAGER ARCHITECT/ENGINEER: PLANT MANAGER PROJECT MACTAN 2 MONDE NISSIN CORPORATION SITE DEVELOPMENT PLAN
CEBU PLANT AR-001
BUBUNAWAN BUBUNAWAN

2nd FLOOR HIGHWAY 54 PLAZA EDSA, WACK-WACK,


MANDALUYONG CITY 1550, PHILIPPINES
TM

PERSPECTIVE
TEL. NO. : (632) 706 - 5155 - 57
(GL 12-13 / A-P) Monde Nissin
LOCATION MAP
STA. CLARA FAX. NO.: (632) 706-5158 SIGNATURE SIGNATURE LOCATION : SACRIS ROAD, CASUNTINGAN, MANDAUE CITY, CEBU, PHILIPPINES
LOCATION : F.REYES ST.,BRGY. BALIBAGO, STA.ROSA LAGUNA,PHILIPPINES
114
[ CHB ]
[ CHB ] [ CHB ] [ CHB ] [ CHB ] [ CHB ] [ CHB ] [ CHB ] [ CHB ]
122 136 121 120 137 119 118 138 117 116 139 115 LAV URI WC

[ CHB ]
45

UP
2000

[ CHB ]
3500

144
8150

2000

4850

104

14225
9.99

[ CHB ]
UP
1
20
2
19

LIFT LIFT 3

OPEN 5
6 OPEN
18
17

16
7
15
8

14
9
10 11 12 13

[ CHB ]

SEPTIC TANK
OIL AND WATER
GREEN
SEPARATOR TANK

[ CHB ]
[ CHB ] FLOOR OPENING

121
PROTECTIVE COVERING
ON FLOOR

AHU DUCT
3 L05 OPEN
AHU - 1 AHU - 2
NEW AHU

[ CHB ]
139
600

107

[ CHB ]
[ CHB ]

[ CHB ]
2

[ CHB ]
600
115 GF + 10500
1200 120 116
138 119
107
[ CHB ]
125
600
1 OPEN
127 129 131
ELEV.
325 324 326 1500 [ MES ]
[ CHB ] GF + 10000
[ CHB ] [ CHB ]
SHELVES

DN
148 ST-02

352 129
125
4300
106 [ VSF ]

[ IPB ]
409 27 SQ.M 5700

[ CHB ]
110

[ CHB ]
122 410 354
411
408
128 130

[ HGW ]
UP DN
128 353 108
11.46 OPEN

[ CHB ]
HALLWAY 4800
412 124

[ CHB ]
126 [ MES ] [ CHB ]
149
152 2500
407 11.31
400

[ CHB ]
133

ELEV.
DN
OPEN
126 4525

[ CHB ]

[ CHB ]

[ CHB ]
123

[ CHB ]
ST-01
321

[ CHB ]

[ CHB ]

[ CHB ]

[ CHB ]
403

[ CHB ]

308
101 4600 104 [ CHB ] [ CHB ] [ CHB ] [ CHB ]
141 142 143 145 105 [ CHB ]
102 103 [ CHB ]

8800 6000

GROUND FLOOR PLAN


THIRD FLOOR PLAN

[ CHB ]
LAV URI WC
[ CHB ]
UP

[ CHB ]
[ CHB ]

[ CHB ]
LOGISTICS WAREHOUSE
LEVEL 2

[ CHB ]
[ CHB ]
[ CHB ]

UP
1
20
2
19

LIFT LIFT 3

EXISTING 2.5mm THK. THERMOPLASTIC TRANSLUSCENT ROOFING


4
18
5
17
6 OPEN
16
7
15
8

14
9
10 11 12 13
EXIT

EXIT

2.5mm THK. THERMOPLASTIC TRANSLUSCENT ROOFING


NOODLE LINE 06
2600

L06
EXIT

[ CHB ]
ACCUMULATOR PROCESS AREA ROLLER AREA HOPPER
2000

AREA
PACKAGING AREA LINE 6
UPPER ROOFING L05

215A
AHU DUCT RAMP
OPEN
220 P/min

150

[ CHB ]
220 P/min
[ HGW ] [ HGW ] [ HGW ]
[ CHB ]

[ CHB ]
LINE 3

[ CHB ]
H:900mm H:455mm
260
PALLETIZING AREA
220 P/min [ CHB ] [ CHB ]
[ CHB ]

OPEN
[ CHB ]

GF + 5000 NOODLE LINE 03 EXISTING 2.5mm THK. THERMOPLASTIC TRANSLUSCENT ROOFING


[ CHB ]
[ HGW ]

[ CHB ]
220 P/min ELEV. ELEV.

NOODLES PACKAGING AREA LINE 3 GF + 5000 UPPER ROOFING


UP
5000

OFFICE [ VSF ]
UP
ST-02
319
DN
[ CHB ]

NOODLE LINE 02
EXISTING 2.5mm THK. THERMOPLASTIC TRANSLUSCENT ROOFING

[ CHB ]
[ CHB ]

[ CHB ]

[ CHB ]
[ CHB ]
LINE 1 [ EFH ] [ VSF ] UP DN
5000

PROCESS AREA OPEN


[ CHB ]

ACCUMULATOR GF + 5000
ST-02 305

[ CHB ]
[ CHB ]

[ CHB ] [ CHB ] sink NOODLE LINE 01


LAV

FALSE OPEN
DN LAV
4500

ELEV. BEAM
PACKAGING AREA LINE 1
[ CHB ]

WASHING

AIR
WC WC

323
UP WC WC
[ 3VT ] SHOWER ENTRY [ CHB ]
ST-01 ST-01
[ CHB ] [ CHB ] [ CHB ] [ CHB ] [ CHB ] [ CHB ] [ CHB ] 314 315 316 301 302 303 [ CHB ] 304 305 [ CHB ] 306 307 [ CHB ] 308 [ CHB ] [ CHB ] [ CHB ] [ CHB ] [ CHB ]
[ CHB ] [ CHB ] [ CHB ]

FOURTH FLOOR PLAN


NOTE: SECOND FLOOR PLAN
FOR SECTIONAL DETAILS REFER SHEET AR -003

CONTRACTOR: SUBMITTED BY: NAME: PROJECT TITLE: OWNER: SHEET CONTENTS: ARCHITECTURAL SHEET NO:

STA. CLARA INTERNATIONAL NORMAN B. ENRIQUEZ REYNALDO L. ANOR NITA N. ALIPOSA GROUND FLOOR PLAN
CORPORATION PROJECT MANAGER ARCHITECT / ENGINEER : PLANT MANAGER PROJECT MACTAN 2 MONDE NISSIN CORPORATION SECOND FLOOR PLAN
CEBU PLANT AR-002
BUBUNAWAN BUBUNAWAN

2nd FLOOR HIGHWAY 54 PLAZA EDSA, WACK-WACK, TM


THIRD FLOOR PLAN
MANDALUYONG CITY 1550, PHILIPPINES
TEL. NO. : (632) 706 - 5155 - 57
(GL 12-13 / A-P) Monde Nissin FOURTH FLOOR PLAN
STA. CLARA FAX. NO.: (632) 706-5158 SIGNATURE SIGNATURE LOCATION : SACRIS ROAD, CASUNTINGAN, MANDAUE CITY, CEBU, PHILIPPINES
LOCATION : F.REYES ST.,BRGY. BALIBAGO, STA.ROSA LAGUNA,PHILIPPINES
1 LONGITUDINAL SECTION / ELEVATION ALONG GRID LINE 13/A-P

3 CROSS SECTION ALONG GRID LINE G/12-13

2 CROSS SECTION ALONG GRID LINE C/12-13

4 CROSS SECTION ALONG GRID LINE J/11-13 5 CROSS SECTION ALONG GRID LINE N'/12-13

CONTRACTOR: SUBMITTED BY: NAME: PROJECT TITLE: OWNER: SHEET CONTENTS: ARCHITECTURAL SHEET NO.:

STA. CLARA INTERNATIONAL NORMAN B. ENRIQUEZ REYNALDO L. ANOR NITA N. ALIPOSA LONGITUDINAL SECTION @GRID LINE 13/A-P
CORPORATION PROJECT MANAGER ARCHITECT / ENGINEER : PLANT MANAGER PROJECT MACTAN 2 MONDE NISSIN CORPORATION CROSS SECTION @ GRID LINE C/12-13
CEBU PLANT AR-003
BUBUNAWAN BUBUNAWAN

2nd FLOOR HIGHWAY 54 PLAZA EDSA, WACK-WACK, TM CROSS SECTION @ GRID LINE G/12-13
MANDALUYONG CITY 1550, PHILIPPINES CROSS SECTION @ GRID LINE J/12-13
TEL. NO. : (632) 706 - 5155 - 57
(GL 12-13 / A-P) Monde Nissin
CROSS SECTION @ GRID LINE N'/12-13
STA. CLARA FAX. NO.: (632) 706-5158 SIGNATURE SIGNATURE LOCATION : SACRIS ROAD, CASUNTINGAN, MANDAUE CITY, CEBU, PHILIPPINES
LOCATION : F.REYES ST.,BRGY. BALIBAGO, STA.ROSA LAGUNA,PHILIPPINES
- LEFT SIDE ELEVATION VIEW (GL 13/A-P)

- FRONT ELEVATION VIEW (GL A/12-13)

2.5mm THK. THERMOPLASTIC TRANSLUSCENT ROOFING

4TH FLOOR -HOPPER AREA

UPPER ROOFING

UPPER ROOFING

2.5mm THK. THERMOPLASTIC TRANSLUSCENT ROOFING

- CEILING WITH SKYLIGHT @ GRID LINE G TO N'

- REAR ELEVATION VIEW (GL P/12-13) F SECTION

CONTRACTOR: SUBMITTED BY: NAME: PROJECT TITLE: OWNER: SHEET CONTENTS: ARCHITECTURAL SHEET NO:

STA. CLARA INTERNATIONAL NORMAN B. ENRIQUEZ REYNALDO L. ANOR NITA N. ALIPOSA


PROJECT MACTAN 2 LEFT SIDE ELEVATION VIEW
CORPORATION PROJECT MANAGER ARCHITECT / ENGINEER : PLANT MANAGER MONDE NISSIN CORPORATION
FRONT ELEVATION VIEW
CEBU PLANT AR-004
BUBUNAWAN BUBUNAWAN

2nd FLOOR HIGHWAY 54 PLAZA EDSA, WACK-WACK, TM

MANDALUYONG CITY 1550, PHILIPPINES REAR ELEVATION VIEW


TEL. NO. : (632) 706 - 5155 - 57
(GL 12-13 / A-P) Monde Nissin
CEILING W/ SKYLIGHT @ GL G-N'
STA. CLARA FAX. NO.: (632) 706-5158 SIGNATURE SIGNATURE LOCATION : SACRIS ROAD, CASUNTINGAN, MANDAUE CITY, CEBU, PHILIPPINES
LOCATION : F.REYES ST.,BRGY. BALIBAGO, STA.ROSA LAGUNA,PHILIPPINES
LAV URI WC
LAV URI WC
EXISTING FHC

[ CHB ]
UP
150 MM Ø EXISTING
FEEDMAIN RISER

LOGISTICS WAREHOUSE
LEVEL 2

100 MMØ UP
1
20
2
19

LIFT LIFT 3

4
18
5
17
6 OPEN
16
7
15
8

14
9
10 11 12 13

COVE LIGHTING SYSTEM


COVE LIGHTING SYSTEM

HD HD COVE LIGHTING SYSTEM


SD SD SD SD
NOODLE LINE 06

2600
PACKAGING LEVEL 1
COVE LIGHTING SYSTEM COVE LIGHTING SYSTEM

OPEN TO BELOW CEILING COVE LIGHTING SYSTEM

2000
SD SD SD SD
HD HD
PS COVE LIGHTING SYSTEM COVE LIGHTING SYSTEM

NOODLE LINE 05 COVE LIGHTING SYSTEM

2.10x0.50 AC DUCT RAD SAD

EXISTING WALL EXISTING WALL EXISTING WALL REMOVED WALL REMOVED WALL

OPEN
RAD SAD

[ CHB ]

[ CHB ]
[ CHB ]

[ CHB ]
GF + 10500
PALLETIZING AREA
[ CHB ]

NOODLE LINE 03 OPEN


ELEV.

GF + 10000
11

DN
ST-02
MIXER & ALKALI
AREA
NOODLE LINE 02 [ VSF ]

[ IPB ]
[ CHB ]
ACCUMULATOR PROCESS AREA

[ CHB ]
UP DN
OPEN

[ CHB ]
sink NOODLE LINE 01
LAV [ CHB ]

ELEV.
LAV
DN
OPEN
WASHING

[ CHB ]

[ CHB ]

[ CHB ]
AIR
WC WC

ST-01
WC WC
PB SHOWER
10

[ CHB ]
403

308
- SECOND FLOOR CEILING LAYOUT - THIRD FLOOR CEILING LAYOUT
[ CHB ]

[ CHB ]
[ CHB ] [ CHB ] [ CHB ] [ CHB ] [ CHB ]

LIFT LIFT

[ CHB ]
[ CHB ]

2.5mm THK. THERMOPLASTIC TRANSLUSCENT ROOFING

[ CHB ]
2.5mm THK. THERMOPLASTIC TRANSLUSCENT ROOFING
[ CHB ]

HOPPER
AREA

UPPER ROOFING

[ CHB ]
UPPER ROOFING UPPER ROOFING

OPEN

[ CHB ]
[ CHB ]
[ CHB ]

[ CHB ]

[ CHB ]

[ CHB ]
OPEN
R.C ME SHAFT

[ CHB ]
[ CHB ]

ELEV.
UPPER ROOFING ENCLOSURE

2.5mm THK. THERMOPLASTIC TRANSLUSCENT ROOFING ST-02


319
[ CHB ]

GF + 20000 MACH.

[ CHB ]
2.5mm THK. THERMOPLASTIC TRANSLUSCENT ROOFING UPPER ROOFING ROOM
[ CHB ]

[ CHB ]

13 SQ.M
[ CHB ]

402

UP DN
OPEN ST-02
305
DN
[ CHB ]

UTILITY
DECK
2.5mm THK. THERMOPLASTIC TRANSLUSCENT ROOFING

[ CHB ]

[ CHB ]
337 SQ.M

[ CHB ]
[ SDW ]

FALSE OPEN
401
[ CHB ]
BEAM

323
ST-01
[ CHB ]

314 315 316 301 302 303 [ CHB ] 304 305 [ CHB ] 306 307 [ CHB ] 308 [ CHB ] [ CHB ] [ CHB ] [ CHB ] [ CHB ]
[ CHB ] [ CHB ]
FALSE
BEAM
323
ST-01
[ CHB ]
[ CHB ] [ CHB ]
314 315 316 301 302 303 [ CHB ] 304 305 [ CHB ] 306 307 [ CHB ] 308 [ CHB ] [ CHB ] [ CHB ] [ CHB ] [ CHB ]
[ CHB ] [ CHB ]

- FOURTH FLOOR CEILING LAYOUT


- ROOF PLAN

CONTRACTOR: SUBMITTED BY: NAME: PROJECT TITLE: OWNER: SHEET CONTENTS: ARCHITECTURAL SHEET NO:

STA. CLARA INTERNATIONAL NORMAN B. ENRIQUEZ REYNALDO L. ANOR NITA N. ALIPOSA SECOND FLOOR PLAN
CORPORATION PROJECT MANAGER ARCHITECT / ENGINEER : PLANT MANAGER PROJECT MACTAN 2 MONDE NISSIN CORPORATION THIRD FLOOR PLAN
CEBU PLANT AR-005
BUBUNAWAN BUBUNAWAN

2nd FLOOR HIGHWAY 54 PLAZA EDSA, WACK-WACK, TM

FOURTH FLOOR PLAN


MANDALUYONG CITY 1550, PHILIPPINES
TEL. NO. : (632) 706 - 5155 - 57
(GL 12-13 / A-P) Monde Nissin ROOF PLAN
STA. CLARA FAX. NO.: (632) 706-5158 SIGNATURE SIGNATURE LOCATION : SACRIS ROAD, CASUNTINGAN, MANDAUE CITY, CEBU, PHILIPPINES
LOCATION : F.REYES ST.,BRGY. BALIBAGO, STA.ROSA LAGUNA,PHILIPPINES
- DOORS AND WINDOWS SCHEDULE

CONTRACTOR: SUBMITTED BY: NAME: PROJECT TITLE: OWNER: SHEET CONTENTS: ARCHITECTURAL SHEET
SHEET
NO.: NO:

STA. CLARA INTERNATIONAL NORMAN B. ENRIQUEZ


REYNALDO L. ANOR NITA N. ALIPOSA
CORPORATION PROJECT MANAGER ARCHITECT / ENGINEER : PLANT MANAGER PROJECT MACTAN 2 MONDE NISSIN CORPORATION
DOORS AND WINDOWS SCHEDULE
CEBU PLANT AR-006
BUBUNAWAN BUBUNAWAN

2nd FLOOR HIGHWAY 54 PLAZA EDSA, WACK-WACK, TM

MANDALUYONG CITY 1550, PHILIPPINES


TEL. NO. : (632) 706 - 5155 - 57
(GL 12-13 / A-P) Monde Nissin
STA. CLARA FAX. NO.: (632) 706-5158 SIGNATURE SIGNATURE LOCATION : SACRIS ROAD, CASUNTINGAN, MANDAUE CITY, CEBU, PHILIPPINES
LOCATION : F.REYES ST.,BRGY. BALIBAGO, STA.ROSA LAGUNA,PHILIPPINES
STRUCTURAL
SCHEDULE OF COLUMN FOOTING

UP

WWTP

UP
LOADING/UNLOADING
DOCK

AHU HEAT EXCHANGER

SF-1 SF-1

MECH 1

MAINTENANCE

STAGING AREA MECH 3


LOGISTICS OFFICE
GENSET
UP
HALLWAY
SALES OFFICE
TANK

TRANSFORMER
UP

YARD

- GROUND FLOOR PLAN / KEY PLAN

CONTRACTOR: SUBMITTED BY: NAME: PROJECT TITLE: OWNER: SHEET CONTENTS: STRUCTURAL SHEET NO:

NORMAN B. ENRIQUEZ REYNALDO L. ANOR NITA N. ALIPOSA


STA. CLARA INTERNATIONAL
CORPORATION PROJECT MANAGER CIVIL ENGINEER PROJECT MACTAN 2 MONDE NISSIN CORPORATION
PLANT MANAGER
GRND FLR PLAN / KEY PLAN
CEBU PLANT ST-001
BUBUNAWAN BUBUNAWAN

2nd FLOOR HIGHWAY 54 PLAZA EDSA, WACK-WACK, TM

MANDALUYONG CITY 1550, PHILIPPINES


TEL. NO. : (632) 706 - 5155 - 57
(GL 12-13 / A-P) Monde Nissin
STA. CLARA FAX. NO.: (632) 706-5158 SIGNATURE SIGNATURE LOCATION : SACRIS ROAD, CASUNTINGAN, MANDAUE CITY, CEBU, PHILIPPINES
LOCATION : F.REYES ST.,BRGY. BALIBAGO, STA.ROSA LAGUNA,PHILIPPINES
1 SECTION
- F1B-R PLAN
- F2A-R PLAN 2 SECTION
B SECTION

4 SECTION
A SECTION
- F3A-R PLAN 3 SECTION
- F4A-R PLAN

6 SECTION

- BLOW-UP
- F5B-R PLAN 7 SECTION

5 SECTION
- C4A-R REINFORCEMENT DETAIL

- NC-1 REINFORCEMENT DETAIL

CONTRACTOR: SUBMITTED BY: NAME: PROJECT TITLE: OWNER: SHEET CONTENTS: STRUCTURAL SHEET NO:

STA. CLARA INTERNATIONAL NORMAN B. ENRIQUEZ REYNALDO L. ANOR NITA N. ALIPOSA F1B-R REINFORCEMENT DETAIL
CORPORATION PROJECT MANAGER CIVIL ENGINEER PLANT MANAGER PROJECT MACTAN 2 MONDE NISSIN CORPORATION F2A-R REINFORCEMENT DETAIL

CEBU PLANT
F3A-R REINFORCEMENT DETAIL
ST-002
BUBUNAWAN BUBUNAWAN

2nd FLOOR HIGHWAY 54 PLAZA EDSA, WACK-WACK, TM


F4A-R REINFORCEMENT DETAIL
MANDALUYONG CITY 1550, PHILIPPINES F5B-R REINFORCEMENT DETAIL
TEL. NO. : (632) 706 - 5155 - 57
(GL 12-13 / A-P) Monde Nissin C4A-R REINFORCEMENT DETAIL
STA. CLARA FAX. NO.: (632) 706-5158 SIGNATURE SIGNATURE LOCATION : SACRIS ROAD, CASUNTINGAN, MANDAUE CITY, CEBU, PHILIPPINES
LOCATION : F.REYES ST.,BRGY. BALIBAGO, STA.ROSA LAGUNA,PHILIPPINES
NEW COLUMN-1 (NC-1) REINFORCEMENT DETAIL
F SECTION

D SECTION

- GL 13/NP LONGITUDINAL BOTTOM BAR


- GL 13/NP LONGITUDINAL TOP BAR - GRID 13/NP TOP VIEW

E SECTION

- GL 13/NP TRANSVERSE BOTTOM BAR - GL 13/NP TRANSVERSE TOP BAR

B GL13/NP SECTION - NC-2 REINFORCEMENT DETAIL


A GL 13/NP SECTION

- GL 12/NP TRANSVERSE TOP BAR


- GL12/NP LONGITUDINAL BOTTOM BAR

9 GL12/NP SECTION

- GRID 12 / NP TOP VIEW

10 GL12/NP SECTION
- GL 12/NP LONGITUDINAL TOP BAR
- GL 12/NP TRANSVERSE BOTTOM BAR
8 GL12/NP SECTION

CONTRACTOR: SUBMITTED BY: NAME: PROJECT TITLE: OWNER: SHEET CONTENTS: STRUCTURAL SHEET NO:

STA. CLARA INTERNATIONAL NORMAN B. ENRIQUEZ REYNALDO L. ANOR NITA N. ALIPOSA


CORPORATION PROJECT MANAGER ARCHITECT/ENGINEER: PLANT MANAGER PROJECT MACTAN 2 MONDE NISSIN CORPORATION GL12/NP REINFORCEMENT DETAIL
2nd FLOOR HIGHWAY 54 PLAZA EDSA, WACK-WACK,
MANDALUYONG CITY 1550, PHILIPPINES
BUBUNAWAN BUBUNAWAN

CEBU PLANT TM
GL13/NP REINFORCEMENT DETAIL
NEW COLUMN-2 (NC-2) REINF. DETAIL ST-003
TEL. NO. : (632) 706 - 5155 - 57
(GL 12-13 / A-P) Monde Nissin
STA. CLARA FAX. NO.: (632) 706-5158 SIGNATURE SIGNATURE LOCATION : SACRIS ROAD, CASUNTINGAN, MANDAUE CITY, CEBU, PHILIPPINES
LOCATION : F.REYES ST.,BRGY. BALIBAGO, STA.ROSA LAGUNA,PHILIPPINES
- SECOND FLOOR FRAMING PLAN
- THIRD FLOOR FRAMING PLAN

ELEV.
UPPER ROOFING

2.5mm THK. THERMOPLASTIC TRANSLUSCENT ROOFING

- LONGITUDINAL SECTION ALONG GRID LINE 13/A-P

- FOURTH FLOOR FRAMING PLAN

CONTRACTOR: SUBMITTED BY: NAME: PROJECT TITLE: OWNER: SHEET CONTENTS: STRUCTURAL SHEET NO:

STA. CLARA INTERNATIONAL NORMAN B. ENRIQUEZ REYNALDO L. ANOR NITA N. ALIPOSA SECOND FLOOR FRAMING PLAN
CORPORATION PROJECT MANAGER ARCHITECT/ENGINEER: PLANT MANAGER PROJECT MACTAN 2 MONDE NISSIN CORPORATION THIRD FLOOR FRAMING PLAN
2nd FLOOR HIGHWAY 54 PLAZA EDSA, WACK-WACK,
MANDALUYONG CITY 1550, PHILIPPINES
BUBUNAWAN BUBUNAWAN

CEBU PLANT TM
FOURTH FLOOR FRAMING PLAN ST-004
TEL. NO. : (632) 706 - 5155 - 57
(GL 12-13 / A-P) Monde Nissin LONGITUDINAL SECTION ALONG GRID LINE 13/A-P
STA. CLARA FAX. NO.: (632) 706-5158 SIGNATURE SIGNATURE LOCATION : SACRIS ROAD, CASUNTINGAN, MANDAUE CITY, CEBU, PHILIPPINES
LOCATION : F.REYES ST.,BRGY. BALIBAGO, STA.ROSA LAGUNA,PHILIPPINES
- CROSS SECTION ALONG GRID LINE A/12-13
- CROSS SECTION ALONG GRID LINE B/12-13

- CROSS SECTION ALONG GRID LINE D/12-13


- CROSS SECTION ALONG GRID LINE C/12-13

CONTRACTOR: SUBMITTED BY: NAME: PROJECT TITLE: OWNER: SHEET CONTENTS: SHEET NO:

STA. CLARA INTERNATIONAL NORMAN B. ENRIQUEZ REYNALDO L. ANOR NITA N. ALIPOSA


CORPORATION PROJECT MANAGER CIVIL ENGINEER : PLANT MANAGER PROJECT MACTAN 2 MONDE NISSIN CORPORATION
CROSS SECTION ALONG GRID LINE A/12-13
CROSS SECTION ALONG GRID LINE B/12-13
CEBU PLANT ST-005
BUBUNAWAN

2nd FLOOR HIGHWAY 54 PLAZA EDSA, WACK-WACK, TM CROSS SECTION ALONG GRID LINE C/12-13
MANDALUYONG CITY 1550, PHILIPPINES CROSS SECTION ALONG GRID LINE D/12-13
TEL. NO. : (632) 706 - 5155 - 57
(GL 12-13 / A-P) Monde Nissin
STA. CLARA FAX. NO.: (632) 706-5158 SIGNATURE SIGNATURE LOCATION : SACRIS ROAD, CASUNTINGAN, MANDAUE CITY, CEBU, PHILIPPINES
LOCATION : F.REYES ST.,BRGY. BALIBAGO, STA.ROSA LAGUNA,PHILIPPINES
- CROSS SECTION ALONG GRID LINE F/12-13
- CROSS SECTION ALONG GRID LINE E/12-13

- CROSS SECTION ALONG GRID LINE G/12-13


X CROSS SECTION ALONG GRID LINE J/11-13

CONTRACTOR: SUBMITTED BY: NAME: PROJECT TITLE: OWNER: SHEET CONTENTS: SHEET NO:

STA. CLARA INTERNATIONAL NORMAN B. ENRIQUEZ REYNALDO L. ANOR NITA N. ALIPOSA


CORPORATION PROJECT MANAGER CIVIL ENGINEER : PLANT MANAGER PROJECT MACTAN 2 MONDE NISSIN CORPORATION
CROSS SECTION ALONG GRID LINE E/12-13
CROSS SECTION ALONG GRID LINE F/12-13
CEBU PLANT ST-006
BUBUNAWAN

2nd FLOOR HIGHWAY 54 PLAZA EDSA, WACK-WACK, TM


CROSS SECTION ALONG GRID LINE G/12-13
MANDALUYONG CITY 1550, PHILIPPINES CROSS SECTION ALONG GRID LINE J/11-13
TEL. NO. : (632) 706 - 5155 - 57
(GL 12-13 / A-P) Monde Nissin
STA. CLARA FAX. NO.: (632) 706-5158 SIGNATURE SIGNATURE LOCATION : SACRIS ROAD, CASUNTINGAN, MANDAUE CITY, CEBU, PHILIPPINES
LOCATION : F.REYES ST.,BRGY. BALIBAGO, STA.ROSA LAGUNA,PHILIPPINES
- BLOW UP "A"

1 SECTION
- BLOW UP "B"

- CROSS SECTION ALONG GRID LINE N'/12-13

X CROSS SECTION @ PROCESS AREA GL 12-13

- CROSS SECTION ALONG GRID LINE P/12-13

- CROSS SECTION ALONG GRID LINE N/12-13

CONTRACTOR: SUBMITTED BY: NAME: PROJECT TITLE: OWNER: SHEET CONTENTS: SHEET NO:

STA. CLARA INTERNATIONAL NORMAN B. ENRIQUEZ REYNALDO L. ANOR NITA N. ALIPOSA PROJECT MACTAN 2 CROSS SECTION @ PROCESS AREA
CORPORATION PROJECT MANAGER CIVIL ENGINEER : PLANT MANAGER CEBU PLANT MONDE NISSIN CORPORATION CROSS SECTION ALONG GRID LINE N'/12-13
CROSS SECTION ALONG GRID LINE N/12-13
ST-007
BUBUNAWAN

2nd FLOOR HIGHWAY 54 PLAZA EDSA, WACK-WACK,


MANDALUYONG CITY 1550, PHILIPPINES
(GL 12-13 / A-P) TM

CROSS SECTION ALONG GRID LINE P/12-13


Monde Nissin
TEL. NO. : (632) 706 - 5155 - 57
STA. CLARA FAX. NO.: (632) 706-5158 SIGNATURE SIGNATURE LOCATION : SACRIS ROAD, CASUNTINGAN, MANDAUE CITY, CEBU, PHILIPPINES
LOCATION : F.REYES ST.,BRGY. BALIBAGO, STA.ROSA LAGUNA,PHILIPPINES
1 SECTION

- DETAIL "A"

- DETAIL "B" 1 SECTION

2 SECTION
- ISOMETRIC VIEW

2 SECTION - ISOMETRIC VIEW

- DETAIL "C" 1 SECTION

- DETAIL "D" 1 SECTION

- ISOMETRIC VIEW
2 SECTION 2 SECTION 3 SECTION

CONTRACTOR: SUBMITTED BY: NAME: PROJECT TITLE: OWNER: SHEET CONTENTS: STRUCTURAL SHEET NO:

STA. CLARA INTERNATIONAL NORMAN B. ENRIQUEZ REYNALDO L. ANOR NITA N. ALIPOSA PROJECT MACTAN 2 DETAIL "A"
CORPORATION PROJECT MANAGER CIVIL ENGINEER : PLANT MANAGER CEBU PLANT MONDE NISSIN CORPORATION DETAIL "B"
ST-008
BUBUNAWAN

2nd FLOOR HIGHWAY 54 PLAZA EDSA, WACK-WACK,


MANDALUYONG CITY 1550, PHILIPPINES
(GL 12-13 / A-P) TM

DETAIL "C"
Monde Nissin
STA. CLARA TEL. NO. : (632) 706 - 5155 - 57
SIGNATURE SIGNATURE LOCATION : SACRIS ROAD, CASUNTINGAN, MANDAUE CITY, CEBU, PHILIPPINES DETAIL "D"
FAX. NO.: (632) 706-5158 LOCATION : F.REYES ST.,BRGY. BALIBAGO, STA.ROSA LAGUNA,PHILIPPINES
- DETAIL "E"
- ISOMETRIC VIEW

- ISOMETRIC VIEW
- DETAIL "F"

1 SECTION
2 SECTION 1 SECTION

2 SECTION

- DETAIL "G" 1 SECTION - ISOMETRIC VIEW 1 SECTION - ISOMETRIC VIEW


- DETAIL "H"

CONTRACTOR: SUBMITTED BY: NAME: PROJECT TITLE: OWNER: SHEET CONTENTS: STRUCTURAL SHEET NO:

STA. CLARA INTERNATIONAL NORMAN B. ENRIQUEZ REYNALDO L. ANOR NITA N. ALIPOSA


DETAIL "E"
CORPORATION PROJECT MANAGER CIVIL ENGINEER : PLANT MANAGER PROJECT MACTAN 2 MONDE NISSIN CORPORATION DETAIL "F"
CEBU PLANT ST-009
BUBUNAWAN

2nd FLOOR HIGHWAY 54 PLAZA EDSA, WACK-WACK, TM DETAIL "G"


MANDALUYONG CITY 1550, PHILIPPINES DETAIL "H"
TEL. NO. : (632) 706 - 5155 - 57
(GL 12-13 / A-P) Monde Nissin
STA. CLARA FAX. NO.: (632) 706-5158 SIGNATURE SIGNATURE LOCATION : SACRIS ROAD, CASUNTINGAN, MANDAUE CITY, CEBU, PHILIPPINES
LOCATION : F.REYES ST.,BRGY. BALIBAGO, STA.ROSA LAGUNA,PHILIPPINES
1 SECTION

- DETAIL "J"

2 SECTION

- ISOMETRIC VIEW

- DETAIL "I" 1 SECTION - ISOMETRIC VIEW

1 SECTION

- DETAIL "L"

1 SECTION

2 SECTION
- ISOMETRIC VIEW - ISOMETRIC VIEW

- DETAIL "K"

CONTRACTOR: SUBMITTED BY: NAME: PROJECT TITLE: OWNER: SHEET CONTENTS: STRUCTURAL SHEET NO:

STA. CLARA INTERNATIONAL NORMAN B. ENRIQUEZ REYNALDO L. ANOR NITA N. ALIPOSA PROJECT MACTAN 2 DETAIL "I"
CORPORATION PROJECT MANAGER CIVIL ENGINEER : PLANT MANAGER CEBU PLANT MONDE NISSIN CORPORATION DETAIL "J"
ST-010
BUBUNAWAN

2nd FLOOR HIGHWAY 54 PLAZA EDSA, WACK-WACK, DETAIL "K"


MANDALUYONG CITY 1550, PHILIPPINES (GL 12-13 / A-P) TM

TEL. NO. : (632) 706 - 5155 - 57


Monde Nissin DETAIL "L"
STA. CLARA FAX. NO.: (632) 706-5158 SIGNATURE SIGNATURE LOCATION : SACRIS ROAD, CASUNTINGAN, MANDAUE CITY, CEBU, PHILIPPINES
LOCATION : F.REYES ST.,BRGY. BALIBAGO, STA.ROSA LAGUNA,PHILIPPINES
1 SECTION
- DETAIL "M"

- DETAIL "N" 1 SECTION - ISOMETRIC VIEW

2 SECTION

- ISOMETRIC VIEW

CONTRACTOR: SUBMITTED BY: NAME: PROJECT TITLE: OWNER: DESCRIPTION SHEET CONTENTS: STRUCTURAL SHEET NO:

STA. CLARA INTERNATIONAL NORMAN B. ENRIQUEZ REYNALDO L. ANOR NITA N. ALIPOSA PROJECT MACTAN 2
CORPORATION PROJECT MANAGER CIVIL ENGINEER : PLANT MANAGER CEBU PLANT MONDE NISSIN CORPORATION DETAIL "M"
ST-011
BUBUNAWAN

2nd FLOOR HIGHWAY 54 PLAZA EDSA, WACK-WACK,


(GL 12-13 / A-P) TM DETAIL "N"
MANDALUYONG CITY 1550, PHILIPPINES
Monde Nissin
TEL. NO. : (632) 706 - 5155 - 57
STA. CLARA FAX. NO.: (632) 706-5158 SIGNATURE SIGNATURE LOCATION : SACRIS ROAD, CASUNTINGAN, MANDAUE CITY, CEBU, PHILIPPINES
LOCATION : F.REYES ST.,BRGY. BALIBAGO, STA.ROSA LAGUNA,PHILIPPINES
ELECTRICAL
²
²

²
²

²
²

PANEL UTILITY
²
²

²
²

MDP
UTILITY

²
² ²
²
²
² ²
²

²
²
²
²

CONTRACTOR: SUBMITTED BY: NAME: PROJECT TITLE: OWNER: SHEET CONTENTS: ELECTRICAL SHEET NO.:

STA. CLARA INTERNATIONAL NORMAN B. ENRIQUEZ FERDINAND L. RUBIA NITA N. ALIPOSA


CORPORATION PROJECT MANAGER PROFESSIONAL ELECTRICAL ENGR : PLANT MANAGER PROJECT MACTAN 2 MONDE NISSIN CORPORATION
SINGLE LINE DIAGRAM
CEBU PLANT EE-001
BUBUNAWAN

2nd FLOOR HIGHWAY 54 PLAZA EDSA, WACK-WACK, TM

MANDALUYONG CITY 1550, PHILIPPINES


TEL. NO. : (632) 706 - 5155 - 57
(GL 12-13 / A-P) Monde Nissin
STA. CLARA FAX. NO.: (632) 706-5158 SIGNATURE SIGNATURE LOCATION : SACRIS ROAD, CASUNTINGAN, MANDAUE CITY, CEBU, PHILIPPINES LOCATION : F.REYES ST.,BRGY. BALIBAGO, STA.ROSA LAGUNA,PHILIPPINES
- SCHEDULE OF LOADS

CONTRACTOR: SUBMITTED BY: NAME: PROJECT TITLE: OWNER: SHEET CONTENTS: SHEET NO.:

STA. CLARA INTERNATIONAL NORMAN B. ENRIQUEZ FERDINAND L. RUBIA NITA N. ALIPOSA


CORPORATION PROJECT MANAGER PROFESSIONAL ELECTRICAL ENGR : PLANT MANAGER PROJECT MACTAN 2 MONDE NISSIN CORPORATION
2nd FLOOR HIGHWAY 54 PLAZA EDSA, WACK-WACK,
MANDALUYONG CITY 1550, PHILIPPINES
BUBUNAWAN

CEBU PLANT TM
LOAD SCHEDULE 1 EE-002
TEL. NO. : (632) 706 - 5155 - 57
(GL 12-13 / A-P) Monde Nissin
STA. CLARA FAX. NO.: (632) 706-5158 SIGNATURE SIGNATURE LOCATION : SACRIS ROAD, CASUNTINGAN, MANDAUE CITY, CEBU, PHILIPPINES
LOCATION : F.REYES ST.,BRGY. BALIBAGO, STA.ROSA LAGUNA,PHILIPPINES
- SCHEDULE OF LOADS

CONTRACTOR: SUBMITTED BY: NAME: PROJECT TITLE: OWNER: SHEET CONTENTS: SHEET NO.:

STA. CLARA INTERNATIONAL NORMAN B. ENRIQUEZ FERDINAND L. RUBIA NITA N. ALIPOSA


CORPORATION PROJECT MANAGER PROFESSIONAL ELECTRICAL ENGR : PLANT MANAGER PROJECT MACTAN 2 MONDE NISSIN CORPORATION
2nd FLOOR HIGHWAY 54 PLAZA EDSA, WACK-WACK,
MANDALUYONG CITY 1550, PHILIPPINES
BUBUNAWAN

CEBU PLANT TM
LOAD SCHEDULE 2 EE-003
TEL. NO. : (632) 706 - 5155 - 57
(GL 12-13 / A-P) Monde Nissin
STA. CLARA FAX. NO.: (632) 706-5158 SIGNATURE SIGNATURE LOCATION : SACRIS ROAD, CASUNTINGAN, MANDAUE CITY, CEBU, PHILIPPINES
LOCATION : F.REYES ST.,BRGY. BALIBAGO, STA.ROSA LAGUNA,PHILIPPINES
ROOF LINE ROOF LINE ROOF LINE ROOF LINE

[ CHB ]
LAV URI WC

UP
[ CHB ]

ROOF LINE
[ CHB ]

LOGISTICS WAREHOUSE
LEVEL 2

ROOF LINE
[ CHB ]
[ CHB ]

UP
UP
1
1 20
2 20 19
2
19
LIFT
LIFT LIFT
LIFT
3

2
3

8
4
18
4
5 18
5 17
6 OPEN 17
6 OPEN 16
7 16
7 15

LP-1
8

LP-2
15
8

9 14
14
9 10 11 12 13
10 11 12 13

EXIT
EXIT
1
ROOF LINE

a c a c a c a b d b d b d
c f
LP-2
d e d e d
5
2600

LP-1
EXIT

PROCESS AREA NOODLE LINE 06


c a c a c a c d b d b d b e d e d e
2000

a a a a a a
c bd

PACKAGING AREA LINE 6


Sa S

ROLLER AREA
f
Sc

e
f 4

Sd
c
NOODLE LINE 05
LP-1 Sa
d e d e d
c a c a c a a b d b d b d b
b b b b b b
AHU DUCT 9
215A
1 3
LP-1 LP-1 LP-1 NOODLE LINE 4
150

[ HGW ] [ HGW ] [ HGW ]


[ CHB ]

LINE 3
260
PALLETIZING AREA
[ CHB ]

[ CHB ]
[ CHB ]
GF + 5000 NOODLE LINE 03

[ CHB ]
[ HGW ]

ELEV.

NOODLES PACKAGING AREA LINE 3 UP


GF + 5000

5000
OFFICE [ VSF ]
UP
DN

[ CHB ]
NOODLE LINE 02

[ CHB ]

[ CHB ]
ACCUMULATOR
LINE 1 [ EFH ] [ VSF ]

5000
[ CHB ]
PROCESS AREA ST-02
GF + 5000

[ CHB ]
[ CHB ]
[ CHB ] [ CHB ] sink NOODLE LINE 01
LAV

DN LAV

4500
ELEV. PACKAGING AREA LINE 1
[ CHB ]

WASHING

WC
AIR
WC

UP WC WC
[ 3VT ] SHOWER ENTRY
ST-01
[ CHB ] [ CHB ] [ CHB ] [ CHB ] [ CHB ] [ CHB ] [ CHB ]
[ CHB ]

[ CHB ]
A 2ND FLOOR LIGHTING LAYOUT
2.5mm THK. THERMOPLASTIC TRANSLUSCENT ROOFING
TO E. LIGHT OUTLET @ MIXER AREA

5
2.5mm THK. THERMOPLASTIC TRANSLUSCENT ROOFING LP-2
h i h i h
L06
HOPPER AREA

[ CHB ]
i h i h i

UPPER ROOFING L05


h i h i h

i
Sh
OPEN

[ CHB ]
[ CHB ]

[ CHB ]
2-TONS CAPACITY
FREIGHT ELEVETOR
[ CHB ]

OPEN

[ CHB ]
ELEV.
UPPER ROOFING
2.5mm THK. THERMOPLASTIC TRANSLUSCENT ROOFING ST-02
319
[ CHB ]
LINE
LAV URI WC
OF BEAM
2.5mm THK. THERMOPLASTIC TRANSLUSCENT ROOFING

[ CHB ]

[ CHB ]
[ CHB ]

[ CHB ]
UP

UP DN
OPEN 305

[ CHB ]
[ CHB ]

FALSE OPEN
BEAM

323
ST-01
[ CHB ]

314 315 316 301 302 303 [ CHB ] 304 305 [ CHB ] 306 307 [ CHB ] 308 [ CHB ] [ CHB ] [ CHB ] [ CHB ] [ CHB ]
[ CHB ] [ CHB ]
[ CHB ]

UP
11
22
20
20
19
19
7
2 LIFT LIFT 33

44
5
5
6
6 OPEN
18

17

16
LP-2
LP-1
7
15
8

14
9
10 11 12 13

b f b f b c e c e c f g f g f
- 4TH FLOOR LIGHTING LAYOUT
[ CHB ]

f b f b f e c e c e
g f g f g

b f b f b c e c e c
e
Sc f
Sb

f g f g f
Sfg

6 7
LP-1 LP-1 AHU DUCT 3
LP-2 OPEN
[ CHB ]

[ CHB ]
[ CHB ]

[ CHB ]

GF + 10500

[ CHB ]

OPEN
PACKAGING AREA LINE 4 ELEV.

GF + 10000
DN

ST-02

[ VSF ]
[ IPB ]
[ CHB ]

[ CHB ]
[ HGW ]

UP DN
OPEN
[ CHB ]

[ CHB ]

[ CHB ]
ELEV.

DN
OPEN
[ CHB ]

[ CHB ]

[ CHB ]

[ CHB ]
ST-01

[ CHB ]

[ CHB ]

[ CHB ]

[ CHB ]
[ CHB ]

403
308

[ CHB ] [ CHB ] [ CHB ] [ CHB ]


[ CHB ] [ CHB ]

- 3RD FLOOR LIGHTING LAYOUT

CONTRACTOR: SUBMITTED BY: NAME: PROJECT TITLE: OWNER: SHEET CONTENTS: SHEET NO.:

NORMAN B. ENRIQUEZ FERDINAND L. RUBIA


STA. CLARA INTERNATIONAL NITA N. ALIPOSA
CORPORATION PROJECT MANAGER PROFESSIONAL ELECTRICAL ENGR : PLANT MANAGER PROJECT MACTAN 2 MONDE NISSIN CORPORATION
SECOND FLOOR LIGHTING LAYOUT
THIRD FLOOR LIGHTING LAYOUT
CEBU PLANT EE-004
BUBUNAWAN

2nd FLOOR HIGHWAY 54 PLAZA EDSA, WACK-WACK, TM


FOURTH FLOOR LIGHTING LAYOUT
MANDALUYONG CITY 1550, PHILIPPINES GENERAL NOTES
TEL. NO. : (632) 706 - 5155 - 57
(GL 12-13 / A-P) Monde Nissin
LEGENDS
STA. CLARA FAX. NO.: (632) 706-5158 SIGNATURE SIGNATURE LOCATION : SACRIS ROAD, CASUNTINGAN, MANDAUE CITY, CEBU, PHILIPPINES
LOCATION : F.REYES ST.,BRGY. BALIBAGO, STA.ROSA LAGUNA,PHILIPPINES
ROOF LINE ROOF LINE ROOF LINE ROOF LINE

[ CHB ]
LAV URI WC

UP
[ CHB ]

ROOF LINE
[ CHB ]

LOGISTICS WAREHOUSE
LEVEL 2

ROOF LINE
[ CHB ]
[ CHB ]

1
1
2
UP
UP
20
20
2
10
19
2
19
LIFT
LIFT LIFT
LIFT
3
3
4
4
5
5
6 OPEN
18
18
17
17 LP-2
LP-1
6 OPEN 16
7 16
7 15
8 15
8

9 14
9 10 11 12 13 14
10 11 12 13

EXIT
EXIT
LP-2
ROOF LINE

2600
EXIT

PROCESS AREA NOODLE LINE 06

2000
PACKAGING AREA LINE 6 ROLLER AREA
NOODLE LINE 05
LP-1
f
Sc

215A
AHU DUCT
220 P/min NOODLE LINE 04
150

220 P/min
[ HGW ] [ HGW ] [ HGW ]
[ CHB ]

H:900mm H:455mm
LINE 3
260
PALLETIZING AREA
220 P/min [ CHB ]

[ CHB ]
[ CHB ]
GF + 5000 NOODLE LINE 03

[ CHB ]
[ HGW ]

220 P/min
ELEV.

NOODLES PACKAGING AREA LINE 3 UP


GF + 5000

5000
OFFICE [ VSF ]
UP
DN

[ CHB ]
NOODLE LINE 02

[ CHB ]

[ CHB ]
ACCUMULATOR
LINE 1 [ EFH ] [ VSF ]

5000
PROCESS AREA

[ CHB ]
ST-02
GF + 5000

[ CHB ]
[ CHB ] [ CHB ] sink NOODLE LINE 01

[ CHB ]
LAV

DN LAV

4500
ELEV. PACKAGING AREA LINE 1
[ CHB ]

WASHING

WC
AIR
WC

UP WC WC
[ 3VT ] SHOWER ENTRY
ST-01
[ CHB ] [ CHB ] [ CHB ] [ CHB ] [ CHB ] [ CHB ] [ CHB ]
[ CHB ]

- 2ND FLOOR POWER LAYOUT

[ CHB ]
2.5mm THK. THERMOPLASTIC TRANSLUSCENT ROOFING 12
4 PP-U
LP-2 EF-1
15
PP-U
2.5mm THK. THERMOPLASTIC TRANSLUSCENT ROOFING
L06

[ CHB ]
HOPPER
AREA

UPPER ROOFING
L05

OPEN

[ CHB ]
[ CHB ]

[ CHB ]
2-TONS CAPACITY
FREIGHT ELEVETOR

[ CHB ]
[ CHB ]
OPEN
LAV URI WC

[ CHB ]
ELEV.
UPPER ROOFING
[ CHB ]
UP

2.5mm THK. THERMOPLASTIC TRANSLUSCENT ROOFING ST-02


319

LINE
OF BEAM
2.5mm THK. THERMOPLASTIC TRANSLUSCENT ROOFING
[ CHB ]

[ CHB ]

[ CHB ]
[ CHB ]
UP DN
OPEN 305

[ CHB ]
FALSE OPEN
BEAM

323
[ CHB ]
ST-01
314 315 316 301 302 303 [ CHB ] 304 305 [ CHB ] 306 307 [ CHB ] 308 [ CHB ] [ CHB ] [ CHB ] [ CHB ] [ CHB ]
[ CHB ] [ CHB ]
EF-2
[ CHB ]

UP
1
1
20
20
2
19
19

LIFT LIFT 3
3

4
18
5
5
17
66 OPEN
16
77
15
8

14
9
10 11 12
12 13

8
LP-1 4
LP-2
[ CHB ]

- 4TH FLOOR HOPPER POWER LAYOUT


AHU DUCT
OPEN
[ CHB ]

[ CHB ]
[ CHB ]

[ CHB ]

GF + 10500

[ CHB ]

OPEN
PACKAGING AREA LINE 4 ELEV.

GF + 10000
DN

ST-02

[ VSF ]
[ IPB ]
[ CHB ]

[ CHB ]
[ HGW ]

UP DN
OPEN
[ CHB ]

[ CHB ]

[ CHB ]
ELEV.

DN
OPEN
[ CHB ]

[ CHB ]

[ CHB ]

[ CHB ]
ST-01

[ CHB ]

[ CHB ]

[ CHB ]

[ CHB ]

403
[ CHB ]

308

[ CHB ] [ CHB ] [ CHB ] [ CHB ]


[ CHB ] [ CHB ]

- 3RD FLOOR POWER LAYOUT

CONTRACTOR: SUBMITTED BY: NAME: PROJECT TITLE: OWNER: SHEET CONTENTS: SHEET NO.:

STA. CLARA INTERNATIONAL NORMAN B. ENRIQUEZ FERDINAND L. RUBIA NITA N. ALIPOSA


CORPORATION PROJECT MANAGER PROFESSIONAL ELECTRICAL ENGR : PLANT MANAGER PROJECT MACTAN 2 MONDE NISSIN CORPORATION SECOND FLOOR POWER LAYOUT
CEBU PLANT THIRD FLOOR POWER LAYOUT
EE-005
BUBUNAWAN

2nd FLOOR HIGHWAY 54 PLAZA EDSA, WACK-WACK, TM

MANDALUYONG CITY 1550, PHILIPPINES FOURTH FLOOR POWER LAYOUT


TEL. NO. : (632) 706 - 5155 - 57
(GL 12-13 / A-P) Monde Nissin
STA. CLARA FAX. NO.: (632) 706-5158 SIGNATURE SIGNATURE LOCATION : SACRIS ROAD, CASUNTINGAN, MANDAUE CITY, CEBU, PHILIPPINES
LOCATION : F.REYES ST.,BRGY. BALIBAGO, STA.ROSA LAGUNA,PHILIPPINES
HD HD HD HD
D5-01 D5-02 D5-03 D5-04
ROOF LINE ROOF LINE ROOF LINE ROOF LINE
POWER

[ CHB ]
LAV URI WC
H5-01

[ CHB ]
UP
[ CHB ]

M5-01

ROOF LINE
[ CHB ]

FOURTH FLOOR HOPPER AREA


LOGISTICS WAREHOUSE
LEVEL 2

SD SD SD SD SD SD HD HD HD HD

D3-01 D3-02 D3-03 D3-04 D3-05 D3-06

ROOF LINE
D4-01 D4-02 D4-03 D4-04
POWER

[ CHB ]
[ CHB ]

H3-01 H4-01
UP
UP
1
1 20
2 20
2 19
19
LIFT
LIFT LIFT
LIFT
3

2 M4-01
3
4
18

M3-01
4 18
5
5 17
6 OPEN 17
6 OPEN 16
7 16
7 15

LP-1
8 15
8

14
9
9 10 11 12 13 14
10 11 12 13

EXIT

EXIT
D2-01 D2-02
THIRD FLOOR PACKAGING AREA MIXER AREA
ROOF LINE

HD HD
SD SD SD SDD1-07
D1-02 D1-03 D1-06

2600
EXIT

M1-02 PROCESS AREA NOODLE LINE 06


PS
TO 3RD FLOOR FDAS LINE

2000
H2-01
M1-01 PACKAGING AREA LINE 6 ROLLER AREA
PS D1-04 SD SD SD SD SD SD SD SD HD HD HD HD
SDD1-01 SD SDD1-05 SD D1-08 H1-01
NOODLE LINE 05 HD HD
D2-04
TO 3RD FLOOR FDAS LINED2-03 PS
D1-01 D1-02 D1-03 D1-04 D1-05 D1-06 D1-07 D1-08 D2-01 D2-02 D2-03 D2-04
H1-01 M2-01 POWER
f
Sc

AHU DUCT H1-01


215A
H2-01
220 P/min NOODLE LINE 04
150
PACKAGING AREA
220 P/min
[ HGW ] [ HGW ] [ HGW ]
MIXER AREA
[ CHB ]

H:900mm H:455mm
LINE 3
260
PALLETIZING AREA
220 P/min [ CHB ] M1-01 M1-02 M2-01

[ CHB ]
[ CHB ]
GF + 5000 NOODLE LINE 03

[ CHB ]
[ HGW ]

ELEV.

NOODLES
220 P/min

PACKAGING AREA LINE 3 UP


GF + 5000 SECOND FLOOR

5000
OFFICE [ VSF ]
UP
DN

[ CHB ]
NOODLE LINE 02

[ CHB ]

[ CHB ]
ACCUMULATOR
LINE 1 [ EFH ] [ VSF ]

5000
PROCESS AREA

[ CHB ]
ST-02
GF + 5000

[ CHB ]
[ CHB ] [ CHB ] sink NOODLE LINE 01
LAV

DN LAV

4500
ELEV.
PACKAGING AREA LINE 1
[ CHB ]

WASHING

AIR
WC WC

SHOWER ENTRY
UP
ST-01
WC WC
PB [ 3VT ]
[ CHB ] [ CHB ] [ CHB ] [ CHB ] [ CHB ] [ CHB ] [ CHB ]
[ CHB ]

HOMERUN TO FACP
GUARDHOUSE FACP
ROAD
GUARD HOUSE

FDAS CABLE RUN UNDER


- 2ND FLOOR FDAS LAYOUT
BRIDGE
GUARD HOUSE
REFER DRWG SHT. NO:
EE - 006 - FDAS SCHEMATIC DIAGRAM

[ CHB ]
LAV URI WC
[ CHB ]
UP
[ CHB ]

[ CHB ]
[ CHB ]

UP
1
20
2
19

LIFT LIFT 3

4
18
5
17
6 OPEN

[ CHB ]
16
7
15
8

9 14
10 11 12 13

TO 2ND FLOOR FDAS LINE


D4-02
SD D3-03 SD SD HD
RISE UPD4-01
HD
D3-01 D3-05 2.5mm THK. THERMOPLASTIC TRANSLUSCENT ROOFING
[ CHB ]

H3-01
D4-04 D4-03 2.5mm THK. THERMOPLASTIC TRANSLUSCENT ROOFING
D3-04 D3-06
HD HD HD HD TO DETECTION DEVICES @ MIXER AREA
PS
M3-01
D3-02SD SD SD
TO 2ND FLOOR FDAS LINE PS L06

[ CHB ]
HOPPER
AREA
AHU DUCT
OPEN UPPER ROOFING L05
HD HD
PS EOL

OPEN
PACKAGING AREA LINE 4

[ CHB ]
[ CHB ]

[ CHB ]
2-TONS CAPACITY
FREIGHT ELEVETOR
DN

[ CHB ]
[ IPB ]

ELEV.

[ CHB ]
UPPER ROOFING
[ HGW ]

OPEN
2.5mm THK. THERMOPLASTIC TRANSLUSCENT ROOFING ST-02
319

LINE
OF BEAM
2.5mm THK. THERMOPLASTIC TRANSLUSCENT ROOFING
[ CHB ]

[ CHB ]
[ CHB ]
ELEV.

DN
OPEN
UP DN
[ CHB ]

[ CHB ]

305

[ CHB ]
403

FALSE
BEAM
323
ST-01
[ CHB ]

314 315 316 301 302 303 [ CHB ] 304 305 [ CHB ] 306 307 [ CHB ] 308 [ CHB ] [ CHB ] [ CHB ] [ CHB ] [ CHB ]
[ CHB ] [ CHB ]

- 3RD FLOOR FDAS LAYOUT


- FOURTH FLOOR PLAN

CONTRACTOR: SUBMITTED BY: NAME: PROJECT TITLE: OWNER: SHEET CONTENTS: SHEET NO.:

STA. CLARA INTERNATIONAL NORMAN B. ENRIQUEZ FERDINAND L. RUBIA NITA N. ALIPOSA


SECOND FLOOR FDAS LAYOUT
CORPORATION PROJECT MANAGER PROFESSIONAL ELECTRICAL ENGR : PLANT MANAGER PROJECT MACTAN 2 MONDE NISSIN CORPORATION THIRD FLOOR FDAS LAYOUT
CEBU PLANT EE-006
BUBUNAWAN BUBUNAWAN

2nd FLOOR HIGHWAY 54 PLAZA EDSA, WACK-WACK, TM


FOURTH FLOOR FDAS LAYOUT
MANDALUYONG CITY 1550, PHILIPPINES
TEL. NO. : (632) 706 - 5155 - 57
(GL 12-13 / A-P) Monde Nissin FDAS SCHEMATIC DIAGRAM
STA. CLARA FAX. NO.: (632) 706-5158 SIGNATURE SIGNATURE LOCATION : SACRIS ROAD, CASUNTINGAN, MANDAUE CITY, CEBU, PHILIPPINES
LOCATION : F.REYES ST.,BRGY. BALIBAGO, STA.ROSA LAGUNA,PHILIPPINES
[ CHB ]
LAV URI WC

[ CHB ]
UP
[ CHB ]

[ CHB ]
LOGISTICS WAREHOUSE
LEVEL 2

[ CHB ]
[ CHB ]
UP
1
20
2
19

LIFT LIFT 3

4 18
5
17
6 OPEN
16
7
15
8

EXIT
9 14
10 11 12 13

EXIT
2600
EXIT
ACCUMULATOR PROCESS AREA NOODLE LINE 06 ROLLER AREA

2000
PACKAGING AREA LINE 6

215A
AHU DUCT
220 P/min

150

220 P/min
[ HGW ] [ HGW ] [ HGW ]

[ CHB ]
H:900mm H:455mm
LINE 3
260
PALLETIZING AREA
220 P/min [ CHB ]

[ CHB ]
NOODLE LINE 03

[ CHB ]
GF + 5000

[ CHB ]
[ HGW ]
220 P/min ELEV.

NOODLES PACKAGING AREA LINE 3 UP


GF + 5000

5000
OFFICE [ VSF ]
UP
DN

[ CHB ]
NOODLE LINE 02

[ CHB ]

[ CHB ]
LINE 1 [ EFH ] [ VSF ]

5000
ACCUMULATOR PROCESS AREA

[ CHB ]
ST-02
GF + 5000

[ CHB ]
[ CHB ] [ CHB ] sink NOODLE LINE 01
LAV

DN LAV

4500
ELEV. PACKAGING AREA LINE 1

[ CHB ]

WASHING
WC WC
AIR
UP WC WC
[ 3VT ] SHOWER ENTRY
ST-01
[ CHB ] [ CHB ] [ CHB ] [ CHB ] [ CHB ] [ CHB ] [ CHB ]
[ CHB ]

[ CHB ]
LAV URI WC
[ CHB ]
UP

[ CHB ]
[ CHB ]

TO 2ND FLOOR TEL. TO 2ND FLOOR CCTV

[ CHB ]
[ CHB ]

TO 4TH FLOOR TEL. TO 4TH FLOOR CCTV

1
2
UP
20
19
EXISTING 2.5mm THK. THERMOPLASTIC TRANSLUSCENT ROOFING TO 3RD FLOOR TEL. TO 3RD FLOOR CCTV
LIFT LIFT 3

4
18
5
17
6 OPEN
16
7
15
8

14
9
10 11 12 13

2.5mm THK. THERMOPLASTIC TRANSLUSCENT ROOFING


EOL EOL

[ CHB ]
HOPPER
AREA
[ CHB ]

UPPER ROOFING

AHU DUCT OPEN

OPEN

[ CHB ]
[ CHB ]

[ CHB ]

[ CHB ]
[ CHB ]
[ CHB ]

[ CHB ]

GF + 10500 [ CHB ]

OPEN
[ CHB ]
EXISTING 2.5mm THK. THERMOPLASTIC TRANSLUSCENT ROOFING

[ CHB ]
ELEV.
OPEN UPPER ROOFING
ELEV.
ST-02
319
GF + 10000
DN

ST-02

EXISTING 2.5mm THK. THERMOPLASTIC TRANSLUSCENT ROOFING

[ CHB ]

[ CHB ]
[ CHB ]
[ VSF ]
[ IPB ]

UP DN
[ CHB ]

[ CHB ]

OPEN 305

[ CHB ]
[ HGW ]

UP DN
OPEN
[ CHB ]

[ CHB ]

FALSE OPEN
[ CHB ] BEAM
ELEV.

DN
OPEN
323
[ CHB ]
[ CHB ]

[ CHB ]

[ CHB ]

ST-01
[ CHB ]

[ CHB ]
ST-01

314 315 316 301 302 303 [ CHB ] 304 305 [ CHB ] 306 307 [ CHB ] 308 [ CHB ] [ CHB ] [ CHB ] [ CHB ]
[ CHB ] [ CHB ]
[ CHB ]

[ CHB ]

[ CHB ]

[ CHB ]

403
[ CHB ]

308

[ CHB ] [ CHB ] [ CHB ] [ CHB ]


[ CHB ] [ CHB ]

CONTRACTOR: SUBMITTED BY: NAME: PROJECT TITLE: OWNER: SHEET CONTENTS: ELECTRICAL SHEET NO.:

STA. CLARA INTERNATIONAL NORMAN B. ENRIQUEZ FERDINAND L. RUBIA NITA N. ALIPOSA


CORPORATION PROJECT MANAGER PROFESSIONAL ELECTRICAL ENGR : PLANT MANAGER PROJECT MACTAN 2 MONDE NISSIN CORPORATION
2ND, 3RD & 4TH FLOOR:
CEBU PLANT CCTV & TELEPHONE LAYOUT
EE-007
BUBUNAWAN

2nd FLOOR HIGHWAY 54 PLAZA EDSA, WACK-WACK, TM

MANDALUYONG CITY 1550, PHILIPPINES


TEL. NO. : (632) 706 - 5155 - 57
(GL 12-13 / A-P) Monde Nissin
STA. CLARA FAX. NO.: (632) 706-5158 SIGNATURE SIGNATURE LOCATION : SACRIS ROAD, CASUNTINGAN, MANDAUE CITY, CEBU, PHILIPPINES LOCATION : F.REYES ST.,BRGY. BALIBAGO, STA.ROSA LAGUNA,PHILIPPINES
NOODLE PLANT BLDG

- (HAND HOLE) BLOW UP


PART PLAN

GUARD HOUSE

A SECTION B SECTION

CONTRACTOR: SUBMITTED BY: NAME: PROJECT TITLE: OWNER: SHEET CONTENTS: SHEET NO.:

STA. CLARA INTERNATIONAL NORMAN B. ENRIQUEZ FERDINAND L. RUBIA NITA N. ALIPOSA


CORPORATION PROJECT MANAGER PROFESSIONAL ELECTRICAL ENGR : PLANT MANAGER PROJECT MACTAN 2 MONDE NISSIN CORPORATION ELECTRICAL DUCTBANK
CEBU PLANT EE-008
BUBUNAWAN

2nd FLOOR HIGHWAY 54 PLAZA EDSA, WACK-WACK, TM

MANDALUYONG CITY 1550, PHILIPPINES


TEL. NO. : (632) 706 - 5155 - 57
(GL 12-13 / A-P) Monde Nissin
STA. CLARA FAX. NO.: (632) 706-5158 SIGNATURE SIGNATURE LOCATION : SACRIS ROAD, CASUNTINGAN, MANDAUE CITY, CEBU, PHILIPPINES
LOCATION : F.REYES ST.,BRGY. BALIBAGO, STA.ROSA LAGUNA,PHILIPPINES
F LONGITUDINAL SECTION / ELEVATION ALONG GRID 13/A-P

NOTE: REFER SECTIONAL DETAIL SHEET-010

114 [ CHB ]
[ CHB ] [ CHB ] [ CHB ] [ CHB ] [ CHB ] [ CHB ] [ CHB ] [ CHB ]
122 136 121 120 137 119 118 138 117 116 139 115 LAV URI WC

[ CHB ]
45

UP
[ CHB ]

2000

[ CHB ]
3500

144
8150

2000

4850

104

14225
9.99

[ CHB ]
[ CHB ]
UP
1
20
2
19

LIFT LIFT 3

4
18

OPEN 5
6
7
OPEN
17

16

15
8

14
9
10 11 12 13

[ CHB ]

2600
141

2000
140

215A
AHU DUCT
3 L05
220 P/min

139
600 118 117
150

107 220 P/min


[ CHB ] [ HGW ] [ HGW ] [ HGW ]

[ CHB ]
600 2
H:900mm H:455mm
260 2-TONS CAPACITY
1200 120 116
119 FREIGHT ELEVETOR
138
107 220 P/min [ CHB ]

125

[ CHB ]
1

[ CHB ]
600 GF + 5000

[ CHB ]
127 129 131

[ HGW ]
220 P/min
ELEV.
325 324 326 1500 [ MES ]
GF + 5000
[ CHB ] UP

5000
[ CHB ] [ CHB ]
SHELVES
148 [ VSF ]
352 129 UP
DN
125

[ CHB ]
4300
106

[ CHB ]
409 27 SQ.M 5700

[ CHB ]
110
122 410 354
411
408 [ EFH ] [ VSF ]
128 130

5000
128 353 108
11.46

[ CHB ]
HALLWAY ST-02
412 4800
124 GF + 5000
126 [ MES ] [ CHB ]
149

[ CHB ]
152 2500 [ CHB ] [ CHB ] sink
407 11.31
400

LAV

133 DN LAV

4500
126 4525
ELEV.

[ CHB ]

WASHING
123 WC WC
AIR
321 ENTRY
UP
ST-01
WC WC
[ 3VT ] SHOWER
[ CHB ] [ CHB ] [ CHB ] [ CHB ] [ CHB ] [ CHB ] [ CHB ]
101 4600 104
141 142 143 145 105 [ CHB ]
102 103
LEDGE
8800 6000

- PANELBOARD LOCATION- GROUND FLOOR - PANEL BOARD LOCATIONS- 2ND FLOOR

NOTE: 1. REFER SECTIONAL DETAIL SHEET-010


2. REFER LOAD SCHEDULE SHEET EE-002 & 003
CONTRACTOR: SUBMITTED BY: NAME: PROJECT TITLE: OWNER: SHEET CONTENTS: ELECTRICAL SHEET NO.:

STA. CLARA INTERNATIONAL NORMAN B. ENRIQUEZ FERDINAND L. RUBIA NITA N. ALIPOSA


CORPORATION PROJECT MANAGER PROFESSIONAL ELECTRICAL ENGR : PLANT MANAGER PROJECT MACTAN 2 MONDE NISSIN CORPORATION LONGITUDINAL SECTION - GL 13/A-P
CEBU PLANT EE-008
BUBUNAWAN

2nd FLOOR HIGHWAY 54 PLAZA EDSA, WACK-WACK, TM PANELBOARD LOCATION-GROUND FLR


MANDALUYONG CITY 1550, PHILIPPINES PANELBOARD LOCATION-SECOND FLR
TEL. NO. : (632) 706 - 5155 - 57
(GL 12-13 / A-P) Monde Nissin
STA. CLARA FAX. NO.: (632) 706-5158 SIGNATURE SIGNATURE LOCATION : SACRIS ROAD, CASUNTINGAN, MANDAUE CITY, CEBU, PHILIPPINES LOCATION : F.REYES ST.,BRGY. BALIBAGO, STA.ROSA LAGUNA,PHILIPPINES
B SECTION C SECTION D SECTION
A SECTION

SECOND FLOOR AREA

E SECTION F SECTION G SECTION I SECTION J SECTION


H SECTION

GROUND FLOOR AREA

CONTRACTOR: SUBMITTED BY: NAME: PROJECT TITLE: OWNER: SHEET CONTENTS: ELECTRICAL SHEET NO.:

STA. CLARA INTERNATIONAL NORMAN B. ENRIQUEZ FERDINAND L. RUBIA NITA N. ALIPOSA


CORPORATION PROJECT MANAGER PROFESSIONAL ELECTRICAL ENGR : PLANT MANAGER PROJECT MACTAN 2 MONDE NISSIN CORPORATION ELECTRICAL SECTIONAL & DETAIL
CEBU PLANT EE-010
BUBUNAWAN

2nd FLOOR HIGHWAY 54 PLAZA EDSA, WACK-WACK, TM


(GROUND and 2ND FLOOR)
MANDALUYONG CITY 1550, PHILIPPINES
TEL. NO. : (632) 706 - 5155 - 57
(GL 12-13 / A-P) Monde Nissin
STA. CLARA FAX. NO.: (632) 706-5158 SIGNATURE SIGNATURE LOCATION : SACRIS ROAD, CASUNTINGAN, MANDAUE CITY, CEBU, PHILIPPINES LOCATION : F.REYES ST.,BRGY. BALIBAGO, STA.ROSA LAGUNA,PHILIPPINES
- MIXER & HOPPER LIGHTING INSTALLATION DETAIL - PACKAGING LIGHTING INSTALLATION DETAIL

- HIGH BAY LIGHTING INSTALLATION DETAIL

CONTRACTOR: SUBMITTED BY: NAME: PROJECT TITLE: OWNER: SHEET CONTENTS: SHEET NO.:

STA. CLARA INTERNATIONAL NORMAN B. ENRIQUEZ FERDINAND L. RUBIA NITA N. ALIPOSA LIGHTING SCHEDULE
CORPORATION PROJECT MANAGER PROFESSIONAL ELECTRICAL ENGR : PLANT MANAGER PROJECT MACTAN 2 MONDE NISSIN CORPORATION HIGH BAY LIGHTING INSTL. DETAIL
CEBU PLANT EE-011
BUBUNAWAN

2nd FLOOR HIGHWAY 54 PLAZA EDSA, WACK-WACK, TM PACKAGING LIGHTING INSTL. DETAIL
MANDALUYONG CITY 1550, PHILIPPINES MIXER & HOPPER LIGHTING INSTL. DETAIL
TEL. NO. : (632) 706 - 5155 - 57
(GL 12-13 / A-P) Monde Nissin
STA. CLARA FAX. NO.: (632) 706-5158 SIGNATURE SIGNATURE LOCATION : SACRIS ROAD, CASUNTINGAN, MANDAUE CITY, CEBU, PHILIPPINES
LOCATION : F.REYES ST.,BRGY. BALIBAGO, STA.ROSA LAGUNA,PHILIPPINES
[ CHB ] [ CHB ] [ CHB ] [ CHB ] [ CHB ] [ CHB ] [ CHB ]
122 136 121 120 137 119 118 138 [ CHB ] 117 116 139 115

45

2000

3500

144
8150

2000

4850

104

14225
9.99

OPEN

[ CHB ]

SEPTIC TANK
OIL AND WATER
GREEN
SEPARATOR TANK

[ CHB ]

121

3 L05
AHU - 1 AHU - 2
NEW AHU

139
600

107
[ CHB ]
600
2
115
1200 120 119 116
138
107

125
600
1
127 129 131

325 324 326 1500 [ MES ]


[ CHB ]
[ CHB ] [ CHB ]
SHELVES
148
352 129
125
4300
106

409 27 SQ.M 5700


110
122 410 354
411
408 128 130
128 353 108
11.46
HALLWAY 4800
412 124
126 [ MES ] [ CHB ]
149
152 2500
407 11.31
400

133
4525
126
123
321

101 4600 104


141 142 143 145 105
102 103

8800 6000

DETAIL "A"
GROUNDING BUSBAR

[ CHB ]
LAV URI WC
[ CHB ]
UP

[ CHB ]
[ CHB ]

[ CHB ]
[ CHB ]

UP
1
20
2
19

LIFT LIFT 3

4
18
5
17
6 OPEN
16
7
15
8

9 14
10 11 12 13
2600

- 2ND FLOOR LAYOUT


2000

215A
AHU DUCT
220 P/min

150

220 P/min
[ HGW ] [ HGW ] [ HGW ]
[ CHB ]

H:900mm H:455mm
260 2-TONS CAPACITY
FREIGHT ELEVETOR
220 P/min [ CHB ]
[ CHB ]
[ CHB ]

GF + 5000

[ CHB ]
[ HGW ]

220 P/min ELEV.


GF + 5000
UP

5000
[ VSF ]
UP
DN
[ CHB ]

[ CHB ]

[ CHB ]
[ EFH ] [ VSF ]

5000
- GROUNDING DETAIL INSTALLATION
[ CHB ]

ST-02
GF + 5000
[ CHB ]

[ CHB ] [ CHB ]

LAV

DN LAV

4500
ELEV.
[ CHB ]

WASHING

WC WC

UP WC WC
[ 3VT ] ENTRY
ST-01
[ CHB ] [ CHB ] [ CHB ] [ CHB ] [ CHB ] [ CHB ] [ CHB ]
[ CHB ]
LEDGE

CONTRACTOR: SUBMITTED BY: NAME: PROJECT TITLE: OWNER: SHEET CONTENTS: ELECTRICAL SHEET NO.:

NORMAN B. ENRIQUEZ FERDINAND L. RUBIA


STA. CLARA INTERNATIONAL NITA N. ALIPOSA GROUNDING LAYOUT
CORPORATION PROJECT MANAGER PROFESSIONAL ELECTRICAL ENGR : PLANT MANAGER PROJECT MACTAN 2 MONDE NISSIN CORPORATION GROUND ROD DETAIL
2nd FLOOR HIGHWAY 54 PLAZA EDSA, WACK-WACK,
MANDALUYONG CITY 1550, PHILIPPINES
BUBUNAWAN

CEBU PLANT TM

GROUNDING BUSBAR DETAIL EE-012


TEL. NO. : (632) 706 - 5155 - 57
(GL 12-13 / A-P) Monde Nissin
STA. CLARA FAX. NO.: (632) 706-5158 SIGNATURE SIGNATURE LOCATION : SACRIS ROAD, CASUNTINGAN, MANDAUE CITY, CEBU, PHILIPPINES
LOCATION : F.REYES ST.,BRGY. BALIBAGO, STA.ROSA LAGUNA,PHILIPPINES
MECHANICAL
114
[ CHB ] [ CHB ] [ CHB ] [ CHB ] [ CHB ] [ CHB ] [ CHB ]
136 121 120 137 119 [ CHB ] 117 116 139 115
122 118 138

45

2000

3500

144
8150

2000

4850

104

14225
9.99

M
OPEN
M

[ CHB ]

SEPTIC TANK
OIL AND WATER
GREEN
SEPARATOR TANK
141

[ CHB ]

140

3 L05

139
AHU - 3
600
M
107

M
600
2
115
1200 116
138
107

1
600 131

325 324 326 1500

[ CHB ]
[ CHB ] [ CHB ]
SHELVES
148
129
352
125
4300
106

409 27 SQ.M 5700


110
122 410 354
411
408
128 353 128 130
11.46 108
HALLWAY 4800
412 124
126 [ MES ] [ CHB ]
149
152 2500
407 11.31
400

133
4525
126
123
321

101 4600 104


141 142 143 145 105
102 103

6000

- BLOW UP DETAIL
8800

- AIRCONDITIONING LAYOUT - GROUND FLOOR

NOTES:
1. FOR EQUIPMENT DATA & SCHEMATIC REFER SHEET ME-003

[ CHB ] [ CHB ]
LAV URI WC LAV URI WC
[ CHB ]

[ CHB ]
UP

UP
[ CHB ]
[ CHB ]

[ CHB ]
LOGISTICS WAREHOUSE
LEVEL 2

[ CHB ]
[ CHB ]
[ CHB ]

UP UP
1 1
20 20
2 2
19
19

LIFT LIFT 3
LIFT LIFT 3

4
4 18
18
5 5
17 17
6 OPEN 6 OPEN
16 16
7 7
15 15
8 8

14 9 14
9
10 11 12 13 10 11 12 13

NOODLE LINE 06
ACCUMULATOR PROCESS AREA ROLLER AREA

[ CHB ]
PACKAGING AREA LINE 6
NOODLE LINE 05

215A

OPEN
220 P/min NOODLE LINE 04

[ CHB ]
PUSH LOCK

-+

150

[ CHB ]
220 P/min
[ HGW ] [ HGW ] [ HGW ]
[ CHB ]

LINE 3

[ CHB ]

[ CHB ]
H:900mm H:455mm
260
GF + 10500
PALLETIZING AREA
220 P/min [ CHB ] [ CHB ]
[ CHB ]
[ CHB ]

GF + 5000 NOODLE LINE 03 OPEN


[ CHB ]
[ HGW ]

220 P/min ELEV. ELEV.


NOODLES PACKAGING AREA LINE 3 GF + 5000
UP GF + 10000
5000

OFFICE

DN
[ VSF ] ST-02
UP
DN
[ CHB ]

[ VSF ]
NOODLE LINE 02

[ IPB ]
[ CHB ]

[ CHB ]
[ CHB ]

[ CHB ]
LINE 1 [ EFH ] [ VSF ]

[ HGW ]
5000

UP DN
PROCESS AREA
[ CHB ]

ACCUMULATOR ST-02 OPEN

[ CHB ]
GF + 5000

[ CHB ]
[ CHB ]

[ CHB ] [ CHB ] sink NOODLE LINE 01


LAV [ CHB ]

ELEV.
DN LAV OPEN
4500

DN
ELEV. PACKAGING AREA LINE 1
[ CHB ]

[ CHB ]

[ CHB ]

[ CHB ]
WASHING

AIR
WC WC

[ CHB ]
ST-01

UP WC WC
[ 3VT ] SHOWER ENTRY

[ CHB ]

[ CHB ]

[ CHB ]

[ CHB ]
ST-01 403
[ CHB ]

308
[ CHB ] [ CHB ] [ CHB ] [ CHB ] [ CHB ] [ CHB ] [ CHB ]
[ CHB ] [ CHB ] [ CHB ] [ CHB ] [ CHB ]
[ CHB ] [ CHB ]

- AC DUCTING LAYOUT - 3RD FLOOR


- AC DUCTING LAYOUT - 2ND FLOOR

CONTRACTOR: SUBMITTED BY: NAME: PROJECT TITLE: OWNER: SHEET CONTENTS: MECHANICAL SHEET NO.:

STA. CLARA INTERNATIONAL NORMAN B. ENRIQUEZ EDWIN Q. TEVES NITA N. ALIPOSA AIRCONDITIONING LAYOUT (GROUND FLOOR)
CORPORATION PROJECT MANAGER PROFESSIONAL MECHANICAL ENGINEER PLANT MANAGER
PROJECT MACTAN 2 MONDE NISSIN CORPORATION AC DUCTING LAYOUT (2ND FLOOR)
2nd FLOOR HIGHWAY 54 PLAZA EDSA, WACK-WACK,
MANDALUYONG CITY 1550, PHILIPPINES
BUBUNAWAN BUBUNAWAN

CEBU PLANT
(GL 12-13 / A-P) Monde Nissin
TM

3RD FLOOR DUCTING & FCU LAYOUT


BLOW UP DETAIL
ME-001
TEL. NO. : (632) 706 - 5155 - 57 LOCATION :
STA. CLARA FAX. NO.: (632) 706-5158 SIGNATURE SIGNATURE
SACRIS ROAD, CASUNTINGAN, MANDAUE CITY, CEBU, PHILIPPINES
LOCATION : F.REYES ST.,BRGY. BALIBAGO, STA.ROSA LAGUNA,PHILIPPINES
M

CONTRACTOR: SUBMITTED BY: NAME: PROJECT TITLE: OWNER: SHEET CONTENTS: MECHANICAL SHEET NO.:

STA. CLARA INTERNATIONAL NORMAN B. ENRIQUEZ EDWIN Q. TEVES NITA N. ALIPOSA


CORPORATION PROJECT MANAGER PROFESSIONAL MECHANICAL ENGINEER PLANT MANAGER
PROJECT MACTAN 2 MONDE NISSIN CORPORATION
2nd FLOOR HIGHWAY 54 PLAZA EDSA, WACK-WACK,
MANDALUYONG CITY 1550, PHILIPPINES
BUBUNAWAN BUBUNAWAN

CEBU PLANT
(GL 12-13 / A-P)
TM

Monde Nissin
SECTIONAL ELEVATION "A-A" ME-002
TEL. NO. : (632) 706 - 5155 - 57 LOCATION :
STA. CLARA FAX. NO.: (632) 706-5158 SIGNATURE SIGNATURE
SACRIS ROAD, CASUNTINGAN, MANDAUE CITY, CEBU, PHILIPPINES
LOCATION : F.REYES ST.,BRGY. BALIBAGO, STA.ROSA LAGUNA,PHILIPPINES
CHILLED WATER S/R SCHEMATIC DIAGRAM

CONTRACTOR: SUBMITTED BY: NAME: PROJECT TITLE: OWNER: SHEET CONTENTS: MECHANICAL SHEET NO.:

STA. CLARA INTERNATIONAL NORMAN B. ENRIQUEZ EDWIN Q. TEVES NITA N. ALIPOSA


CORPORATION PROJECT MANAGER PROFESSIONAL MECHANICAL ENGINEER PLANT MANAGER
PROJECT MACTAN 2 MONDE NISSIN CORPORATION
CHILLED WATER SCHEMATIC DIAGRAM

2nd FLOOR HIGHWAY 54 PLAZA EDSA, WACK-WACK,


MANDALUYONG CITY 1550, PHILIPPINES
BUBUNAWAN BUBUNAWAN

CEBU PLANT
(GL 12-13 / A-P)
TM

Monde Nissin
AHU/FCU TYPICAL INSTALLATION
EQUIPMENT SCHEDULE ME-003
TEL. NO. : (632) 706 - 5155 - 57 LOCATION :
STA. CLARA FAX. NO.: (632) 706-5158 SIGNATURE SIGNATURE
SACRIS ROAD, CASUNTINGAN, MANDAUE CITY, CEBU, PHILIPPINES
LOCATION : F.REYES ST.,BRGY. BALIBAGO, STA.ROSA LAGUNA,PHILIPPINES
[ CHB ]
URI WC
114 LAV

[ CHB ] [ CHB ] [ CHB ] [ CHB ] [ CHB ] [ CHB ] [ CHB ]


122 136 121 120 137 119 118 138 [ CHB ] 117 116 139 115

[ CHB ]
UP
[ CHB ]

45

2000

[ CHB ]
3500

144
8150
LOGISTICS WAREHOUSE
2000
LEVEL 2
4850

104

14225
9.99

[ CHB ]
[ CHB ]
[ CHB ]
FAD DUCTING BELOW SLAB
FAD DUCTING BELOW SLAB UP
1
20
2
19

LIFT LIFT 3

4
18
5
17
6 OPEN
16
7
15
8

OPEN 9
14
10 11 12 13

[ CHB ]

CARTONS
SEPTIC TANK
500x600MM 500x700MM 500x800MM 500x900MM 500x600MM OIL AND WATER
GREEN
SEPARATOR TANK
141

[ CHB ] PACKAGING AREA NOODLE LINE 06


140 500x600MM 500x700MM 500x800MM 500x900MM 500x600MM
FINISHED GOODS

215A
AHU DUCT NOODLE LINE 05
3 220 P/min NOODLE LINE 04
139 150

600 AHU - 3 220 P/min


( 2.56 SQM) [ HGW ] [ HGW ] [ HGW ]

[ CHB ]
107 LINE 3

M
H:900mm H:455mm
CHWS/R INLET 260 2-TONS CAPACITY
2 Y-STRAINER
600
115
PALLETIZING AREA FREIGHT ELEVETOR
1200 116 220 P/min [ CHB ]
138
107

[ CHB ]
[ CHB ]
GF + 5000 NOODLE LINE 03

[ CHB ]
[ HGW ]
1 220 P/min ELEV.
600
131
NOODLES PACKAGING AREA LINE 3 UP
GF + 5000

5000
325 324 326 1500

[ CHB ] [ CHB ]
[ CHB ] OFFICE [ VSF ]
SHELVES DN
UP

148
129

[ CHB ]
352
125 NOODLE LINE 02
106

[ CHB ]

[ CHB ]
4300

409 27 SQ.M 5700


110
LINE 1 [ EFH ] [ VSF ]

5000
122 410 354
411

[ CHB ]
408
128 353 128 130 ACCUMULATOR GF + 5000
ST-02
11.46 108
HALLWAY 4800
412 124
126 [ MES ] [ CHB ]

[ CHB ]
[ CHB ] [ CHB ] sink NOODLE LINE 01
149
152 2500
407 11.31
LAV

400

DN LAV

4500
ELEV. PACKAGING AREA LINE 1

[ CHB ]
133

WASHING
WC

126 4525
WC
AIR
123 UP WC WC
[ 3VT ] SHOWER ENTRY
ST-01
321 [ CHB ] [ CHB ] [ CHB ] [ CHB ] [ CHB ] [ CHB ] [ CHB ]
[ CHB ]
101 4600 104 LEDGE
141 142 143 145 105
102 103

8800 6000

VENTILATION SYSTEM LAYOUT - GROUND FLOOR - VENTILATION AIR TERMINAL LAYOUT- SECOND FLOOR
-

A VENTILATION CROSS SECTION

CONTRACTOR: SUBMITTED BY: NAME: PROJECT TITLE: OWNER: SHEET CONTENTS: MECHANICAL SHEET NO.:

STA. CLARA INTERNATIONAL NORMAN B. ENRIQUEZ EDWIN Q. TEVES NITA N. ALIPOSA VENTILATION LAYOUT PLAN - GRND FLOOR
CORPORATION PROJECT MANAGER PROFESSIONAL MECHANICAL ENGINEER PLANT MANAGER
PROJECT MACTAN 2 MONDE NISSIN CORPORATION
2nd FLOOR HIGHWAY 54 PLAZA EDSA, WACK-WACK,
MANDALUYONG CITY 1550, PHILIPPINES
BUBUNAWAN BUBUNAWAN

CEBU PLANT
(GL 12-13 / A-P)
TM

Monde Nissin
VENTILATION BOLLARD LAYOUT-2ND FLR ME-004
TEL. NO. : (632) 706 - 5155 - 57 VENTILATION CROSS SECTION
STA. CLARA FAX. NO.: (632) 706-5158 SIGNATURE SIGNATURE
LOCATION : SACRIS ROAD, CASUNTINGAN, MANDAUE CITY, CEBU, PHILIPPINES LOCATION : F.REYES ST.,BRGY. BALIBAGO, STA.ROSA LAGUNA,PHILIPPINES
LINE 6

TYP. VOLUME DAMPER

LINE 5
SECOND FLOOR LINE

SF-N5 SF-N6
GROUND FLOOR LINE

- BOLLARD DETAIL

- BOTTOM PLATE DETAIL - ELEVATION VIEW

- BOLLARD INSTALLATION DETAIL

CONTRACTOR: SUBMITTED BY: NAME: PROJECT TITLE: OWNER: SHEET CONTENTS: MECHANICAL SHEET NO.:

STA. CLARA INTERNATIONAL NORMAN B. ENRIQUEZ EDWIN Q. TEVES NITA N. ALIPOSA VENTILATION SCHEMATIC DIAGRAM
CORPORATION PROJECT MANAGER PROFESSIONAL MECHANICAL ENGINEER PLANT MANAGER
PROJECT MACTAN 2 MONDE NISSIN CORPORATION
2nd FLOOR HIGHWAY 54 PLAZA EDSA, WACK-WACK,
MANDALUYONG CITY 1550, PHILIPPINES
BUBUNAWAN BUBUNAWAN

CEBU PLANT
(GL 12-13 / A-P)
TM

Monde Nissin
BOLLARD INSTALLATION DETAIL
AIR TERMINAL - BOLLARD DETAIL ME-005
TEL. NO. : (632) 706 - 5155 - 57
STA. CLARA FAX. NO.: (632) 706-5158 SIGNATURE SIGNATURE
LOCATION : SACRIS ROAD, CASUNTINGAN, MANDAUE CITY, CEBU, PHILIPPINES LOCATION : F.REYES ST.,BRGY. BALIBAGO, STA.ROSA LAGUNA,PHILIPPINES
LAV LAV
15% SLOPE

URI URI

2000
3500
2000

RAMP DOWN

UP
1
2 20 19
3
54 18
6 OPEN 1617
7 15
8
9 101113
12 14
1200

ENTRY
[ HGW ]
PC PC SHELVES ST-02

PANTRY SALES
SUPERVISORS (CEBU-BASED)
LOGISTICS OFFICE

PC PC SHELVES

HALLWAY SLOPE
SALES OFFICE

LAV
T-101
SALES
WC
MANAGER
STAFF ACCOUNTING

WC LAVLAV
HP LP
EMPLOYEES STAB OUT
ENTRY ENTRANCE
4''Ø 4''Ø 4''Ø 4''Ø 4''Ø 4''Ø 3''Ø 3''Ø 3''Ø 3''Ø 4''Ø

- STEAM HIGH & LOW PRESSURE LAYOUT - GROUND FLOOR

CONTRACTOR: SUBMITTED BY: NAME: PROJECT TITLE: OWNER: SHEET CONTENTS: MECHANICAL SHEET NO.:

STA. CLARA INTERNATIONAL NORMAN B. ENRIQUEZ EDWIN Q. TEVES NITA N. ALIPOSA


CORPORATION PROJECT MANAGER PROFESSIONAL MECHANICAL ENGINEER PLANT MANAGER
PROJECT MACTAN 2 MONDE NISSIN CORPORATION
2nd FLOOR HIGHWAY 54 PLAZA EDSA, WACK-WACK,
MANDALUYONG CITY 1550, PHILIPPINES
BUBUNAWAN BUBUNAWAN

CEBU PLANT
(GL 12-13 / A-P)
TM

Monde Nissin
HP & LP STEAM SUPPLY LAYOUT
ME-006
TEL. NO. : (632) 706 - 5155 - 57 LOCATION :
STA. CLARA FAX. NO.: (632) 706-5158 SIGNATURE SIGNATURE
SACRIS ROAD, CASUNTINGAN, MANDAUE CITY, CEBU, PHILIPPINES
LOCATION : F.REYES ST.,BRGY. BALIBAGO, STA.ROSA LAGUNA,PHILIPPINES
- TYP. PIPE INSULATION & CLADDING

- STEAM SCHEMATIC DIAGRAM

CONTRACTOR: SUBMITTED BY: NAME: PROJECT TITLE: OWNER: SHEET CONTENTS: MECHANICAL SHEET NO.:

STA. CLARA INTERNATIONAL NORMAN B. ENRIQUEZ EDWIN Q. TEVES NITA N. ALIPOSA


PROJECT MACTAN 2 HP & LP STEAM - SCHEMATIC
CORPORATION PROJECT MANAGER PROFESSIONAL MECHANICAL ENGINEER PLANT MANAGER MONDE NISSIN CORPORATION
2nd FLOOR HIGHWAY 54 PLAZA EDSA, WACK-WACK,
MANDALUYONG CITY 1550, PHILIPPINES
BUBUNAWAN BUBUNAWAN

CEBU PLANT
(GL 12-13 / A-P)
TM

Monde Nissin
PIPE CLADDING & INSULATION ME-007
TEL. NO. : (632) 706 - 5155 - 57 LOCATION :
STA. CLARA FAX. NO.: (632) 706-5158 SIGNATURE SIGNATURE
SACRIS ROAD, CASUNTINGAN, MANDAUE CITY, CEBU, PHILIPPINES
LOCATION : F.REYES ST.,BRGY. BALIBAGO, STA.ROSA LAGUNA,PHILIPPINES
FIRE PROTECTION
NOTE:
FOR FIREPRO DETAIL REFER SHEET FP - 002

114
[ CHB ] [ CHB ] [ CHB ] [ CHB ] [ CHB ] [ CHB ] [ CHB ] [ CHB ]
121 120 137 119 118 138 117 116 139 115 [ CHB ]
LAV URI WC

45

[ CHB ]
UP
[ CHB ]
2000

[ CHB ]
LOGISTICS WAREHOUSE
LEVEL 2
4850

104

14225
9.99

[ CHB ]
[ CHB ]
UP
1
20

OPEN 2
19

LIFT LIFT 3

4
18
5
17
6 OPEN
16
7
15
8

[ CHB ] 14
9
10 11 12 13

EXIT
NOODLE LINE 06

EXIT
ACCUMULATOR PROCESS AREA ROLLER AREA

PACKAGING AREA LINE 6


121 NOODLE LINE 05

REMOVED WALL
3 L05 215A

AHU - 1 AHU - 2
NEW AHU

139 220 P/min NOODLE LINE 04


600 -+
PUSH LOCK

107
[ CHB ] 150

600 2 220 P/min


[ HGW ] [ HGW ] [ HGW ]

[ CHB ]
120 116
115 H:900mm H:455mm
LINE 3
1200
119 260 2-TONS CAPACITY
138
107 PALLETIZING AREA FREIGHT ELEVETOR
125 220 P/min [ CHB ]
600
1
131

[ CHB ]
127 129

[ CHB ]
GF + 5000 NOODLE LINE 03

[ CHB ]
[ MES ]

[ HGW ]
325 324 326 1500 220 P/min ELEV.
[ CHB ] [ CHB ]
SHELVES
[ CHB ]
NOODLES PACKAGING AREA LINE 3 UP
GF + 5000

5000
148
125
352 129 OFFICE [ VSF ]
UP

4300
106 DN

[ CHB ]
409 27 SQ.M 110
5700 NOODLE LINE 02
122 410 354

[ CHB ]
411

[ CHB ]
408 128 130
128 353 108
11.46
HALLWAY LINE 1 [ EFH ] [ VSF ]

5000
412 4800
124 PROCESS AREA

[ CHB ]
126 [ MES ] [ CHB ] ACCUMULATOR GF + 5000
ST-02
149
152 2500
407 11.31

[ CHB ]
400
[ CHB ] [ CHB ] sink NOODLE LINE 01
133 LAV

126 4525
DN
123 LAV

4500
ELEV. PACKAGING AREA LINE 1

[ CHB ]
321

WASHING
WC
AIR
WC

UP WC WC
[ 3VT ] SHOWER ENTRY
101 4600 104 ST-01
141 142 143 145 105 [ CHB ]
102 103 [ CHB ] [ CHB ] [ CHB ] [ CHB ] [ CHB ] [ CHB ]
[ CHB ]

8800 6000

- GROUND FLOOR FIRE PROTECTION POINT OF CONNECTION - SECOND FLOOR FIRE PROTECTION SYSTEM

[ CHB ]
LAV URI WC
[ CHB ]
UP

[ CHB ]
[ CHB ]

[ CHB ]
[ CHB ]

UP
1
20
2
19

LIFT LIFT 3

2.5mm THK. THERMOPLASTIC TRANSLUSCENT ROOFING


4
18
5
17
6 OPEN
16
7
15
8

14
9
10 11 12 13

2.5mm THK. THERMOPLASTIC TRANSLUSCENT ROOFING


L06

[ CHB ]
[ CHB ]

HOPPER
AREA

UPPER ROOFING L05

OPEN OPEN
[ CHB ]

[ CHB ]
[ CHB ]

[ CHB ]
[ CHB ]

[ CHB ]
[ CHB ]

2-TONS CAPACITY
GF + 10500
FREIGHT ELEVETOR

[ CHB ] [ CHB ]

OPEN OPEN
ELEV.

[ CHB ]
ELEV.
UPPER ROOFING
GF + 10000
2.5mm THK. THERMOPLASTIC TRANSLUSCENT ROOFING
DN

ST-02 ST-02
319

[ VSF ]
[ IPB ]

2.5mm THK. THERMOPLASTIC TRANSLUSCENT ROOFING

[ CHB ]
[ CHB ]

[ CHB ]
[ CHB ]
[ CHB ]
[ HGW ]

UP DN UP DN
OPEN OPEN
[ CHB ]

305

[ CHB ]
[ CHB ]

[ CHB ]
ELEV.

OPEN FALSE OPEN


DN

BEAM
[ CHB ]

[ CHB ]

[ CHB ]

[ CHB ]
ST-01

323
[ CHB ]

[ CHB ]

[ CHB ]

[ CHB ]

[ CHB ]
[ CHB ]

403 ST-01
308

[ CHB ] [ CHB ] [ CHB ] [ CHB ] 314 315 316 301 302 303 [ CHB ] 304 305 [ CHB ] 306 307 [ CHB ] 308 [ CHB ] [ CHB ] [ CHB ] [ CHB ] [ CHB ]
[ CHB ] [ CHB ] [ CHB ] [ CHB ]

NOTE:
- THIRD FLOOR FIRE PROTECTION SYSTEM - FOURTH FLOOR FIRE PROTECTION SYSTEM
FOR FIREPRO DETAIL REFER SHEET FP - 002

CONTRACTOR: SUBMITTED BY: NAME: PROJECT TITLE: OWNER: SHEET CONTENTS: FIRE PROTECTION SHEET NO.:

STA. CLARA INTERNATIONAL NORMAN B. ENRIQUEZ EDWIN Q. TEVES NITA N. ALIPOSA PROJECT MACTAN 2 GROUND FLOOR FIRE PRO POINT OF CONNECTION
CORPORATION PROJECT MANAGER SANITARY ENGR / MASTER PLUMBER : PLANT MANAGER CEBU PLANT MONDE NISSIN CORPORATION
2nd FLOOR HIGHWAY 54 PLAZA EDSA, WACK-WACK,
MANDALUYONG CITY 1550, PHILIPPINES
BUBUNAWAN BUBUNAWAN

(GL 12-13 / A-P) Monde Nissin


TM
SECOND FLOOR FIRE PROTECTION SYSTEM
THIRD FLOOR FIRE PROTECTION SYSTEM FP - 001
TEL. NO. : (632) 706 - 5155 - 57
FOURTH FLOOR FIRE PROTECTION SYSTEM
STA. CLARA FAX. NO.: (632) 706-5158 SIGNATURE SIGNATURE LOCATION : SACRIS ROAD, CASUNTINGAN, MANDAUE CITY, CEBU, PHILIPPINES LOCATION : F.REYES ST.,BRGY. BALIBAGO, STA.ROSA LAGUNA,PHILIPPINES
B
FL LIN
AN D
GE

100MMØ
B
FH FL LIN
C AN D
Ø GE FH
M Ø C HO
15 M M
32 00M PP

100MMØ
1 15 ER
10 0M C
0M MØ

GV

150MMØ
AIN R FH
SM FR ISE C
RO
S FLGROOM R
C F OO UN
Ø E IR R D
M CH XIT E
0M
100MMØ

TH AM 13 MI
IRD 10 BE E XE
IN

100MMØ
R
FL R MØG L
OO 0M IN
R 15 IST
100MMØ

EX P
FH
C
1
EX 50M

100MMØ
IST MØ RO
13 ING LL
S ER
AR TAG LIN
EA IN
G E
32MMØ

SE RIS
CO BF ER
ND 10 V
FL 0M
OO FH MØ
R C INE
MØ L GR
0M NG
15 ISTI OU
ND
EX FL
OO
R
10
GR 0M PA

ma

OU CK
ND AG
FL ING - FIRE PRO GL P/13 (2NF/3RD/4TH FLOORS)
OO 2

32MMØ
R

PA
CK
AG
IN FH
G C
1

FLBLIN
AN D

32MMØ
GE
TH
IRD
FL
OO
R
FH
C
PROJECT TITLE:

ma

B
FL LIN
PROJECT TITLE:

AN D
PROJECT TITLE:
GE

SE
- FIRE PRO PACKAGING AREAS CO
ND
FL
OO
R

- FIRE HOSE CABINET DETAIL


GR
OU
ND
FL
OO
R

- FIRE PROTECTION ISOMETRIC DIAGRAM

CONTRACTOR: SUBMITTED BY: NAME: PROJECT TITLE: OWNER: SHEET CONTENTS: FIRE PROTECTION SHEET NO.:

STA. CLARA INTERNATIONAL NORMAN B. ENRIQUEZ EDWIN Q. TEVES NITA N. ALIPOSA


CORPORATION PROJECT MANAGER SANITARY ENGR / MASTER PLUMBER : PLANT MANAGER
PROJECT MACTAN 2 MONDE NISSIN CORPORATION FIRE PROTECTION ISOMETRIC DIAGRAM
2nd FLOOR HIGHWAY 54 PLAZA EDSA, WACK-WACK,
MANDALUYONG CITY 1550, PHILIPPINES
BUBUNAWAN BUBUNAWAN

CEBU PLANT
(GL 12-13 / A-P)
TM

Monde Nissin
FIRE HOSE CABINET DETAIL FP-002
TEL. NO. : (632) 706 - 5155 - 57 LOCATION :
STA. CLARA FAX. NO.: (632) 706-5158 SIGNATURE SIGNATURE
SACRIS ROAD, CASUNTINGAN, MANDAUE CITY, CEBU, PHILIPPINES
LOCATION : F.REYES ST.,BRGY. BALIBAGO, STA.ROSA LAGUNA,PHILIPPINES
PLUMBING
[ CHB ]
LAV URI WC

[ CHB ]
UP
[ CHB ]
[ CHB ]

LOGISTICS WAREHOUSE
LEVEL 2

[ CHB ]
[ CHB ]

UP
1
20
2
19

LIFT LIFT 3

4 18
5
17
6 OPEN
16
7
15
8

14
9
10 11 12 13

CARTONS

D D CO D D CO D D CO CO
CO CO
NOODLE LINE 06

PACKAGING D D CO D PROCESS AREA D CO D CO D


AREA

EXISTING 200mmØ WASTE PIPE


CO
FINISHED GOODS 100 Ø WASTE PIPE
NOODLE LINE 05

AHU DUCT
D D
220 P/min NOODLE LINE 04
ALKALI TANK
PUSH LOCK

-+

EE PANEL
150

220 P/min
[ HGW ] [ HGW ] [ HGW ]
CO CO
[ CHB ]

H:900mm H:455mm
LINE 3
260
PALLETIZING AREA 150 Ø EXISTING WASTE
CO
220 P/min
PIPE COLLECTOR

[ CHB ]
[ CHB ]
GF + 5000 NOODLE LINE 03
[ HGW ]

220 P/min
ELEV.

NOODLES PACKAGING AREA LINE 3 UP


GF + 5000

5000
OFFICE [ VSF ] D D D D D D
UP
DN

[ CHB ]
NOODLE LINE 02 CO CO CO CO
CO
LINE 1 [ EFH ] [ VSF ]

5000
ACCUMULATOR PROCESS ST-02
GF + 5000
AREA

[ CHB ]
[ CHB ] [ CHB ] sink NOODLE LINE 01
LAV

DN LAV

4500
ELEV.
PACKAGING AREA LINE 1
[ CHB ]

WASHING

AIR
WC WC

UP WC WC
[ 3VT ] SHOWER ENTRY
ST-01
[ CHB ] [ CHB ] [ CHB ] [ CHB ] [ CHB ] [ CHB ] [ CHB ]
[ CHB ]
LEDGE

X SECTION

- SECOND FLOOR PLAN

[ CHB ]
[ CHB ] [ CHB ] [ CHB ] [ CHB ] [ CHB ]

LIFT LIFT

[ CHB ]
[ CHB ]
A DETAIL B DETAIL

[ CHB ]
C DETAIL UPPER ROOFING UPPER ROOFING

[ CHB ]

[ CHB ]
R.C ME SHAFT

[ CHB ]
ENCLOSURE

[ CHB ]

GF + 20000 MACH.

[ CHB ]
UPPER ROOFING ROOM
402 13 SQ.M

ST-02
DN

UTILITY
DECK
2.5mm THK. THERMOPLASTIC TRANSLUSCENT ROOFING

[ CHB ]

[ CHB ]
337 SQ.M

[ CHB ]
[ SDW ]

401
[ CHB ]

FALSE
BEAM
323
ST-01
[ CHB ]
[ CHB ] [ CHB ]
314 315 316 301 302 303 [ CHB ] 304 305 [ CHB ] 306 307 [ CHB ] 308 [ CHB ] [ CHB ] [ CHB ] [ CHB ] [ CHB ]
[ CHB ] [ CHB ]

- DOWNSPOUT LAYOUT

1 SECTION 2 SECTION

D DETAIL

NAME: PROJECT TITLE:


CONTRACTOR: SUBMITTED BY: OWNER: SHEET CONTENTS: PLUMBING SHEET NO.:

STA. CLARA INTERNATIONAL NORMAN B. ENRIQUEZ REYNALDO L. ANOR NITA N. ALIPOSA PROJECT MACTAN 2
DOWNSPOUT LAYOUT
CORPORATION PROJECT MANAGER CIVIL ENGINEER / MASTER PLUMBER PLANT MANAGER CEBU PLANT MONDE NISSIN CORPORATION
2nd FLOOR HIGHWAY 54 PLAZA EDSA, WACK-WACK,
MANDALUYONG CITY 1550, PHILIPPINES
BUBUNAWAN BUBUNAWAN

(GL 12-13 / A-P) Monde Nissin


TM

PROCESS DRAIN LAYOUT PL-001


TEL. NO. : (632) 706 - 5155 - 57 LOCATION : DETAILS AND SECTIONS
STA. CLARA FAX. NO.: (632) 706-5158 SIGNATURE SIGNATURE
SACRIS ROAD, CASUNTINGAN, MANDAUE CITY, CEBU, PHILIPPINES
LOCATION : F.REYES ST.,BRGY. BALIBAGO, STA.ROSA LAGUNA,PHILIPPINES
J

Y SECTION @ GRID LINE 12

Z SECTION @ GRID LINE 13

NAME: PROJECT TITLE:


CONTRACTOR: SUBMITTED BY: OWNER: SHEET CONTENTS: PLUMBING SHEET NO.:

STA. CLARA INTERNATIONAL NORMAN B. ENRIQUEZ REYNALDO L. ANOR NITA N. ALIPOSA PROJECT MACTAN 2
CORPORATION PROJECT MANAGER CIVIL ENGINEER / MASTER PLUMBER PLANT MANAGER CEBU PLANT MONDE NISSIN CORPORATION SECTION @ GL 12 DOWNSPOUT DETAIL
2nd FLOOR HIGHWAY 54 PLAZA EDSA, WACK-WACK,
MANDALUYONG CITY 1550, PHILIPPINES
BUBUNAWAN BUBUNAWAN

(GL 12-13 / A-P) TM

Monde Nissin
SECTION @ GL 13 DOWNSPOUT DETAIL PL-002
TEL. NO. : (632) 706 - 5155 - 57 LOCATION :
STA. CLARA FAX. NO.: (632) 706-5158 SIGNATURE SIGNATURE
SACRIS ROAD, CASUNTINGAN, MANDAUE CITY, CEBU, PHILIPPINES
LOCATION : F.REYES ST.,BRGY. BALIBAGO, STA.ROSA LAGUNA,PHILIPPINES
EXIT LAV LAV
15% SLOPE

UP
URI URI
RAMP DOWN

RAMP DOWN

NOTE:
1. PROCES PIPING SCHEMATIC REFER SHEET PL - 005
UP
1
2 20 19
3
54 18
6 17
OPEN 16
LIFT LIFT 7
8 15
9 101113
12 14

LOADING/UNLOADING

[ HGW ]
PC PC SHELVES

125 PANTRY SALES


SUPERVISORS (CEBU-BASED)
LOGISTICS OFFICE
150
PC PC SHELVES

HALLWAY SLOPE
SALES OFFICE

COUNTER LAV
400

SALES
WC
MANAGER
UP
STAFF ACCOUNTING

WC LAVLAV

- PALM OIL LINE - GROUND FLOOR

EXIT LAV LAV


15% SLOPE
LAV URI WC

ST-03 URI URI


2000

RAMP DOWN

UP
ST-04
3500

[ CHB ]

147 LOGISTICS
2000 WAREHOUSE

RAMP DOWN 104 LEVEL 2


LINE OF 2ND FLOOR ABOVE

9.99

5% SLOPE

UP
1
2 20 19
3
54 18 UP
6 OPEN 1617
LIFT LIFT 7
1
2
20

8 15 LIFT LIFT 3
19

4
18
5

9 101113
12 14 6
7
OPEN
17

16

15
8

14
9
10 11 12 13

EXIT
EXIT
2600
EXIT
ROLLER AREA

2000
LINE OF 2ND FLOOR ABOVE PROCESS AREA
1200

3
14200

NOODLE LINE 04
600

PUSH LOCK

-+
600

150

2
1200

PROPOSED LOCATION OF
PALLETIZING AREA
CONTROL BOX FOR 1
1500 600

THREE (3) DOCK LEVELER

[ HGW ]
ENTRY ELEV.
[ HGW ]
PC PC SHELVES NOODLES UP

125 PANTRY SALES OFFICE


SUPERVISORS (CEBU-BASED) UP
DN
LOGISTICS OFFICE
409
PC PC SHELVES

[ CHB ]
408

[ CHB ]
UP
HALLWAY SLOPE
SALES OFFICE PROCESS AREA

[ CHB ]
ACCUMULATOR ST-02
COUNTER LAV

SALES sink
WC
MANAGER
UP LAV
STAFF ACCOUNTING
DN LAV

ELEV.
WC LAVLAV WC WC
AIR
PACKAGING AREA LINE 1
UP WC WC
SHOWER ENTRY
ST-01

- CDA,PALM OIL,PROCESS WATER & LP STEAM - 2ND FLOOR

- COMPRESSED DRY AIR - GROUND FLOOR

NAME: PROJECT TITLE:


CONTRACTOR: SUBMITTED BY: OWNER: SHEET CONTENTS: PLUMBING SHEET NO.:

STA. CLARA INTERNATIONAL NORMAN B. ENRIQUEZ REYNALDO L. ANOR NITA N. ALIPOSA PROJECT MACTAN 2
CORPORATION PROJECT MANAGER CIVIL ENGINEER / MASTER PLUMBER PLANT MANAGER CEBU PLANT MONDE NISSIN CORPORATION PALM OIL LINE (GROUND FLOOR)
2nd FLOOR HIGHWAY 54 PLAZA EDSA, WACK-WACK,
MANDALUYONG CITY 1550, PHILIPPINES
BUBUNAWAN BUBUNAWAN

(GL 12-13 / A-P)


TM

Monde Nissin
COMPRESSED DRY AIR CONNECTION (GRND FLR)
CDA,PALM OIL, WATER & LP STEAM(2ND FLR) PL-003
TEL. NO. : (632) 706 - 5155 - 57 LOCATION :
STA. CLARA FAX. NO.: (632) 706-5158 SIGNATURE SIGNATURE
SACRIS ROAD, CASUNTINGAN, MANDAUE CITY, CEBU, PHILIPPINES
LOCATION : F.REYES ST.,BRGY. BALIBAGO, STA.ROSA LAGUNA,PHILIPPINES
NOTE:
1. PROCES PIPING SCHEMATIC REFER SHEET PL - 005

AHU DUCT

UP
1
20
2
19
3

4
18
5
17
6 OPEN
16
7
15
8

14
9
10 11 12 13

PACKAGING AREA LINE 4

ELEV.
DN

- COMPRESSED DRY AIR - 3RD FLOOR

EXIT LAV LAV


15% SLOPE
10.46
URI URI
2000

[ CHB ]
LAV URI WC

[ CHB ]
3500

UP
[ CHB ]
2000

RAMP DOWN

5% SLOPE

[ CHB ]
UP
1
2 20 19
3
54 18
LIFT LIFT 6 17
OPEN 16 UP
7 15
1
20

8
2
19

LIFT LIFT 3

4 18
5

9 101113
12 14 6
7
OPEN
17
16
15
8

9 14
10 11 12 13

[ CHB ]
LOADING/UNLOADING

LINE OF 2ND FLOOR ABOVE


1200

ROOL-UP DOOR

[ CHB ]

[ CHB ]
[ CHB ]

[ CHB ]
GF + 10500
2
[ CHB ]

OPEN
ELEV.
PROPOSED LOCATION OF
CONTROL BOX FOR 1 LOCATION OF DOCK LEVELER
GF + 10000
THREE (3) DOCK LEVELER

DN
ST-02

ENTRY
[ HGW ] [ VSF ]

[ IPB ]
PC PC SHELVES

[ CHB ]

[ CHB ]
125 PANTRY SALES

[ HGW ]
UP DN
SUPERVISORS (CEBU-BASED) OPEN

[ CHB ]
LOGISTICS OFFICE

[ CHB ]
150
122 PC PC SHELVES
128
[ CHB ]
HALLWAY SLOPE
SALES OFFICE

ELEV.
DN
OPEN

[ CHB ]

[ CHB ]

[ CHB ]
COUNTER LAV

[ CHB ]
ST-01
407

[ CHB ]

[ CHB ]

[ CHB ]

[ CHB ]
400
403

[ CHB ]

308
SALES [ CHB ] [ CHB ] [ CHB ] [ CHB ]
WC [ CHB ]
UP MANAGER [ CHB ]
ELEV. STAFF ACCOUNTING

WC LAVLAV

EMPLOYEES
ENTRY ENTRANCE

- PROCESS WATER SYSTEM - 3RD FLOOR MIXER


- PROCESS WATER SYSTEM - GROUND FLOOR

NAME: PROJECT TITLE:


CONTRACTOR: SUBMITTED BY: OWNER: SHEET CONTENTS: PLUMBING SHEET NO.:

STA. CLARA INTERNATIONAL NORMAN B. ENRIQUEZ REYNALDO L. ANOR NITA N. ALIPOSA PROJECT MACTAN 2
PROCESS WATER CONNECTION (GROUND FLOOR)
CORPORATION PROJECT MANAGER CIVIL ENGINEER / MASTER PLUMBER PLANT MANAGER CEBU PLANT MONDE NISSIN CORPORATION
2nd FLOOR HIGHWAY 54 PLAZA EDSA, WACK-WACK,
MANDALUYONG CITY 1550, PHILIPPINES
BUBUNAWAN BUBUNAWAN

(GL 12-13 / A-P)


Monde Nissin
TM PROCESS WATER (3RD FLOOR MIXER)
COMPRESSED DRY AIR (3RD FLOOR MIXER)
PL-004
TEL. NO. : (632) 706 - 5155 - 57 LOCATION :
STA. CLARA FAX. NO.: (632) 706-5158 SIGNATURE SIGNATURE
SACRIS ROAD, CASUNTINGAN, MANDAUE CITY, CEBU, PHILIPPINES
LOCATION : F.REYES ST.,BRGY. BALIBAGO, STA.ROSA LAGUNA,PHILIPPINES
- COMPRESS DRY AIR SCHEMATIC DIAGRAM

- PROCESS WATER SCHEMATIC DIAGRAM - PALM OIL SCHEMATIC DIAGRAM

NAME: PROJECT TITLE:


CONTRACTOR: SUBMITTED BY: OWNER: SHEET CONTENTS: PLUMBING SHEET NO.:

STA. CLARA INTERNATIONAL NORMAN B. ENRIQUEZ REYNALDO L. ANOR NITA N. ALIPOSA PROJECT MACTAN 2 PALM OILSHEMATIC DIAGRAM
CORPORATION PROJECT MANAGER CIVIL ENGINEER / MASTER PLUMBER PLANT MANAGER CEBU PLANT MONDE NISSIN CORPORATION
2nd FLOOR HIGHWAY 54 PLAZA EDSA, WACK-WACK,
MANDALUYONG CITY 1550, PHILIPPINES
BUBUNAWAN BUBUNAWAN

(GL 12-13 / A-P)


TM

Monde Nissin
CDA SCHEMATIC DIAGRAM
PROCESS WATER SCHEM. DIAGRAM
PL-005
TEL. NO. : (632) 706 - 5155 - 57 LOCATION :
STA. CLARA FAX. NO.: (632) 706-5158 SIGNATURE SIGNATURE
SACRIS ROAD, CASUNTINGAN, MANDAUE CITY, CEBU, PHILIPPINES
LOCATION : F.REYES ST.,BRGY. BALIBAGO, STA.ROSA LAGUNA,PHILIPPINES

You might also like