You are on page 1of 14

EXPENSE REPORT - BIAYA PERJALANAN DINAS

Name / Gr: S. Marshall Kakiaila


GR : IIA DW1566PT. AKR Corporindo Tbk A: SPBKB Gringsing - Batang, Semarang
Work Peri : 13 s/d 14 Jan 2020 (PLO SPBKB AKR Gringsing - B:
Date Repo: 15 Jan 2020 C:
Transportation
Lodging Cost Meal Cost

(*) Work
Description CostOther Employe Other Employe

DOC.
DAY

Field

Loc.
NO
DATE TIME Travel History Travel Than
& Work Stage Transp e e
Expense 10 Employe 11
Total Amount from Previous sheet = s e
1 Jan, 13
04.00 - 04.30
Mobilization to Airport Taxi home - Airport Soekarno Hatta 211,200
05.10 - 06.10
CGK - SRG, ID-6342 20 Tol Joglo 15,000
Tol Cengkareng 7,500
Cost of Transportation/Lodge A v'd by HO N/A 70,000
08.00 - 09.30
Mobilization to Gringsing - Tol Krapyak 2 5,000
Tol Weleri 35,500
11.30 - 14.30
Safety induction
Collecting and review documents /w MIGAS
Visual Inspection
14.35 - 16.00
Demob to Hotel Gasolyne 300,000

2 Jan, 14
10.00 - 13.00 Cost of Transportation/Lodge A v'd by HO 270,000 70,000
Draft and sign BA (Berita Acara)
13.00 - 15.00
Demob to Semarang
17.15 - 18.15
SRG - JKT, JT-0503 21
18.30 - 19.30
Back to Home Taxi airport to home 234,460
Airport shurcharge, Jkt 10,500

458769572.xlsx
TOTAL = 0 819,160 270,000 140,000
Prepared by Verified By Approved By For Accounting Use Biaya Transport =
Biaya Penginapan =
Biaya Makan/Minum/Snack =
S. Marshall Kakiailatu Hadi Sunarso Office Supplies & Other consumables =
Date : 15 Jan 2020 Date : Date : TOTAL =

458769572.xlsx
1 of 1
Currency
IDR
Off.
Meal Cost
Other Supplies
Than & Other BILL NO
Employe Consum
e ables

1
2
3

4
5

7
8

458769572.xlsx
0 0
819,160
270,000
140,000

###

458769572.xlsx
BILL/ Name / Grad: Sandy Marshal/ II Attachment Bill
DOC Work Periode: 13 s/d 14 Jan 2020 Saya Menyatakan bahwa data yang saya berikan dihalam
No. Date Report : 15 Jan 2020 Name/Signature: Sandy Marshall : 15 Jan 2020

458769572.xlsx
BIL
L/ Name / Grade : S. Marshall Kakiai Attachment Bill
DO Work Periode : 13 s/d 14 Jan 202 Saya Menyatakan bahwa data yang saya berikan dihalaman in
C
Date Report : 15 Jan 2020 Name/Signature/DaS. Marshall Kakiailat
No.

TOTAL KM Liter Foto Odometer


Day Date KM Pagi KM Sore Rp
Kumulatif Bensin Foto Pagi

1 Jan , 13 37901 37949 48 ###

2 Jan , 14 37949 38152 251


Attachment Bill
Saya Menyatakan bahwa data yang saya berikan dihalaman ini adalah benar.

: 15 Jan 2020

Foto Odometer
Foto Sore
Taksi Berangkat Pesawat

Taxi Pulang
BILL/ Name / Gra: Agus Boy Simanjuntak / III Attachment Bill
DOC Work Perio : 13 s/d 14 Jan 2020 Saya Menyatakan bahwa data yang saya berikan d
No. Date Repor: 15 Jan 2020 Name/Signature: Agus Boy Simanjuntak / III Jan 2020

DECLARATION FOR TRANSPORTATION REIMBURSEMENT


TIME SHEET Month : April 2019
Inspector Name 1 2 3 4 5 6 7 8 9###
###
###
###
###
###
###
###
######
###
### ###
###
###
###
###
###
###
###
###

oy Simanjuntak (saya) M A B B B B A A D
ngaturan Kend Sendiri X X X X X X X

TIME SHEET Month :


Inspector Name
1 2 3 4 5 6 7 8 9###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###

ngaturan Kend Sendiri

TIME SHEET Month :


Inspector Name
1 2 3 4 5 6 7 8 9###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###

ngaturan Kend Sendiri


rk Location : Untuk Anda
A: Segat Delivery Station - Pangkalan Kerinci M : Mobilisasi (day 1 bekerjaD : Demobilisasi (hari terakhi
B: Segat Gas Plant - Desa Langgam; Pelalawan - Riau X : On Duty Dilapangan dan saya melakukan reimbursem
Y : On Duty Dilapangan dan saya melakukan reimburseme
A/B/C work location adalah sama dengan lokasi yang terte
Untuk menandai rekan anda yan D : Demobilisasi Rekan and
M : Mobilisasi rekan anda
A/B/C work location adalah sama dengan lokasi yang terte
ya berikan dihalaman ini adalah benar.
Jan 2020

ENT

31

31
(hari terakhir bekerja)
reimbursement untuk pengaturan kendaraan sendiri
reimbursement untuk driver
si yang tertera di Expense Report
si Rekan anda

si yang tertera di Expense Report anda

You might also like