Supplier Name: J.P.ENTERPRISES Supplier Code: 500014 Location :-LUMAX IND Ltd. PANTNAGER
Submission Level
S.No. Requirements
Level 1 Level 2 Level 3 Level 4 Level 5 AVAILABILITY Y/N
1 Design Records of Saleable Product R S S * R N
- for Proprietary Components / Details R R R * R N
- for all other Components / Details R S S * R N
2 Engineering Change Documents, if any R S S * R N
4 Design FMEA R R S * R N
5 Process Flow Diagram R R S * R Y
6 Process FMEA R R S * R Y
7 Dimensional Results R S S * R N
8A Material Test Results # R S S * R Y
8B Performance Test Results R S S * R Y
9 Initial Process Study R R S * R N
10 Measurement System Analysis Study R R S * R N
11 Qualified Laboratory Documentation R S S * R N
12 Control Plan R R S * R Y
13 Part Submission Warrant (PSW) S S S S S Y
Appearance Approval Report (AAR)
14 S S S S N
if applicable *
Bulk Material Requirements Checklist
15 R R R * R N
(for bulk material PPAP only)
16 Sample Product (Qty. as asked by Cust) R S S * R Y
17 Master Sample (02 sets) R R R * R N
18 Checking Aids R R R * R Y
Records of Compliance
19 With Customer-Specific R R S * R N
Requirements
LEGENDS R = Retain REMARKS: - A copy of PPAP & master samples shall be retained with supplier
S = Submit to Customer - for Plastic material, Test Certificate from Supplier or Photograph of bag giving Name and Batch Code details shall be provided
* = Submit to Customer on request
JP/QC/017 REV:00 DATE: 12/06/18
PART SUBMISSION WARRANT
Part Name STUD PIN COMP H/L YG4 Part Number 16007237
Safety and/or
Government Regulation Yes No Engineering Drawing Change Level Dated
Level 1 -- Warrant, Appearance Approval Report (for designated appearance items only).
Level 2 -- Warrant, Parts, Drawing, Inspection Results, Laboratory and Functional Results, Appearance Approval Report
Level 3 -- At Customer Location -- Warrant, Parts, Drawings, Inspection Results, Laboratory and Functional Results
Appearance Approval Report, Process Capability Results, Capability Study, Process Control Plan, Gauge
Study FMEA.
Level 5 -- At Supplier Location -- Warrant, Parts, Drawings, Inspection Results, Laboratory and Functional Results
Appearance Approval Report, Process Capability Results, Capability Study, Process Control Plan, Gauge
Study FMEA.
SUBMISSION RESULTS
The results for dimensional measurement material and functional tests appearance criteria statistical process
package. These results meet all drawing and specification requirements : Yes No (If "No" -- Explanation Required ).
DECLARATION
I affirm that the samples represented by this warrant are representative of our parts and have been made to the applicable customer
drawing and specifications and are made from specified materials on regular production tooling with no operations other than the regular
production process. I have noted any deviations from this declaration below :
EXPLANATION / COMMENTS
Print Name PAWAN KUMAR PATHAK Title M.D Phone No. 9873564673
20
RM Storage
30
Moulding & Inspection
50
Final Inspection
60 Packing
70 Storage
& Despatch
-161-
SUPPLIER NAME M/s. J.P.Enterprises APPROVED BY (SPOC) CHECKED BY (SQR) PREPARED BY
LUMAX INDUSTRIES PANTNAGAR
SUPPLIER CODE 500014 PAWAN PATHAK KAPIL
PART NAME STUD PIN COMP H/L YG4 PERSON IN CHARGE PAWAN PATHAK DRAWING NO. REVISION NO.:-
PART NO 16007237 CORE TEAM Mr.Jaipal,Mr.Akash,Mr.Kapil,Mr.Pramod REVISION DATE:- ……..
//PROTOTTPE //PRELAUNCH// PRODUCTION// :
CONTROL CHARACTERISTIC (PART/PRODUCT PARAMETERS) MANUFACTURING CONDITION CONTROL (PROCESS PARAMETERS)
Cp/Cpk RESULT
MEASURING RECORDING SPECIAL (is result < 1.33, RECORD MEASURING RECORDING
PROCESS NAME OPN NO. CHECK POINT SPEC. RESP. INSPECTION TOOL CHECK POINT SPEC. RESP. CHECK METHOD ILLUSTRATION
FREQUENCY SHEET CHAR. CLASS then action plan FREQ. FREQ. SHEET
reqd.)
100% By Operator
Packing Packing of Part should be OK Supervisor Despatch Visual
2 Times/Shift-QA Engr.
SPECIFICATION
S.NO PARAMETER
& TOLERANCE 1 2 3 4 5 OK / NOT REMARKS
2 Finish Black OK OK OK OK OK ok
3 Dia. 31.50±0.30mm ok
31.52 31.54 31.54 31.56 31.53
4 Thread ID 5.0±0.10mm ok
4.97 4.98 4.95 4.96 4.98
5 Flap thick. 3.0±0.10mm 2.94 2.96 2.98 2.97 2.94 ok
6 Lock Dim (small) 4.0±0.10mm 4.02 4.02 4.06 4.08 4.05 ok
7 Lock Dim (Big) 6.0±0.10mm 6.02 6.08 6.03 6.04 6.02 ok
8 Dim. 5.30±0.10mm 5.34 5.36 5.31 5.36 5.32 ok
9 Dim. 13.0±0.20mm 12.95 12.91 12.96 12.97 12.95 ok
10 Dia 21.0±0.20mm 21.02 21.06 21.04 21.03 21.07 ok
11 Stud length 49.0±030mm 49.12 49.16 49.18 49.15 49.15 ok
12 Thread Dia. 4.8±0.10mm 4.75 4.76 4.74 4.75 4.76 ok
prep.by appd.by
J.P. ENTERPRISES
PROCESS FMEA
Process Failure Mode And Effects Analysis
Part Name . STUD PIN COMP H/L YG4 Rev. No.
(Process FMEA)
FMEA Number:
Part No. 16007237 Process Responsibility: Mr.Pawan Pathak Prepared by: Mr.Kapil
Model Year(s)/Vehicle(s) Key Date : 6/12/2018 Rev No.
Mr.Jaipal,Mr.Akash,Mr.Kapil,Mr
Team: Customer Lumax Ind. Ltd. Rev. Date
.Pramod
Detail Before Change Detail After Change Change
S.No. Drg.Rev.No. Drg.Rev.Date Change Sugg.By Status
Ammendment Detail Sugg. To
Material
Stock
NOT PROPER Identiification
NOT PROPER Not Maintion FIFO Regester to be
STORAGE IDENTIFICATION. system 4 STORAGE OF
mainton after
2 checked by 7 56
RAW MATERIAL STORE
Identification
KEEPER
SETUP
MOULD APPROVAL &
CONDITION INPROCESS
INJECTION TIME SHORT MOULDING CHART INSPECTION
LESS /SHRINKAGE 7 SETTING NOT OK
FOLLOW & 2 2HRS. & 100% 5 70
SETTING DONE VISUAL
BY SETTER INSPECTION BY
OPERATOR
SETUP
MOULD APPROVAL &
CONDITION INPROCESS
INJECTION TIME CHART INSPECTION
OVER
EXTRA FLASHES 5 SETTING NOT OK
FOLLOW & 2 2HRS. & 100% 5 50
SETTING DONE VISUAL
BY SETTER INSPECTION BY
OPERATOR
SETUP
MOULD APPROVAL &
CONDITION INPROCESS
COOLING TIME CHART INSPECTION
LESS
SHRINKAGE 7 SETTING NOT OK
FOLLOW & 2 2HRS. & 100% 5 70
SETTING DONE VISUAL
BY SETTER INSPECTION BY
OPERATOR
SETUP
MOULD APPROVAL &
CONDITION INPROCESS
FITMENT
COOLING TIME CHART INSPECTION
OVER
PROBLEM AT 7 SETTING NOT OK
FOLLOW & 2 2HRS. & 100% 5 70
CUSTOMER END
SETTING DONE VISUAL
BY SETTER INSPECTION BY
MOULDING OPERATOR
PROCESS &
30 COOLING OF
PARTS/
INSPECTION SETUP
MOULD APPROVAL &
CONDITION INPROCESS
PART NOT FILLING CHART INSPECTION
HOLD TIME LESS
PROPERLY 7 SETTING NOT OK
FOLLOW & 2 2HRS. & 100% 5 70
SETTING DONE VISUAL
BY SETTER INSPECTION BY
OPERATOR
SETUP
MOULD APPROVAL &
CONDITION INPROCESS
HOLD TIME CHART INSPECTION
OVER
NO EFFECT 7 SETTING NOT OK
FOLLOW & 2 2HRS. & 100% 5 70
SETTING DONE VISUAL
BY SETTER INSPECTION BY
OPERATOR
SETUP
MOULD APPROVAL &
CONDITION INPROCESS
SHORT MOULDING
CHART INSPECTION
HEAT-1 LESS /SHRINKAGE/ 7 SETTING NOT OK
FOLLOW & 2 2HRS. & 100% 5 70
MOISTURE
SETTING DONE VISUAL
BY SETTER INSPECTION BY
OPERATOR
SETUP
MOULD APPROVAL &
CONDITION INPROCESS
FLOW
CHART INSPECTION
HEAT-1 OVER MARK/MATERIAL 7 SETTING NOT OK
FOLLOW & 2 2HRS. & 100% 5 70
BURN
SETTING DONE VISUAL
BY SETTER INSPECTION BY
OPERATOR
30 MOULDING
PROCESS & SETUP
COOLING OF MOULD APPROVAL &
PARTS/ CONDITION INPROCESS
MATERIAL NOT CHART INSPECTION
INSPECTION HEAT-2 LESS
FLOW IN BARREL 7 SETTING NOT OK
FOLLOW & 2 2HRS. & 100% 5 70
SETTING DONE VISUAL
BY SETTER INSPECTION BY
OPERATOR
SETUP
MOULD APPROVAL &
CONDITION INPROCESS
CHART INSPECTION
HEAT-2 OVER MATERIAL BURN 7 SETTING NOT OK
FOLLOW & 2 2HRS. & 100% 5 70
SETTING DONE VISUAL
BY SETTER INSPECTION BY
OPERATOR
SETUP
MOULD APPROVAL &
CONDITION INPROCESS
MATERIAL NOT CHART INSPECTION
HEAT-3 LESS FLOW IN BARREL 7 SETTING NOT OK
FOLLOW & 2 2HRS. & 100% 5 70
SETTING DONE VISUAL
BY SETTER INSPECTION BY
OPERATOR
SETUP
MOULD APPROVAL &
CONDITION INPROCESS
CHART INSPECTION
HEAT-3 OVER MATERIAL BURN 7 SETTING NOT OK
FOLLOW & 2 2HRS. & 100% 5 70
SETTING DONE VISUAL
BY SETTER INSPECTION BY
OPERATOR
SETUP
MOULD APPROVAL &
CONDITION INPROCESS
MATERIAL NOT CHART INSPECTION
HEAT-4 LESS FLOW IN BARREL 7 SETTING NOT OK
FOLLOW & 2 2HRS. & 100% 5 70
SETTING DONE VISUAL
BY SETTER INSPECTION BY
OPERATOR
SETUP
MOULD APPROVAL &
CONDITION INPROCESS
CHART INSPECTION
HEAT-4 OVER MATERIAL BURN 7 SETTING NOT OK
FOLLOW & 2 2HRS. & 100% 5 70
SETTING DONE VISUAL
BY SETTER INSPECTION BY
OPERATOR
SETUP
MOULD APPROVAL &
INJ CONDITION INPROCESS
SHORT MOULDING CHART INSPECTION
PRESSURE /SHRINKAGE 7 SETTING NOT OK
FOLLOW & 2 2HRS. & 100% 5 70
LESS SETTING DONE VISUAL
BY SETTER INSPECTION BY
OPERATOR
SETUP
MOULD APPROVAL &
INJ CONDITION INPROCESS
CHART INSPECTION
PRESSURE EXTRA FLASHES 5 SETTING NOT OK
FOLLOW & 2 2HRS. & 100% 5 50
OVER SETTING DONE VISUAL
BY SETTER INSPECTION BY
OPERATOR
SETUP
MOULD APPROVAL &
CONDITION INPROCESS
INJ SPEED CHART INSPECTION
LESS
SHRINKAGE 7 SETTING NOT OK
FOLLOW & 2 2HRS. & 100% 5 70
SETTING DONE VISUAL
BY SETTER INSPECTION BY
OPERATOR
SETUP
MOULD APPROVAL &
CONDITION INPROCESS
INJ SPEED CHART INSPECTION
OVER
EXTRA FLASHES 5 SETTING NOT OK
FOLLOW & 2 2HRS. & 100% 5 50
SETTING DONE VISUAL
BY SETTER INSPECTION BY
OPERATOR
TO TRAINED 100% VISUAL
GATE POOR REJECTED BY NOT PROPERLY
40 CUTTING APPERANCE CUSTOMER 4 BUFFING/CUTTING
THE 3 CHECK BY 7 84
OPERATOR OPERATOR
TO TRAINED 100% VISUAL
POOR REJECTED BY NOT PROPERLY
50 DEFLESHING APPERANCE CUSTOMER 4 BUFFING/CUTTING
THE 3 CHECK BY 7 84
OPERATOR OPERATOR
NOT PROPERLY TO TRAINED 100% VISUAL
FINAL POOR REJECTED BY
60 INSPECTION APPERANCE CUSTOMER 4 INSPECTION BY THE 3 CHECK BY 7 84
OPERATOR OPERATOR OPERATOR
Packing Std.
Packing Qty. Customer not Packing Std. not
5 to be 2 4 40
More & Less. accepted followed
followed
Packing/Stackin Operator
Damaging of Customer not As per work
5 g not 2 cum packer 4 40
product accepted instruction.
70 Packing homogeneous check and
sign the
TO packing slip
2.WRONG PROVIDE
Customer not NO LABLING
PACKING 7 THE 2 4 56
accepted STD.
SLIP LABLING
STD.
PDI Report
Inspection Fitment
Material skip at Inspection as per
80 P.D.I notdone as problem at 4 2 6 48
pdi as per FIS sampling
per standard Customer end
plan
Despatch to Despatch
Despatch not Despatch
Customer not be regester
90 DESPATCH as per 6 regester not 2 4 48
accepted monitoring follow on
sehedule follow
daily. daily
JP/QC/017
.